CN107217674A - Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method - Google Patents

Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method Download PDF

Info

Publication number
CN107217674A
CN107217674A CN201710324303.2A CN201710324303A CN107217674A CN 107217674 A CN107217674 A CN 107217674A CN 201710324303 A CN201710324303 A CN 201710324303A CN 107217674 A CN107217674 A CN 107217674A
Authority
CN
China
Prior art keywords
cutting
rock
foundation ditch
cut
cubic meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710324303.2A
Other languages
Chinese (zh)
Inventor
卫芷
刘晖
韩锦峰
吴晓兵
弓晓丽
常彦妮
穆锦峰
王续东
高志奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN201710324303.2A priority Critical patent/CN107217674A/en
Publication of CN107217674A publication Critical patent/CN107217674A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention belongs to the realm of building construction, larger is influenceed on geology around in order to solve conventional blast construction, the problem of ripe city of closeness greatly can not be applied to, and then enter rock non-explosive excavation construction method there is provided a kind of cubic meter of stone foundation ditch, using water conservancy diversion+circular saw cutting excavating load construction, rock stratum water is dredged into low-lying place first and carries out pump drainage, then basement rock is cut using circular saw, crushing and clearing finally is carried out to the basement rock after cutting, the non-explosive excavation construction cheated into batholith is realized, the propulsion cutting mode of cutting is segmented during cutting using subregion.Of the invention low with labor intensity using " water conservancy diversion+illegally occupy cutting excavating load " progress rock stratum excavation, effect on environment is small, and the advantages such as rule are excavated in operation, while influence of the rock stratum water to excavation can be controlled effectively.

Description

Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method
Technical field
The invention belongs to the realm of building construction, and in particular to a kind of cubic meter of stone base suitable for big, the ripe residential block of closeness Cheat into rock non-explosive excavation construction method.
Background technology
For the building in mountain construction, structures, being arranged on its basis at lithostratigraphy, generally using blasting technology more Foundation excavation is carried out, but for flow of the people is big, maturation zone people area, the potential safety hazard of blast working mode is big, while can be to surrounding Geology affects, and causes blast working mode to there is limitation.
The content of the invention
The present invention influences larger to solve conventional blast construction on geology around, it is impossible to apply to the big maturation of closeness The problem of city, and then enter rock non-explosive excavation construction method there is provided a kind of cubic meter of stone foundation ditch.
The present invention is adopted the following technical scheme that:
A kind of cubic meter of stone foundation ditch enters rock non-explosive excavation construction method, using water conservancy diversion+circular saw cutting excavating load construction, first by rock Layer water dredges low-lying place and carries out pump drainage, and then basement rock is cut using circular saw, and finally the basement rock after cutting is carried out Crushing and clearing, realizes the non-explosive excavation construction cheated into batholith.
Need that the rock stratum of excavation area make an on-the-spot survey to examine before construction, elevation control pilot measurement is excavated into base to region, ejection is excavated Control line is cheated, and clears up the loose earth's surface debris of excavation region surface, specific work progress is as follows:
Rock stratum water conservancy diversion:Drainage ditch is excavated in the cutting operation face surveyed in bullet in advance at the position of foundation ditch edge, and in low land The catch pit being connected with drainage ditch is set at gesture, slush pump is installed, water-pumping/draining is carried out;
Basement rock is cut:Disk is set to saw track along margin of foundation pit, the cutting operation face surveyed using circular saw along bullet is cut;
Basement rock crushing and clearing:Crushing and clearing is carried out to the bulk basement rock after cutting separation using pick machine, the basement rock after crushing is straight Footpath is not more than 50cm, convenient transhipment.
The propulsion cutting mode of cutting is segmented during cutting using subregion, foundation ditch cut surface is divided into respect to foundation ditch center some Symmetrical cutting area, each cutting area unit is uniformly divided into some cut length again;Carried out immediately after the completion of one cut length cutting Crushing and clearing, then next cut length is cut, until cutting completes a cutting area unit, then proceed to cut symmetrical cutting area Unit.The stability being cut with beneficial to foundation ditch is maintained in digging process is segmented using subregion, is prevented because geology particularity occurs The problem of unbalance loading is caved in.
The cutting segment length is 10-15 meters, and the main specification according to selected circular saw of the Cutting Length is determined, makes cutting The basement rock that segment unit is produced just is beneficial to single and transported, meanwhile, it is comprehensive that cutter unit should combine the factors such as the service life of circular saw Close and determine, facilitate cut length to be just beneficial to check when switching, repair, change circular saw.
The diameter of the circular saw bit is not less than 1 meter, and maximum depth of cut control is between 40--50cm, depth of cut root According to circular saw diameter and consider the factors such as power of motor determine.
Cutting surface evenness after cutting is ± 5cm, should then be modified cutting more than the flatness, it is to avoid excessive is recessed Fall into or projection influence subsequent construction.
The circular saw edge is provided with the baffle plate for preventing that stone flour from splashing, and prevents a large amount of stone flours and splashes, airborne dust occurs, Ensure that stone flour can carry out precipitation process in small area.
The present invention has the advantages that:
1st, the mode that the present invention is combined using water conservancy diversion+disk saw cut substitutes traditional blast working, when solving explosion Potential safety hazard, has fewer environmental impacts;
2nd, using disk saw cut, with the smooth well-behaved advantage of operation excavation face, the influence to geology around can effectively be reduced;
3rd, cut before carried out water conservancy diversion processing, control influence of the rock stratum water to follow-up excavation construction, be conducive to quickening construct into Degree;
4th, water conservancy diversion water can be used for the stone flour that processing cutting is produced, and had both realized effective utilization to rock stratum water, and had saved water resource, The problem of suiting measures to local conditions to solve stone flour airborne dust simultaneously.
Brief description of the drawings
Fig. 1 is rectangle foundation pit subregion stepwise schematic views figure;
In figure:S1, S2 ... are cutting area unit, and L1, L2 ... are cut length.
Embodiment
The present invention is directed to the building foundation pit construction at ripe residential block, and the scheme tentatively drafted has three kinds:
Scheme one:Using hydraulic splitting machine
1)Pick crusher machine is used first, digs out free face;
2)Then punched using cutting drill, insert the jacking mechanism of hydraulic splitting machine;
3)Start hydraulic splitting machine jacking, free face side cubic meter of stone capping will be leaned on;
4)Last pick machine coordinates broken, cubic meter of stone cleaning.
Scheme two:Using disk saw cut
1)Levelling of the land in foundation ditch is carried out first;
2)Circular saw track installation;
3)Disk saw cut;
4)Pick crusher machine is cleared up.
Scheme three:It is broken using swelling agent
1)Free face is carried out first to crush;
2)Down-the-hole drill jewel hole powder charge;
3)Heating expansion is broken, the cleaning of pick machine addi-tional crusher.
It is final to determine, using " water conservancy diversion+illegally occupy cutting excavating load ", rock stratum water to be dredged into low-lying place first and carries out pump drainage, so Basement rock is cut using circular saw afterwards, crushing and clearing finally is carried out to the basement rock after cutting, is realized into the non-quick-fried of batholith hole Break excavation construction.
1st, technological principle
By excavating drainage ditch at the construction field (site), setting the measure of catch pit in physical features lower, rock stratum water is carried out effectively to dredge Lead, illegally occupied using major diameter along margin of foundation pit and set disk to saw track progress foundation ditch subregion segmentation cutting, larger foundation ditch is split Into some fritters, the excavation construction cheated into batholith is realized in the rock stratum for recycling pick crusher machine to separate.
2nd, technological process
Foundation ditch levelling of the land → guiding gutter and catch pit construction → disk saw cut → basement rock crushing and clearing.
3rd, specific practice
3.1st, foundation ditch levelling of the land
The rock stratum of excavation area is made an on-the-spot survey, by elevation control pilot measurement to region is excavated, ejects excavation pit control line, will excavate The loose earth's surface debris of region surface is cleaned out.
3.2nd, guiding gutter and catch pit construction
For excavating rock stratum, generally there is rock stratum water system, to ensure disk saw cut cubic meter of stone job safety, leaned in cutting operation face Setting drainage ditch is excavated in nearly foundation ditch edge position in advance, and sets catch pit in physical features lower position, installs slush pump, enters Row water-pumping/draining(When lift is too high, and slush pump can not meet use requirement, welded steel plate sedimentation basin is used in foundation ditch, mud is used Foundation ditch internal water accumulation is evacuated to sedimentation basin by pump, is after precipitation discharged water using clarified water pump).
The timely pump drainage of ponding water conservancy diversion:
In disk saw cut cubic meter of stone operation, the smooth pump drainage of ponding is most important.Consider for security standpoint, cutting mechanics exist Underwater work, easily causes shell dew electricity, personnel cause security incident to less important work;Consider for mechanical protection angle, Cutting mechanics easily cause short circuit in underwater work, damage motor, and not only cost is raised, and the duration can not also ensure.
In order to ensure cutting mechanics normal construction, cutting operation face(Close to building enclosure marginal position)Gutter is set, And catch pit is set in horizontal relative elevation lower position, and the slush pump that lift is cutting depth is set, carry out water-pumping/draining(Example Such as, certain project excavation of foundation pit depth is 34m, and plan sets lift 34m slush pumps).But find more than lift 15m in market survey Slush pump it is less, therefore can discuss use sewage pump or clarified water pump, but sewage pump machinery is larger, is moved in foundation ditch, lift compared with Hardly possible operation;Foundation ditch inner clip mud is more, and clarified water pump can not be applicable.
Finally, welded steel plate sedimentation basin is used in foundation ditch, and foundation ditch internal water accumulation is evacuated to precipitation from short lift slush pump Chi Hou, is discharged water using clarified water pump through being deposited in.
Checking on effect:Checked through scene, the scope of operation is without obvious ponding.
3.3rd, basement rock is cut
Circular saw track installation is carried out, from diameter 1m or so circular saw bit, it is considered to which rock strength grade is different in foundation ditch, most Between big depth of cut control 40--50cm.Cutting is completed after one section, is manually cleared up the remaining stone flour of the scope of operation, it is ensured that cutting is made Industry face is smooth.
Stone flour processing:
In cutting process, whether stone flour is cleared up in time, will directly affect the efficiency of the cutting lower floor cubic meter of stone.
First, baffle plate is set at circular saw edge, prevents most of stone flour from splashing, increase cleaning difficulty.
Secondly, stone flour is cleared up to catch pit using digging machine, will be unified after stone flour pump drainage to sedimentation basin using slush pump Cleaning.
Finally, manually the remaining stone flour of the scope of operation is cleared up, it is ensured that cutting operation face is smooth.
Checking on effect:Checked through scene, the scope of operation can be smoothed out cutting operation without accumulation stone flour.
Depth of cut is determined:
Circular saw depth of cut directly affect rock excavation whether the key that can be smoothly completed, depth of cut is big, mechanical load Greatly, electric motor short circuit, damage are easily caused;Depth of cut is small, cuts every time relatively thin, and earthwork is less, and the duration can not ensure.Technology Personnel spy sits on how each depth of cut controls for this problem.
First, it is considered to country rock grade in foundation ditch, from diameter 1m circular saw bit, maximum depth of cut is 50cm.But warp Field observation is crossed, running at full capacity device efficiency is relatively low and larger to motor damage, the cutting loss time caused is longer.Together When measurement cutting abolish after rock flatness be ± 5cm, so the average depth of cut of setting is by 45cm controls.
Secondly, to avoid workmen from blindly robbing work or misoperation, station by scene should be strengthened, and workmen is carried out Education,
Checking on effect:Check that the average 45cm of every layer of depth of cut ensure that mechanical continuous operation, not occur short circuit through scene The phenomenons such as shutdown.
3.4th, basement rock crushing and clearing
In cutting process, stone flour must be cleared up synchronously in time, by setting baffle plate at circular saw edge, prevent stone flour from splashing. Basement rock after cutting is cleared up using pick crusher machine, entrucking outward transport.Stone flour is cleared up to catch pit using digging machine, utilizes slush pump By unified cleaning after stone flour pump drainage to sedimentation basin.
By taking certain rectangle foundation pit shown in Fig. 1 as an example, be classified as six cutting area units, cutting sequence be followed successively by S1, S2, S3, S4, S5, S6, each cutting area unit are further divided into several sections of cuttings of L1, L2, L3, L4 and completed, and continuous 9 days to stone Excavated volume is counted daily for side, is as a result found that the averagely daily excavated volume of the cubic meter of stone can reach 358m3, is met what is formulated before construction Target.
The present invention carries out rock stratum excavation using " water conservancy diversion+illegally occupy cutting excavating load " has labor intensity low, effect on environment Small, the advantages such as rule are excavated in operation, while influence of the rock stratum water to excavation can be controlled effectively.

Claims (7)

1. a kind of cubic meter of stone foundation ditch enters rock non-explosive excavation construction method, it is characterised in that:Using water conservancy diversion+circular saw cutting excavating load Construction, is dredged low-lying place by rock stratum water first and carries out pump drainage, then basement rock cut using circular saw, finally to cutting Basement rock afterwards carries out crushing and clearing, realizes the non-explosive excavation construction cheated into batholith.
2. cubic meter of stone foundation ditch according to claim 1 enters rock non-explosive excavation construction method, it is characterised in that needed before construction pair The rock stratum of excavation area make an on-the-spot survey examining, and by elevation control pilot measurement to region is excavated, ejects excavation pit control line, and clear up excavation The loose earth's surface debris of region surface, specific work progress is as follows:
Rock stratum water conservancy diversion:Drainage ditch is excavated in the cutting operation face surveyed in bullet in advance at the position of foundation ditch edge, and in low land The catch pit being connected with drainage ditch is set at gesture, slush pump is installed, water-pumping/draining is carried out;
Basement rock is cut:Disk is set to saw track along margin of foundation pit, the cutting operation face surveyed using circular saw along bullet is cut;
Basement rock crushing and clearing:Crushing and clearing is carried out to the bulk basement rock after cutting separation using pick machine, the diameter after crushing is not More than 50cm.
3. cubic meter of stone foundation ditch according to claim 2 enters rock non-explosive excavation construction method, it is characterised in that:Adopted during cutting The propulsion cutting mode of cutting is segmented with subregion, foundation ditch cut surface is divided into some symmetrical cutting areas with respect to foundation ditch center, often Individual cutting area unit is uniformly divided into some cut length again;Crushing and clearing is carried out immediately after the completion of one cut length cutting, then is cut Next cut length, until cutting completes a cutting area unit, then proceedes to cut symmetrical cutting area unit.
4. cubic meter of stone foundation ditch according to claim 3 enters rock non-explosive excavation construction method, it is characterised in that:The cut length Length is 10-15 meters.
5. cubic meter of stone foundation ditch according to claim 4 enters rock non-explosive excavation construction method, it is characterised in that:The circular saw The diameter of piece is not less than 1 meter, and maximum depth of cut control is between 40--50cm.
6. cubic meter of stone foundation ditch according to claim 5 enters rock non-explosive excavation construction method, it is characterised in that:Cutting after cutting Face flatness is ± 5cm.
7. cubic meter of stone foundation ditch according to claim 6 enters rock non-explosive excavation construction method, it is characterised in that:The circular saw Edge is provided with the baffle plate for preventing that stone flour from splashing.
CN201710324303.2A 2017-05-10 2017-05-10 Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method Pending CN107217674A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710324303.2A CN107217674A (en) 2017-05-10 2017-05-10 Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710324303.2A CN107217674A (en) 2017-05-10 2017-05-10 Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method

Publications (1)

Publication Number Publication Date
CN107217674A true CN107217674A (en) 2017-09-29

Family

ID=59944102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710324303.2A Pending CN107217674A (en) 2017-05-10 2017-05-10 Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method

Country Status (1)

Country Link
CN (1) CN107217674A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119191A (en) * 2019-12-18 2020-05-08 中建三局基础设施建设投资有限公司 Rock foundation pit guide hole type non-blasting excavation method
CN113279422A (en) * 2021-06-10 2021-08-20 中庆建设有限责任公司 Excavation method suitable for hard rock stratum enlarged foundation
CN113802516A (en) * 2021-08-16 2021-12-17 江苏龙源振华海洋工程有限公司 Reef position processing method
CN115787768A (en) * 2022-12-16 2023-03-14 中建海峡建设发展有限公司 Method for excavating harder rock in ultra-narrow and ultra-deep foundation pit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203729363U (en) * 2013-11-13 2014-07-23 牛发启 Strip-shaped deep and narrow foundation excavating equipment
CN104060620A (en) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 Karst fissure water control method for deep foundation pit
CN104314574A (en) * 2014-10-13 2015-01-28 福州市规划设计研究院 Hard rock tunnel non-blasting digging blocking method and construction method
CN104775437A (en) * 2015-02-15 2015-07-15 福建省闽南建筑工程有限公司 Cutting type constructing method for excavating rock foundation pits in construction site
AU2014262181A1 (en) * 2014-11-06 2016-05-26 VHS IP Pty Ltd Process for exposing underground utilities

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060620A (en) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 Karst fissure water control method for deep foundation pit
CN203729363U (en) * 2013-11-13 2014-07-23 牛发启 Strip-shaped deep and narrow foundation excavating equipment
CN104314574A (en) * 2014-10-13 2015-01-28 福州市规划设计研究院 Hard rock tunnel non-blasting digging blocking method and construction method
AU2014262181A1 (en) * 2014-11-06 2016-05-26 VHS IP Pty Ltd Process for exposing underground utilities
CN104775437A (en) * 2015-02-15 2015-07-15 福建省闽南建筑工程有限公司 Cutting type constructing method for excavating rock foundation pits in construction site

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119191A (en) * 2019-12-18 2020-05-08 中建三局基础设施建设投资有限公司 Rock foundation pit guide hole type non-blasting excavation method
CN113279422A (en) * 2021-06-10 2021-08-20 中庆建设有限责任公司 Excavation method suitable for hard rock stratum enlarged foundation
CN113802516A (en) * 2021-08-16 2021-12-17 江苏龙源振华海洋工程有限公司 Reef position processing method
CN115787768A (en) * 2022-12-16 2023-03-14 中建海峡建设发展有限公司 Method for excavating harder rock in ultra-narrow and ultra-deep foundation pit

Similar Documents

Publication Publication Date Title
CN107217674A (en) Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method
WO2018045746A1 (en) Method for construction of boom-type roadheader for urban shallow tunnel with intensive karst and rich water
CN103046931B (en) Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode
CN102278115A (en) High-efficiency safe environment-friendly mining method for rare shallow-buried ore layer in irregular strip-shaped distribution
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN101705691A (en) Construction method of dewatering well under foundation slab in foundation pit
CN103291308A (en) Boom-type roadheader for tunnel construction and tunnel construction method
CN104947690A (en) Grooving construction method for embedding underground continuous wall into rock
Sobko et al. SUBSTANTIATING RATIONAL SCHEDULE TO LOAD TRUCKS USING DRAGLINES WHILE MINING A PIT OF MOTRONIVSKYI MPP.
CN105065004A (en) Shallow-buried large-span rock tunnel portal section weak blasting excavation construction method
CN104948833B (en) Mountainous region gas pipeline construction method
CN111852554B (en) Rapid trenching method for large water inrush quantity pit open-pit mine small-block full-section deep one-time blasting
CN111852555B (en) Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine
RU2632604C1 (en) Method for forming and depreserving steep temporary nonactive walls when developing deep laying deposits
CN104315251A (en) Manual pipe jacking construction method for earth and rock combined geological conditions
Chen et al. Cutting, Wear and replacement of cutting tools during shield tunneling
CN106088122A (en) Opencut end side infiltration step cuts the comprehensive processing method of row
CN105696625B (en) The dredging method of immersed tube tunnel rubble bedding desilting system
Leichnitz Analysis of collapses on tunnel construction sites on the new lines of the German Federal Railway
CN116927178B (en) Construction method of granite boulder geological underground diaphragm wall
CN109555141A (en) Strong drainage system for ultra-large deep foundation pit and construction method
CN113931646B (en) Water control system and method for open TBM construction of special inclined shaft of coal mine
CN103615009A (en) Method for excavating soil between piles of CFG pile composite foundation
CN1456832A (en) Underwater pipe jacking tunnelling process with balanced supply and discharge
Hashida et al. Linkway Construction Underneath Existing MRT Tunnels by Open Faced Rectangular Shield for Marina Bay Station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wei Zhi

Inventor after: Liu Hui

Inventor after: Sun Dongyan

Inventor after: Wu Xiaobing

Inventor after: Gong Xiaoli

Inventor after: Chang Yanni

Inventor after: Mu Jinfeng

Inventor after: Wang Xudong

Inventor after: Gao Zhiqi

Inventor before: Wei Zhi

Inventor before: Liu Hui

Inventor before: Han Jinfeng

Inventor before: Wu Xiaobing

Inventor before: Gong Xiaoli

Inventor before: Chang Yanni

Inventor before: Mu Jinfeng

Inventor before: Wang Xudong

Inventor before: Gao Zhiqi

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20170929

RJ01 Rejection of invention patent application after publication