CN107219810A CN201710432821.6A CN201710432821A CN107219810A CN 107219810 A CN107219810 A CN 107219810A CN 201710432821 A CN201710432821 A CN 201710432821A CN 107219810 A CN107219810 A CN 107219810A
Authority
CN
China
Prior art keywords
path
building
user
control method
target route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710432821.6A
Other languages
Chinese (zh)
Other versions
CN107219810B (en
Inventor
唐文
赵龙生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Trane Air Conditioning Systems China Co Ltd
Original Assignee
Trane Air Conditioning Systems China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Trane Air Conditioning Systems China Co Ltd filed Critical Trane Air Conditioning Systems China Co Ltd
Priority to CN201710432821.6A priority Critical patent/CN107219810B/en
Publication of CN107219810A publication Critical patent/CN107219810A/en
Application granted granted Critical
Publication of CN107219810B publication Critical patent/CN107219810B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Abstract

The application provides a kind of building control method.In the application, the building control method includes:Determine destination path;Destination path is included at least one passage of start position, final position and the connection source position and final position in building;Target route is generated according to destination path;Target route is to include the set of at least one one-dimensional line segment, end to end formation target route between at least one one-dimensional line segment, and one-dimensional line segment is used to identify passage, and line segment carries the information of the corresponding building equipment of passage;Determine the corresponding trigger condition of target route;According to trigger condition and target route, building equipment is controlled.The technical scheme of the application, realization is simple, and cost is low, the problems such as path orientation for being positioned user using sensor and being introduced can also be avoided inaccurate and delay is controlled.

Description

Building control method
Technical field
The application is related to building control technology field, more particularly to a kind of building control method.
Background technology
In building system particularly commercial buildings, the behavior of user is usually two kinds, first:It is fixed on some fixed bit Put, second:It is moved to another position.Most building control system (including air-conditioning system), is primarily upon for upper State the application of the first situation, i.e. user and be fixed on the control action taken during some position.
Some control systems (including air-conditioning system) or safety-protection system, then can pay close attention to second above-mentioned of situation, i.e., ought use When family is moved, controlled accordingly.For such case, following several information can be mainly paid close attention to, and take corresponding action: First:The location of user's start position;Second:The position for the destination that user thinks;3rd:Generate the reality by building Map and navigation information.In such control system, generally by the way of mobile sensing, wireless or image, that is, use and move Dynamic, radio communication or shooting/infrared equipment auxiliary realize the position of positioning user, also to generate the map of complexity.
The content of the invention
The embodiment of the present application provides a kind of building control method, realizes that simply cost is low.
The application section Example provides a kind of building control method, and applied to server, methods described includes:
Determine destination path;The destination path is included in start position, final position and connection in the building The start position and at least one passage in the final position;
Target route is generated according to the destination path;The target route is to include the collection of at least one one-dimensional line segment Close, end to end between at least one described one-dimensional line segment to form the target route, the one-dimensional line segment is described for identifying Passage, the line segment carries the information of the corresponding building equipment of the passage;
Determine the corresponding trigger condition of the target route;
According to the trigger condition and the target route, the building equipment is controlled.
The major technique effect that the embodiment of the present application is reached is:The destination path that can be pre-set by user with it is right The trigger condition answered, controls the corresponding building equipment of the destination path, realizes simply, and can avoid using big quantity sensor To detect the mobile route of user, the cost of building control is reduced, can also avoid positioning user using sensor and introducing Path orientation is inaccurate and the problems such as control delay.
In one embodiment of the application, the determination destination path, it may include:
The two-dimensional channel map of the building is sent to client;
Receive the first path determined based on the two-dimensional channel map from the client;
The destination path is determined based on the first path.
The technical scheme of the application, be able to can lead to user by the two-dimensional channel map to client offer building Cross client and visually know building channel information, and determine therefrom that destination path.
In one embodiment of the application, it is described receive based on the two-dimensional channel map determine first path it Afterwards, it may also include:
At least one second path recommended based on the first path is sent to the client;
It is described that the destination path is determined based on the first path, it may include:
Receive the be selected based on the first path with few second path the 3rd from the client Path;
3rd path is defined as the destination path.
The technical scheme of the application, the path that can be provided based on user is provided recommendation paths and selected for user, then is based on The path that user chooses determines destination path, so, may provide the user with multiple reference paths so that user selects, is conducive to Improve Consumer's Experience.
In one embodiment of the application, it is described receive based on the two-dimensional channel map determine first path it Afterwards, it may also include:
Send whether according to the first path backtracking inquiry message;
Receive the response message based on the inquiry message;
The response message is according to the first path backtracking, then based on the response message and the first via Footpath, obtains the 4th path;Wherein, the start position in the 4th path is the final position of the first path, the described 4th The final position in path is the start position of the first path;
It is described that the destination path is determined based on the first path, it may include:
The first path and the 4th path are defined as the destination path.
The technical scheme of the application, may provide the user with the option according to backtracking, and user can be facilitated to determine to return Loop footpath, saves the time that user determines destination path.
It is described that target route is generated according to the destination path in one embodiment of the application, it may include:
The direction of the destination path is determined based on the destination path;The direction of the destination path is included upstairs with Building;
Direction based on the destination path determines the one-dimensional line segment for identifying stair;Wherein, for identifying same Stall Ladder is different from the length of one-dimensional line segment downstairs upstairs;
Target route is generated based on the one-dimensional line segment for being used to identify stair.
It is described to determine the corresponding trigger condition of the target route in one embodiment of the application, it may include:
Receive the subscription time for triggering the target route from client;
The trigger condition is determined based on the subscription time.
The technical scheme of the application, can allow user to set the subscription time of destination path as trigger condition, can be with User is allowed once to set after subscription time, it is its provider that the building equipment in the subscription time on destination path is enjoyed for a long time Just.
It is described according to the trigger condition and the target route, control the building equipment, it may include:
When reaching the subscription time, the building equipment work is triggered.
It is described according to the trigger condition and the target route in one embodiment of the application, control the building Space equipment, it may include:
Receive the information that the start position is reached for instruction user;It is the triggering that user, which reaches the start position, Condition;
Based on the information that the start position is reached for instruction user, the building equipment work is triggered.
The technical scheme of the application, the building equipment work is triggered when can reach the information of start position obtaining user Make, so, in time building equipment can be controlled to work.
It is described according to the trigger condition and the target route in one embodiment of the application, control the building Before space equipment, it may also include:
Receive the configuration information for determining the building equipment working method from client;
It is described that the building equipment is controlled according to the trigger condition and the target route, including:
According to the trigger condition, the target route and the configuration information, the building equipment is controlled.
The technical scheme of the application, can allow user to set building equipment working method, so that building equipment can be by Setting according to user is operated, and provides the user the service of personalization.
In one embodiment of the application, the building equipment may include lighting apparatus, air-conditioning equipment, VMC, Any combination in security device.
Brief description of the drawings
Fig. 1 is a kind of flow chart of building control method shown in the exemplary embodiment of the application one.
Fig. 2 is a kind of flow chart of building control method shown in the application further example embodiment.
Fig. 3 is a kind of flow chart of building control method shown in the application further example embodiment.
Fig. 4 is a kind of flow chart of building control method shown in the application further example embodiment.
Fig. 5 is a kind of flow chart of building control method shown in the application further example embodiment.
Fig. 6 is a kind of flow chart of building control method shown in the application further example embodiment.
Fig. 7 is a kind of flow chart of building control method shown in the application further example embodiment.
Fig. 8 is a kind of flow chart of building control method shown in the application further example embodiment.
Embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represent same or analogous key element.Following exemplary embodiment Described in embodiment do not represent all embodiments consistent with the application.On the contrary, they are only and such as appended right The example of the consistent apparatus and method of some aspects be described in detail in claim, the application.
It is the purpose only merely for description specific embodiment in term used in this application, and is not intended to be limiting the application. " one kind ", " described " and "the" of singulative used in the application and appended claims are also intended to including majority Form, unless context clearly shows that other implications.It is also understood that term "and/or" used herein refers to and wrapped It may be combined containing one or more associated any or all of project listed.
It will be appreciated that though various information, but this may be described using term first, second, third, etc. in the application A little information should not necessarily be limited by these terms.These terms are only used for same type of information being distinguished from each other out.For example, not departing from In the case of the application scope, the first information can also be referred to as the second information, similarly, and the second information can also be referred to as One information.Depending on linguistic context, word as used in this " if " can be construed to " ... when " or " when ... When " or " in response to determining ".
Below in conjunction with the accompanying drawings, some embodiments of the present application are elaborated.In the case where not conflicting, following realities Applying the feature in example and embodiment can be mutually combined.
At present, navigate for user in building or convenient building service provided the user based on user's mobile route, Such as Lighting control, airconditioning control, VMC control etc., are required to by the way of mobile sensing, wireless or image, i.e., The position of positioning user is realized using movement, radio communication or shooting/infrared equipment auxiliary, the map of complexity is also generated.By In needing to use substantial amounts of sensor, the cost of building control is improved, building system interior building structure is additionally, since and answers Miscellaneous, veil is more, and the precision that mobile sensing, wireless or image recognition are positioned is poor, and the map and navigation information of structure be not also smart Really, meanwhile, if user moving speed is fast, the change system of system of users position has little time response, causes control to be prolonged Late, poor user experience.
Based on this, the embodiment of the present application provides a kind of building control method, not only realizes that simply cost is low, moreover, also The problems such as path orientation for positioning user using sensor and introducing can be avoided inaccurate and delay is controlled.
Referring to Fig. 1, the building control method that the exemplary embodiment of the application is provided, applied to server.The building Space control method comprises the following steps S101~S104:
In step S101, destination path is determined.Destination path be included in start position in building, final position and Connection source position and at least one passage in final position.
In embodiments herein, destination path is that user sets in client and is committed to service by client Device.For start position, user can be set according to the channel case and self-demand of building, it can also be provided that in building The position of entrance guard device.Can be the destination locations of user for final position, such as 17 buildings Room 1711.For connecting The passage in point position and final position can include any combination in passageway, elevator, step ladder.For example, the start position of user For the position of entrance guard device, in the Stall hall of building, final position is 17 buildings Room 1711, the then position of entrance guard device and 17 buildings There are many kinds in the combination of channels between Room 1711, for example, it is a kind of in addition to using walking positioned at the passage of same floor, remaining Passage is only with the combination of channels of access to elevators:The passage on the position of entrance guard device to 1 building elevator doorway, 17 building, 1 Lou Zhi Access to elevators, the passage of 17 buildings elevator doorway positions to 17 buildings Room 1711.Certainly, also there are a lot of other predictable passages Combination, will not be repeated here.
In step s 102, target route is generated according to destination path.Target route is to include at least one one-dimensional line segment Set, end to end formation target route between at least one one-dimensional line segment, one-dimensional line segment is used to identify passage, and line segment is carried The information of the corresponding building equipment of passage.
In embodiments herein, it is used without the one-dimensional line segment in direction to identify one or one section of passage, it is so many The set of individual one-dimensional line segment can just represent the stretch footpath in building, simply not carry side mutual between path shape, path The relations such as position.
Wherein, can be possessed following property by the passage of one dimensional line segment identification:
1. one or one section of passage only one of which starting point and a terminal;
2. the beginning and end of passage is interchangeable, unless this passage is one-way trip;
3. two passages can only pass through beginning and end if necessary to connect;I.e. one passage can not be by another passage Connected in non-starting point and non-destination county.For example, during two passage formation T-shaped roads junction, then the two passages are identified by 3 line segments, Rather than 2 line segments, and for example, during two passage formation crossroads, then the two passages are identified by 4 line segments, rather than 2 Line segment;
4. the start position of user and final position must be on some passages;
If 5. the start position of user and final position are not in the beginning or end of some passage, and apart from the passage This passage farther out, then can be further divided into 2 passages by beginning and end;
6. different floor gaps may have step ladder, elevator etc., every elevator/step ladder can also use an one-dimensional line segment and length etc. Personality presentation, length characteristic is determined according to the characteristic of elevator/step ladder, and user's moving direction has relation, such as same stair (electricity Ladder/step ladder), length when upstairs and downstairs can be set to different.All passages of all floorings in so whole building can Represented with the set of one-dimensional line segment;
7. the standard for distinguishing different passages is not shape (straight line, turn, broken line, curve, the gradient), but branch road, step ladder, Elevator, gate inhibition etc..
These one-dimensional line segment bands can also carry following information:Some of the information of the corresponding building equipment of passage, passage Feature, such as length, width, decoration situation and channel type, passage on or passage proximate distinguishing mark thing such as toilet, Room security, balcony etc..Wherein, building equipment includes any group in lighting apparatus, air-conditioning equipment, VMC, security device Close.
In step s 103, the corresponding trigger condition of target route is determined.Trigger condition can pass through client by user Set and server is committed to by client.
In step S104, according to trigger condition and target route, building equipment is controlled.Touched when trigger condition is satisfied The corresponding building equipment work of target route is sent out, is provided the user conveniently.
In the embodiment of the present application, the destination path that can be pre-set by user and corresponding trigger condition, control should The corresponding building equipment of destination path, is realized simply, and can avoid being detected the mobile road of user using big quantity sensor Footpath, reduces the cost of building control, can also avoid positioning user using sensor and the path orientation that introduces it is inaccurate with And the problems such as control delay.
Referring to Fig. 2, the building control method that the further example embodiment of the application is provided.In the present embodiment, with The path submitted based on user determines to illustrate exemplified by destination path.In the present embodiment, the step of determining destination path is specific Comprise the following steps S201~S203:
In step s 201, the two-dimensional channel map of building is sent to client.
In step S202, the first path determined based on the two-dimensional channel map from the client is received.
In step S203, the destination path is determined based on the first path.
In the present embodiment, above-mentioned client be may be mounted on the fixed terminal in building, and the terminal can be provided Display screen and input unit, the display screen can be touch-screens, can also receive user's input information.
Client receive user input set the goal really path instruction when, the instruction is committed to and set for building The server of standby control, server sends the two-dimensional channel map of building to client in response to above-mentioned instruction, and client exists Receive and the two-dimensional channel map is shown after the two-dimensional channel map.Wherein, two-dimensional channel map includes owning in building Passage, can divide floor to show, such as, the passage (electricity that user can be checked between the passage of each floor, and each floor Ladder, step ladder etc.).
Based on two-dimensional channel map, user can select start position, final position and connect the start position with At least one passage in the final position determines first path, and it is determined that being committed to clothes by client after first path Business device.First path can be defined as the destination path by server after first path is received.
In the present embodiment, user can be made to pass through visitor by the two-dimensional channel map to client offer building Building channel information is visually known at family end, and determines therefrom that destination path, and the path for being also based on user's submission determines mesh Path is marked, is realized simple.
Referring to Fig. 3, the building control method that the further example embodiment of the application is provided.In the present embodiment, with The path and recommendation paths submitted based on user determine to illustrate exemplified by destination path.In the present embodiment, target road is determined The step of footpath, specifically includes following steps S301~S305:
In step S301, the two-dimensional channel map of building is sent to client.
In step s 302, the first path determined based on the two-dimensional channel map from the client is received.
In step S303, at least one second path recommended based on the first path is sent to the client.
In step s 304, receive from the client based on the first path and few second path The 3rd selected path.
In step S305, the 3rd path is defined as the destination path.
In the present embodiment, server can be based on first path to visitor after the first path of user's submission is received Family end sends the second path of multiple recommendations, wherein, the start position in the second path is identical with the start position of first path, the The final position in two paths is identical with the final position of first path.Client after the second path of multiple recommendations is received, Shown in the lump with first path, wherein, client, when showing the second path with first path, is that the two is placed in into two dimension Passage map is shown, so, the information in the second path can be known in order to user's concrete image, and is easy to user to aobvious The path shown is compared, and selection more conforms to the path of actual demand as the 3rd path, is committed to server.
In the present embodiment, server can also be evaluated first path with the second path recommended, and provide each The evaluation information in path, such as, walking is few, the time is short, air is good etc., and the evaluation information in each path is sent to client It has been shown that, it is for reference, the path that user is determined for compliance with rapidly actual demand can be aided in as the 3rd path, improve and use Family determines the efficiency of destination path.
In the present embodiment, multiple recommendation paths are provided by the path submitted based on user, so that user selects, and are based on The path that user chooses determines destination path, is easy to the path that user's selection more conforms to actual demand as destination path, has Beneficial to raising Consumer's Experience.
Referring to Fig. 4, the building control method that the further example embodiment of the application is provided.In the present embodiment, with Determine to illustrate exemplified by destination path according to the demand of backtracking based on user.In the present embodiment, destination path is determined Step specifically includes following steps S401~S406:
In step S401, the two-dimensional channel map of the building is sent to client.
In step S402, the first path determined based on the two-dimensional channel map from the client is received.
In step S403, send whether according to the first path backtracking inquiry message.
In step s 404, the response message based on the inquiry message is received.
In step S405, if the response message is according to the first path backtracking, answered based on described Message and the first path are answered, the 4th path is obtained;Wherein, the start position in the 4th path is the first path Final position, the final position in the 4th path is the start position of the first path.
In step S406, the first path and the 4th path are defined as the destination path.
In the present embodiment, the first path that user is submitted by client may be one of destination path, and server exists Receive after the first path that user is submitted by client, sent based on first path to client ask the user whether according to The inquiry message of backtracking, user responds the message by client, and client receives the backward clothes of response instruction of user Business device sends the response message based on above-mentioned inquiry message.The response message can be disappearing according to first path backtracking Cease or not according to the message of first path backtracking.When response message is according to the first path backtracking Message when, server replaces start position and the final position of the first path, obtains the 4th path, and by first path It is defined as destination path in the lump with the 4th path.
, can be based on first path and the 4th tunnel in the step of the follow-up generation target route according to the destination path Footpath generates two target routes simultaneously, first can also generate the first route based on first path, then replace the starting point of the first route Position and final position, obtain the second route, and the first route and the second route are all target routes.
In the present embodiment, it can be returned by asking the user whether according to backtracking, and in user's needs according to former road Return when based on user submit path directly obtain return path, without user repeat selection start position, final position with And the connection start position determines return path with the passage in the final position, is easy to user quickly to determine target road Footpath.
Referring to Fig. 5, the building control method that the further example embodiment of the application is provided.In the present embodiment, with How to generate in target route and illustrated exemplified by the one-dimensional line segment of stair.In the present embodiment, generated according to the destination path The step of target route, specifically includes following steps S501~S503:
In step S501, the direction of the destination path is determined based on the destination path.The side of the destination path To including upstairs and downstairs.
In step S502, the direction based on the destination path determines the one-dimensional line segment for identifying stair.Wherein, use It is different from the length of one-dimensional line segment downstairs upstairs in identifying same stair.
In step S503, target route is generated based on the one-dimensional line segment for being used to identify stair.
In the present embodiment, the direction in the direction of destination path, i.e. user's movement is first determined, further according to the side of destination path The one-dimensional line segment of mark stair is determined to mark.Due to for the same stair as passage, it may be possible to which user is along the passage Upstairs, it is also possible to be that user goes downstairs along the passage, it is two kinds of different situations of difference, while server identification is also allowed for, can To use the same stair of one dimensional line segment identification of different length, such as, when the line segment length that stair are identified when upstairs is more than downstairs The line segment length of stair is identified, is realized simple.
In the present embodiment, the one-dimensional line segment for identifying stair is determined by the direction of the destination path, with the side of difference The one-dimensional line segment of same stair is identified into different destination paths, is easy to server to recognize, is realized simple.
Referring to Fig. 6, the building control method that the further example embodiment of the application is provided.In the present embodiment, with Trigger condition be subscription time exemplified by illustrate.In the present embodiment, the step of the corresponding trigger condition of the target route is determined Suddenly following steps S601~S602 is specifically included:
In step s 601, the subscription time for triggering the target route from client is received.
In step S602, the trigger condition is determined based on the subscription time.
In the present embodiment, user can set the subscription time of destination path by client.The subscription time is used for Trigger server and be based on the corresponding building equipment of destination path control.Specifically, client receives the subscription time of user's input, And subscription time is committed to server, subscription time is configured to the trigger condition of destination path by server.Working as server When detecting current time and reaching subscription time, just trigger the corresponding building equipment work of destination path (such as open illumination, it is empty Adjust equipment, VMC etc.), provide the user conveniently.
After server, which detects user, reaches target location, control building equipment is closed, to save the energy.Such as, room Objective brush CUSTOM HOUSE HOTEL, when opening door, the reader device being arranged on door is sent for indicating the telecommunications that door is unlocked to server Number, server determines that tenant reaches final position, the corresponding building equipment in control targe path after the electric signal is received (illumination, air-conditioning equipment, VMC etc.) is closed.
In the present embodiment, by the corresponding building equipment in subscription time control targe path, user can be allowed once to set Put after subscription time, the building equipment in the subscription time on destination path is enjoyed for a long time and provides convenient for it.
Referring to Fig. 7, the building control method that the further example embodiment of the application is provided.In the present embodiment, with User reaches the start position of destination path to illustrate exemplified by trigger condition.In the present embodiment, according to the trigger condition With the target route, the step of controlling the building equipment specifically includes following steps S701~S702:
In step s 701, the information that the start position is reached for instruction user is received.User reaches the starting point Position is the trigger condition.
In step S702, based on the information that the start position is reached for instruction user, the building are triggered Equipment works.
In the present embodiment, start position can be the position where security device (such as gate inhibition), when security device inspection (such as after user's brush access card) is measured after user, the electric signal that start position is reached for instruction user is sent to server, Server is when receiving the electric signal, the corresponding building equipment work of triggering destination path.
In the present embodiment, the building equipment work is triggered when can reach the information of start position obtaining user, this Sample, in time can control building equipment to work.
Referring to Fig. 8, the building control method that the further example embodiment of the application is provided.In the present embodiment, with Illustrated exemplified by the work method control building equipment work of the building equipment set based on user.In the present embodiment, building Control method comprises the following steps S801~S805:
In step S801, destination path is determined.
In step S802, target route is generated according to the destination path.
In step S803, the corresponding trigger condition of the target route is determined.
In step S804, the configuration information for determining the building equipment working method from client is received.
In step S805, according to the trigger condition, the target route and the configuration information, the building are controlled Equipment.
In the present embodiment, user can also be according to the work side of the corresponding building equipment of individual preference destination path Formula.Such as, the personal preference of user can be included following aspects:
1. tendency destination path length, whether tend to step ladder, whether tend to elevator, whether tend to refrigeration or Heat, whether tend to have VMC, whether tend to by some mark (or avoidance), or be wherein combined;
2. the building equipment list opened on destination path and the corresponding method of operation;
3. unlocking condition or the opening time of each building equipment list;
4. the closedown condition of each building equipment list;
5. there are not different preferences in the same time;Such as the preference difference in morning, noon, evening, need to set three sets of preferences.
In the present embodiment, user can set personal preference by client, and be committed to server by client, take User is identified (such as can be CUSTOM HOUSE HOTEL mark, access card mark etc.), building equipment is worked based on personal preference by business device The configuration information of mode, destination path, trigger condition binding preserve, and control building equipment based on these information.
The present embodiment, can allow user to set building equipment working method, so that building equipment can be according to user's Setting is operated, and provides the user the service of personalization.
It should be noted that conflict is not present between unique user or each user above is only having in the same time In the case of building equipment control method, there is a situation where that concurrent user moves for the same time, can be based on user's Priority, first responds the high user of priority, for priority identical user, can be by competing or compromising (such as in turn altogether Enjoy) mode carry out the control of building equipment.
Embodiments herein can possess following beneficial effect:First, user can be customized in moving process Building system device service, without multiple authentication user right (for example swiping the card) be conducive to lifted Consumer's Experience.The Two, building system need not open all devices, and the equipment on some path is only just opened when needing, and particularly need not Open the occasion of all devices, such as evening.When user has arrived at destination or the time alreadys exceed default subscription time Target road is then closed through corresponding building equipment, possesses larger energy-saving effect.3rd, pass through setting for the building system of customization Standby service, can also guide user to be rapidly achieved destination, particularly in the intersection of passage, the only illumination on destination path During opening of device, it can be indicated to user direction.4th, aid in realizing without installing big quantity sensor, it is cost-effective.
The preferred embodiment of the application is the foregoing is only, not to limit the application, all essences in the application God is with principle, and any modification, equivalent substitution and improvements done etc. should be included within the scope of the application protection.

Claims (10)

1. a kind of building control method, it is characterised in that applied to server, methods described includes:
Determine destination path;The destination path is included in described in start position, final position and connection in the building Start position and at least one passage in the final position;
Target route is generated according to the destination path;The target route is to include the set of at least one one-dimensional line segment, institute The end to end formation target route between at least one one-dimensional line segment is stated, the one-dimensional line segment is used to identify the passage, The line segment carries the information of the corresponding building equipment of the passage;
Determine the corresponding trigger condition of the target route;
According to the trigger condition and the target route, the building equipment is controlled.
2. building control method according to claim 1, it is characterised in that the determination destination path, including:
The two-dimensional channel map of the building is sent to client;
Receive the first path determined based on the two-dimensional channel map from the client;
The destination path is determined based on the first path.
3. building control method according to claim 2, it is characterised in that the reception is based on the two-dimensional channel map After the first path of determination, in addition to:
At least one second path recommended based on the first path is sent to the client;
It is described that the destination path is determined based on the first path, including:
Receive threeth path selected with few second path based on the first path from the client;
3rd path is defined as the destination path.
4. building control method according to claim 2, it is characterised in that the reception is based on the two-dimensional channel map After the first path of determination, in addition to:
Send whether according to the first path backtracking inquiry message;
Receive the response message based on the inquiry message;
If the response message is according to the first path backtracking, based on the response message and the first via Footpath, obtains the 4th path;Wherein, the start position in the 4th path is the final position of the first path, the described 4th The final position in path is the start position of the first path;
It is described that the destination path is determined based on the first path, including:
The first path and the 4th path are defined as the destination path.
5. building control method according to claim 1, it is characterised in that described that target is generated according to the destination path Route, including:
The direction of the destination path is determined based on the destination path;The direction of the destination path includes upstairs and gone downstairs;
Direction based on the destination path determines the one-dimensional line segment for identifying stair;Wherein, for identifying same stair Building is different from the length of one-dimensional line segment downstairs;
Target route is generated based on the one-dimensional line segment for being used to identify stair.
6. building control method according to claim 1, it is characterised in that the determination target route is corresponding to be touched Clockwork spring part, including:
Receive the subscription time for triggering the target route from client;
The trigger condition is determined based on the subscription time.
7. building control method according to claim 6, it is characterised in that described according to the trigger condition and the mesh Route is marked, the building equipment is controlled, including:
When reaching the subscription time, the building equipment work is triggered.
8. building control method according to claim 1, it is characterised in that described according to the trigger condition and the mesh Route is marked, the building equipment is controlled, including:
Receive the information that the start position is reached for instruction user;It is the triggering bar that user, which reaches the start position, Part;
Based on the information that the start position is reached for instruction user, the building equipment work is triggered.
9. building control method according to claim 1, it is characterised in that described according to the trigger condition and the mesh Before mark route, the control building equipment, in addition to:
Receive the configuration information for determining the building equipment working method from client;
It is described that the building equipment is controlled according to the trigger condition and the target route, including:
According to the trigger condition, the target route and the configuration information, the building equipment is controlled.
10. building control method according to claim 1, it is characterised in that the building equipment includes lighting apparatus, sky Adjust any combination in equipment, VMC, security device.
CN201710432821.6A 2017-06-09 2017-06-09 Building control method Active CN107219810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710432821.6A CN107219810B (en) 2017-06-09 2017-06-09 Building control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710432821.6A CN107219810B (en) 2017-06-09 2017-06-09 Building control method

Publications (2)

Publication Number Publication Date
CN107219810A true CN107219810A (en) 2017-09-29
CN107219810B CN107219810B (en) 2021-03-23

Family

ID=59948500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710432821.6A Active CN107219810B (en) 2017-06-09 2017-06-09 Building control method

Country Status (1)

Country Link
CN (1) CN107219810B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108093372A (en) * 2017-11-27 2018-05-29 努比亚技术有限公司 A kind of method for obtaining path, device and computer readable storage medium
CN110881235A (en) * 2018-09-04 2020-03-13 西门子(中国)有限公司 Intelligent lighting control system
CN114183898A (en) * 2021-12-07 2022-03-15 珠海格力电器股份有限公司 New fan system reservation method, device and system, electronic equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101983314A (en) * 2008-04-03 2011-03-02 皇家飞利浦电子股份有限公司 Method of guiding a user from an initial position to a destination in a public area
US20120290636A1 (en) * 2011-05-11 2012-11-15 Google Inc. Quality control of mapping data
CN103222342A (en) * 2011-02-09 2013-07-24 三菱电机株式会社 Building equipment management apparatus
CN103344239A (en) * 2013-07-03 2013-10-09 重庆邮电大学 Navigation method in buildings
CN104807459A (en) * 2015-04-30 2015-07-29 吴博 Indoor navigation system and navigation method thereof
CN105606099A (en) * 2015-09-07 2016-05-25 广东欧珀移动通信有限公司 Scenic spot navigation method and terminal

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101983314A (en) * 2008-04-03 2011-03-02 皇家飞利浦电子股份有限公司 Method of guiding a user from an initial position to a destination in a public area
CN103222342A (en) * 2011-02-09 2013-07-24 三菱电机株式会社 Building equipment management apparatus
US20120290636A1 (en) * 2011-05-11 2012-11-15 Google Inc. Quality control of mapping data
CN103344239A (en) * 2013-07-03 2013-10-09 重庆邮电大学 Navigation method in buildings
CN104807459A (en) * 2015-04-30 2015-07-29 吴博 Indoor navigation system and navigation method thereof
CN105606099A (en) * 2015-09-07 2016-05-25 广东欧珀移动通信有限公司 Scenic spot navigation method and terminal

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108093372A (en) * 2017-11-27 2018-05-29 努比亚技术有限公司 A kind of method for obtaining path, device and computer readable storage medium
CN108093372B (en) * 2017-11-27 2020-08-21 南京青柚信息科技有限公司 Path acquisition method and device and computer readable storage medium
CN110881235A (en) * 2018-09-04 2020-03-13 西门子(中国)有限公司 Intelligent lighting control system
CN114183898A (en) * 2021-12-07 2022-03-15 珠海格力电器股份有限公司 New fan system reservation method, device and system, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN107219810B (en) 2021-03-23

Similar Documents

Publication Publication Date Title
CN110405767B (en) Leading method, device, equipment and storage medium for intelligent exhibition hall
CN103476694B (en) User's guiding is carried out by electronic apparatus
CN107219810A (en) Building control method
KR101641326B1 (en) parking management system
KR20100132059A (en) Method of guiding a user from an initial position to a destination in a public area
KR101758160B1 (en) Parking system for guiding an optimal path and method thereof
JP2018505503A (en) System, method and computer program for access control system
CN110915243A (en) Method for adjusting bluetooth connectivity to expedite access control
US20170122745A1 (en) Route guidance service apparatus
EP3097544B1 (en) A structure including a passageway
KR102390752B1 (en) System for guiding parking location
KR102393619B1 (en) System for producing parking map using deep-learning
KR101903706B1 (en) Method for determining space in which electronic device is located using charger of the electronic device, the electronic device and the charger
AU2019356099B2 (en) System and method for position determination in a building
KR20150135633A (en) Service providing system and method for guiding a route of pedestrian, apparatus and computer readable medium having computer program recorded therefor
KR20200126501A (en) Automatic enterance system for apartmet house
JP2019116379A (en) Transportation means guide system
KR20190063708A (en) Indoor navigation system usnig smart phone
JP2006170828A (en) Portable terminal
KR101754180B1 (en) Wireless car parking management system using LPWAN
KR101299379B1 (en) Apparatus and method for providing route using virtual world
JP6121579B2 (en) Wireless positioning service system, wireless positioning service method, computer program for executing the method on a computer, and file distribution system
KR20160075151A (en) System and method for providing an elevator movement service
KR102298581B1 (en) System for guiding parking location
CN110869984A (en) Intent-driven building occupancy path and system interaction optimization

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant