CN107165180A - 一种管井防流砂降水方法 - Google Patents
一种管井防流砂降水方法 Download PDFInfo
- Publication number
- CN107165180A CN107165180A CN201710521068.8A CN201710521068A CN107165180A CN 107165180 A CN107165180 A CN 107165180A CN 201710521068 A CN201710521068 A CN 201710521068A CN 107165180 A CN107165180 A CN 107165180A
- Authority
- CN
- China
- Prior art keywords
- pipe well
- quicksand
- precipitation method
- drainage section
- precipitation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明涉及建筑施工领域,具体是一种管井防流砂降水方法;其特征是:包括步骤1,制作防淤堵滤层滤水段:首先在滤水段外侧绑扎一层细度纤维针刺非织造土工织物,然后在该土工织物外侧绑扎一层粗度纤维针刺非织造土工织物;步骤2,布设降水管井:按照设计方案布设降水管井,使防淤堵滤层滤水段位于流砂层中;步骤3,使用管井进行基坑降水:确保水位降低至基坑开挖面以下。本降水方法,通过采用土工织物对滤水段进行加强,从而避免流砂堵塞管井使沉井作业无法正常进行的问题。
Description
技术领域
本发明涉及建筑施工领域,具体是一种管井防流砂降水方法。
背景技术
基坑施工中降水是首要工作,只有基坑周边地下水降到开挖面以下,基坑开挖方可安全进行。流砂层地质具有非常大的危害,含流砂层的基坑降水面临滤管淤堵等问题,大大增加降水难度,并影响施工进度和基坑安全。
发明内容
本发明的目的在于克服现有技术的不足,提供一种管井防流砂降水方法,其不仅适用于含流砂层的基坑降水施工,还适用于其他各类基坑的降水施工。
为了达到上述目的,本发明是这样实现的:
一种管井防流砂降水方法,包括
步骤1,制作防淤堵滤层滤水段:首先在滤水段外侧绑扎一层细度纤维针刺非织造土工织物,然后在该土工织物外侧绑扎一层粗度纤维针刺非织造土工织物;
步骤2,布设降水管井:按照设计方案布设降水管井,使防淤堵滤层滤水段位于流砂层中;
步骤3,使用管井进行基坑降水:确保水位降低至基坑开挖面以下。
所述的管井防流砂降水方法,防淤堵滤层滤水段外侧由粗、细两种纤维的针刺非织造土工织物包裹。
所述的管井防流砂降水方法,管井的数量须通过计算确定。
所述的管井防流砂降水方法,使用管井进行基坑降水须确保水位降低至基坑开挖面以下不少于0.5m。
所述的管井防流砂降水方法,针刺非织造土工织物的细度纤维为6D纤维,粗度纤维为8D纤维。
本降水方法,通过采用土工织物对滤水段进行加强,从而避免流砂堵塞管井使沉井作业无法正常进行的问题。
具体实施方式
以下通过具体实施例进一步说明本发明。
一种管井防流砂降水方法,包括
步骤1,制作防淤堵滤层滤水段:首先在滤水段外侧绑扎一层细度纤维针刺非织造土工织物,然后在该土工织物外侧绑扎一层粗度纤维针刺非织造土工织物;
步骤2,布设降水管井:按照设计方案布设降水管井,使防淤堵滤层滤水段位于流砂层中;
步骤3,使用管井进行基坑降水:确保水位降低至基坑开挖面以下。
所述的管井防流砂降水方法,防淤堵滤层滤水段外侧由粗、细两种纤维的针刺非织造土工织物包裹。
所述的管井防流砂降水方法,管井的数量须通过计算确定。
所述的管井防流砂降水方法,使用管井进行基坑降水须确保水位降低至基坑开挖面以下不少于0.5m。
所述的管井防流砂降水方法,针刺非织造土工织物的细度纤维为6D纤维,粗度纤维为8D纤维。
本降水方法,通过采用土工织物对滤水段进行加强,从而避免流砂堵塞管井使沉井作业无法正常进行的问题。
Claims (5)
1.一种管井防流砂降水方法,其特征是:包括
步骤1,制作防淤堵滤层滤水段:首先在滤水段外侧绑扎一层细度纤维针刺非织造土工织物,然后在该土工织物外侧绑扎一层粗度纤维针刺非织造土工织物;
步骤2,布设降水管井:按照设计方案布设降水管井,使防淤堵滤层滤水段位于流砂层中;
步骤3,使用管井进行基坑降水:确保水位降低至基坑开挖面以下。
2.根据权利要求1所述的管井防流砂降水方法,其特征是:防淤堵滤层滤水段外侧由粗、细两种纤维的针刺非织造土工织物包裹。
3.根据权利要求1所述的管井防流砂降水方法,其特征是,管井的数量须通过计算确定。
4.根据权利要求1所述的管井防流砂降水方法,其特征在于,使用管井进行基坑降水须确保水位降低至基坑开挖面以下不少于0.5m。
5.根据权利要求2所述的管井防流砂降水方法,其特征是,针刺非织造土工织物的细度纤维为6D纤维,粗度纤维为8D纤维。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710521068.8A CN107165180A (zh) | 2017-06-30 | 2017-06-30 | 一种管井防流砂降水方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710521068.8A CN107165180A (zh) | 2017-06-30 | 2017-06-30 | 一种管井防流砂降水方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107165180A true CN107165180A (zh) | 2017-09-15 |
Family
ID=59827236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710521068.8A Pending CN107165180A (zh) | 2017-06-30 | 2017-06-30 | 一种管井防流砂降水方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107165180A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002146767A (ja) * | 2000-11-09 | 2002-05-22 | Kinki Kiso Koji Kk | 集排水構造 |
CN104032760A (zh) * | 2013-03-05 | 2014-09-10 | 李孝虎 | 一种基坑施工管井降水方法 |
CN104131412A (zh) * | 2014-07-16 | 2014-11-05 | 东华大学 | 一种复合结构土工过滤材料的制备方法 |
CN205839777U (zh) * | 2016-05-31 | 2016-12-28 | 中国一冶集团有限公司 | 井点降水井滤水结构 |
-
2017
- 2017-06-30 CN CN201710521068.8A patent/CN107165180A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002146767A (ja) * | 2000-11-09 | 2002-05-22 | Kinki Kiso Koji Kk | 集排水構造 |
CN104032760A (zh) * | 2013-03-05 | 2014-09-10 | 李孝虎 | 一种基坑施工管井降水方法 |
CN104131412A (zh) * | 2014-07-16 | 2014-11-05 | 东华大学 | 一种复合结构土工过滤材料的制备方法 |
CN205839777U (zh) * | 2016-05-31 | 2016-12-28 | 中国一冶集团有限公司 | 井点降水井滤水结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480974B (zh) | 一种适用于上游式尾矿库的反向排渗系统及上游式尾矿库 | |
CN104032760A (zh) | 一种基坑施工管井降水方法 | |
CN205314118U (zh) | 一种大型基础的排水系统 | |
CN104631475A (zh) | 一种下穿河流浅埋暗挖隧道的安全快速施工方法 | |
CN205677631U (zh) | 具有疏水功能的箱式隧底复合拱形隧道衬砌构造 | |
CN106087953B (zh) | 一种防治山区大型弃土场泥石流的排水施工方法 | |
CN108385714A (zh) | 一种生态护岸用挡土结构及其施工方法 | |
CN104314090A (zh) | 深基坑基岩排水暗沟及其排水系统和排水施工方法 | |
WO2018036317A1 (zh) | 一种集水排浸系统及其施工方法 | |
CN106759241A (zh) | 一种真空预压法地基处理排水结构 | |
CN103266633B (zh) | 一种湿法冶金尾渣库防渗漏排污水排洪方法 | |
CN204676488U (zh) | 一种新型的挡墙反滤排水结构 | |
CN204551510U (zh) | 一种填方路基集水降压井降排水结构 | |
CN103541330A (zh) | 一种有效提前排水并延长澄清距离的尾矿库排洪系统 | |
CN104805873A (zh) | 多防线可监测地下室水压力释放抗浮系统 | |
CN105544696A (zh) | 一种山丘区水土保持坡面截流促渗方法 | |
CN206245444U (zh) | 雨水渗透系统 | |
CN103061351B (zh) | 防止地下室底板隆起、渗水的装置 | |
CN107165180A (zh) | 一种管井防流砂降水方法 | |
CN218148458U (zh) | 一种裂隙发育岩层深水深基坑降排水系统 | |
CN203057815U (zh) | 一种滨海盐碱地绿化排碱系统 | |
CN205369281U (zh) | 一种辐射井降水结构 | |
CN106759764A (zh) | 一种多功能地下分洪道的方法及系统 | |
CN114775699A (zh) | 一种后浇带结构及其施工方法 | |
CN106638641A (zh) | 基坑降水水井结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170915 |