CN107217999A - Drilling at the sea riser upper attachment means - Google Patents
Drilling at the sea riser upper attachment means Download PDFInfo
- Publication number
- CN107217999A CN107217999A CN201710570589.2A CN201710570589A CN107217999A CN 107217999 A CN107217999 A CN 107217999A CN 201710570589 A CN201710570589 A CN 201710570589A CN 107217999 A CN107217999 A CN 107217999A
- Authority
- CN
- China
- Prior art keywords
- poppet
- drilling
- fore
- attachment means
- stock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 20
- 239000000725 suspension Substances 0.000 claims abstract description 16
- 238000010276 construction Methods 0.000 claims abstract description 7
- 241001125879 Gobio Species 0.000 claims description 8
- 238000005452 bending Methods 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 abstract description 13
- 238000009434 installation Methods 0.000 abstract description 11
- 238000013461 design Methods 0.000 abstract description 9
- 241000826860 Trapezium Species 0.000 abstract description 7
- 238000004458 analytical method Methods 0.000 abstract description 3
- 238000012423 maintenance Methods 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/002—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
- E21B19/004—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
The invention provides drilling at the sea riser upper attachment means, including the fore-stock being obliquely installed and the after-poppet being vertically arranged, the both sides of the fore-stock are respectively fixedly connected by a side stand with the after-poppet respectively;The upper end of the after-poppet is provided with female container joint unit;Coiled tubing supporting construction is installed on the after-poppet;The side of the remote after-poppet of the fore-stock from top to bottom is provided with underwater connector interface unit and suspension platform.In the above-mentioned technical solutions, fore-stock and after-poppet connect and form a trapezium structure layout, the layout of rectangular frame structure of the prior art is abandoned, and pass through finite element analysis simulating, verifying, the design requirements such as intensity, fatigue under various working conditions can be met comprehensively, therefore, integrally-built weight can not only be mitigated significantly, and due to the simplification of structure, production and transport installation and the maintenance in later stage etc. is all greatly simplified, therefore significantly save manufacture and installation and transportation cost.
Description
Technical field
The present invention relates to drilling at the sea technical field, more particularly to a kind of drilling at the sea riser upper attachment means.
Background technology
In deep-sea oil project, the connection of standpipe and standpipe and FPSO oil tankers is most important.Wherein, marine riser top
Connection component is critical component.
The design of marine riser top connection component involves the dynamic of the dynamic loading, the dynamic loading of standpipe, oil tanker of suspension cylinder
Load and the dynamic loading of various connecting lines transmission, thus it is extremely complex.The size of marine riser top connection component is general
Up to more than ten meter, design weight is generally at more than 100 tons.In addition, different according to the purposes of standpipe, each marine riser top connects
The design of connected components has certain difference.
Although marine riser top of the prior art connection component meets all working condition requirements, but complicated, manufacture
It is all very high with installation cost.Especially deep-sea drilling ship operation, cost is extremely expensive, and the time length of installation is to cost impact
Greatly.
The content of the invention
It is an object of the invention to provide a kind of drilling at the sea riser upper attachment means, with solve manufacture in the prior art and
The problem of installation cost is high.
In order to solve the above technical problems, the invention provides a kind of drilling at the sea riser upper attachment means, including tilt
The fore-stock of setting and the after-poppet being vertically arranged, the both sides of the fore-stock respectively pass through a side stand and the rear branch respectively
Frame is fixedly connected;The upper end of the after-poppet is provided with female container joint unit;Coiled tubing branch is installed on the after-poppet
Support structure;The side of the remote after-poppet of the fore-stock from top to bottom is provided with underwater connector interface unit and outstanding
Hang platform.
Preferably, the after-poppet includes two main stay tubes be arrangeding in parallel, the upper end peace of described two main stay tubes
Equipped with suspension stake, the lower end of described two main stay tubes is connected by chamfering link interface unit.
Preferably, the upper end of the main stay tube is provided with main lifting backing plate, the main lifting backing plate and is formed with main hang
Fill hole.
Preferably, it is provided with lifting gudgeon in the middle part of the main stay tube.
Preferably, the fore-stock includes two oblique branch pipes be arrangeding in parallel.
Preferably, it is provided with reverse gudgeon in the middle part of the oblique branch pipe.
Preferably, the lower end of the oblique branch pipe is provided with transport hanger.
Preferably, it is also equipped with counter-bending booster on the fore-stock.
Preferably, the counter-bending booster is located between the underwater connector interface unit and the suspension platform
Position.
Preferably, the fore-stock, the after-poppet, the side stand and the coiled tubing supporting construction are using envelope
The hollow pipe fitting closed is made, and female container joint unit, the suspension platform and suspension stake use open pipe fitting
It is made.
In the above-mentioned technical solutions, fore-stock and after-poppet connect and form a trapezium structure layout, have abandoned existing
The layout of rectangular frame structure in technology, and pass through finite element analysis simulating, verifying, various working conditions can be met comprehensively
Under the design requirement such as intensity, fatigue, therefore, can not only mitigate integrally-built weight significantly, and due to the letter of structure
Change, production and transport installation and the maintenance in later stage etc. is all greatly simplified, therefore significantly save manufacture and installation and transportation
Cost.For traditional box-structure, the present invention has low, intensity fatigue life height of lightweight, manufacturing cost etc. aobvious
Write advantage.
In addition to objects, features and advantages described above, the present invention also has other objects, features and advantages.
The present invention is further detailed explanation below.
Brief description of the drawings
The Figure of description for constituting the part of the present invention is used for providing a further understanding of the present invention, and of the invention shows
Meaning property embodiment and its illustrate be used for explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the stereogram of the present invention;
Fig. 2 is another stereogram of the present invention;
Fig. 3 is the another stereogram of the present invention.
Reference in figure:1st, side stand;2nd, female container joint unit;3rd, coiled tubing supporting construction;4th, connect under water
Device interface unit;5th, suspension platform;6th, main stay tube;7th, stake is hung;8th, chamfering link interface unit;9th, main lifting backing plate;10、
Lift gudgeon;11st, oblique branch pipe;12nd, gudgeon is overturned;13rd, hanger is transported;14th, counter-bending booster.
Embodiment
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases
Mutually combination.The present invention is described in detail with reference to embodiment.
In order that those skilled in the art more fully understand the present invention program, below by the skill in the embodiment of the present invention
Art scheme is clearly and completely described, it is clear that described embodiment is only the embodiment of a part of the invention, without
It is whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not before creative work is made
The every other embodiment obtained is put, should all belong to the scope of protection of the invention.
Deep-sea oil production technique is the weakness of China, and China is used as an energy demand big country, following marine stone
Oil exploitation has huge demand and prospect.
The invention provides a kind of drilling at the sea riser upper attachment means, including the fore-stock being obliquely installed and set vertically
The after-poppet put, the both sides of the fore-stock are respectively fixedly connected by a side stand 1 with the after-poppet respectively;Propped up after described
The upper end of frame is provided with female container joint unit 2;Coiled tubing supporting construction 3 is installed on the after-poppet;The fore-stock
The side of the remote after-poppet underwater connector interface unit 4 and suspension platform 5 from top to bottom are installed.
In the above-mentioned technical solutions, fore-stock and after-poppet connect and form a trapezium structure layout, have abandoned existing
The layout of rectangular frame structure in technology, and pass through finite element analysis simulating, verifying, various working conditions can be met comprehensively
Under the design requirement such as intensity, fatigue, therefore, can not only mitigate integrally-built weight significantly, and due to the letter of structure
Change, production and transport installation and the maintenance in later stage etc. is all greatly simplified, therefore significantly save manufacture and installation and transportation
Cost.For traditional box-structure, the present invention has low, intensity fatigue life height of lightweight, manufacturing cost etc. aobvious
Write advantage.
The present invention is laid out the structural framing for changing symmetric form of the prior art by above-mentioned trapezium structure, takes into full account
The serious asymmetry of load in standpipe connection, can make the direction of structure and load basically identical, give full play to structure
Potentiality.
Present invention could apply in the connection of the various standpipes of deepwater oilfield, being not limited only to SLHR, (single line is combined
Standpipe) standpipe, to production riser, service standpipe, water filling standpipe, gas transmission standpipe etc. are also suitable.Total is divided into by function
Several minor structures, production and detection after installing and installing are relatively succinct.
Preferably, the after-poppet includes two main stay tubes 6 be arrangeding in parallel, the upper end of described two main stay tubes 6
Suspension stake 7 is installed, the lower end of described two main stay tubes 6 is connected by chamfering link interface unit 8.Preferably, before described
Support includes two oblique branch pipes 11 be arrangeding in parallel.
Preferably, the upper end of the main stay tube 6 is provided with main lifting backing plate 9, the main lifting backing plate 9 and is formed with master
Hole for hoist.
Preferably, the middle part of the main stay tube 6 is provided with lifting gudgeon 10.Preferably, the middle part of the oblique branch pipe 11
It is provided with reverse gudgeon 12.Preferably, the lower end of the oblique branch pipe 11 is provided with transport hanger 13.Transporting and hoisting is actual installation
During unusual the key link, among trapezium structure layout designs, by above-described embodiment, devise rational lifting knot
Structure is to meet actual installation needs.
Preferably, counter-bending booster 14 is also equipped with the fore-stock.Preferably, the counter-bending booster 14
Position between the underwater connector interface unit 4 and the suspension platform 5.
Preferably, the fore-stock, the after-poppet, the side stand and the coiled tubing supporting construction 3 are used
The hollow pipe fitting of closing is made, and female container joint unit 2, the suspension platform 5 and the suspension stake 7 are using open
Pipe fitting is made.Using the form of hollow pipe fitting and the open pipe fitting phase structure of this closing, enable part close from
And the buoyancy of system is improved, can make that weight of the whole system in water is weight in the air about 2/3rds.
The unsymmetric structure that trapezium structure is laid out in the present invention is for symmetrical structure of the prior art, fully
The settling position of structure barycenter is considered, ensure that the position of structure barycenter is constant when designing each sub-unit.In addition, setting
When counting trapezium structure layout, the present invention can complete total using 10 kinds of different size tubulars, thus can use as far as possible few
Various sizes of part, reduces the expense for ordering material and welding processing.Finally, present invention design has taken into full account all set
Operating mode is counted, designs and is designed in strict accordance with the serial international standard of Offshore Engineering.
Each part dimension of the present invention is relatively fixed, and can be adjusted according to purposes difference.Because the particularity of ocean engineering,
The environmental load that the standpipe of different purposes is born is entirely different, therefore URA structures must also be adjusted according to different purposes.This
The characteristics of inventing trapezoidal layout is that the size of most of part is relatively fixed, and other parts part can be carried out suitably according to purposes
Adjustment.For example, to nonproductive URA and water filling URA, basic structure is constant, merely transversely spacing needs to do certain adjustment.
It is connected with the drilling at the sea riser upper in most close BP Angola Block 31 (31 plate) project
Device is compared, it is an advantage of the invention that structure significantly simplifies, and more rationally, intensity fatigue life significantly improves.In system
Cost can be greatly reduced in making and installing.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should be included in the scope of the protection.
Claims (10)
1. a kind of drilling at the sea riser upper attachment means, it is characterised in that including the fore-stock being obliquely installed and be vertically arranged
After-poppet, the both sides of the fore-stock are respectively fixedly connected by a side stand (1) with the after-poppet respectively;
The upper end of the after-poppet is provided with female container joint unit (2);
Coiled tubing supporting construction (3) is installed on the after-poppet;
The side of the remote after-poppet of the fore-stock from top to bottom is provided with underwater connector interface unit (4) and outstanding
Hang platform (5).
2. drilling at the sea riser upper attachment means according to claim 1, it is characterised in that the after-poppet includes two
The individual main stay tube (6) be arrangeding in parallel, the upper end of described two main stay tubes (6) is provided with suspension stake (7), described two main branch
The lower end of stay tube (6) is connected by chamfering link interface unit (8).
3. drilling at the sea riser upper attachment means according to claim 2, it is characterised in that the main stay tube (6)
Upper end be provided with main lifting backing plate (9), main lifting backing plate (9) and be formed with main hole for hoist.
4. drilling at the sea riser upper attachment means according to claim 3, it is characterised in that the main stay tube (6)
Middle part be provided with lifting gudgeon (10).
5. drilling at the sea riser upper attachment means according to claim 4, it is characterised in that the fore-stock includes two
The individual oblique branch pipe (11) be arrangeding in parallel.
6. drilling at the sea riser upper attachment means according to claim 5, it is characterised in that the oblique branch pipe (11)
Middle part is provided with reverse gudgeon (12).
7. drilling at the sea riser upper attachment means according to claim 6, it is characterised in that the oblique branch pipe (11)
Lower end is provided with transport hanger (13).
8. drilling at the sea riser upper attachment means according to claim 3, it is characterised in that also pacify on the fore-stock
Equipped with counter-bending booster (14).
9. drilling at the sea riser upper attachment means according to claim 8, it is characterised in that the counter-bending booster
(14) it is located at the position between the underwater connector interface unit (4) and the suspension platform (5).
10. drilling at the sea riser upper attachment means according to claim 6, it is characterised in that the fore-stock, described
After-poppet, the side stand and the coiled tubing supporting construction (3) are made of the hollow pipe fitting of closing, female container
Interface unit (2), the suspension platform (5) and the suspension stake (7) are made of open pipe fitting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710570589.2A CN107217999B (en) | 2017-07-13 | 2017-07-13 | Upper connecting device of marine drilling riser |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710570589.2A CN107217999B (en) | 2017-07-13 | 2017-07-13 | Upper connecting device of marine drilling riser |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107217999A true CN107217999A (en) | 2017-09-29 |
CN107217999B CN107217999B (en) | 2024-05-14 |
Family
ID=59952467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710570589.2A Active CN107217999B (en) | 2017-07-13 | 2017-07-13 | Upper connecting device of marine drilling riser |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107217999B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111654681A (en) * | 2019-03-04 | 2020-09-11 | 安世亚太科技股份有限公司 | Projection splicing method of DLP optical machine |
CN111654680A (en) * | 2019-03-04 | 2020-09-11 | 安世亚太科技股份有限公司 | Projection splicing method and device of digital light processing optical machine |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6461083B1 (en) * | 1999-02-19 | 2002-10-08 | Bouygues Offshore | Method and device for linking surface to the seabed for a submarine pipeline installed at great depth |
US20030161690A1 (en) * | 2000-07-20 | 2003-08-28 | Breivik Kare G. | Offshore loading or production system for dynamically positioned ships |
CN1720165A (en) * | 2002-10-16 | 2006-01-11 | 辛格尔浮筒系船公司 | Riser installation vessel and method of using the same |
CN201260047Y (en) * | 2008-09-10 | 2009-06-17 | 中国电力科学研究院 | Asymmetric line discharging tackle |
US20120085544A1 (en) * | 2010-10-12 | 2012-04-12 | Bp Exploration Operating Company Limited | Marine subsea free-standing riser systems and methods |
CN102434129A (en) * | 2011-12-24 | 2012-05-02 | 大连理工大学 | Ultra-deepwater offshore oil-gas engineering developing system and mounting method thereof |
CN104265228A (en) * | 2014-10-09 | 2015-01-07 | 中国海洋石油总公司 | Free standing type stand pipe top connection structure |
CN105525888A (en) * | 2014-09-28 | 2016-04-27 | 中国海洋石油总公司 | Terminal connector of deep water free standing type vertical pipe system |
US20160115667A1 (en) * | 2013-05-13 | 2016-04-28 | Saipem S.A. | Device For Anchoring A Raceway Mounting Of A Seabed-To-Surface Facility |
CN207110998U (en) * | 2017-07-13 | 2018-03-16 | 安世亚太科技股份有限公司 | Drilling at the sea riser upper attachment means |
-
2017
- 2017-07-13 CN CN201710570589.2A patent/CN107217999B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6461083B1 (en) * | 1999-02-19 | 2002-10-08 | Bouygues Offshore | Method and device for linking surface to the seabed for a submarine pipeline installed at great depth |
US20030161690A1 (en) * | 2000-07-20 | 2003-08-28 | Breivik Kare G. | Offshore loading or production system for dynamically positioned ships |
CN1720165A (en) * | 2002-10-16 | 2006-01-11 | 辛格尔浮筒系船公司 | Riser installation vessel and method of using the same |
CN201260047Y (en) * | 2008-09-10 | 2009-06-17 | 中国电力科学研究院 | Asymmetric line discharging tackle |
US20120085544A1 (en) * | 2010-10-12 | 2012-04-12 | Bp Exploration Operating Company Limited | Marine subsea free-standing riser systems and methods |
CN102434129A (en) * | 2011-12-24 | 2012-05-02 | 大连理工大学 | Ultra-deepwater offshore oil-gas engineering developing system and mounting method thereof |
US20160115667A1 (en) * | 2013-05-13 | 2016-04-28 | Saipem S.A. | Device For Anchoring A Raceway Mounting Of A Seabed-To-Surface Facility |
CN105525888A (en) * | 2014-09-28 | 2016-04-27 | 中国海洋石油总公司 | Terminal connector of deep water free standing type vertical pipe system |
CN104265228A (en) * | 2014-10-09 | 2015-01-07 | 中国海洋石油总公司 | Free standing type stand pipe top connection structure |
CN207110998U (en) * | 2017-07-13 | 2018-03-16 | 安世亚太科技股份有限公司 | Drilling at the sea riser upper attachment means |
Non-Patent Citations (1)
Title |
---|
康庄,等, vol. 40, no. 5, pages 174 - 179 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111654681A (en) * | 2019-03-04 | 2020-09-11 | 安世亚太科技股份有限公司 | Projection splicing method of DLP optical machine |
CN111654680A (en) * | 2019-03-04 | 2020-09-11 | 安世亚太科技股份有限公司 | Projection splicing method and device of digital light processing optical machine |
CN111654681B (en) * | 2019-03-04 | 2024-04-19 | 北京谦恒德科技有限公司 | Projection splicing method of DLP optical machine |
Also Published As
Publication number | Publication date |
---|---|
CN107217999B (en) | 2024-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101980917B (en) | Liquid storing and offloading device and drilling and production installations on sea based thereon | |
US8403058B2 (en) | Offshore unit and method of installing wellhead platform using the offshore unit | |
AU2007319011B2 (en) | Hybrid riser tower and methods of installing same | |
CN104527940B (en) | Ocean platform block offshore double-boat integral migration method | |
CN105064958A (en) | Vertical multi-joint fishing net protection underground pipe manifold | |
CN107217999A (en) | Drilling at the sea riser upper attachment means | |
BRPI1012886B1 (en) | MODULAR SURFACE INSTALLATION, SYSTEM, AND, METHOD FOR INSTALLING A SURFACE INSTALLATION IN A STRUCTURE OUTSIDE THE COAST | |
CN203258184U (en) | Folding type deepwater subsea pipeline terminal | |
CN207110998U (en) | Drilling at the sea riser upper attachment means | |
CN105752861B (en) | Using buoyant mass and hang the method for leading dual-purpose rope installation deep-sea underwater heavy facility | |
CN106585872B (en) | The method of the upper layer module integrated operations of floating type production, storage and offloading device | |
CN201615337U (en) | Submarine pipeline oil catcher | |
CN108590547B (en) | Standpipe installation method | |
CN100430292C (en) | Water intake riser | |
CN105525888A (en) | Terminal connector of deep water free standing type vertical pipe system | |
CN104494792A (en) | Transportation device and transportation method for ocean engineering structures | |
CN103662383A (en) | Oil pipeline clamping fixture | |
CN203048399U (en) | Special lifting bracket for lifting drilling modules of deepwater drilling ship | |
CN106115508A (en) | A kind of combination type pontoon hangs | |
CN203497865U (en) | Off-centering underwater casing head hoisting frame | |
CN103058046A (en) | Deepwater drilling ship drilling module lifting-dedicated hanger | |
CN105775074B (en) | Gradually the heavy erection of equipment method in deep-sea of buoyant mass is freely discharged | |
CN201952095U (en) | Shackle-free connected hanging bar | |
Lim et al. | Evolution of the production semisubmersible | |
CN107143291A (en) | Counter-bending booster |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |