CN107190133B - A kind of preparation method of drug broken shaft - Google Patents

A kind of preparation method of drug broken shaft Download PDF

Info

Publication number
CN107190133B
CN107190133B CN201710402053.XA CN201710402053A CN107190133B CN 107190133 B CN107190133 B CN 107190133B CN 201710402053 A CN201710402053 A CN 201710402053A CN 107190133 B CN107190133 B CN 107190133B
Authority
CN
China
Prior art keywords
broken shaft
crushing cutter
broken
finished product
crushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710402053.XA
Other languages
Chinese (zh)
Other versions
CN107190133A (en
Inventor
张妮
韩宁宁
王文娟
聂玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Zhicheng Accounting Service Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710402053.XA priority Critical patent/CN107190133B/en
Publication of CN107190133A publication Critical patent/CN107190133A/en
Application granted granted Critical
Publication of CN107190133B publication Critical patent/CN107190133B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/28Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for plain shafts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D27/00Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting
    • B22D27/02Use of electric or magnetic effects
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/002Heat treatment of ferrous alloys containing Cr
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/005Heat treatment of ferrous alloys containing Mn
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/007Heat treatment of ferrous alloys containing Co
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/008Heat treatment of ferrous alloys containing Si
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D2221/00Treating localised areas of an article
    • C21D2221/02Edge parts
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Abstract

The present invention relates to a kind of preparation methods of drug broken shaft, including annealing after smelting, molding, deep cooling, selective hardening, tempering and finishing, pass through the reasonable setting to each step so that broken shaft hardness gets a promotion, and in the case where not increasing cost, the hardness of crushing cutter working face is substantially increased.While the form by rationally limiting crushing cutter so that it is more durable and durable.

Description

A kind of preparation method of drug broken shaft
Technical field
The invention belongs to medical instruments and alloy Field of Heat-treatment, and in particular to a kind of preparation method of drug broken shaft.
Background technology
In Medicines production process, the processing step that broken right and wrong are usually advised, but not right at present broken Crusher members make an exhaustive study, by the existing crusher members used find after studying in detail, existing broken portion Part much also has comparable hardness mostly all using conventional glass hard steel due to having in pharmaceutical raw material, When being crushed these pharmaceutical raw materials, it is easy to damage crusher members.There are also accurate crusher members to use hard Alloy(Such as WC-Co classes), but this series hard alloy price general charged is very high, using such hard alloy as drug The slightly aobvious waste of crusher members.Therefore it is not very high for how developing a kind of cost, but the good drug of crushing effect is crushed portion Part, which just becomes, attains problem to be solved.
Invention content
A kind of preparation method of drug broken shaft of proposition of the present invention.
It is realized by following technological means:
A kind of preparation method of drug broken shaft, the drug broken shaft include broken shaft body, spiral crushing knife, top Bearing and bottom end bearing.
The top bearing and bottom end bearing are located on the both ends of the broken shaft body respectively, and the broken shaft body is Cylinder, the spiral crushing knife be looped around in a manner of downward spiral in the broken shaft body and with the broken shaft sheet Body by integral forming.
The spiral crushing knife is crushing cutter surface side close to the face of top bearing side(Groundwork face), close to bottom end axis The face held is crushing cutter back side(Underwork face), the radian of the crushing cutter surface side is less than the radian of the crushing cutter back side; Crushing cutter middle-end is that the radian of two respective arcs in side changes node, which is divided into crushing cutter section broken Point of a knife end and crushing cutter butt, the radian at the crushing cutter tip are more than the radian of crushing cutter butt, the crushing cutter butt with The broken shaft body is connected.
The broken shaft body and spiral crushing knife are molded after smelting using hard alloy steel and are integrally formed.
The heat treatment of following steps is used after mold casting forming.
(1)Annealing, by after mold casting forming broken shaft body and spiral crushing knife semi-finished product be transported in annealing furnace, with Stove heat keeps the temperature 1 ~ 2 hour, then cools to room temperature with the furnace to 830 ~ 860 DEG C.
(2)Micro- deep cooling:By step(1)Semi-finished product after processing, which are transported in deep cooling box, is cooled to -92 ~ -118 DEG C, holds Continue insurance 25 ~ 35min of temperature, then goes out deep cooling box and restores to room temperature.
(3)Selective hardening:By step(2)Semi-finished product after processing are transported in vaccum sensitive stove and are heated to 1080 ~ 1105 DEG C, 15 ~ 25min is kept the temperature, then sprays water with high pressure to crushing cutter surface side, waits for that entire semi-finished product are cooled to 100 ~ 150 DEG C After terminate to spray water, be integrally placed in quenching oil and be cooled to room temperature.
(4)Tempering:By step(3)Obtained semi-finished product are returned and are set in vaccum sensitive stove, with stove heat to 500 ~ 520 DEG C, Heat preservation 1 ~ 2 hour, then comes out of the stove and is air-cooled to room temperature.
(5)Finishing:By step(4)Semi-finished product after processing obtain broken shaft sheet after trimming, polishing, finishing processing The finished product that body and spiral crushing knife are integrated.
Preferably, the ratio L between crushing cutter butt length and crushing cutter tip length:L1=(1~1.2):(0.8~ 1).
Preferably, step(3)In spray water with high pressure, the temperature sprayed water is maintained at 25 ~ 35 DEG C.
Preferably, content is calculated as the hard alloy steel by mass percentage:C:0.6 ~ 0.9%, Si:0.3 ~ 0.6%, Mn:0.8 ~ 1.2%, Cr:5 ~ 6%, Mo:6 ~ 8%, W:2 ~ 5%, Ti:0.3 ~ 0.5%, Nb:0.1 ~ 0.2%, Co:0.1 ~ 0.2%, P< 0.02%, S<0.01%, La:0.05 ~ 0.1%, surplus is Fe and inevitable impurity, and the TiC and NbC in its microstructure Hardening constituent particle disperse is in matrix.
Preferably, during the molding during broken shaft is provided at both ends with Electric Pulse Treatment device to molding Broken shaft carry out Electric Pulse Treatment, wherein electrical impulse frequency is 90 ~ 260Hz, and pulsewidth is 20 ~ 120 μ s, and peak current density is 60~220A·mm-2, processing time is to continue 10 ~ 25s after casting is sealed.
Preferably, described spray water with high pressure as periodical water spray, spray water at interval of 0.5 ~ 1.2s, 1 ~ 2min of water spray duration.
Effect of the invention is that:
1, by containing dimension to specific components(The especially wherein addition of Ti alloying elements and content setting)Carry out specific heat Processing carries out part especially for crushing cutter surface side and is quickly cooled down, during spraying water with high pressure, due to the temperature of crushing cutter surface side Degree is dramatic decrease, but alloy is the good conductor of heat, and other parts are not sprayed water, so heat is above at this, from And meeting transfer of heat is at this and again so that the temperature at this increases, to realize the quick reduction-of temperature at this slightly Rise-continuation quickly reduces-slightly gos up again such durations variation, so as to crystal grain in the microstructure by the face More refinement, TiC, NbC hard phase disperse are more uniform(If whole water-spraying control, although can also improve hardness, due to There is no periodic temperature change, to which hard phase disperse will not be made uniform, and degree of grain refinement is also slightly owed It lacks).And crushing cutter surface side be with solid medicine raw material principal contact surfaces so that the surface side hardness and wearability obtain by force Change.Pass through detection, the hardness of surface side(300℃)HRC>62, it is highest to reach 69HRC.
2, it is configured by the shape to crushing cutter, vertical section top radian is more than root, so that when broken Time will not generate entire knife contact surface larger stress concentration, and since what is be crushed is block stock, it is only necessary to tip foot It is enough hard, too big acute angle is not needed to, to both protect blade to nor affect on normal work intensity.Pass through opposite side Radian is set smaller than back side radian so that main working face was more strengthened contacts with block stocks more as possible.Due to Surface side is by reinforcing, therefore more contact instead can the entire crushing cutter of further protection(Especially back side).Pass through The length at crushing cutter tip and butt is defined so that radian variation is happened at as possible by subapical position, is avoided Tip is too sharp to which the generation of tip breakage problem occur.
3, by the way that the electric pulse of suitable parameters is arranged at both ends when molding so that during casting solidification, compared with Big dendrite portions are smashed by electric pulse, to form new forming core core so that subsequent heat treatment continues crystal grain thinning and accomplishes fluently Basis.It is heat-treated by reasonable set, coordinates above-mentioned molding electric pulse technique, crystalline substance has further been refined during deep cooling Grain so that steel integral strength is improved, and hardness is strengthened, in conjunction with selective hardening so that internal heat is flowed It is dynamic, the efficiency of heat treatment is enhanced, it is to which Electric Pulse Treatment and heat treatment preferably organically combine, the intensity of steel and hardness is big Big improves.The hardness of back side has also reached 62 HRC(300℃)Left and right.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of drug broken shaft of the present invention.
Fig. 2 is the broken section structural schematic diagram of crushing cutter in broken shaft of the present invention.
Wherein:1- is crushed shaft body, 11- spiral crushing knives, 111- crushing cutter butts, 112- crushing cutters tip, and 113- is broken Broken knife middle-end, 114- crushing cutter back sides, 115- crushing cutters surface side, the tops 12- bearing, the bottom ends 13- bearing, L- crushing cutter butts are long Degree, L1Crushing cutter tip length.
Specific implementation mode
Embodiment 1
As depicted in figs. 1 and 2:
A kind of preparation method of drug broken shaft, the drug broken shaft include broken shaft body, spiral crushing knife, top Bearing and bottom end bearing.
The top bearing and bottom end bearing are located on the both ends of the broken shaft body respectively, and the broken shaft body is Cylinder, the spiral crushing knife be looped around in a manner of downward spiral in the broken shaft body and with the broken shaft sheet Body by integral forming.
The spiral crushing knife is crushing cutter surface side close to the face of top bearing side(Groundwork face), close to bottom end axis The face held is crushing cutter back side(Underwork face), the radian of the crushing cutter surface side is less than the radian of the crushing cutter back side; Crushing cutter middle-end is that the radian of two respective arcs in side changes node, which is divided into crushing cutter section broken Point of a knife end and crushing cutter butt, the radian at the crushing cutter tip are more than the radian of crushing cutter butt, the crushing cutter butt with The broken shaft body is connected.
Ratio L between crushing cutter butt length and crushing cutter tip length:L1=1:0.9.
The broken shaft body and spiral crushing knife are molded after smelting using hard alloy steel and are integrally formed.
Content is calculated as the hard alloy steel by mass percentage:C:0.62%, Si:0.38%, Mn:0.9%, Cr:5.2%, Mo:6.1%, W:2.5%, Ti:0.32%, Nb:0.12%, Co:0.13%, P:0.01%, S:0.005%, La:0.062%, surplus Fe With inevitable impurity, and in the microstructure of its finished product the particle disperse of TiC and NbC hardening constituents in matrix.
During the molding broken shaft of the Electric Pulse Treatment device to molding during is provided at both ends in broken shaft Electric Pulse Treatment is carried out, wherein electrical impulse frequency is 120Hz, and pulsewidth is 30 μ s, peak current density 80Amm-2, when processing Between for casting sealing after continue 15s.
The heat treatment of following steps is used after mold casting forming.
(1)Annealing, by after mold casting forming broken shaft body and spiral crushing knife semi-finished product be transported in annealing furnace, with Stove heat keeps the temperature 1.2 hours, then cools to room temperature with the furnace to 838 DEG C.
(2)Micro- deep cooling:By step(1)Semi-finished product after processing, which are transported in deep cooling box, is cooled to -98 DEG C, lasting to keep the temperature Then 28min goes out deep cooling box and restores to room temperature.
(3)Selective hardening:By step(2)Semi-finished product after processing, which are transported in vaccum sensitive stove, is heated to 1092 DEG C, 18min is kept the temperature, is then sprayed water with high pressure to crushing cutter surface side, terminates water spray after entire semi-finished product are cooled to 115 DEG C, it is whole It is placed in quenching oil and is cooled to room temperature.
In wherein spraying water with high pressure, the temperature sprayed water is maintained at 28 DEG C.
It is described to spray water with high pressure as periodical water spray, water spray duration 1.5min primary at interval of 1s water sprays.
(4)Tempering:By step(3)Obtained semi-finished product are returned and are set in vaccum sensitive stove, with stove heat to 508 DEG C, heat preservation It 1.5 hours, then comes out of the stove and is air-cooled to room temperature.
(5)Finishing:By step(4)Semi-finished product after processing obtain broken shaft sheet after trimming, polishing, finishing processing The finished product that body and spiral crushing knife are integrated.
Comparative example 1
This comparative example cancels electric pulse, and quenching is set as integral quenching, obtains final products and embodiment 1 and carries out pair Than, after 20 hours impact tests, obtains the abrasion of this comparative example crushing cutter and destroy 1.5 times that size is embodiment 1, damage Rate is 1.3 times of embodiment 1.
Embodiment 2
As depicted in figs. 1 and 2:
A kind of preparation method of drug broken shaft, the drug broken shaft include broken shaft body, spiral crushing knife, top Bearing and bottom end bearing.
The top bearing and bottom end bearing are located on the both ends of the broken shaft body respectively, and the broken shaft body is Cylinder, the spiral crushing knife be looped around in a manner of downward spiral in the broken shaft body and with the broken shaft sheet Body by integral forming.
The spiral crushing knife is crushing cutter surface side close to the face of top bearing side(Groundwork face), close to bottom end axis The face held is crushing cutter back side(Underwork face), the radian of the crushing cutter surface side is less than the radian of the crushing cutter back side; Crushing cutter middle-end is that the radian of two respective arcs in side changes node, which is divided into crushing cutter section broken Point of a knife end and crushing cutter butt, the radian at the crushing cutter tip are more than the radian of crushing cutter butt, the crushing cutter butt with The broken shaft body is connected.
Ratio L between crushing cutter butt length and crushing cutter tip length:L1=1.1:0.85.
The broken shaft body and spiral crushing knife are molded after smelting using hard alloy steel and are integrally formed.
Content is calculated as the hard alloy steel by mass percentage:C:0.8%, Si:0.52%, Mn:1.1%, Cr:5.8%, Mo:6.9%, W:3.8%, Ti:0.36%, Nb:0.18%, Co:0.19%, P:0.012%, S:0.001%, La:0.09%, surplus Fe With inevitable impurity, and in its microstructure the particle disperse of TiC and NbC hardening constituents in matrix.
During the molding broken shaft of the Electric Pulse Treatment device to molding during is provided at both ends in broken shaft Electric Pulse Treatment is carried out, wherein electrical impulse frequency is 220Hz, and pulsewidth is 100 μ s, peak current density 210Amm-2, processing Time is lasting 22s after casting sealing.
The heat treatment of following steps is used after mold casting forming.
(1)Annealing, by after mold casting forming broken shaft body and spiral crushing knife semi-finished product be transported in annealing furnace, with Stove heat keeps the temperature 1.3 hours, then cools to room temperature with the furnace to 852 DEG C.
(2)Micro- deep cooling:By step(1)Semi-finished product after processing, which are transported in deep cooling box, is cooled to -105 DEG C, lasting to protect Then warm 32min goes out deep cooling box and restores to room temperature.
(3)Selective hardening:By step(2)Semi-finished product after processing, which are transported in vaccum sensitive stove, is heated to 1100 DEG C, 22min is kept the temperature, is then sprayed water with high pressure to crushing cutter surface side, terminates water spray after entire semi-finished product are cooled to 138 DEG C, it is whole It is placed in quenching oil and is cooled to room temperature.
In wherein spraying water with high pressure, the temperature sprayed water is maintained at 32 DEG C.
It is described to spray water with high pressure as periodical water spray, it sprays water at interval of 0.8s, water spray duration 1.5min.
(4)Tempering:By step(3)Obtained semi-finished product are returned and are set in vaccum sensitive stove, with stove heat to 512 DEG C, heat preservation It 1.8 hours, then comes out of the stove and is air-cooled to room temperature.
(5)Finishing:By step(4)Semi-finished product after processing obtain broken shaft sheet after trimming, polishing, finishing processing The finished product that body and spiral crushing knife are integrated.
Comparative example 2
This comparative example other parts and embodiment 2 are identical, the difference is that without adding Ti, and heat in hard alloy steel There is no subzero treatment in processing(Micro- deep cooling), obtain after finished product after 20 hours impact tests, obtaining this comparative example crushing cutter Abrasion size is 1.2 times of embodiment 1, and spoilage is 1.5 times of embodiment 1.
Embodiment 3
As depicted in figs. 1 and 2:
A kind of preparation method of drug broken shaft, the drug broken shaft include broken shaft body, spiral crushing knife, top Bearing and bottom end bearing.
The top bearing and bottom end bearing are located on the both ends of the broken shaft body respectively, and the broken shaft body is Cylinder, the spiral crushing knife be looped around in a manner of downward spiral in the broken shaft body and with the broken shaft sheet Body by integral forming.
The spiral crushing knife is crushing cutter surface side close to the face of top bearing side(Groundwork face), close to bottom end axis The face held is crushing cutter back side(Underwork face), the radian of the crushing cutter surface side is less than the radian of the crushing cutter back side; Crushing cutter middle-end is that the radian of two respective arcs in side changes node, which is divided into crushing cutter section broken Point of a knife end and crushing cutter butt, the radian at the crushing cutter tip are more than the radian of crushing cutter butt, the crushing cutter butt with The broken shaft body is connected.Ratio L between crushing cutter butt length and crushing cutter tip length:L1=1.1:1.
The broken shaft body and spiral crushing knife are molded after smelting using hard alloy steel and are integrally formed.
Content is calculated as the hard alloy steel by mass percentage:C:0.85%, Si:0.56%, Mn:1.0%, Cr:5.5%, Mo:6.6%, W:3.2%, Ti:0.35%, Nb:0.15%, Co:0.13%, P:0.008%, S:0.005%, La:0.08%, surplus Fe With inevitable impurity, and in its microstructure the particle disperse of TiC and NbC hardening constituents in matrix.
During the molding broken shaft of the Electric Pulse Treatment device to molding during is provided at both ends in broken shaft Electric Pulse Treatment is carried out, wherein electrical impulse frequency is 120Hz, and pulsewidth is 90 μ s, peak current density 120Amm-2, processing Time is to continue 20 after casting is sealed.
The heat treatment of following steps is used after mold casting forming.
(1)Annealing, by after mold casting forming broken shaft body and spiral crushing knife semi-finished product be transported in annealing furnace, with Stove heat keeps the temperature 1.5 hours, then cools to room temperature with the furnace to 850 DEG C.
(2)Micro- deep cooling:By step(1)Semi-finished product after processing, which are transported in deep cooling box, is cooled to -102 DEG C, lasting to protect Then warm 20min goes out deep cooling box and restores to room temperature.
(3)Selective hardening:By step(2)Semi-finished product after processing, which are transported in vaccum sensitive stove, is heated to 1092 DEG C, 20min is kept the temperature, is then sprayed water with high pressure to crushing cutter surface side, terminates water spray after entire semi-finished product are cooled to 130 DEG C, it is whole It is placed in quenching oil and is cooled to room temperature.
In wherein spraying water with high pressure, the temperature sprayed water is maintained at 20 DEG C.
(4)Tempering:By step(3)Obtained semi-finished product are returned and are set in vaccum sensitive stove, with stove heat to 511 DEG C, heat preservation It 1.5 hours, then comes out of the stove and is air-cooled to room temperature.
(5)Finishing:By step(4)Semi-finished product after processing obtain broken shaft sheet after trimming, polishing, finishing processing The finished product that body and spiral crushing knife are integrated.

Claims (6)

1. a kind of preparation method of drug broken shaft, which is characterized in that the drug broken shaft is broken including broken shaft body, spiral Broken knife, top bearing and bottom end bearing;
The top bearing and bottom end bearing are located on the both ends of the broken shaft body respectively, and the broken shaft body is cylinder Shape, the spiral crushing knife be looped around in a manner of downward spiral in the broken shaft body and with the broken shaft body one It is body formed;
The spiral crushing knife is crushing cutter surface side close to the face of top bearing side, is broken knife spine close to the face of bottom end bearing Side, the crushing cutter surface side are main working face, and the crushing cutter back side is underwork face, the radian of the crushing cutter surface side Less than the radian of the crushing cutter back side;Crushing cutter middle-end is that the radian of two respective arcs in side changes node, this is broken Crushing cutter section is divided into crushing cutter tip and crushing cutter butt by knife middle-end, and the radian at the crushing cutter tip is more than crushing cutter root The radian at end, the crushing cutter butt are connected with the broken shaft body;
The broken shaft body and spiral crushing knife are molded after smelting using hard alloy steel and are integrally formed;
The heat treatment of following steps is used after mold casting forming:
(1)Annealing, by after mold casting forming broken shaft body and spiral crushing knife semi-finished product be transported in annealing furnace, with stove plus Heat keeps the temperature 1 ~ 2 hour, then cools to room temperature with the furnace to 830 ~ 860 DEG C;
(2)Micro- deep cooling:By step(1)Semi-finished product after processing, which are transported in deep cooling box, is cooled to -92 ~ -118 DEG C, lasting to protect 25 ~ 35min of temperature, then goes out deep cooling box and restores to room temperature;
(3)Selective hardening:By step(2)Semi-finished product after processing, which are transported in vaccum sensitive stove, is heated to 1080 ~ 1105 DEG C, 15 ~ 25min is kept the temperature, is then sprayed water with high pressure to crushing cutter surface side, terminates spray after entire semi-finished product are cooled to 100 ~ 150 DEG C Water is integrally placed in quenching oil and is cooled to room temperature;
(4)Tempering:By step(3)Obtained semi-finished product are returned and are set in vaccum sensitive stove, with stove heat to 500 ~ 520 DEG C, heat preservation 1 It ~ 2 hours, then comes out of the stove and is air-cooled to room temperature;
(5)Finishing:By step(4)Semi-finished product after processing obtained after trimming, polishing, finishing processing broken shaft body and The finished product that spiral crushing knife is integrated.
2. the preparation method of drug broken shaft according to claim 1, which is characterized in that crushing cutter butt length with it is broken Ratio L between knife tip length:L1=(1~1.2):(0.8~1).
3. the preparation method of drug broken shaft according to claim 1, which is characterized in that step(3)In spray water with high pressure In, the temperature sprayed water is maintained at 25 ~ 35 DEG C.
4. the preparation method of drug broken shaft according to claim 1, which is characterized in that the hard alloy steel presses quality Degree is calculated as:C:0.6 ~ 0.9%, Si:0.3 ~ 0.6%, Mn:0.8 ~ 1.2%, Cr:5 ~ 6%, Mo:6 ~ 8%, W:2 ~ 5%, Ti: 0.3 ~ 0.5%, Nb:0.1 ~ 0.2%, Co:0.1 ~ 0.2%, P<0.02%, S<0.01%, La:0.05 ~ 0.1%, surplus is Fe and can not The impurity avoided, and in its microstructure the particle disperse of TiC and NbC hardening constituents in matrix.
5. the preparation method of drug broken shaft according to claim 1, which is characterized in that broken during the molding Broken axis is provided at both ends with Electric Pulse Treatment device and carries out Electric Pulse Treatment, wherein electrical impulse frequency to the broken shaft during molding For 90 ~ 260Hz, pulsewidth is 20 ~ 120 μ s, and peak current density is 60 ~ 220Amm-2, processing time is to continue after casting is sealed 10~25s。
6. the preparation method of drug broken shaft according to claim 1, which is characterized in that described to spray water with high pressure as periodicity Water spray is sprayed water at interval of 0.5 ~ 1.2s, 1 ~ 2min of water spray duration.
CN201710402053.XA 2017-06-01 2017-06-01 A kind of preparation method of drug broken shaft Expired - Fee Related CN107190133B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710402053.XA CN107190133B (en) 2017-06-01 2017-06-01 A kind of preparation method of drug broken shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710402053.XA CN107190133B (en) 2017-06-01 2017-06-01 A kind of preparation method of drug broken shaft

Publications (2)

Publication Number Publication Date
CN107190133A CN107190133A (en) 2017-09-22
CN107190133B true CN107190133B (en) 2018-09-04

Family

ID=59876086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710402053.XA Expired - Fee Related CN107190133B (en) 2017-06-01 2017-06-01 A kind of preparation method of drug broken shaft

Country Status (1)

Country Link
CN (1) CN107190133B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108570538B (en) * 2018-05-08 2019-10-08 胡方娟 A kind of hydraulic engineering device preparation method
CN108977740A (en) * 2018-08-08 2018-12-11 浙江中科河冶深冷科技有限公司 A kind of hard alloy strengthening treatment process method
CN110938738B (en) * 2019-11-22 2021-11-05 天水锻压机床(集团)有限公司 Heat treatment method of 800T gantry liquid-transferring press head and lifting appliance assembly for heat treatment

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2212881B1 (en) * 2002-04-01 2005-05-01 Grupo Tatoma, S.L. CUBA WITH DOUBLE BACKGROUND AND MIXING MACHINE FOR FEEDING.
CN100457952C (en) * 2007-06-26 2009-02-04 郑州航空工业管理学院 Casting high speed steel cutter and preparation method thereof
CN103757546B (en) * 2014-01-15 2015-10-07 上海晔川机械刀片有限公司 Wood-working machine tools peeler blade high alloy cutlery steel and heat processing technique thereof
CN106694153A (en) * 2016-12-23 2017-05-24 孝感市伊莱迦电子科技有限公司 High-efficient medicinal material processing equipment

Also Published As

Publication number Publication date
CN107190133A (en) 2017-09-22

Similar Documents

Publication Publication Date Title
CN107190133B (en) A kind of preparation method of drug broken shaft
RU96115917A (en) METHOD RELATING TO THE PRODUCTION OF COMPOSITE METAL PRODUCT
CN109971980A (en) The method for improving CrCoNi medium entropy alloy mechanical property using magnetic field
DE3811091A1 (en) METHOD FOR COMMANDING LOW CONTAMINATION OF SOLID, PIECE OF SILICONE
Mosallanejad et al. In-situ alloying of a fine grained fully equiaxed Ti-based alloy via electron beam powder bed fusion additive manufacturing process
EP1851350B1 (en) Method for casting titanium alloy
JPWO2020110891A1 (en) Molding powder
JP2006504868A5 (en)
Herrera et al. Effect of C content on the mechanical properties of solution treated as-cast ASTM F-75 alloys
CN111534721B (en) Co-Cr-Mo-N alloy and preparation method thereof
CN109468485A (en) A kind of preparation method of nanometer of endogenous TiC particle reinforced aluminum alloy plate
JP2003313612A (en) Process for producing grain-refined martensitic stainless steel and cutting tool using the stainless steel
CN101899634B (en) Method for eliminating elongated flaky Fe-enriched phase in aluminum alloy
CN108098062B (en) A kind of railroad sawing machine diamond saw blade and its production technology
US9101984B2 (en) High hardness, corrosion resistant PM Nitinol implements and components
JP6484086B2 (en) Method for producing tool steel castings
CN110117711A (en) A method of driving amorphous alloy is quickly rejuvenated
CN110923431A (en) Heat treatment method of hammer head steel casting
CN106011420B (en) A kind of preparation method of high uniformity mould steel
JPS62196324A (en) Manufacture of high carbon martensitic stainless steel suitable for quenching treatment
CN107075688B (en) Hot rolling titanium slab and its manufacturing method
CN115283595B (en) Martensite antibacterial stainless steel outdoor knife and preparation method thereof
CN106868431A (en) New material pedicle screw and its manufacture method
KR102046232B1 (en) Method for manufacturing blank for forming
CN104368755B (en) A kind of motor-car drives the casting technique of arm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Ni

Inventor after: Han Ningning

Inventor after: Wang Wenjuan

Inventor after: Nie Ling

Inventor before: Wang Wenjuan

Inventor before: Nie Ling

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180731

Address after: 266200 grade seven hospital, Jimo, Qingdao, Shandong

Applicant after: Zhang Ni

Address before: 101300 Beijing Shunyi District Shunyi District 12 Garden Road, TEDA Technology Park 1 Shunda Medical Technology Co., Ltd.

Applicant before: Wang Wenjuan

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201009

Address after: No. 910, unit 1, building 1, office building 2, Shimao Plaza, Yunlong District, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou Zhicheng Accounting Service Co.,Ltd.

Address before: 266200 Jimo City, Qingdao City, Shandong Province, seven level health hospital

Patentee before: Zhang Ni

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180904

CF01 Termination of patent right due to non-payment of annual fee