CN107187322A CN201710447459.XA CN201710447459A CN107187322A CN 107187322 A CN107187322 A CN 107187322A CN 201710447459 A CN201710447459 A CN 201710447459A CN 107187322 A CN107187322 A CN 107187322A
Authority
CN
China
Prior art keywords
train
pantograph
phase
information
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710447459.XA
Other languages
Chinese (zh)
Other versions
CN107187322B (en
Inventor
王位
刘华
许良中
张振华
陈哲
廖国强
郑维飞
易如方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Zhuzhou Locomotive Co Ltd
Original Assignee
CRRC Zhuzhou Locomotive Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Zhuzhou Locomotive Co Ltd filed Critical CRRC Zhuzhou Locomotive Co Ltd
Priority to CN201710447459.XA priority Critical patent/CN107187322B/en
Publication of CN107187322A publication Critical patent/CN107187322A/en
Application granted granted Critical
Publication of CN107187322B publication Critical patent/CN107187322B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L5/00Current collectors for power supply lines of electrically-propelled vehicles
    • B60L5/18Current collectors for power supply lines of electrically-propelled vehicles using bow-type collectors in contact with trolley wire
    • B60L5/22Supporting means for the contact bow
    • B60L5/28Devices for lifting and resetting the collector
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/02Details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Current-Collector Devices For Electrically Propelled Vehicles (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The guard method of split-phase bow net and device are crossed the invention discloses one kind, the split-phase bow net protection dress of crossing includes input module, control module and output module, and this, which crosses split-phase bow net guard method, includes:The input module sends the overconfidence number that train reaches phase-separating section to the control module;The control module is received after the overconfidence number, judges whether the train has two rising bow pantographs simultaneously in two overlaps of neutral section end, if it is, the control signal for controlling pantograph drop bow is sent to the output module;The output module sends the control signal to a pantograph, controls the pantograph drop bow.The purpose that the automatic protection for realizing bow net when train rising bow ran split-phase by the present invention is controlled.

Description

One kind crosses the guard method of split-phase bow net and device
Technical field
It is more particularly to a kind of to cross the guard method of split-phase bow net and dress the present invention relates to rail vehicles technical field Put.
Background technology
On railway is not to be provided by a power supply station by power network, and usually one power supply station is responsible for certain area The phase of electric current is not necessarily identical between domain, Liang Ge power supply stations, is not had so being one section between connection Liang Ge power supply stations power network Have " power network " of electricity, this section " power network " is referred to as split-phase, and train was referred to as split-phase by this section.In railway locomotive car Contact net net pressing type is divided into exchange standard and direct current standard in technical field, exchange standard two phase arms of contactor it Between need to be isolated by phase-separating section, in order to prevent the operation of train multiple pantograph rising bows from causing two phase arms of ac contactor net Between short circuit, the compatibility between pantograph and neutral section need to be accounted for.
At present, it is mainly what is solved by two ways for this problem:The first is to cross split-phase according to circuit Situation, determines that suitable train marshalling list ensures that pantograph is cut and meets actual track demand before train sets out;It is for second When train marshalling list rising bow pantograph spacing, which can not meet circuit, crosses split-phase demand, train operator's active operation controlling switch make by Pantograph drop bow passes through phase-separating section.But, first way needs to be adjusted marshalling according to the circuit used every time, compares consumption When effort, simultaneously for marshalling adjustment cause sizable workload;The second way has aggravated the labor intensity of driver, It is likely to occur simultaneously after driver's maloperation and serious influence is caused to bow net.
The content of the invention
Above mentioned problem is directed to, the present invention provides one kind and crosses the guard method of split-phase bow net and device, realizes train rising bow The purpose of the automatic protection control of bow net when running split-phase.
To achieve these goals, split-phase bow net guard method is crossed there is provided one kind according to the first aspect of the invention, should Method was applied to split-phase bow net protecting device, and the device includes input module, control module and output module, described to cross split-phase Bow net guard method includes:
The input module sends the overconfidence number that train reaches phase-separating section to the control module;
The control module is received after the overconfidence number, judges whether the train has two rising bow pantographs same When in two overlaps of neutral section end, if it is, by control pantograph drop bow control signal send to described Output module;
The output module sends the control signal to a pantograph, controls the pantograph drop bow.
It is preferred that, the split-phase bow net protecting device of crossing also included split-phase detection module, and this method also includes:
It is described to cross the electromagnetic signal that split-phase detection module senses ground by ground induction coil, whether judge the train Phase-separating section is reached, if it is, the overconfidence number for reaching phase-separating section is sent to the input module.
It is preferred that, the split-phase bow net protecting device of crossing also includes pantograph state-storage module and phase-separating section data storage Module, this method also includes:
The pantograph state-storage module sends the distance between the pantograph of acquisition information to the control module;
The phase-separating section data memory module will retrieve the current phase-separating section information passed through of the acquisition train and send to institute Control module is stated, wherein, the phase-separating section information includes the neutral segment length of the train actual motion section phase-separating section with Property section length.
It is preferred that, the split-phase bow net protecting device of crossing also includes network control module, information storage module and train control Molding block, this method also includes:
The network control module sends the quantity information of the voltage on line side signal of acquisition and rising bow pantograph to described Pantograph state-storage module;
Described information memory module sends the relevant information of the train to the pantograph state-storage module, its In, the relevant information of the train include the grouping information of train, the length information of train, the arrangement range information of pantograph and The threshold value information of train;
The Train Control module sends the current running section information of the train of acquisition to the phase-separating section data Memory module.
It is preferred that, the pantograph state-storage module also includes computing unit and transmitting element, the pantograph state Memory module sends the distance between the pantograph of acquisition information to the control module, including:
The computing unit is calculated according to the quantity information of the rising bow pantograph received and the relevant information of the train Obtain the distance between pantograph information;
The transmitting element sends the distance between pantograph information to the control module.
It is preferred that, the control module includes the first judging unit, the second judging unit, the 3rd judging unit and sets single Member, the control module is received after the overconfidence number, judges whether the train has two rising bow pantographs to exist simultaneously In two overlaps of neutral section end, if it is, the control signal for controlling pantograph drop bow is sent to the output Module, including:
When receiving overconfidence, whether first judging unit judges the train under AC network pressing type Operation, if it is, the operational mode that the train is run under AC network compacting is sent to second judging unit;
Second judging unit judges whether the train is multiple pantograph operations, if it is, will be the multiple The operation information of pantograph operation is sent to the 3rd judging unit;
The setting unit is believed according to the distance between the pantograph received information and the current running section of the train Breath, sets the default judgement bar for meeting described two rising bow pantographs of train simultaneously in two overlaps of neutral section end Part, wherein, the preparatory condition is the neutral segment length that the distance between two rising bow pantographs are not more than the phase-separating section, and And the distance between two rising bow pantographs are not less than the neutral section length of the phase-separating section;
3rd judging unit judges whether the rising bow pantograph of the train meets default Rule of judgment, if it is, Then the control signal for controlling pantograph drop bow is sent to the output module.
According to the second aspect of the invention there is provided one kind cross split-phase bow net protecting device, the device include input module, Control module and output module, wherein,
The input module, the overconfidence number for train to be reached to phase-separating section is sent to the control module;
The control module, for receiving after the overconfidence number, judge the train whether have two rising bows by Pantograph in two overlaps of neutral section end, is sent if it is, pantograph will be controlled to drop the control signal bent simultaneously To the output module;
The output module, for the control signal to be sent to a pantograph, controls the pantograph drop bow.
It is preferred that, the device also includes:
Split-phase detection module is crossed, the electromagnetic signal for sensing ground by ground induction coil judges that the train is No arrival phase-separating section, if it is, the overconfidence number for reaching phase-separating section is sent to the input module.
It is preferred that, the device also includes:
Pantograph state-storage module, for the distance between the pantograph of acquisition information to be sent to the control mould Block;
Phase-separating section data memory module, sends to institute for that will retrieve the current phase-separating section information passed through of the acquisition train Control module is stated, wherein, the phase-separating section information includes the neutral segment length of the train actual motion section phase-separating section with Property section length.
It is preferred that, the device also includes:
Network control module, for the quantity information of the voltage on line side signal of acquisition and rising bow pantograph to be sent to described Pantograph state-storage module;
Information storage module, for the relevant information of the train to be sent to the pantograph state-storage module, its In, the relevant information of the train include the grouping information of train, the length information of train, the arrangement range information of pantograph and The threshold value information of train;
Train Control module, for the current running section information of the train of acquisition to be sent to the phase-separating section data Memory module.
It is preferred that, the pantograph state-storage module also includes computing unit and transmitting element, wherein,
The computing unit, for the letter related to the train of the quantity information according to the rising bow pantograph received Breath, calculates and obtains the distance between pantograph information;
The transmitting element, for the distance between pantograph information to be sent to the control module.
It is preferred that, the control module includes the first judging unit, the second judging unit, the 3rd judging unit and sets single Member, wherein,
When receiving overconfidence, first judging unit, for judging the train whether in AC network pressure Run under standard, if it is, the operational mode that the train is run under AC network compacting sends to described second and judged Unit;
Second judging unit, for judging whether the train is multiple pantograph operations, if it is, will be described The operation information of multiple pantograph operations is sent to the 3rd judging unit;
The setting unit, for according to the distance between the pantograph received information and the current Operational Zone of the train Segment information, sets and meets described two rising bow pantographs of train default in two overlaps of neutral section end is sentenced simultaneously Broken strip part, wherein, the preparatory condition is the neutral segment length that the distance between two rising bow pantographs are not more than the phase-separating section Degree, and the distance between two rising bow pantographs are not less than the neutral section length of the phase-separating section;
3rd judging unit, for judging whether the rising bow pantograph of the train meets default Rule of judgment, such as Fruit is then to send the control signal for controlling pantograph drop bow to the output module.
Compared to prior art, the present invention obtains the overconfidence number that train reached phase-separating section by input module, so Judge whether the train there are two overlaps of two rising bow pantographs simultaneously in neutral section end by control module afterwards It is interior, if it is, the control signal for controlling pantograph drop bow is sent to the output module;Finally by output module by institute State control signal to send to a pantograph, control the pantograph drop bow.When the operation of train rising bow is interval by phase-separating section Without going to adjust form of train formation according to line condition, without the artificial operation of driver, pass through control module automatic decision Rising bow pantograph present position, is then controlled accordingly, realizes the purpose of the automatic protection control of bow net.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of structural representation for crossing split-phase bow net protecting device that the embodiment of the present invention one is provided;
Fig. 2 is a kind of schematic flow sheet for crossing split-phase bow net guard method that the embodiment of the present invention one is provided;
Fig. 3 is a kind of structural representation for crossing split-phase bow net protecting device that the embodiment of the present invention two is provided;
Train pantograph is apart from schematic diagram Fig. 4 is crosses split-phase in the embodiment of the present invention when.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Term " first " and " second " in description and claims of this specification and above-mentioned accompanying drawing etc. are to be used for area Not different objects, rather than for describing specific order.In addition term " comprising " and " having " and their any deformations, It is intended to cover non-exclusive include.For example contain the process of series of steps or unit, method, system, product or set It is standby not to be set in the step of having listed or unit, but the step of may include not list or unit.
Embodiment one
It is that a kind of of the offer of the embodiment of the present invention one crosses the structural representation of split-phase bow net protecting device referring to Fig. 1, and joins See a kind of schematic flow sheet for crossing split-phase bow net guard method that Fig. 2 provides for the embodiment of the present invention one, it is described to cross split-phase bow net Protection device includes input module 1, control module 2 and output module 3, and the split-phase bow net guard method excessively includes following step Suddenly:
S11, the input module 1 send the overconfidence number that train reaches phase-separating section to the control module 2;
S12, the control module connect 2 and received after the overconfidence number, judge the train whether have two rising bows by Pantograph in two overlaps of neutral section end, is sent if it is, pantograph will be controlled to drop the control signal bent simultaneously To the output module 3;
S13, the output module 3 send the control signal to a pantograph, control the pantograph drop bow.
By technical scheme disclosed in the embodiment of the present invention one, train is obtained by input module and reached the undue of phase-separating section Phase signals, then judge two that whether the train has two rising bow pantographs simultaneously in neutral section end by control module In overlap, if it is, the control signal for controlling pantograph drop bow is sent to the output module;Finally by output Module sends the control signal to a pantograph, controls the pantograph drop bow.When the operation of train rising bow passes through split-phase Form of train formation is adjusted without being gone according to line condition at trivial, without the artificial operation of driver, passes through control module Automatic decision rising bow pantograph present position, is then controlled accordingly, realizes the purpose of the automatic protection control of bow net.
Embodiment two
Procedure with reference to described in the embodiment of the present invention one and Fig. 2, and referring to Fig. 3, Fig. 3 is the embodiment of the present invention A kind of two structural representations for crossing split-phase bow net protecting device provided, specifically,
The split-phase bow net protecting device of crossing also included split-phase detection module 4, described to cross the guard method of split-phase bow net also Including:
It is described to cross the electromagnetic signal that split-phase detection module senses ground by ground induction coil, whether judge the train Phase-separating section is reached, if it is, the overconfidence number for reaching phase-separating section is sent to the input module.
Accordingly, the split-phase bow net protecting device of crossing also is deposited including pantograph state-storage module 5 and phase-separating section data Module 6 is stored up, this method also includes:
The pantograph state-storage module sends the distance between the pantograph of acquisition information to the control module;
The phase-separating section data memory module will retrieve the current phase-separating section information passed through of the acquisition train and send to institute Control module is stated, wherein, the phase-separating section information includes the neutral segment length of the train actual motion section phase-separating section with Property section length.
Accordingly, the split-phase bow net protecting device of crossing also includes network control module 7, information storage module 8 and train Control module 9, this method also includes:
The network control module sends the quantity information of the voltage on line side signal of acquisition and rising bow pantograph to described Pantograph state-storage module;
Described information memory module sends the relevant information of the train to the pantograph state-storage module, its In, the relevant information of the train include the grouping information of train, the length information of train, the arrangement range information of pantograph and The threshold value information of train;
Specifically, described information memory module could be arranged to display screen, input grouping information can be provided for driver, compiled The interface of group vehicle and modification train information.
The Train Control module sends the current running section information of the train of acquisition to the phase-separating section data Memory module.
Corresponding, the pantograph state-storage module also includes computing unit and transmitting element, the pantograph state Memory module sends the distance between the pantograph of acquisition information to the control module, including:
The computing unit is calculated according to the quantity information of the rising bow pantograph received and the relevant information of the train Obtain the distance between pantograph information;
The transmitting element sends the distance between pantograph information to the control module.
Corresponding, the control module includes the first judging unit, the second judging unit, the 3rd judging unit and sets single Member, the control module is received after the overconfidence number, judges whether the train has two rising bow pantographs to exist simultaneously In two overlaps of neutral section end, if it is, the control signal for controlling pantograph drop bow is sent to the output Module, including:
When receiving overconfidence, whether first judging unit judges the train under AC network pressing type Operation, if it is, the operational mode that the train is run under AC network compacting is sent to second judging unit;
Second judging unit judges whether the train is multiple pantograph operations, if it is, will be the multiple The operation information of pantograph operation is sent to the 3rd judging unit;
Specifically, judging whether the train runs under AC network pressing type, it is such as direct current standard, is controlled without protection System, is such as to exchange standard, then judges that the pantograph of train is single bow operation or bends operation more, is just protected when many bows are run Shield control.
The setting unit is believed according to the distance between the pantograph received information and the current running section of the train Breath, sets the default judgement bar for meeting described two rising bow pantographs of train simultaneously in two overlaps of neutral section end Part, wherein, the preparatory condition is the neutral segment length that the distance between two rising bow pantographs are not more than the phase-separating section, and And the distance between two rising bow pantographs are not less than the neutral section length of the phase-separating section;
3rd judging unit judges whether the rising bow pantograph of the train meets default Rule of judgment, if it is, Then the control signal for controlling pantograph drop bow is sent to the output module.
Specifically, referring to Fig. 4 for train pantograph is apart from schematic diagram during mistake split-phase in the embodiment of the present invention, in order to prevent row The multiple pantograph rising bow operations of car cause short circuit between two phase arms of ac contactor net, need to be between pantograph and neutral section Compatibility is accounted for, i.e., the distance of two pantographs need to be more than neutrality segment length D or less than neutral section length D '.
By technical scheme disclosed in the embodiment of the present invention two, the train operation obtained according to pantograph state-storage module The situation information of marshalling, calculating obtains the distance between train pantograph;And obtained according to phase-separating section data memory module The data of train operation section, judge whether the train has two rising bow pantographs simultaneously in neutral section end by molding block Two overlaps in, if it is, by control pantograph drop bow control signal send to the output module;Finally lead to Cross output module to send the control signal to a pantograph, control the pantograph drop bow.When the operation of train rising bow is logical When crossing phase-separating section interval, in order to prevent short circuit between the multiple pantograph rising bows operation morality and justice ac contactor two phase arms of net of train The generation of phenomenon, without being gone to adjust form of train formation according to line condition, without the artificial operation of driver, by controlling mould Block automatic decision rising bow pantograph present position, is then controlled accordingly, realizes the mesh of the automatic protection control of bow net 's.
Embodiment three
The reality corresponding, of the invention with the mistake split-phase bow net guard method disclosed in the embodiment of the present invention one and embodiment two Apply example three and additionally provide a kind of split-phase bow net protecting device excessively, referring to Fig. 3, the device includes input module 1, the and of control module 2 Output module 3, wherein,
The input module 1, the overconfidence number for train to be reached to phase-separating section is sent to the control module;
The control module 2, for receiving after the overconfidence number, judge the train whether have two rising bows by Pantograph in two overlaps of neutral section end, is sent if it is, pantograph will be controlled to drop the control signal bent simultaneously To the output module;
The output module 3, for the control signal to be sent to a pantograph, controls the pantograph drop bow.
Accordingly, the device also includes:
Split-phase detection module 4 is crossed, the electromagnetic signal for sensing ground by ground induction coil judges that the train is No arrival phase-separating section, if it is, the overconfidence number for reaching phase-separating section is sent to the input module 1.
Corresponding, the device also includes:
Pantograph state-storage module 5, for the distance between the pantograph of acquisition information to be sent to the control mould Block 2;
Phase-separating section data memory module 6, for will retrieve obtain the current phase-separating section information passed through of the train send to The control module 2, wherein, the neutral segment length of the phase-separating section information including the train actual motion section phase-separating section and Neutral section length.
Corresponding, the device also includes:
Network control module 7, for the quantity information of the voltage on line side signal of acquisition and rising bow pantograph to be sent to institute State pantograph state-storage module 5;
Information storage module 8, for the relevant information of the train to be sent to the pantograph state-storage module 5, Wherein, the relevant information of the train includes grouping information, the length information of train, the arrangement range information of pantograph of train With the threshold value information of train;
Train Control module 9, for the current running section information of the train of acquisition to be sent to the phase-separating section number According to memory module 6.
Specifically, the pantograph state-storage module 5 also includes computing unit 51 and transmitting element 52, wherein,
The computing unit 51, for the letter related to the train of the quantity information according to the rising bow pantograph received Breath, calculates and obtains the distance between pantograph information;
The transmitting element 52, for the distance between pantograph information to be sent to the control module.
Specifically, the control module 2 includes the first judging unit 21, the second judging unit 22, the 3rd judging unit 23 With setting unit 24, wherein,
When receiving overconfidence, first judging unit 21, for judging the train whether in AC network Run under pressing type, if it is, the operational mode that the train is run under AC network compacting sends to described second and sentenced Disconnected unit;
Second judging unit 22, for judging whether the train is the operation of multiple pantographs, if it is, by institute The operation information for stating multiple pantograph operations is sent to the 3rd judging unit;
The setting unit 24, for currently being run according to the distance between the pantograph received information and the train Section information, sets and meets described two rising bow pantographs of train presetting in two overlaps of neutral section end simultaneously Rule of judgment, wherein, the preparatory condition is the neutral section that the distance between two rising bow pantographs are not more than the phase-separating section Length, and the distance between two rising bow pantographs are not less than the neutral section length of the phase-separating section;
3rd judging unit 23, for judging whether the rising bow pantograph of the train meets default Rule of judgment, If it is, the control signal for controlling pantograph drop bow is sent to the output module.
In embodiments of the invention three, the overconfidence number that train reached phase-separating section is obtained by input module, so Judge whether the train there are two overlaps of two rising bow pantographs simultaneously in neutral section end by control module afterwards It is interior, if it is, the control signal for controlling pantograph drop bow is sent to the output module;Finally by output module by institute State control signal to send to a pantograph, control the pantograph drop bow.When the operation of train rising bow is interval by phase-separating section Without going to adjust form of train formation according to line condition, without the artificial operation of driver, pass through control module automatic decision Rising bow pantograph present position, is then controlled accordingly, realizes the purpose of the automatic protection control of bow net.
The embodiment of each in this specification is described by the way of progressive, and what each embodiment was stressed is and other Between the difference of embodiment, each embodiment identical similar portion mutually referring to.For device disclosed in embodiment For, because it is corresponded to the method disclosed in Example, so description is fairly simple, related part is said referring to method part It is bright.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (12)

1. one kind crosses split-phase bow net guard method, it is characterised in that this method was applied to split-phase bow net protecting device, the device Including input module, control module and output module, the split-phase bow net guard method excessively includes:
The input module sends the overconfidence number that train reaches phase-separating section to the control module;
The control module is received after the overconfidence number, judges whether the train has two rising bow pantographs to exist simultaneously In two overlaps of neutral section end, if it is, the control signal for controlling pantograph drop bow is sent to the output Module;
The output module sends the control signal to a pantograph, controls the pantograph drop bow.
2. according to the method described in claim 1, it is characterised in that the split-phase bow net protecting device of crossing also included split-phase inspection Module is surveyed, this method also includes:
It is described to cross the electromagnetic signal that split-phase detection module senses ground by ground induction coil, judge whether the train reaches Phase-separating section, if it is, the overconfidence number for reaching phase-separating section is sent to the input module.
3. according to the method described in claim 1, it is characterised in that the split-phase bow net protecting device of crossing also includes pantograph shape State memory module and phase-separating section data memory module, this method also include:
The pantograph state-storage module sends the distance between the pantograph of acquisition information to the control module;
The phase-separating section data memory module will retrieve the current phase-separating section information passed through of the acquisition train and send to the control Molding block, wherein, the phase-separating section information includes neutral segment length and the differential gap of the train actual motion section phase-separating section Length.
4. method according to claim 3, it is characterised in that the split-phase bow net protecting device of crossing also includes network control Module, information storage module and Train Control module, this method also include:
The network control module sends the quantity information of the voltage on line side signal of acquisition and rising bow pantograph to described by electricity Bend state-storage module;
Described information memory module sends the relevant information of the train to the pantograph state-storage module, wherein, institute Stating the relevant information of train includes grouping information, the length information of train, the arrangement range information and train of pantograph of train Threshold value information;
The Train Control module sends the current running section information of the train of acquisition to the phase-separating section data storage Module.
5. method according to claim 4, it is characterised in that the pantograph state-storage module also includes computing unit And transmitting element, the pantograph state-storage module sends the distance between the pantograph of acquisition information to the control mould Block, including:
The computing unit is calculated and obtained according to the quantity information of the rising bow pantograph received and the relevant information of the train The distance between pantograph information;
The transmitting element sends the distance between pantograph information to the control module.
6. method according to claim 5, it is characterised in that the control module is sentenced including the first judging unit, second Disconnected unit, the 3rd judging unit and setting unit, the control module are received after the overconfidence number, judge the train Whether there are two rising bow pantographs simultaneously in two overlaps of neutral section end, if it is, will control pantograph drop The control signal of bow is sent to the output module, including:
When receiving overconfidence, first judging unit judges whether the train is transported under AC network pressing type OK, if it is, the operational mode that the train is run under AC network compacting is sent to second judging unit;
Second judging unit judges whether the train is multiple pantograph operations, if it is, by the multiple by electricity The operation information of bow operation is sent to the 3rd judging unit;
The setting unit according to the distance between the pantograph received information and the current running section information of the train, if The default Rule of judgment for meeting described two rising bow pantographs of train simultaneously in two overlaps of neutral section end is put, its In, the preparatory condition is not more than the neutral segment length of the phase-separating section, and two for the distance between two rising bow pantographs The distance between individual rising bow pantograph is not less than the neutral section length of the phase-separating section;
3rd judging unit judges whether the rising bow pantograph of the train meets default Rule of judgment, if it is, will The control signal of control pantograph drop bow is sent to the output module.
7. one kind crosses split-phase bow net protecting device, it is characterised in that described device includes input module, control module and output mould Block, wherein,
The input module, the overconfidence number for train to be reached to phase-separating section is sent to the control module;
The control module, for receiving after the overconfidence number, judges whether the train has two rising bow pantographs Simultaneously in two overlaps of neutral section end, if it is, the control signal for controlling pantograph drop bow is sent to institute State output module;
The output module, for the control signal to be sent to a pantograph, controls the pantograph drop bow.
8. device according to claim 7, it is characterised in that the device also includes:
Split-phase detection module is crossed, the electromagnetic signal for sensing ground by ground induction coil judges whether the train arrives Up to phase-separating section, if it is, the overconfidence number for reaching phase-separating section is sent to the input module.
9. device according to claim 7, it is characterised in that the device also includes:
Pantograph state-storage module, for the distance between the pantograph of acquisition information to be sent to the control module;
Phase-separating section data memory module, sends to the control for that will retrieve the current phase-separating section information passed through of the acquisition train Molding block, wherein, the phase-separating section information includes neutral segment length and the differential gap of the train actual motion section phase-separating section Length.
10. device according to claim 9, it is characterised in that the device also includes:
Network control module, for the quantity information of the voltage on line side signal of acquisition and rising bow pantograph to be sent to described by electricity Bend state-storage module;
Information storage module, for the relevant information of the train to be sent to the pantograph state-storage module, wherein, institute Stating the relevant information of train includes grouping information, the length information of train, the arrangement range information and train of pantograph of train Threshold value information;
Train Control module, for the current running section information of the train of acquisition to be sent to the phase-separating section data storage Module.
11. device according to claim 10, it is characterised in that the pantograph state-storage module also includes calculating single Member and transmitting element, wherein,
The computing unit, for the quantity information and the relevant information of the train according to the rising bow pantograph received, meter Calculate and obtain the distance between pantograph information;
The transmitting element, for the distance between pantograph information to be sent to the control module.
12. device according to claim 11, it is characterised in that the control module includes the first judging unit, second Judging unit, the 3rd judging unit and setting unit, wherein,
When receiving overconfidence, first judging unit, for judging the train whether in AC network pressing type Lower operation, if it is, the operational mode that the train is run under AC network compacting is sent to second judging unit;
Second judging unit, for judging whether the train is multiple pantograph operations, if it is, will be the multiple The operation information of pantograph operation is sent to the 3rd judging unit;
The setting unit, for according to the distance between the pantograph received information and the current running section letter of the train Breath, sets the default judgement bar for meeting described two rising bow pantographs of train simultaneously in two overlaps of neutral section end Part, wherein, the preparatory condition is the neutral segment length that the distance between two rising bow pantographs are not more than the phase-separating section, and And the distance between two rising bow pantographs are not less than the neutral section length of the phase-separating section;
3rd judging unit, for judging whether the rising bow pantograph of the train meets default Rule of judgment, if it is, Then the control signal for controlling pantograph drop bow is sent to the output module.
CN201710447459.XA 2017-06-14 2017-06-14 Passing neutral section bow net protection method and device Active CN107187322B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710447459.XA CN107187322B (en) 2017-06-14 2017-06-14 Passing neutral section bow net protection method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710447459.XA CN107187322B (en) 2017-06-14 2017-06-14 Passing neutral section bow net protection method and device

Publications (2)

Publication Number Publication Date
CN107187322A true CN107187322A (en) 2017-09-22
CN107187322B CN107187322B (en) 2020-03-24

Family

ID=59879691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710447459.XA Active CN107187322B (en) 2017-06-14 2017-06-14 Passing neutral section bow net protection method and device

Country Status (1)

Country Link
CN (1) CN107187322B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109484193A (en) * 2018-12-03 2019-03-19 中车长春轨道客车股份有限公司 A kind of intercity EMU pantograph selection control system of heavy four marshallings
CN110116658A (en) * 2018-02-05 2019-08-13 中车株洲电力机车研究所有限公司 The matched method and device of split-phase vehicle net is crossed for subregion institute's electronic switch ground
CN112721748A (en) * 2019-10-14 2021-04-30 株洲中车时代电气股份有限公司 Method, system, device and medium for automatically passing through dead zone of urban rail transit train

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU587020A1 (en) * 1975-10-27 1978-01-05 Восточный научно-исследовательский институт по безопасности работ в горной промышленности Contact wire mains sectionating station
JPH11348612A (en) * 1998-06-11 1999-12-21 Meidensha Corp Monitoring system for feeder system for electric railway
CN201009771Y (en) * 2006-12-22 2008-01-23 陕西理工学院 Electricity-proof over-split phase device of engine
CN201320971Y (en) * 2008-11-06 2009-10-07 株洲田龙铁道电气有限公司 Electric locomotive bow lowering device
CN101746284A (en) * 2009-12-31 2010-06-23 华南理工大学 Excessive phase system of railway electric locomotive based on video identification and method thereof
EP2415626A1 (en) * 2009-03-13 2012-02-08 Kabushiki Kaisha Toshiba Railroad vehicle system and control method therefor
EP3069918A1 (en) * 2015-03-19 2016-09-21 Siemens Aktiengesellschaft Assembly and method for brake energy recovery of a vehicle into a catenary
CN106671828A (en) * 2015-11-11 2017-05-17 中车大连电力牵引研发中心有限公司 Train neutral-section passing control method and device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU587020A1 (en) * 1975-10-27 1978-01-05 Восточный научно-исследовательский институт по безопасности работ в горной промышленности Contact wire mains sectionating station
JPH11348612A (en) * 1998-06-11 1999-12-21 Meidensha Corp Monitoring system for feeder system for electric railway
CN201009771Y (en) * 2006-12-22 2008-01-23 陕西理工学院 Electricity-proof over-split phase device of engine
CN201320971Y (en) * 2008-11-06 2009-10-07 株洲田龙铁道电气有限公司 Electric locomotive bow lowering device
EP2415626A1 (en) * 2009-03-13 2012-02-08 Kabushiki Kaisha Toshiba Railroad vehicle system and control method therefor
CN101746284A (en) * 2009-12-31 2010-06-23 华南理工大学 Excessive phase system of railway electric locomotive based on video identification and method thereof
EP3069918A1 (en) * 2015-03-19 2016-09-21 Siemens Aktiengesellschaft Assembly and method for brake energy recovery of a vehicle into a catenary
CN106671828A (en) * 2015-11-11 2017-05-17 中车大连电力牵引研发中心有限公司 Train neutral-section passing control method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴积钦: "《受电弓与接触网系统》", 31 December 2010 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110116658A (en) * 2018-02-05 2019-08-13 中车株洲电力机车研究所有限公司 The matched method and device of split-phase vehicle net is crossed for subregion institute's electronic switch ground
CN110116658B (en) * 2018-02-05 2021-09-21 中车株洲电力机车研究所有限公司 Method and device for matching electronic switch ground passing phase separation vehicle network of district station
CN109484193A (en) * 2018-12-03 2019-03-19 中车长春轨道客车股份有限公司 A kind of intercity EMU pantograph selection control system of heavy four marshallings
CN109484193B (en) * 2018-12-03 2022-08-16 中车长春轨道客车股份有限公司 Pantograph selection control system for multiple-connection four-unit intercity marshalling motor train unit
CN112721748A (en) * 2019-10-14 2021-04-30 株洲中车时代电气股份有限公司 Method, system, device and medium for automatically passing through dead zone of urban rail transit train
CN112721748B (en) * 2019-10-14 2022-11-22 株洲中车时代电气股份有限公司 Method, system, device and medium for automatically passing through dead zone of urban rail transit train

Also Published As

Publication number Publication date
CN107187322B (en) 2020-03-24

Similar Documents

Publication Publication Date Title
CN105501069B (en) Double-standard current collecting system and method
CN107187322A (en) One kind crosses the guard method of split-phase bow net and device
CN204596156U (en) Self-adaptation tidal lane control system
CN102152746B (en) Pavement charging and charged device series for electric vehicle
CN110139790A (en) Control method for stopping and shutoff control unit
CN104080685A (en) Circuit breaker controller for electrically powered train
CN203344967U (en) Automatic passing neutral section system of electric locomotive
CN101746284B (en) Excessive phase system of railway electric locomotive based on video identification and method thereof
CN104002834A (en) Loop induction based tram main track switch control system and method
CN106828176B (en) Mobile charging control system of mobile charging vehicle
CN103400420A (en) Parking lot control system
CN109435707A (en) The power supply circuit and railroad vehicle of railroad vehicle
CN109515481A (en) A kind of circuit, the train of the not parking auto-changeover control power of ATP and LKJ
CN106385444A (en) Car toll method based on car networking, terminal and server
CN103043083A (en) Method and system for describing line topology in train control system
CN103625310A (en) Subsection split phase automatic-passing system of electric railway and split phase automatic-passing method thereof
CN104008659B (en) A kind of system and method precisely monitoring intersection signal control device control effects
CN107527507A (en) Underground garage Intelligent traffic management systems
CN105809750A (en) ETC charging method, device and system
CN106240603B (en) A kind of railway Non-automatic blocking home signal is close to section design method
CN204856905U (en) Supplementary suggestion device of highway ring road export vehicle lane change based on WIFI
CN106781557A (en) A kind of signal controls the pedestrians crossing time compensation system and method in section
CN2787499Y (en) Vehicular automatic neutral-section passing system
AU2016234948B2 (en) Improved power supply system for an overhead contact line
CN204423640U (en) A kind of single channel vehicle control device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant