CN107196230A - A kind of big span tension stringing construction method and support frame - Google Patents

A kind of big span tension stringing construction method and support frame Download PDF

Info

Publication number
CN107196230A
CN107196230A CN201710464040.5A CN201710464040A CN107196230A CN 107196230 A CN107196230 A CN 107196230A CN 201710464040 A CN201710464040 A CN 201710464040A CN 107196230 A CN107196230 A CN 107196230A
Authority
CN
China
Prior art keywords
big span
support
tension stringing
support frame
upper support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710464040.5A
Other languages
Chinese (zh)
Inventor
方学军
杜春阳
毕建全
王梦实
黄磊
邓哲
常子威
左韬
刘明洋
张国萍
郑茂堂
于海鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Transmission and Transformation Engineering Corp
Original Assignee
State Grid Corp of China SGCC
Tianjin Electric Power Transmission and Transformation Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tianjin Electric Power Transmission and Transformation Engineering Corp filed Critical State Grid Corp of China SGCC
Priority to CN201710464040.5A priority Critical patent/CN107196230A/en
Publication of CN107196230A publication Critical patent/CN107196230A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The present invention relates to a kind of big span tension stringing construction method, big span tension stringing support frame is installed on two ground for needing to draw between the steel tower of stringing, the big span tension stringing support frame jack-up draught line.The big span tension stringing support frame includes pole support, upper support, towards top sheave group and gag lever post, pole support upper end both lateral sides are symmetrically fixed with support, four groups are uniformly provided with the top lateral separation of upper support towards top sheave group, every group is fixed with a gag lever post towards the upper support top in the middle part of top sheave group both lateral sides.The present invention installs support frame in big span, shortens distance in independent span, and then shorten the distraction force of stretching machine, it is to avoid occur bracket phenomenon, although the structure of this support frame is simple, efficiently solves the technical barrier for being difficult to overcome for a long time.

Description

A kind of big span tension stringing construction method and support frame
Technical field
The present invention relates to for big span Poling Construction in electric transmission line erection, especially a kind of big span tension stringing is applied Work method and support frame.
Background technology
In electric transmission line erection in big span Poling Construction, distraction force, which crosses conference, causes constructional difficulties, according to long-term The statistics of construction experience and live distraction force construction note, analysis finds that it is not strain section really to influence distraction force excessive Apart from long, but a certain independent span is excessive in strain section causes distraction force to increase.
The content of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide one kind is simple in construction, reduction is taken up an area, be easy to apply The big span construction method of work, safe and reliable tension stringing and support frame.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of big span tension stringing construction method, it is characterised in that:Between two steel towers for needing traction stringing Big span tension stringing support frame is installed, the big span tension stringing support frame jack-up draught line on ground.
Moreover, the big span tension stringing support frame includes pole support, upper support, towards top sheave group and spacing Bar, pole support upper end both lateral sides are symmetrically fixed with support, and four groups are uniformly provided with the top lateral separation of upper support Towards top sheave group, every group is fixed with a gag lever post towards the upper support top in the middle part of top sheave group both lateral sides.
Moreover, being made up of towards top sheave assembly pulley a central pulley and two edge pulleys, central pulley and side Edge pulley coaxle is to central pulley is arranged on upper support top middle portion, and it is forward and backward that two edge pulleys are symmetrically mounted on central pulley The upper support top of both sides, central pulley than on edge pulley along high.
Moreover, being fixed with raker beam, upper support and raker beam between the side wall of cantilever end and the pole support of upper support Between tilt be fixed with a plurality of buttress brace.
Moreover, the transverse ends in upper support are symmetrically fixed with hangers.
Advantages and positive effects of the present invention are:
The present invention installs support frame in big span, shortens distance in independent span, and then the distraction force of shortening stretching machine, Avoid occurring bracket phenomenon, although the structure of this support frame is simple, efficiently solve the technology for being difficult to overcome for a long time difficult Topic.
Brief description of the drawings
Fig. 1 is form of construction work schematic diagram of the invention;
Fig. 2 is the structural front view of big span tension stringing support frame;
Fig. 3 is Fig. 2 right view.
Embodiment
Below in conjunction with the accompanying drawings and the invention will be further described by specific embodiment, following examples are descriptive , it is not limited, it is impossible to which protection scope of the present invention is limited with this.
A kind of big span tension stringing construction method, referring to shown in accompanying drawing 1, between two steel towers for needing traction stringing Ground on big span tension stringing support frame is installed, the big span tension stringing support frame jack-up draught line, thus shorten solely Distance in vertical span, reduces distraction force.
The concrete structure of the big span tension stringing support frame referring to shown in accompanying drawing 2 to accompanying drawing 3, including pole support 7, Upper support 4, towards top sheave group and gag lever post 3, pole support upper end both lateral sides are symmetrically fixed with support, in upper support Top lateral separation is uniformly provided with four groups towards top sheave group, and every group equal towards the upper support top in the middle part of top sheave group both lateral sides A gag lever post is fixed with, limitation wire passes through towards correspondence position in top sheave group;
It is made up of towards top sheave assembly pulley a central pulley 1 and two edge pulleys 2, central pulley and edge are slided Wheel is coaxial, is arranged sideways in triangle disposition, and central pulley is arranged on upper support top middle portion, and two edge pulleys are symmetrically installed On the upper support top of central pulley front and rear sides, central pulley than on edge pulley along high, it is ensured that wire slides flexible.
In order to ensure structural strength, raker beam 6 is fixed between the side wall of cantilever end and the pole support of upper support, on Tilted between support and raker beam and be fixed with a plurality of buttress brace 8, enhancing structure intensity.
For the ease of installation and movable supporting frame, hangers 5 is symmetrically fixed with the transverse ends of upper support, is easy to connection Rope.
Although disclosing embodiments of the invention and accompanying drawing for the purpose of illustration, those skilled in the art can manage Solution:Do not departing from the present invention and spirit and scope of the appended claims in, it is various replace, change and modifications all be it is possible, Therefore, the scope of the present invention is not limited to embodiment and accompanying drawing disclosure of that.

Claims (5)

1. a kind of big span tension stringing construction method, it is characterised in that:Need to draw the ground between the steel tower of stringing at two Big span tension stringing support frame is installed, the big span tension stringing support frame jack-up draught line on face.
2. big span tension stringing construction method according to claim 1, it is characterised in that:The big span tension stringing Support frame includes pole support, upper support, towards top sheave group and gag lever post, and pole support upper end both lateral sides are symmetrically fixed with Upper support, four groups are uniformly provided with the top lateral separation of upper support towards top sheave group, and every group towards top sheave group both lateral sides The upper support top at middle part is fixed with a gag lever post.
3. big span tension stringing construction method according to claim 2, it is characterised in that:Towards top sheave assembly pulley be by One central pulley and two edge pulley compositions, central pulley and edge pulley coaxle are to central pulley is arranged on upper support Frame top middle portion, two edge pulleys are symmetrically mounted on the upper support top of central pulley front and rear sides, and central pulley compares edge Along height on pulley.
4. big span tension stringing construction method according to claim 2, it is characterised in that:Upper support cantilever end with Raker beam is fixed between the side wall of pole support, is tilted between upper support and raker beam and is fixed with a plurality of buttress brace.
5. big span tension stringing construction method according to claim 2, it is characterised in that:In the transverse ends of upper support Symmetrically it is fixed with hangers.
CN201710464040.5A 2017-06-19 2017-06-19 A kind of big span tension stringing construction method and support frame Pending CN107196230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710464040.5A CN107196230A (en) 2017-06-19 2017-06-19 A kind of big span tension stringing construction method and support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710464040.5A CN107196230A (en) 2017-06-19 2017-06-19 A kind of big span tension stringing construction method and support frame

Publications (1)

Publication Number Publication Date
CN107196230A true CN107196230A (en) 2017-09-22

Family

ID=59879284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710464040.5A Pending CN107196230A (en) 2017-06-19 2017-06-19 A kind of big span tension stringing construction method and support frame

Country Status (1)

Country Link
CN (1) CN107196230A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0819817A (en) * 1994-07-06 1996-01-23 Chugai Ro Co Ltd Belt wrapper
CN1317858A (en) * 2001-04-26 2001-10-17 李国兴 Hot-line method for substituting compound optical fibre cable (OPGW) for ground line of overhead high-voltage transmission lines
CN101431222A (en) * 2008-12-11 2009-05-13 江苏省电力公司南京供电公司 Turning roller set
CN101552444A (en) * 2008-04-02 2009-10-07 达特默斯大学托管会 System and method for deicing of power line cables
CN201473116U (en) * 2009-07-29 2010-05-19 苏州工业园区慧博自动化技术有限公司 Novel pay-off constant tension controller of wire winding system
CN102856841A (en) * 2012-10-11 2013-01-02 山东铝业工程有限公司 Mechanical laying method for large-section overhead cable
CN104993421A (en) * 2015-06-30 2015-10-21 国家电网公司 Movable line laying crossing structure
CN105356406A (en) * 2015-12-01 2016-02-24 国网重庆市电力公司电力科学研究院 Inland river ship shore power cable collecting and releasing system
CN105977868A (en) * 2016-06-28 2016-09-28 河南送变电工程公司 Y-type spanning device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0819817A (en) * 1994-07-06 1996-01-23 Chugai Ro Co Ltd Belt wrapper
CN1317858A (en) * 2001-04-26 2001-10-17 李国兴 Hot-line method for substituting compound optical fibre cable (OPGW) for ground line of overhead high-voltage transmission lines
CN101552444A (en) * 2008-04-02 2009-10-07 达特默斯大学托管会 System and method for deicing of power line cables
CN101431222A (en) * 2008-12-11 2009-05-13 江苏省电力公司南京供电公司 Turning roller set
CN201473116U (en) * 2009-07-29 2010-05-19 苏州工业园区慧博自动化技术有限公司 Novel pay-off constant tension controller of wire winding system
CN102856841A (en) * 2012-10-11 2013-01-02 山东铝业工程有限公司 Mechanical laying method for large-section overhead cable
CN104993421A (en) * 2015-06-30 2015-10-21 国家电网公司 Movable line laying crossing structure
CN105356406A (en) * 2015-12-01 2016-02-24 国网重庆市电力公司电力科学研究院 Inland river ship shore power cable collecting and releasing system
CN105977868A (en) * 2016-06-28 2016-09-28 河南送变电工程公司 Y-type spanning device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭辉,马敬: "输电线路跨越障碍物施工新方法探讨", 《创新科技》 *

Similar Documents

Publication Publication Date Title
KR101450715B1 (en) Handrail post connecting apparatus for deck rod
CN204103371U (en) A kind of movable type cable laying apparatu
CN107196230A (en) A kind of big span tension stringing construction method and support frame
CN211974254U (en) Steel construction canopy slide rail construction platform
CN211057625U (en) Prefabricated pier stud of assembled installation aligning device
CN107244449B (en) Flush baffle device
CN110797798A (en) A guide rope guiding device and unwrapping wire coaster for unwrapping wire coaster
CN210178366U (en) Scattered cable saddle portal system of narrow space tunnel anchor of super large inclination
CN204675726U (en) Purlin lifting auxiliary device
CN207177305U (en) Prefabricated beam stretching jack suspension door frame
CN113233369B (en) Construction equipment convenient to bridge member installation
CN212176670U (en) Contact net pillar protection device
CN201730055U (en) Bridge arch rib self-balancing construction mounting structure
CN209970667U (en) Roller type photovoltaic glass assembly platform
CN105752843A (en) Anti-shake gantry crane
CN210744607U (en) A guide rope guiding device and unwrapping wire coaster for unwrapping wire coaster
CN106223372B (en) A kind of mechanism for the lateral load that vertical load is converted into stake
CN211312220U (en) Tensioning equipment moving device
CN210926872U (en) Seven-wheel paying-off tackle
CN210086786U (en) Construction device for photovoltaic power station
CN219909327U (en) High-rise building steel construction convenient to installation
CN212187779U (en) Novel supporting structure of amusement equipment
CN105977868A (en) Y-type spanning device
CN216638597U (en) Elevator counterweight frame structure
CN219362774U (en) Assembled steel strand wires pay-off

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922