CN107156937A - A kind of preparation method of mold cup - Google Patents

A kind of preparation method of mold cup Download PDF

Info

Publication number
CN107156937A
CN107156937A CN201710396414.4A CN201710396414A CN107156937A CN 107156937 A CN107156937 A CN 107156937A CN 201710396414 A CN201710396414 A CN 201710396414A CN 107156937 A CN107156937 A CN 107156937A
Authority
CN
China
Prior art keywords
pocket
lining
plus
preparation
mold cup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710396414.4A
Other languages
Chinese (zh)
Other versions
CN107156937B (en
Inventor
张伟英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Meishanzi Garments Co Ltd
Original Assignee
Suzhou Meishanzi Garments Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Meishanzi Garments Co Ltd filed Critical Suzhou Meishanzi Garments Co Ltd
Priority to CN201710396414.4A priority Critical patent/CN107156937B/en
Publication of CN107156937A publication Critical patent/CN107156937A/en
Application granted granted Critical
Publication of CN107156937B publication Critical patent/CN107156937B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A41WEARING APPAREL
    • A41CCORSETS; BRASSIERES
    • A41C5/00Machines, appliances, or methods for manufacturing corsets or brassieres

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Textile Engineering (AREA)
  • Details Of Garments (AREA)

Abstract

The invention discloses a kind of preparation method of mold cup, comprise the following steps:A) material is prepared:Prepare lining and cup, described lining includes left plus U.S. pocket, right plus U.S. pocket and lower card lining;B) make and combine plus U.S. pocket:Add U.S. pocket, the described right side to add U.S. pocket to be made on a described left side to combine plus U.S. pocket;C) lining is arranged:U.S. pocket is added to be put into sewing template and arrange described lower card lining and described combination;D) template is sewed:Carry out template suture;E) the rim of a bowl pinches province:Form the mold cup circle being engaged with the cup;F) lining is enclosed:Described lining circle is put into the cup and peripheral suture is carried out.The preparation method for the mold cup that the present invention is provided, card lining is split above and below eliminating, cost is reduced, and using template sewing, it is not only simple to operate, the speed of sewing can be improved, and then improving production efficiency, product still has the function of inserting and add U.S. pocket, and product is not in the quality problems such as oblique tuft, yields is improved, preferable social benefit and larger economic benefit can be produced.

Description

A kind of preparation method of mold cup
Technical field
Field is manufactured the present invention relates to underwear, and in particular to a kind of preparation method of mold cup.
Background technology
With science and technology progress and the improvement of people's living standards, requirement more and more higher of the modern society to underwear, and Brassiere is as a staple product of underwear, and the raising of its replacement frequency promotes the rising of brassiere usage amount.And the system of mold cup Work is a basic flow of brassiere, and referring to accompanying drawing 1, operating procedure of the prior art is:A) material is prepared:First prepare default The 4 pieces of linings and cup of size, 4 pieces of linings include left plus U.S. pocket, right plus U.S. pocket, lower card lining and upper card lining;B) knot is made Close plus U.S. pocket:A left side plus U.S. pocket, right plus U.S.A are gone around in circles and infolding 1cm, composition is combined plus U.S. pocket;C) lower U.S. pocket is made:Will knot Close plus U.S. pocket is laid on lower card lining, and carry out peripheral pre-stitching, lower U.S. pocket is made;D) lining is arranged:Lower U.S. pocket is tiled In lower section, upper card lining is laid on lower U.S. pocket, and arrangement makes the radian of the upper end of card lining and lower U.S. pocket match;e) Stowing:The lower end of upper card lining is subjected to concealed wire suture with lower U.S. pocket;F) open-wire line is pressed:Pressure open-wire line suture is carried out, is obtained and cup The lining circle being engaged;G) lining is enclosed:Lining circle after open-wire line is sutured is put into cup and carries out peripheral suture;H) insert Plus U.S. pad:It will add in unstitched partial insertion mold cup lining of the U.S. pad from combining and adding U.S. pocket, obtain final products.
Wherein step e) and operation f) are the most difficult, as being time-consuming, laborious process for underwear product, because arc Degree is big, there is certain operation difficulty for employee, if during operation upper card lining and lower U.S. 2 layers of pocket combine gestures it is inconsistent when, 2 layers can be caused to occur eating, and gesture is irregular, and oblique tuft occurs in final finished;It is due to lining using relatively thin although labor intensity is not high Knitting fabric, be very easy to roll, can only outer power pave, so employee must side when carrying out concealed wire or open-wire line suture Fabric is smoothed out with the fingers flat by operation side, spend time on material treatment excessively, the equipment dead time is more, cause employee's output man-hour compared with It is low, take in low, the operation employee's resignation rate for ultimately resulting in this process is high, and bottleneck occurs in streamline, overall production is produced compared with Big influence.
The content of the invention
In view of this, in order to overcome the defect of prior art, it is an object of the invention to provide a kind of preparation method of mold cup, This method eliminate above and below the segmentation of card lining, reduce cost, and using template sewing, it is not only simple to operate, seam can be improved The speed of system, and then improving production efficiency, product still have the function of inserting and add U.S. pocket, and product is not in the quality such as oblique tuft Problem, improves yields, with considerable economic benefit.
In order to achieve the above object, the present invention uses following technical scheme:
A kind of preparation method of mold cup, it is characterised in that comprise the following steps:
A) material is prepared:Prepare the lining and cup of pre-set dimension, described lining include left plus U.S. pocket, right plus U.S. pocket and Lower card lining;
B) make and combine plus U.S. pocket:Add U.S. pocket, the described right side to add U.S. pocket to be made on a described left side to combine plus U.S. pocket;
C) lining is arranged:U.S. pocket is added to be put into sewing template and carry out whole described lower card lining and described combination Reason;
D) template is sewed:Template suture is carried out, open-wire line is pressed;
E) the rim of a bowl pinches province:Lining after template is sutured carries out the rim of a bowl and pinches province, forms the mold cup being engaged with the cup Circle;
F) lining is enclosed:Described lining circle is put into the cup and peripheral suture is carried out, mold cup lining is obtained.
Preferably, the profile of the cup and the lower card lining matches.
It is further preferred that described lower card lining adds the profile of U.S. pocket to match with the combination.
Preferably, combined described in step b) plus the preparation method of U.S. pocket is:By the right part of the left plus U.S. pocket and institute The left part of right plus U.S. pocket is stated along straight line infolding and certain length is sutured downwards along the upper end for folding straight line, described combination is made Plus U.S. pocket.
It is further preferred that described stitch length is 4-5cm.
It is further preferred that the position of open-wire line described in step d) adds the bottom phase of U.S. pocket stitch length with the combination Correspondence.
Preferably, the arrangement lining in step c) is:Described combination adds U.S. pocket positioned at the top of the lower card lining, and Lower card lining described in keeping is corresponding with the profile radian that the combination adds U.S. pocket.
Preferably, described step also includes g) inserting plus U.S. pad:By add U.S. pad from the combination add U.S. pocket in the folding In mold cup lining described in the unstitched partial insertion of folded straight line.
Due to the implementation of above technical scheme, a kind of preparation method of the mold cup of the invention provided has compared with prior art Have the following advantages:
1. this method eliminate above and below card lining segmentation, reduce lining consumption, also save cut-parts man-hour, reduce into This, is computed, the 1 jiao/part of fabric cost savings after improvement, and cost of labor saves 1.2 jiaos/part, can reduce by 2.2 jiaos/part altogether;
Operated 2. original radian suture operation is become straight line stitching instrument by this method, operational reliability is sewed using template Height, it is not only simple to operate, the speed of sewing, and then improving production efficiency can be improved, product still has the function of inserting and add U.S. pocket, And product is not in the quality problems such as oblique tuft, improves yields;
3. this method can reduce action and the time that employee arranges lining, employee's fatigue strength is reduced;
4. applied widely add the product of U.S. pocket function to use this method, it is necessary to place, preferable society can be produced Can benefit and larger economic benefit.
Brief description of the drawings
Fig. 1 is the Making programme figure of mold cup in the prior art;
Fig. 2 is the Making programme figure of mold cup in the preferred embodiments of the present invention;
Fig. 3 is the rearview of mold cup in the preferred embodiments of the present invention;
Fig. 4 is the stacking decomposing schematic representation of mold cup in the preferred embodiments of the present invention;
Wherein:A left side plus U.S. pocket -1, the right side plus U.S. pocket -2, lower card lining -3, cup -4, open-wire line -5, plus U.S. pad -6.
Embodiment
The preferred embodiment of the present invention is described in detail below in conjunction with the accompanying drawings.
As in Figure 2-4, a kind of preparation method of mold cup of the present embodiment, comprises the following steps:
Step S1:Prepare material
Prepare the lining and cup 4 of pre-set dimension, lining includes left plus U.S. pocket 1, right plus U.S. pocket 2 and lower card lining 3.Cup 4 match with the profile of lower card lining 3.
Step S2:Make and combine plus U.S. pocket
Add U.S. pocket 1, right plus U.S. pocket 2 to be made on a left side to combine plus U.S. pocket, preparation method is:By the right part of left plus U.S. pocket 1 with The right side plus the left part of U.S. pocket 2 suture along straight line infolding and downwards 4-5cm along the upper end for folding straight line, are made and combine plus U.S. pocket.Knot Close plus the profile of U.S. pocket and lower card lining 3 matches.
Step S3:Arrange lining
Add U.S. pocket to be put into sewing template and arranged with combining lower card lining 3, will combine plus U.S.'s pocket is located at lower card The top of lining 3, and keep lower card lining 3 to add the profile radian of U.S. pocket corresponding with combining.
Step S4:Template is sewed
Template suture is carried out, open-wire line is pressed, the position of open-wire line 5 adds the bottom phase of U.S. pocket stitch length with being combined in step S2 Correspondence.
Step S5:The rim of a bowl pinches province
Lining after template is sutured carries out the rim of a bowl and pinches province, forms the mold cup circle being engaged with cup 4.
Step S6:Enclose lining
Lining circle is put into cup 4 and peripheral suture is carried out, suture is the dotted line of outermost in accompanying drawing 3.
Step S7:Insert plus U.S. pad
It will add in the unstitched partial insertion mold cup lining of folding straight line of the U.S. pad 6 from combining and adding U.S. pocket, obtain final Product.
In step S7 plus U.S. pad can choose whether insertion according to the situation of actual use.
The preparation method for the mold cup that the present invention is provided, eliminate above and below card lining segmentation, reduce lining consumption, also save Cut-parts man-hours, reduce cost;Original radian suture operation is become straight line stitching instrument operation by this method, is stitched using template System, operational reliability is high, not only simple to operate, can improve the speed of sewing, and then improving production efficiency, and product will not There are the quality problems such as oblique tuft, improve yields, product still has the function of inserting and add U.S. pocket;It is whole that this method can reduce employee Action and the time of lining are managed, employee's fatigue strength is reduced;It is applied widely to add the product of U.S. pocket function to adopt, it is necessary to place With this method, preferable social benefit and larger economic benefit can be produced.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow person skilled in the art Scholar can understand present disclosure and implement according to this, and it is not intended to limit the scope of the present invention.It is all according to the present invention The equivalent change or modification that Spirit Essence is made, should all be included within the scope of the present invention.

Claims (8)

1. a kind of preparation method of mold cup, it is characterised in that comprise the following steps:
A) material is prepared:Prepare the lining and cup of pre-set dimension, described lining includes left plus U.S. pocket, right plus U.S. pocket and lower card Lining;
B) make and combine plus U.S. pocket:Add U.S. pocket, the described right side to add U.S. pocket to be made on a described left side to combine plus U.S. pocket;
C) lining is arranged:U.S. pocket is added to be put into sewing template and arranged described lower card lining and described combination;
D) template is sewed:Template suture is carried out, open-wire line is pressed;
E) the rim of a bowl pinches province:Lining after template is sutured carries out the rim of a bowl and pinches province, forms the mold cup circle being engaged with the cup;
F) lining is enclosed:Described lining circle is put into the cup and peripheral suture is carried out, mold cup lining is obtained.
2. the preparation method of a kind of mold cup according to claim 1, it is characterised in that the cup and the lower card lining Profile match.
3. the preparation method of a kind of mold cup according to claim 2, it is characterised in that described lower card lining and the knot Close plus the profile of U.S. pocket matches.
4. the preparation method of a kind of mold cup according to claim 1, it is characterised in that combined described in step b) plus U.S. pocket Preparation method be:The right part of the left plus U.S. pocket and the left part of the right plus U.S. pocket is along straight line infolding and straight along folding The upper end of line sutures downwards certain length, and described combination is made and adds U.S. pocket.
5. the preparation method of a kind of mold cup according to claim 4, it is characterised in that described stitch length is 4-5cm.
6. a kind of preparation method of mold cup according to claim 5, it is characterised in that the position of open-wire line described in step d) It is corresponding with the bottom that the combination adds U.S. pocket stitch length.
7. a kind of preparation method of mold cup according to claim 1, it is characterised in that the arrangement lining in step c) is: Described combination adds U.S. pocket to be located at the top of the lower card lining, and keeps described lower card lining to add U.S. pocket with the combination Profile radian is corresponding.
8. the preparation method of a kind of mold cup according to claim 1, it is characterised in that described step also includes g) inserting adding U.S.'s pad:U.S. pad will be added from the mold cup lining described in the unstitched partial insertion of folding straight line in U.S. pocket is added In.
CN201710396414.4A 2017-05-31 2017-05-31 A kind of production method of mold cup Active CN107156937B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710396414.4A CN107156937B (en) 2017-05-31 2017-05-31 A kind of production method of mold cup

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710396414.4A CN107156937B (en) 2017-05-31 2017-05-31 A kind of production method of mold cup

Publications (2)

Publication Number Publication Date
CN107156937A true CN107156937A (en) 2017-09-15
CN107156937B CN107156937B (en) 2019-02-19

Family

ID=59822080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710396414.4A Active CN107156937B (en) 2017-05-31 2017-05-31 A kind of production method of mold cup

Country Status (1)

Country Link
CN (1) CN107156937B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB755091A (en) * 1954-11-19 1956-08-15 Emile Jean Eugene Delaye Method for producing brassiere cups
CN101218992A (en) * 2008-01-16 2008-07-16 苏州美山子制衣有限公司 Bra cup and processing method thereof
CN102048250A (en) * 2010-09-20 2011-05-11 苏州美山子制衣有限公司 Bra mold cup and manufacturing process thereof
CN203538401U (en) * 2013-08-16 2014-04-16 苏州美山子制衣有限公司 Environmental breathable vertical cotton cup
CN104432600A (en) * 2014-11-28 2015-03-25 苏州美山子制衣有限公司 Bra cup with beautifying pocket arranged inside and production method of bra cup

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB755091A (en) * 1954-11-19 1956-08-15 Emile Jean Eugene Delaye Method for producing brassiere cups
CN101218992A (en) * 2008-01-16 2008-07-16 苏州美山子制衣有限公司 Bra cup and processing method thereof
CN102048250A (en) * 2010-09-20 2011-05-11 苏州美山子制衣有限公司 Bra mold cup and manufacturing process thereof
CN203538401U (en) * 2013-08-16 2014-04-16 苏州美山子制衣有限公司 Environmental breathable vertical cotton cup
CN104432600A (en) * 2014-11-28 2015-03-25 苏州美山子制衣有限公司 Bra cup with beautifying pocket arranged inside and production method of bra cup

Also Published As

Publication number Publication date
CN107156937B (en) 2019-02-19

Similar Documents

Publication Publication Date Title
CN105146836B (en) The plate-making method of western-style clothes sleeve symmetrical tripe and check
JP2005533197A (en) A bra with a hidden band, a blank to make this bra, and how to make this bra
CN103445357B (en) A kind of manufacture craft of Western-style clothes collar
CN104172822B (en) Washable silk quilt and manufacturing method thereof
CN105852288B (en) Clothes are opened flat vent in the sides of a garment construction manufacturing method
CN206165849U (en) In trousers front of a garment and have these trousers in trousers of front of a garment
CN107156937A (en) A kind of preparation method of mold cup
CN106343618B (en) A kind of seamless knitted man solid straight angle trousers and manufacturing method
CN204861224U (en) Brassiere does not have trace flank
CN106192197B (en) Sock opening sewing method and structure
CN104172821B (en) A kind of drawing of silkworm silk quilt
CN204132980U (en) A kind of silk quilt washed
CN106690440A (en) Flat seaming machine of stitched low-cut liners socks
CN203182089U (en) Panty arc-shaped waistband
CN104643351B (en) A kind of business wear sleeve meets the sewing method of human body elbow camber
CN106333405B (en) Hang lining clothes and fold door vent in the sides of a garment construction manufacturing method
CN113261735A (en) Down jacket digging instead of direct filling process
CN109072521A (en) Assembling is for seat or method and the relevant decoration of the decoration for filling furniture
CN106978677A (en) Five jiaos of polygon double pleats paste block auxiliary sewing templates of pin mouthful
CN207428494U (en) A kind of multi-functional sleeve
CN106805297A (en) A kind of cutting of garment sleeve vent in the sides of a garment and method of sewing
CN106490906B (en) A kind of production method of gravity quilt
CN104757832B (en) A kind of novel quilt sewing method
CN206062239U (en) A kind of folded door vent in the sides of a garment structure of clothing
CN206062238U (en) It is a kind of to hang the folded door vent in the sides of a garment structure of lining clothing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200325

Address after: Suzhou Meijia Pingwang Town Road Wujiang District No. 1 of 215221 cities in Jiangsu Province

Patentee after: SUZHOU MEISHANZI GARMENTS Co.,Ltd.

Address before: Suzhou Meijia Pingwang Town Road Wujiang District No. 1 of 215221 cities in Jiangsu Province

Co-patentee before: SUZHOU MEISHANZI GARMENTS Co.,Ltd.

Patentee before: Zhang Weiying

TR01 Transfer of patent right