CN107190713A - Karst funnel reservoir and its flood-discharge tunnel and excavation method - Google Patents

Karst funnel reservoir and its flood-discharge tunnel and excavation method Download PDF

Info

Publication number
CN107190713A
CN107190713A CN201710606577.0A CN201710606577A CN107190713A CN 107190713 A CN107190713 A CN 107190713A CN 201710606577 A CN201710606577 A CN 201710606577A CN 107190713 A CN107190713 A CN 107190713A
Authority
CN
China
Prior art keywords
tunnel
karst funnel
intake
karst
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710606577.0A
Other languages
Chinese (zh)
Other versions
CN107190713B (en
Inventor
王俊杰
谭又曼
邱珍锋
赵天龙
赵迪
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongchang Tiangong Survey Group Co ltd
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201710606577.0A priority Critical patent/CN107190713B/en
Publication of CN107190713A publication Critical patent/CN107190713A/en
Application granted granted Critical
Publication of CN107190713B publication Critical patent/CN107190713B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • E02B9/02Water-ways
    • E02B9/06Pressure galleries or pressure conduits; Galleries specially adapted to house pressure conduits; Means specially adapted for use therewith, e.g. housings, valves, gates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of Karst funnel reservoir spillway tunnel, including the vertical shaft section being arranged in the periphery rock mass of Karst funnel, provided with intake tunnel section between the upper end of the vertical shaft section and Karst funnel side wall, water outlet Tunnel Section is provided between the lower end of the vertical shaft section and the free drainage passage of Karst funnel.The invention also discloses a kind of Karst funnel reservoir and a kind of construction method of Karst funnel reservoir spillway tunnel.The excavation method of the Karst funnel reservoir spillway tunnel of the present invention, first construction shaft mesopore in shaft excavation construction, full face tunneling vertical shaft, is conducive to the waste of shaft excavation to be transported from the water outlet tunnel excavated, improves the security and economy of vertical excavation construction again.

Description

Karst funnel reservoir and its flood-discharge tunnel and excavation method
Technical field
It is specifically a kind of Karst funnel reservoir and its flood-discharge tunnel and excavation the invention belongs to hydraulic engineering technical field Method.
Background technology
Karst funnel reservoir is a kind of new reservoir, is characterized in cutting off Karst funnel and its by storehouse bottom seal structure The contact of bottom free drainage passage, makes Karst funnel have retaining Cheng Ku after the function of storage surface water.Due to Karst funnel Periphery usually not surface drainage is distributed, and the release floodwatering flow of Karst funnel reservoir can not be directly discharged into periphery surface drainage, therefore, Just turn into suitable selection using the free drainage passage flood discharge of Karst funnel bottom, sometimes even unique selection.
When the free drainage passage by the use of Karst funnel bottom is exported as release floodwatering flow, the flood releasing structure of reservoir leads to Often be arranged in the side wall rock mass of Karst funnel, such flood releasing structure belongs to flood-discharge tunnel, how to excavate flood-discharge tunnel just into One of key technical problem urgently to be resolved hurrily is built for flood releasing structure.
The content of the invention
In view of this, it is an object of the invention to provide a kind of Karst funnel reservoir and its flood-discharge tunnel and excavation method, The technical purpose of the excavation of Karst funnel reservoir spillway tunnel can be realized.
To reach above-mentioned purpose, the present invention provides following technical scheme:
Present invention firstly provides a kind of Karst funnel reservoir spillway tunnel, including it is perpendicular in the periphery rock mass of Karst funnel Well, is provided with intake tunnel, the lower end of the vertical shaft and the day of Karst funnel between the upper end of the vertical shaft and Karst funnel side wall Water outlet tunnel is provided between right drainage channel.
Further, the delivery port bottom surface elevation of the water outlet tunnel is not less than the elevation of Karst funnel free drainage passage.
The invention also provides a kind of Karst funnel reservoir, including for blocking the storehouse bottom of Karst funnel free drainage passage Formed for water storage and passed through between the periphery rock mass of the Karst funnel in plugging structure, the storehouse bottom seal structure and portion disposed thereon The storage area of antiseepage drain process;The intake structure for water intaking, the emptying for being vented storage area are provided with the storage area Building and Karst funnel reservoir spillway tunnel as described above;The water inlet of the intake tunnel is located at the storehouse bottom seal structure Top, and ordinary water level elevation of the water inlet elevation less than the storage area of the intake tunnel;The water outlet tunnel goes out The mouth of a river is located at the lower section of the storehouse bottom seal structure;The emptying building is arranged on the bottom of the storage area, the water intaking Building is arranged on the middle part of the storage area.
Further, the water inlet bottom surface elevation of the emptying building is equal to or slightly lower than the level of dead water height of the storage area Journey.
Further, aqueduct, and the intake elevation of the intake structure are connected with the intake structure Between the level of dead water elevation and ordinary water level elevation of the storage area.
The invention also provides a kind of excavation method of Karst funnel reservoir spillway tunnel, comprise the following steps:
1)Excavate intake tunnel:Intake tunnel, and root are excavated by design size using the excavation method of conventional rock hydraulic tunnel Country rock is reinforced according to actual conditions;
2)Excavate water outlet tunnel:Water outlet tunnel, and root are excavated by design size using the excavation method of conventional rock hydraulic tunnel Country rock is reinforced according to actual conditions;
3)Excavating shaft mesopore:The position for intending excavating shaft is found in the intake tunnel excavated, and using rig pore-forming side Method, pore-forming is drilled down into along the axis for intending excavating shaft, until penetrating the water outlet tunnel top surface excavated;
4)Excavating shaft:Since intend excavating shaft position top, from top to bottom excavating shaft until with going out for having excavated Water tunnel is connected and reaches design requirement, and country rock is reinforced according to actual conditions.
Further, the step 3)In, the diameter of the vertical shaft mesopore determines in order to be slagged tap from hole for principle.
Further, the step 4)In, the waste that excavating shaft is produced is sent to by the vertical shaft mesopore excavated have been excavated Water outlet tunnel after transport.
The beneficial effects of the present invention are:
The excavation method of the Karst funnel reservoir spillway tunnel of the present invention, first construction shaft mesopore in shaft excavation construction, then entirely Section excavation vertical shaft, is conducive to the waste of shaft excavation to be transported from the water outlet tunnel excavated, improves vertical excavation construction Security and economy.
Brief description of the drawings
In order that the purpose of the present invention, technical scheme and beneficial effect are clearer, the present invention provides drawings described below and carried out Explanation:
Fig. 1 is the three-dimensional construction schematic diagram of the excavation method of Karst funnel reservoir spillway tunnel of the present invention;
Fig. 2 is step 1)Structural representation after excavation;
Fig. 3 is step 2)Structural representation after excavation;
Fig. 4 is step 3)Structural representation after excavation;
Fig. 5 is step 4)Structural representation after excavation;
Fig. 6 is the flow chart of the excavation method of the present embodiment Karst funnel reservoir spillway tunnel.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, so that those skilled in the art can be with It is better understood from the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
As shown in figure 1, a kind of targeted Karst funnel of the excavation method of the present embodiment Karst funnel reservoir spillway tunnel Reservoir, including for blocking the storehouse bottom seal structure of Karst funnel free drainage passage, the storehouse bottom seal structure is with being located at it Formed between the periphery rock mass of the Karst funnel on top for water storage and through the storage area of antiseepage drain process;Set in the storage area There are the intake structure for water intaking, the emptying building for being vented storage area and the Karst funnel reservoir spillway for flood discharge Tunnel.The Karst funnel reservoir spillway tunnel of the present embodiment, including the vertical shaft in the periphery rock mass of Karst funnel, it is described perpendicular Intake tunnel, the lower end of the vertical shaft and the free drainage passage of Karst funnel are provided between the upper end of well and Karst funnel side wall Between be provided with water outlet tunnel.And the delivery port bottom surface elevation of water outlet tunnel is not less than the elevation of Karst funnel free drainage passage.
The water inlet of the intake tunnel is located at the storehouse bottom seal superstructure, and the water inlet of the intake tunnel is high Journey is less than the ordinary water level elevation of the storage area;The delivery port of the water outlet tunnel is located under the storehouse bottom seal structure Side;The emptying building is arranged on the bottom of the storage area, and the intake structure is arranged on the middle part of the storage area. The water inlet bottom surface elevation for being vented building is equal to or slightly lower than the level of dead water elevation of the storage area.On the intake structure Be connected with aqueduct, and the intake structure intake elevation be located at the level of dead water elevation of the storage area with it is normal Between water level elevation.
Specifically, the excavation method of the Karst funnel reservoir spillway tunnel of the present embodiment, comprises the following steps:
1)Excavate intake tunnel:Intake tunnel, and root are excavated by design size using the excavation method of conventional rock hydraulic tunnel Country rock is reinforced according to actual conditions;
2)Excavate water outlet tunnel:Water outlet tunnel, and root are excavated by design size using the excavation method of conventional rock hydraulic tunnel Country rock is reinforced according to actual conditions;
3)Excavating shaft mesopore:The position for intending excavating shaft is found in the intake tunnel excavated, and using rig pore-forming side Method, pore-forming is drilled down into along the axis for intending excavating shaft, until penetrating the water outlet tunnel top surface excavated;The vertical shaft mesopore Diameter determines in order to be slagged tap from hole for principle;
4)Excavating shaft:Since intend excavating shaft position top, from top to bottom excavating shaft until with going out for having excavated Water tunnel is connected and reaches design requirement, and country rock is reinforced according to actual conditions;The waste that excavating shaft is produced is by having excavated Vertical shaft mesopore is transported after being sent to the water outlet tunnel excavated.
In addition, flood-discharge tunnel excavation construction can not block the natural of Karst funnel bottom because of construction interim measure or waste etc. Drainage channel.
The excavation method of the Karst funnel reservoir spillway tunnel of the present embodiment, in shaft excavation construction in first construction shaft Hole, then full face tunneling vertical shaft, are conducive to the waste of shaft excavation to be transported from the water outlet tunnel excavated, improve vertical excavation The security and economy of construction.
Embodiment described above is only the preferred embodiment to absolutely prove the present invention and being lifted, protection model of the invention Enclose not limited to this.Equivalent substitute or conversion that those skilled in the art are made on the basis of the present invention, in the present invention Protection domain within.Protection scope of the present invention is defined by claims.

Claims (8)

1. a kind of Karst funnel reservoir spillway tunnel, it is characterised in that:Including the vertical shaft in the periphery rock mass of Karst funnel, Intake tunnel, the lower end of the vertical shaft and the natural row of Karst funnel are provided between the upper end of the vertical shaft and Karst funnel side wall Water outlet tunnel is provided between aquaporin.
2. Karst funnel reservoir spillway tunnel according to claim 1, it is characterised in that:The delivery port bottom of the water outlet tunnel Face elevation is not less than the elevation of Karst funnel free drainage passage.
3. a kind of Karst funnel reservoir, it is characterised in that:Including the storehouse bottom seal for blocking Karst funnel free drainage passage Formed between the periphery rock mass of the Karst funnel in structure, the storehouse bottom seal structure and portion disposed thereon for water storage and through antiseepage The storage area of drain process;The intake structure for water intaking, the emptying for being vented storage area is provided with the storage area to build Thing and Karst funnel reservoir spillway tunnel as claimed in claim 1 or 2;The water inlet of the intake tunnel is located at the storehouse underseal Stifled superstructure, and ordinary water level elevation of the water inlet elevation less than the storage area of the intake tunnel;The water outlet tunnel The delivery port in hole is located at the lower section of the storehouse bottom seal structure;The emptying building is arranged on the bottom of the storage area, institute State the middle part that intake structure is arranged on the storage area.
4. Karst funnel reservoir according to claim 3, it is characterised in that:The water inlet bottom surface of the emptying building is high Journey is equal to or slightly lower than the level of dead water elevation of the storage area.
5. the Karst funnel reservoir according to claim 3 or 4, it is characterised in that:It is connected with the intake structure Aqueduct, and the intake elevation of the intake structure is located at level of dead water elevation and the ordinary water level elevation of the storage area Between.
6. a kind of excavation method of Karst funnel reservoir spillway tunnel as claimed in claim 1 or 2, it is characterised in that:Including such as Lower step:
1)Excavate intake tunnel:Intake tunnel, and root are excavated by design size using the excavation method of conventional rock hydraulic tunnel Country rock is reinforced according to actual conditions;
2)Excavate water outlet tunnel:Water outlet tunnel, and root are excavated by design size using the excavation method of conventional rock hydraulic tunnel Country rock is reinforced according to actual conditions;
3)Excavating shaft mesopore:The position for intending excavating shaft is found in the intake tunnel excavated, and using rig pore-forming side Method, pore-forming is drilled down into along the axis for intending excavating shaft, until penetrating the water outlet tunnel top surface excavated;
4)Excavating shaft:Since intend excavating shaft position top, from top to bottom excavating shaft until with going out for having excavated Water tunnel is connected and reaches design requirement, and country rock is reinforced according to actual conditions.
7. the excavation method of Karst funnel reservoir spillway tunnel according to claim 6, it is characterised in that:The step 3) In, the diameter of the vertical shaft mesopore determines in order to be slagged tap from hole for principle.
8. the excavation method of Karst funnel reservoir spillway tunnel according to claim 7, it is characterised in that:The step 4) In, the waste that excavating shaft is produced is transported after being sent to the water outlet tunnel excavated by the vertical shaft mesopore excavated.
CN201710606577.0A 2017-07-24 2017-07-24 Karst funnel reservoir and flood discharge tunnel and excavation method thereof Active CN107190713B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710606577.0A CN107190713B (en) 2017-07-24 2017-07-24 Karst funnel reservoir and flood discharge tunnel and excavation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710606577.0A CN107190713B (en) 2017-07-24 2017-07-24 Karst funnel reservoir and flood discharge tunnel and excavation method thereof

Publications (2)

Publication Number Publication Date
CN107190713A true CN107190713A (en) 2017-09-22
CN107190713B CN107190713B (en) 2020-02-14

Family

ID=59884032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710606577.0A Active CN107190713B (en) 2017-07-24 2017-07-24 Karst funnel reservoir and flood discharge tunnel and excavation method thereof

Country Status (1)

Country Link
CN (1) CN107190713B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755622A (en) * 2018-07-25 2018-11-06 中国水利水电第十四工程局有限公司 A kind of excavation method of large-diameter circular cartridge type down stream surge-chamber

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130236251A1 (en) * 2011-10-18 2013-09-12 Eric W. Smith Rock bolt sealing system
CN104110012A (en) * 2014-07-28 2014-10-22 中国电建集团西北勘测设计研究院有限公司 Low-permeability rock-fill material concrete panel rock-fill dam

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130236251A1 (en) * 2011-10-18 2013-09-12 Eric W. Smith Rock bolt sealing system
CN104110012A (en) * 2014-07-28 2014-10-22 中国电建集团西北勘测设计研究院有限公司 Low-permeability rock-fill material concrete panel rock-fill dam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴明洋: ""刘家沟面板堆石坝坝体设计与运行期应力变形研", 《中国优秀硕士学位论文全文数据库(电子期刊)》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755622A (en) * 2018-07-25 2018-11-06 中国水利水电第十四工程局有限公司 A kind of excavation method of large-diameter circular cartridge type down stream surge-chamber
CN108755622B (en) * 2018-07-25 2023-05-09 中国水利水电第十四工程局有限公司 Excavation method of large-diameter cylindrical tail water pressure regulating chamber

Also Published As

Publication number Publication date
CN107190713B (en) 2020-02-14

Similar Documents

Publication Publication Date Title
CN203947484U (en) A kind of drainage of foundation pit and circulating water utilization system
CN105178289A (en) Prefabricated downcast pipe pile in building foundation pit and use method thereof
CN103266594A (en) Slide-resistant pile
CN205875194U (en) Pouring jacket cofferdam bearing platform structure
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN105696543B (en) A kind of method that dam front row is seeped when red mud dump constructs sub- dam
CN206829179U (en) A kind of retaining wall structure
CN205012325U (en) Prefabricated precipitation tubular pile in building foundation
CN107190713A (en) Karst funnel reservoir and its flood-discharge tunnel and excavation method
CN107268547B (en) Karst funnel reservoir and flood discharge building and construction method thereof
CN204940314U (en) A kind of bellend pressure reduction well and deep foundation ditch structure thereof
CN207498973U (en) A kind of power station grout curtain cuts dirty drainage tube
CN203757177U (en) Mud sand sludge area manual pipe jacking construction device
CN110185051A (en) Deep narrow excavation water discharge method
CN206647046U (en) A kind of PHC pipe piles core device native clearly
CN104975610A (en) Expanded-end decompression well, deep foundation pit structure and construction method for expanded-end decompression well
CN210621642U (en) Drainage structure for high-speed flow area of stilling pool
CN207228137U (en) Light well point collector pipe available for hydraulic flushing in hole
CN207211173U (en) CFRD reverse drainage system
CN207376762U (en) A kind of flood control electricity row station
CN203096696U (en) High and low composite backwater weir
CN202450511U (en) Grouting device
CN206721903U (en) Hybrid negative-pressure vacuum dewatering well
CN107503331A (en) Karst funnel reservoir and its well formula flood releasing structure and construction method
CN205975651U (en) Ultradeep foundation pit just strides outer wall french drain drainage structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230310

Address after: Room C7-101, Type C R&D and Production Plant, Saville International Enterprise Town, No. 1388, Jingkai Avenue, Nanchang Economic and Technological Development Zone, Nanchang City, Jiangxi Province, 330052

Patentee after: Zhongchang Tiangong Survey Group Co.,Ltd.

Address before: 400074 Chongqing Jiaotong University, 66 Avenue, Nan'an District, Chongqing

Patentee before: CHONGQING JIAOTONG University

TR01 Transfer of patent right