CN107159830A CN201710594342.4A CN201710594342A CN107159830A CN 107159830 A CN107159830 A CN 107159830A CN 201710594342 A CN201710594342 A CN 201710594342A CN 107159830 A CN107159830 A CN 107159830A
Authority
CN
China
Prior art keywords
forging
plate
blank
quenching
carried out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710594342.4A
Other languages
Chinese (zh)
Inventor
程仁策
吕正风
王雪强
罗顺成
何星星
韩兆玉
黄少鹏
张成江
程志远
赵俊凤
戴菡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Nanshan Aluminium Co Ltd
Yantai Nanshan University
Original Assignee
Shandong Nanshan Aluminium Co Ltd
Yantai Nanshan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Nanshan Aluminium Co Ltd, Yantai Nanshan University filed Critical Shandong Nanshan Aluminium Co Ltd
Priority to CN201710594342.4A priority Critical patent/CN107159830A/en
Publication of CN107159830A publication Critical patent/CN107159830A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Abstract

The present invention provides a kind of forging method, is related to Alloy Processing field, forging method comprises the following steps:Forge step:Blank forging is molded, at least four times jumping-ups are included during forging molding and are pulled out at least one times;Quenching Step:The forging plate of forging molding is quenched;Two-stage time effect step:Two-stage time effect processing is carried out to forging plate.The process of forging molding is used for blank forging into forging plate, and includes at least four times jumping-ups during forging molding and pull out at least one times, can prevent forging plate cracking, make the forging of forging plate saturating, the structure property of forging plate is improved, then forging plate is quenched, the case hardness of forging plate is effectively improved, cold deformation is carried out to forging plate again, reduction forging Stress of plate interior, finally carries out two-stage time effect processing, stabilizing tissue to forging plate, improve the mechanical performance of forging plate, and then improve the case hardness of forging plate.

Description

Forging method
Technical field
The present invention relates to Alloy Processing field, more particularly, to a kind of forging method.
Background technology
In mould, industrial production to be molded, be blow molded, extrude, die casting, forging forming, the method such as smelting or punching press obtain The various moulds and instrument of required product.In brief, mould is the instrument for making formed article, and this instrument is by various Part is constituted, and different moulds are made up of different parts.It is mainly realized by the change of institute's moulding material physical state The processing of article profile.Have the title of " mother of industry ".
Mould, which under external force turns into blank, given shape and the product of size, is widely used in punching, die forging, modeling In the forming of compression moulding or the injection of product such as material, rubber and ceramics.Mould generally comprises two parts of dynamic model and cover half, two Person is partable.Product is taken out when separating, blank is injected mold cavity shaping when closing up.Mould is precision instrument, its shape Shape is complicated, and needs to bear the expansive force of blank, therefore mould has higher requirement to its case hardness.
In recent years, because the growths of light industry such as plastics, electronics have driven a large amount of of mould to use.Traditional moulds are generally steel Mould, but because the weight of steel mold is big, easily get rusty, processing difficulties and price is high, mould of the prior art begins to use Aluminium alloy forging plate makes mould, so as to substitute steel mold.But, although the intensity of aluminum alloy materials is high, but plasticity is poor, and aluminium is closed Bodkin plate easily ftractures in forging process, and difficult, structure property is difficult to ensure thoroughly for forging, causes the surface of aluminium alloy forging plate hard Degree is relatively low, causes the performance of aluminum alloy mould not good.
The content of the invention
It is hard with the surface for solving aluminium alloy forging plate of the prior art it is an object of the invention to provide a kind of forging method The relatively low technical problem of degree.
The forging method that the present invention is provided, comprises the following steps:
Forge step:Blank forging is molded, at least four times jumping-ups and at least one are included during forging molding Secondary pulling;
Quenching Step:The forging plate of forging molding is quenched;
Two-stage time effect step:Two-stage time effect processing is carried out to forging plate.
Further, in the forging step, the upset ratio of jumping-up is not less than 2 each time.
Further, in the quenching Step, the heating-up temperature of quenching is 472 ± 3 DEG C, and soaking time is 1min/mm, is quenched The cooling medium of fire is water, and the temperature of cooling water is 20 ± 5 DEG C, soak time >=0.13min/mm of the forging plate in cooling water.
Further, in the two-stage time effect step, the first stage is incubated 5 hours, second-order at a temperature of 65 ± 5 DEG C Section is incubated 24 hours at a temperature of 121 ± 5 DEG C.
Further, heating blank step is also included before forging step:
Heat blank step:Blank is heated, the soaking time of blank heating is 1.3min/mm.
Further, it is further comprising the steps of between forging step and quenching Step:
Cooling after forged step:The forging plate of forging molding is cooled down, cooling medium is water, leaching of the forging plate in cooling water The bubble time >=0.13min/mm.
Further, it is further comprising the steps of between cooling after forged step and quenching Step:
Ultrasonic examination step:Ultrasonic examination is carried out to the forging plate after cooling after forged, for confirming that forging plate whether there is The crackle extended internally or folding.
Further, it is further comprising the steps of between ultrasonic examination step and quenching Step:
Machining steps:Forging trigger is machined to quench size;
Surface cleaning step:Surface clean is carried out to forging plate, cutting fluid and chip for removing forging plate surface.
Further, it is further comprising the steps of between quenching Step and two-stage time effect step:
Cold deformation step:Cold deformation is carried out to the upper and lower surface for forging plate, cold deformation is 1.5%-2.5%.
Further, it is further comprising the steps of after two-stage time effect step:
Hardness determination step:Hardness determination is carried out to forging plate.
The forging method that the present invention is provided, comprises the following steps:Forge step:Blank forging is molded, in forging molding During include at least four times jumping-ups and pulling out at least one times;Quenching Step:The forging plate of forging molding is quenched;It is double Level ageing stage:Two-stage time effect processing is carried out to forging plate.The process of forging molding is used for blank forging into forging plate, and in forging Cause to include at least four times jumping-ups during type and pull out at least one times, forging plate cracking can be prevented, make the forging of forging plate saturating, carry The structure property of height forging plate, is then quenched to forging plate, effectively improves the case hardness of forging plate, then carry out cold become to forging plate Shape, reduction forging Stress of plate interior finally carries out two-stage time effect processing to forging plate, and stabilizing tissue improves the mechanical performance of forging plate, and then Improve the case hardness of forging plate.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
The flow chart one of forging method provided in an embodiment of the present invention during Fig. 1;
Fig. 2 is the flowchart 2 of forging method provided in an embodiment of the present invention;
Fig. 3 is the flow chart 3 of forging method provided in an embodiment of the present invention;
Fig. 4 is the flow chart four of forging method provided in an embodiment of the present invention.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation Example is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to Be easy to the description present invention and simplify description, rather than indicate or imply signified device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", only For descriptive purposes, and it is not intended that indicating or implying relative importance.Wherein, term " first position " and " second place " For two different positions.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
The invention provides a kind of forging method, embodiment is given below the forging method that the present invention is provided is carried out in detail Description.
Fig. 1 is the flow chart one of forging method provided in an embodiment of the present invention;Fig. 2 is forging provided in an embodiment of the present invention The flowchart 2 of method;Fig. 3 is the flow chart 3 of forging method provided in an embodiment of the present invention;Fig. 4 is that the embodiment of the present invention is carried The flow chart four of the forging method of confession.
Specifically, as shown in Figures 1 to 4, the forging method that the present embodiment is provided comprises the following steps:
Step S1 heats blank step:Blank is heated, the soaking time of blank heating is 1.3min/mm.
Specifically, it is necessary to be heated to aluminum alloy blank, aluminium alloy before forging molding is carried out to aluminum alloy blank The soaking time of blank heating determines that is, the soaking time of every millimeter of effective thickness of aluminum alloy blank is divided according to 1.3min/mm 1.3 minutes are not needed, and the effective thickness of such as aluminum alloy blank is 10mm, then the soaking time of aluminum alloy blank heating is 13 Minute.
After being heated to aluminum alloy blank, step S2 is carried out.
Step S2 forges step:Blank forging is molded, during forging molding include at least four times jumping-ups and Pull out at least one times;The upset ratio of jumping-up is not less than 2 each time.
Wherein, forging molding is used to aluminum alloy blank being forged into aluminium alloy forging plate, during forging molding, including At least four times jumping-ups and pull out at least one times, also, the upset ratio of jumping-up is not less than 2 each time.Jumping-up refers to use pressure Blank is enabled aluminum alloy to highly to reduce and the process of diameter (or lateral dimension) increase.During jumping-up, aluminum alloy blank End face wants smooth and vertical with axis, and forging firmly just will prevent that forging is askew, and upset force is appropriate, prevents from forming eel-like figure shape Or interlayer.Pulling is to reduce cross-sectional area, the forging process that length increases.Aluminum alloy blank by least four times jumping-ups with And forging plate is formed after pulling out at least one times, forging plate cracking can be prevented, makes the forging of forging plate saturating, the structure property of forging plate, enhancing is improved Forge the case hardness of plate.
After aluminum alloy blank forging molding, step S3 is carried out.
Step S3 cooling after forged steps:The forging plate of forging molding is cooled down, cooling medium is water, forging plate is in cooling water In soak time >=0.13min/mm.
Specifically, in the present embodiment cooling medium be room temperature water, wherein, aluminum alloy blank complete forging molding after, it is necessary to Water cooling after being forged to aluminium alloy forging plate, aluminium alloy forging plate is immersed in the cooling water of room temperature, soak time >=0.13min/ The effective thickness of mm, such as aluminium alloy forging plate is 10mm, and aluminium alloy forging plate needs to soak in cooling water at least 1.3 minutes, with Complete cooling after forged.
After the completion of cooling after forged, step S4 is carried out.
Step S4 ultrasonic examination steps:Ultrasonic examination is carried out to the forging plate after cooling after forged, for confirming that forging plate is It is no to there is the crackle extended internally or folding.
Wherein, ultrasonic examination is to penetrate the depths of metal material using ultrasound, and enters another section by a section When, a kind of method of part defect is checked the characteristics of interface edge reflects, when ultrasonic beam from piece surface by visiting Head passes to metal inside, just occurs back wave when running into defect with part bottom surface respectively, impulse waveform is formed on fluorescent screen, Judge defective locations and size according to these impulse waveforms.
Aluminium alloy forging plate is carried out on ultrasonic wave stand, is able to confirm that forging plate whether there is the crackle extended internally or folding, So as to ensure that aluminium alloy forges the quality of plate, prevent aluminium alloy from forging plate and defect occur.
After the completion of ultrasonic examination, step S5 is carried out.
Step S5 machining steps:Forging trigger is machined to quench size;
It is machined to by forging trigger after the completion of quenching size, carries out step S6.
Step S6 surface cleaning steps:Surface clean is carried out to forging plate, cutting fluid and chip for removing forging plate surface.
After surface clean is carried out to forging plate, step S7 is carried out.
Step S7 quenching Steps:The forging plate of forging molding is quenched;The heating-up temperature of quenching is 472 ± 3 DEG C, insulation Time is 1min/mm, and the cooling medium of quenching is water, and the temperature of cooling water is 20 ± 5 DEG C, when forging immersion of the plate in cooling water Between >=0.13min/mm.
Wherein, the heating-up temperature of quenching is 472 ± 3 DEG C, such as 469 DEG C, 470 DEG C, 471 DEG C, 472 DEG C, 473 DEG C, 474 DEG C Or 475 DEG C of grades arbitrarily suitable temperature, soaking time is 1min/mm, and the effective thickness for for example forging plate is 10mm, and soaking time is 10 minutes.Forging plate is heated to appropriate temperature and kept after a period of time, is carried out quickly with being soaked into cooling water Cooling, the temperature of cooling water is 20 ± 5 DEG C, such as 15 DEG C, 16 DEG C, 17 DEG C, 18 DEG C, 19 DEG C, 20 DEG C, 21 DEG C, 22 DEG C, 23 DEG C, 24 DEG C or 25 DEG C, soak time >=0.13min/mm of the forging plate in cooling water, the effective thickness for for example forging plate is 10mm, forges plate Soak time in cooling water is at least 1.3 minutes.
Wherein, quenching can improve the aluminium alloy forging case hardness of plate, intensity, wearability, toughness and fatigue strength, have Enhancing aluminium alloy in effect ground forges the comprehensive mechanical performance of plate, and the corrosion resistance that aluminium alloy forges plate can also be improved to a certain extent.
Forge plate to complete after quenching, carry out step S8.
Step S8 cold deformation steps:Cold deformation is carried out to the upper and lower surface for forging plate, cold deformation is 1.5%- 2.5%.
The upper and lower surface of aluminium alloy forging plate is carried out after cold deformation, carries out step S9.
Step S9 two-stage time effect steps:Two-stage time effect processing is carried out to forging plate, the first stage protects at a temperature of 65 ± 5 DEG C Temperature 5 hours, second stage is incubated 24 hours at a temperature of 121 ± 5 DEG C.Aluminium alloy is forged plate and handled by two-stage time effect, can Stable aluminium alloy forges the interior tissue of plate, improves the comprehensive mechanical performance that aluminium alloy forges plate.
It is further comprising the steps of after two-stage time effect processing:
Step S10 hardness determination steps:Hardness determination is carried out to forging plate, so as to judge whether forging plate hardness is qualified;
Step S11 machining steps:Forging trigger is machined to finished size;
Step S12 flaw detection steps:Flaw detection, according to 6519B grades of standards of GB T, detects a flaw to forging plate, so as to judge to forge plate With the presence or absence of defect;
Step S13 checks and accepts step:Check and accept, check and check finished appearance;
Step S14 packaging steps:Packaging, uses wood pallets packaging forging plate.
The forging method that the present embodiment is provided, including at least four times jumping-ups and at least one times during forging molding Pulling, can prevent forging plate cracking, make the forging of forging plate saturating, improve the structure property of forging plate, then forging plate be quenched, effectively The case hardness of forging plate is improved, then cold deformation is carried out to forging plate, reduction forging Stress of plate interior is finally carried out at two-stage time effect to forging plate Reason, stabilizing tissue improves the mechanical performance of forging plate, and then improve the case hardness of forging plate.
It should be noted that the forging method that the present embodiment is provided is applied to aluminum alloy materials, the forging that the present invention is provided Method can also be applied to other arbitrarily in suitable material.
The forging method that the present embodiment is provided, due to comprising the following steps:Forge step:Blank forging is molded, in forging Cause to include at least four times jumping-ups during type and pull out at least one times;The upset ratio of jumping-up is not less than 2 each time.Quench Fiery step:The forging plate of forging molding is quenched;The heating-up temperature of quenching is 472 ± 3 DEG C, and soaking time is 1min/mm, is quenched The cooling medium of fire is water, and the temperature of cooling water is 20 ± 5 DEG C, soak time >=0.13min/mm of the forging plate in cooling water. Two-stage time effect step:Two-stage time effect processing is carried out to forging plate, the first stage is incubated 5 hours, second-order at a temperature of 65 ± 5 DEG C Section is incubated 24 hours at a temperature of 121 ± 5 DEG C.Aluminium alloy is forged plate and handled by two-stage time effect, being capable of stabilizing tissue, improvement aluminium Alloy forges the comprehensive mechanical performance of plate.The process of forging molding is used for blank forging into forging plate, and in the mistake of forging molding Journey includes at least four times jumping-ups and pulled out at least one times, can prevent forging plate cracking, make the forging of forging plate saturating, improve the group of forging plate Performance is knitted, then forging plate is quenched, the case hardness of forging plate is effectively improved, then two-stage time effect processing is carried out to forging plate, So as to stabilizing tissue, improve the mechanical performance of forging plate, and then improve the case hardness of forging plate.
Specification is 1200 × 800 × 370mm 7075 aluminium alloys forging plate, is manufactured as stated above, forging plate surface hardness is equal More than 150HB.
Specification is 2500 × 1500 × 220mm 7075 aluminium alloys forging plate, is manufactured as stated above, forging plate surface hardness is equal More than 150HB.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of forging method, it is characterised in that comprise the following steps:
Forge step:Blank forging is molded, at least four times jumping-ups are included during forging molding and are pulled out at least one times It is long;
Quenching Step:The forging plate of forging molding is quenched;
Two-stage time effect step:Two-stage time effect processing is carried out to forging plate.
2. forging method according to claim 1, it is characterised in that in the forging step, the jumping-up of jumping-up each time Than being not less than 2.
3. forging method according to claim 1, it is characterised in that in the quenching Step, the heating-up temperature of quenching is 472 ± 3 DEG C, soaking time is 1min/mm, and the cooling medium of quenching is water, and the temperature of cooling water is 20 ± 5 DEG C, and forging plate is cold But soak time >=0.13min/mm in water.
4. forging method according to claim 1, it is characterised in that in the two-stage time effect step, the first stage is 65 5 hours are incubated at a temperature of ± 5 DEG C, second stage is incubated 24 hours at a temperature of 121 ± 5 DEG C.
5. the forging method according to any one of claim 1-4, it is characterised in that also include before forging step Heat blank step:
Heat blank step:Blank is heated, the soaking time of blank heating is 1.3min/mm.
6. forging method according to claim 5, it is characterised in that also include between forging step and quenching Step with Lower step:
Cooling after forged step:The forging plate of forging molding is cooled down, cooling medium is water, when forging immersion of the plate in cooling water Between >=0.13min/mm.
7. forging method according to claim 6, it is characterised in that also wrapped between cooling after forged step and quenching Step Include following steps:
Ultrasonic examination step:Ultrasonic examination is carried out to the forging plate after cooling after forged, for confirming forging plate with the presence or absence of inside The crackle of extension or folding.
8. forging method according to claim 7, it is characterised in that between ultrasonic examination step and quenching Step also Comprise the following steps:
Machining steps:Forging trigger is machined to quench size;
Surface cleaning step:Surface clean is carried out to forging plate, cutting fluid and chip for removing forging plate surface.
9. forging method according to claim 1, it is characterised in that also include between quenching Step and two-stage time effect step Following steps:
Cold deformation step:Cold deformation is carried out to the upper and lower surface for forging plate, cold deformation is 1.5%-2.5%.
10. forging method according to claim 9, it is characterised in that further comprising the steps of after two-stage time effect step:
Hardness determination step:Hardness determination is carried out to forging plate.
CN201710594342.4A 2017-07-20 2017-07-20 Forging method Pending CN107159830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710594342.4A CN107159830A (en) 2017-07-20 2017-07-20 Forging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710594342.4A CN107159830A (en) 2017-07-20 2017-07-20 Forging method

Publications (1)

Publication Number Publication Date
CN107159830A true CN107159830A (en) 2017-09-15

Family

ID=59817945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710594342.4A Pending CN107159830A (en) 2017-07-20 2017-07-20 Forging method

Country Status (1)

Country Link
CN (1) CN107159830A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108080548A (en) * 2017-12-20 2018-05-29 西南铝业(集团)有限责任公司 A kind of processing method of 2024 aluminium alloy open die forgings
CN108127344A (en) * 2017-12-20 2018-06-08 西南铝业(集团)有限责任公司 A kind of processing method of 6082 aluminium alloy open die forgings
CN111001742A (en) * 2019-12-06 2020-04-14 陕西宏远航空锻造有限责任公司 Forging method for improving performance of 7050-T7452 free forge piece
CN111364522A (en) * 2020-03-13 2020-07-03 焦利国 Forged well lid and manufacturing method thereof
CN112676504A (en) * 2020-12-09 2021-04-20 山东南山铝业股份有限公司 Free forging processing method of aviation aluminum alloy arc forging plate
CN112872256A (en) * 2020-12-28 2021-06-01 西南铝业(集团)有限责任公司 Production process of 7039 alloy super-wide plate forging

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101698916A (en) * 2009-11-13 2010-04-28 中国航空工业集团公司北京航空材料研究院 Novel high-strength/tenacity aluminum alloy and preparation method thereof
CN102644039A (en) * 2011-02-17 2012-08-22 北京有色金属研究总院 Preparation method of high-quality 6061 aluminium alloy forging for semiconductor equipment
CN102732761A (en) * 2012-06-18 2012-10-17 中国航空工业集团公司北京航空材料研究院 7000 series aluminum alloy material and preparation method thereof
CN104152825A (en) * 2014-08-28 2014-11-19 航天精工股份有限公司 A thermal treatment method of a 7-series aluminum alloy
CN104232978A (en) * 2014-09-01 2014-12-24 航天材料及工艺研究所 Preparation method of copper-silver-zirconium alloy large-size forged biscuit
CN105088113A (en) * 2015-08-27 2015-11-25 东北轻合金有限责任公司 Method for manufacturing aluminum alloy free forge piece for spaceflight
CN106498248A (en) * 2016-11-18 2017-03-15 东北轻合金有限责任公司 The manufacture method of aluminum alloy die forgings

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101698916A (en) * 2009-11-13 2010-04-28 中国航空工业集团公司北京航空材料研究院 Novel high-strength/tenacity aluminum alloy and preparation method thereof
CN102644039A (en) * 2011-02-17 2012-08-22 北京有色金属研究总院 Preparation method of high-quality 6061 aluminium alloy forging for semiconductor equipment
CN102732761A (en) * 2012-06-18 2012-10-17 中国航空工业集团公司北京航空材料研究院 7000 series aluminum alloy material and preparation method thereof
CN104152825A (en) * 2014-08-28 2014-11-19 航天精工股份有限公司 A thermal treatment method of a 7-series aluminum alloy
CN104232978A (en) * 2014-09-01 2014-12-24 航天材料及工艺研究所 Preparation method of copper-silver-zirconium alloy large-size forged biscuit
CN105088113A (en) * 2015-08-27 2015-11-25 东北轻合金有限责任公司 Method for manufacturing aluminum alloy free forge piece for spaceflight
CN106498248A (en) * 2016-11-18 2017-03-15 东北轻合金有限责任公司 The manufacture method of aluminum alloy die forgings

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘瑞堂: "《机械零件失效分析与实例》", 28 February 2015, 哈尔滨工业大学出版社 *
刘静安等: "《铝合金锻造技术》", 30 June 2012, 冶金工业出版社 *
张宏伟: "《铝锻造生产技术问答》", 30 April 2013, 中南大学出版社 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108080548A (en) * 2017-12-20 2018-05-29 西南铝业(集团)有限责任公司 A kind of processing method of 2024 aluminium alloy open die forgings
CN108127344A (en) * 2017-12-20 2018-06-08 西南铝业(集团)有限责任公司 A kind of processing method of 6082 aluminium alloy open die forgings
CN111001742A (en) * 2019-12-06 2020-04-14 陕西宏远航空锻造有限责任公司 Forging method for improving performance of 7050-T7452 free forge piece
CN111364522A (en) * 2020-03-13 2020-07-03 焦利国 Forged well lid and manufacturing method thereof
CN112676504A (en) * 2020-12-09 2021-04-20 山东南山铝业股份有限公司 Free forging processing method of aviation aluminum alloy arc forging plate
CN112676504B (en) * 2020-12-09 2022-07-15 山东南山铝业股份有限公司 Free forging processing method of aviation aluminum alloy arc forging plate
CN112872256A (en) * 2020-12-28 2021-06-01 西南铝业(集团)有限责任公司 Production process of 7039 alloy super-wide plate forging

Similar Documents

Publication Publication Date Title
CN107159830A (en) Forging method
CN105921672B (en) A kind of method of the isothermal forging of straight bevel gear
CN105598328B (en) Mould steel forging method
CN105331913B (en) Method for thermally extruding and deforming high-temperature alloy Inconel 625 pipe through short process
CN107812871B (en) A kind of high flange becomes the thick wall head solid forging method of wall thickness
CN109108196B (en) Preparation method of high-strength and high-toughness aluminum alloy die forging for airplane wing
CN103962802B (en) Warm extrusion forming process of internal thread joint of petroleum drill rod
CN105642805A (en) Manufacturing method for shell
CN106734465B (en) Method based on the hot press-formed production automobile B-column of multilayer common metal composite plate
CN105215242B (en) Method for forging concavity mold cavity module
CN105081159A (en) Die forging method for titanium alloy disk
CN104338882A (en) Forming method of motor enclosure forging of third-generation nuclear power coolant pump
CN111250639B (en) Blank forming method for GH4169 large-sized special-shaped ring forging
CN108145386A (en) A kind of optimization preparation method of LF2 aviations conduit
CN108237197A (en) A kind of forging method for improving the flaw detection of structural steel large-sized ring part
TWI679070B (en) Forging and drawing method for aluminum alloy pipe fittings
CN108213110A (en) A kind of preparation method of catheter blank and aluminum alloy conduit
CN112475180A (en) Forging die and method for step shaft type forge piece
CN106862879B (en) A kind of cold-forging forming technique of the hollow output shaft with flange
CN1160522C (en) Technology for manufacturing large-diameter thick-wall seamless steel pipe
WO2023115752A1 (en) Die forging forming die and die forging forming method for large l-shaped hollow thin-walled pipe
CN110961872A (en) Preparation method of large-size titanium alloy seamless deep-hole cylinder
CN107186149B (en) One-die two-piece forging die and method for drill pipe joint
CN109175058A (en) A kind of plate semisolid air pressure thixotropic forming method
CN108941304A (en) A kind of tubing semisolid air pressure thixotropic forming method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915

RJ01 Rejection of invention patent application after publication