CN107217867A - It is a kind of to be used for the preparation method of high-altitude operation platform ladder cage up and down - Google Patents

It is a kind of to be used for the preparation method of high-altitude operation platform ladder cage up and down Download PDF

Info

Publication number
CN107217867A
CN107217867A CN201710604068.4A CN201710604068A CN107217867A CN 107217867 A CN107217867 A CN 107217867A CN 201710604068 A CN201710604068 A CN 201710604068A CN 107217867 A CN107217867 A CN 107217867A
Authority
CN
China
Prior art keywords
ladder cage
platform
preparation
guard rail
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710604068.4A
Other languages
Chinese (zh)
Inventor
崔松明
王利君
朱松
张智博
方吉
唐春乐
耿帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710604068.4A priority Critical patent/CN107217867A/en
Publication of CN107217867A publication Critical patent/CN107217867A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G27/00Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps

Abstract

It is used for the preparation method of high-altitude operation platform ladder cage up and down the invention provides a kind of, it is characterised in that including:Step S1, welds ladder cage framework, all around steel wire is protected framework using equal leg angle;Step S2, uses steel plate jig on ladder cage framework, is marked time using angle steel welding;Step S3, installs handrail on marking time, and guard rail is installed at the top of ladder cage;Step S4, paints to ladder cage framework outside, handrail and guard rail;Wherein, the platform in above-mentioned steps S2 includes being arranged on the first platform of base of frame, is arranged on the second platform of frame mid portion and is arranged on the 3rd platform of frame roof;In above-mentioned steps S3, the guard rail of installation is arranged on the 3rd platform surrounding.Make that lower channel cost is low, it is easy, time saving to install displacement using preparation method proposed by the present invention, service efficiency is high, it is mobile convenient and speed is fast.

Description

It is a kind of to be used for the preparation method of high-altitude operation platform ladder cage up and down
Technical field
The present invention relates to technical field of building construction, it is used for high-altitude operation platform ladder cage up and down in particular to one kind Preparation method.
Background technology
Manual site makes the artificial input amount of work high above the ground lower channel greatly, and repetition is installed, shift operation amount is larger, time-consuming And influence work efficiency, lower channel is precipitous when highly high and there is potential safety hazard, while occupied ground is larger.Lower channel length is long It is transport, mobile difficult, cause lower channel can not effectively, it is mobile in time in place, influence work high above the ground construction speed.
The content of the invention
In consideration of it, the preparation method that the present invention proposes a kind of above and below be used for high-altitude operation platform ladder cage, improves high-altitude and makees The manufacturing speed and quality of industry lower channel, improve and lead to above and below its convenience and promptness for installing, shifting and use, optimization Road preparation method, saves time and cost of labor that lower channel makes.
The preparation method that the present invention proposes a kind of above and below be used for high-altitude operation platform ladder cage, it is characterised in that including:
Step S1, welds ladder cage framework, all around steel wire is protected framework using equal leg angle;
Step S2, uses steel plate jig on ladder cage framework, is marked time using angle steel welding;
Step S3, installs handrail on marking time, and guard rail is installed at the top of ladder cage;
Step S4, paints to ladder cage framework outside, handrail and guard rail;
Wherein, the platform in above-mentioned steps S2 includes being arranged on the first platform of base of frame, is arranged on frame mid portion Second platform and the 3rd platform for being arranged on frame roof;
In above-mentioned steps S3, the guard rail of installation is arranged on the 3rd platform surrounding.
Further, it is above-mentioned to be used for the preparation method of high-altitude operation platform ladder cage up and down, it is characterised in that the width of marking time 20cm, high 20cm, long 90cm.
Further, it is above-mentioned to be used for the preparation method of high-altitude operation platform ladder cage up and down, it is characterised in that the framework is long Spend 3m, wide 2m, high 4m.
Further, it is above-mentioned to be used for the preparation method of high-altitude operation platform ladder cage up and down, it is characterised in that to use steel pipe system Make handrail and guard rail.
Further, it is above-mentioned to be used for the preparation method of high-altitude operation platform ladder cage up and down, it is characterised in that the platform is long 2m, wide 65cm.
Beneficial effects of the present invention:
Make that lower channel cost is low, it is easy, time saving to install displacement using the present invention, service efficiency is high, it is mobile convenient and Speed is fast.Improved using this preparation method, optimize the preparation method of lower channel and simplify program, formed standardization and make Technique, concentrated processing make, and improve quality and work efficiency that lower channel makes, improve the practicality of lower channel, save The time for making, shifting, installing and cost of labor, should be widely promoted application.
The method provided using the present invention, can be made ladder cage by special messenger's concentrated processing, and ladder cage makes quality height, effect It is good, save time and work efficiency, substantially increase above and below the ladder cage convenience and promptness that use.
The preparation method low manufacture cost provided using the present invention, it is simple to operation, it is economical and practical.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, various other advantages and benefit is common for this area Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention Limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the structural front view of embodiments of the invention;
Fig. 2 is the structure right view of embodiments of the invention.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although showing the disclosure in accompanying drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Complete conveys to those skilled in the art.It should be noted that in the case where not conflicting, embodiment in the present invention and Feature in embodiment can be mutually combined.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Embodiment referring to the preparation method of Fig. 1, the present invention ladder cage provided mainly includes:Ladder cage framework, platform, mark time And the handrail on marking time, the guard rail on platform.Specifically, the method for making ladder cage can be divided into following steps, Including:Step S1, welds ladder cage framework, all around steel wire is protected framework using equal leg angle;Step S2, in ladder cage frame Steel plate jig is used on frame, is marked time using angle steel welding;Step S3, installs handrail on marking time, and is installed at the top of ladder cage Guard rail;Step S4, paints to ladder cage framework outside, handrail and guard rail;Wherein, the platform in above-mentioned steps S2 includes setting The first platform 31 in base of frame, it is arranged on the second platform 32 of frame mid portion and is arranged on the 3rd platform of frame roof 33;In above-mentioned steps S3, the guard rail of installation is arranged on the surrounding of the 3rd platform 33.
Specifically, in above-described embodiment, the size length 11 of ladder cage is 3 meters, and wide 12 be 2 meters, and high 2 be 4 meters, and ladder cage is used 7.5cm*7.5cm equal leg angle welding production frameworks.Wherein, the height of ladder cage can be adjusted according to actual needs.Each ladder cage is set Put two sections of stair steps, stair step 4 includes the first stair step 41 and the second stair step 42,0.9 meter of stair step length, 1.7 meters of stair projected length, every section of stair set 8 and marked time, and tread run is 0.20 meter, it is adjacent mark time between vertical height set 0.20 meter is set to, here using the welding stair step of 7.5cm*7.5cm equal leg angles.Three platforms, Mei Geping are set in ladder cage Platform size specification is 0.65m*2m*0.05m, and with 5mm steel plate platform for making, platform is respectively welded at the top of ladder cage, middle part On bottom.First handrail 61, the second stair step are set in the security that ladder cage is used, the first stair step 41 in order to strengthen Second handrail 62 is set on 42, and the surrounding of the 3rd platform 33 sets guardrail 5, and all around steel wire is protected ladder cage framework, and φ is used here 48*3mm steel pipe manufacturings balustrade and guardrail, framework and fixation are gone along with sb. to guard him with wire netting, finally to outside ladder cage framework, help Hand and the yellow black alternate paint of railing brushing complete to make.By ladder cage framework outside, handrail and the yellow black alternate paint of railing brushing, carry The whole structure of ladder cage warning is risen.
With continued reference to Fig. 2, the first stair step 41 is arranged on the second platform dextral 322, and the second stair step 42 is arranged on Second platform sinistral 311, reserves certain gap, such design symbol between the first stair step 41 and the second stair step 42 Design specification as unification.
Those skilled in the art should be understood that, the size of above-mentioned ladder cage, the quantity of stair step and specification, flat The size and quantity of platform can be designed according to actual conditions, can be by the section of stair step if ladder cage dimensional height is higher The comparison of number design is more, and such as 6 meters high ladder cages, the hop count quantity of stair step could be arranged to three sections, meanwhile, mark time, be The passage led between the platform of adjacent layer, the quantity marked time can by the spacing between platform and it is adjacent mark time between it is vertical high The effect of distance of degree.The vertical height between marking time such as is set to 15cm or 25cm, is equally reached and normally uses The effect of ladder cage.If the platform quantity of ladder cage is n, the hop count of stair step can be n-1 sections.For the face of ladder cage Color, preferably eye-catching color, such as yellow, white, black etc. can make one just can clearly differentiate the color of ladder cage a long way off, Meet the purpose of design.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (5)

1. a kind of be used for the preparation method of high-altitude operation platform ladder cage up and down, it is characterised in that including:
Step S1, welds ladder cage framework, all around steel wire is protected framework using equal leg angle;
Step S2, uses steel plate jig on ladder cage framework, is marked time using angle steel welding;
Step S3, installs handrail on marking time, and guard rail is installed at the top of ladder cage;
Step S4, paints to ladder cage framework outside, handrail and guard rail;
Wherein, the platform in above-mentioned steps S2 includes being arranged on the first platform of base of frame, is arranged on the second of frame mid portion Platform and the 3rd platform for being arranged on frame roof;
In above-mentioned steps S3, the guard rail of installation is arranged on the 3rd platform surrounding.
2. according to claim 1 be used for the preparation method of high-altitude operation platform ladder cage up and down, it is characterised in that described to step on Step width 20cm, high 20cm, long 90cm.
3. according to claim 1 be used for the preparation method of high-altitude operation platform ladder cage up and down, it is characterised in that the frame Frame length 3m, wide 2m, high 4m.
4. according to claim 1 be used for the preparation method of high-altitude operation platform ladder cage up and down, it is characterised in that uses steel Pipe makes handrail and guard rail.
5. according to claim 1 be used for the preparation method of high-altitude operation platform ladder cage up and down, it is characterised in that described flat Director 2m, wide 65cm.
CN201710604068.4A 2017-07-21 2017-07-21 It is a kind of to be used for the preparation method of high-altitude operation platform ladder cage up and down Pending CN107217867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710604068.4A CN107217867A (en) 2017-07-21 2017-07-21 It is a kind of to be used for the preparation method of high-altitude operation platform ladder cage up and down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710604068.4A CN107217867A (en) 2017-07-21 2017-07-21 It is a kind of to be used for the preparation method of high-altitude operation platform ladder cage up and down

Publications (1)

Publication Number Publication Date
CN107217867A true CN107217867A (en) 2017-09-29

Family

ID=59954101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710604068.4A Pending CN107217867A (en) 2017-07-21 2017-07-21 It is a kind of to be used for the preparation method of high-altitude operation platform ladder cage up and down

Country Status (1)

Country Link
CN (1) CN107217867A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222007A (en) * 2017-12-26 2018-06-29 中国十七冶集团有限公司 A kind of installation method of novel deep basal pit occasional passage

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3626242B2 (en) * 1994-11-25 2005-03-02 ジャパン スチールス インターナショナル株式会社 Multi-stage construction method of temporary staircase with landing in shaft
CN202215006U (en) * 2011-09-07 2012-05-09 中国建筑土木建设有限公司路桥分公司 Tool-type fixed ladder for construction
CN203531421U (en) * 2013-09-03 2014-04-09 中国建筑第二工程局有限公司 Movable tower type ladder stand
CN204000932U (en) * 2014-06-03 2014-12-10 天津市达森城交钢结构有限公司 Lower channel in safety in a kind of deep foundation pit construction operation
CN104533106A (en) * 2014-12-22 2015-04-22 天津二建建筑工程有限公司 Single-layer three-dimensional prefabricated sunken construction ladder stand assembled along with excavation of foundation pit and construction method
CN204920280U (en) * 2015-08-25 2015-12-30 株洲国铁实业有限公司 Safe cat ladder
CN204940915U (en) * 2015-07-21 2016-01-06 张战胜 Dish button construction safety cat ladder

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3626242B2 (en) * 1994-11-25 2005-03-02 ジャパン スチールス インターナショナル株式会社 Multi-stage construction method of temporary staircase with landing in shaft
CN202215006U (en) * 2011-09-07 2012-05-09 中国建筑土木建设有限公司路桥分公司 Tool-type fixed ladder for construction
CN203531421U (en) * 2013-09-03 2014-04-09 中国建筑第二工程局有限公司 Movable tower type ladder stand
CN204000932U (en) * 2014-06-03 2014-12-10 天津市达森城交钢结构有限公司 Lower channel in safety in a kind of deep foundation pit construction operation
CN104533106A (en) * 2014-12-22 2015-04-22 天津二建建筑工程有限公司 Single-layer three-dimensional prefabricated sunken construction ladder stand assembled along with excavation of foundation pit and construction method
CN204940915U (en) * 2015-07-21 2016-01-06 张战胜 Dish button construction safety cat ladder
CN204920280U (en) * 2015-08-25 2015-12-30 株洲国铁实业有限公司 Safe cat ladder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222007A (en) * 2017-12-26 2018-06-29 中国十七冶集团有限公司 A kind of installation method of novel deep basal pit occasional passage

Similar Documents

Publication Publication Date Title
CN104131688B (en) The special external hanging type job platform of assembled architecture and method of operating thereof
CN106193568A (en) Mobile steel truss operating platform
JP6021604B2 (en) Temporary scaffolding and its assembly method
CN107217867A (en) It is a kind of to be used for the preparation method of high-altitude operation platform ladder cage up and down
CN206752894U (en) A kind of standard regularization stair
CN204728554U (en) The integral structure of channel and double-deck operation platform
CN203767643U (en) Closed type steelwork conveying trestle bridge
CN104533097B (en) The recursion staged construction method of assembled tier building
CN210316280U (en) Assembled construction safety protection stair
CN102587601A (en) Multistage connection cage-type staircase
CN207314692U (en) A kind of precast stair
CN203531421U (en) Movable tower type ladder stand
CN215366767U (en) Non-supporting temporary steel bridge
CN205976573U (en) Large -span stand cable protection canopy
KR101741070B1 (en) grating
CN204983876U (en) Flue gas monitoring platform of addding on building reinforced concrete chimney
CN109057319B (en) Cylindrical structure inside full hall floor type scaffold
CN208473352U (en) A kind of standardization vertical shaft walks up and down with assembled ladder cage
CN210918009U (en) Combined prefabricated staircase
US10662651B2 (en) Roofing shingle with uneven edge cut
CN207062676U (en) Temporary road pad
CN207228604U (en) A kind of unilateral suspension type aerial movement steel platform
CN202510965U (en) Improved zigzag flat steel or H flat steel
CN203755717U (en) Assembly type up and down pedestrian path for deep foundation pit
CN215520076U (en) Elevator well head operation layer protection cage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170929