CN107152578B - Pipeline modification device and with oily hot work method - Google Patents

Pipeline modification device and with oily hot work method Download PDF

Info

Publication number
CN107152578B
CN107152578B CN201710409863.8A CN201710409863A CN107152578B CN 107152578 B CN107152578 B CN 107152578B CN 201710409863 A CN201710409863 A CN 201710409863A CN 107152578 B CN107152578 B CN 107152578B
Authority
CN
China
Prior art keywords
clamping plate
pipeline
special
threeway
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710409863.8A
Other languages
Chinese (zh)
Other versions
CN107152578A (en
Inventor
张惠军
祝鹏
鲍国
李国权
李瑜
李贵良
张寒松
田文钊
董学召
代小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Industrial Equipment Installation Group Co.,Ltd.
Original Assignee
INDUSTRIAL DEVICES INSTALLATION CO SICHUAN PROVINCE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INDUSTRIAL DEVICES INSTALLATION CO SICHUAN PROVINCE filed Critical INDUSTRIAL DEVICES INSTALLATION CO SICHUAN PROVINCE
Priority to CN201710409863.8A priority Critical patent/CN107152578B/en
Publication of CN107152578A publication Critical patent/CN107152578A/en
Application granted granted Critical
Publication of CN107152578B publication Critical patent/CN107152578B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/04Tapping pipe walls, i.e. making connections through the walls of pipes while they are carrying fluids; Fittings therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L13/00Non-disconnectible pipe-joints, e.g. soldered, adhesive or caulked joints
    • F16L13/02Welded joints
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow from or in pipes or hoses
    • F16L55/1026Fire protection devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow from or in pipes or hoses
    • F16L55/12Means for stopping flow from or in pipes or hoses by introducing into the pipe a member expandable in situ
    • F16L55/128Means for stopping flow from or in pipes or hoses by introducing into the pipe a member expandable in situ introduced axially into the pipe or hose
    • F16L55/132Means for stopping flow from or in pipes or hoses by introducing into the pipe a member expandable in situ introduced axially into the pipe or hose the closure device being a plug fixed by radially deforming the packing
    • F16L55/134Means for stopping flow from or in pipes or hoses by introducing into the pipe a member expandable in situ introduced axially into the pipe or hose the closure device being a plug fixed by radially deforming the packing by means of an inflatable packing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/18Appliances for use in repairing pipes

Abstract

The present invention provides a kind of pipeline modification device and with oily hot work method, it is related to petrochemical industry.The device includes special clamping plate and isometrical special threeway;Special clamping plate includes tightening device, circular first clamping plate, second clamping plate and refractory flexible body therebetween;Tightening device is used to reduce the distance between first clamping plate and second clamping plate and fix;Isometrical special threeway includes threeway body and sealing plate;A circle connecting flange ring is welded in one of branch pipe of threeway body;Connecting flange ring is detachably connected with sealing plate;Special clamping plate can just take out for blocking old pipeline through connecting flange ring.This method is needing the place transformed to break pipe, is then isolated at disconnected pipe by special clamping plate.After isolation, you can weld special threeway, then take out special clamping plate by the opening of threeway.Then sealing plate closing threeway again, isolates oil gas, is then operated again after progress.The present invention realizes the band fire construction to aviation kerosine pipeline.

Description

Pipeline modification device and with oily hot work method
Technical field
The present invention relates to technical field of petrochemical industry, more particularly, to a kind of pipeline modification device and with oily hot work side Method.
Background technology
In use for some time, system needs the transformation in terms of progress technique, flow, such as machine level ground to aviation kerosine pipeline After pipeline increases new oiling branch pipe, aviation fuel pipeline is relocated situations such as new old pipeline connection, although pipeline has carried out stopping transportation, has let out The processes such as pressure, oil extraction, but still have situation existing for Residual oil (gas) in pipeline.
In this case carry out during fire operation (fire operation of this programme meaning typically refers to pipeline weld job), very There is a situation where explosion on fire, the prior art lacks a kind of safe fire operation method, substantially oil gas is waited to escape automatically It constructs after dissipating, the stand-by period is very long.
Based on this, the present invention provides a kind of pipeline modification device and with oily hot work method to solve above-mentioned technology Problem.
The content of the invention
It is an object of the invention to provide a kind of pipeline modification device, to realize the isolation to oil gas in pipeline.
The present invention also aims to provide a kind of band oil hot work method, the band to aviation kerosine pipeline is used to implement Fire construction.
Based on above-mentioned first purpose, the present invention provides a kind of pipeline modification device, special clamping plate and isometrical special threeway; The special clamping plate includes tightening device, circular first clamping plate and second clamping plate, the first clamping plate and the second clamping plate It is stacked;Refractory flexible body is provided between the first clamping plate and the second clamping plate;
The tightening device is used to reduce the distance between the first clamping plate and the second clamping plate and fix;
The isometrical special threeway includes threeway body and sealing plate;
A circle connecting flange ring is welded in wherein the first branch pipe of the threeway body;The connecting flange ring with it is described Sealing plate is detachably connected;Second branch pipe of the threeway body is used for and original seal for pipe joints is affixed connects, the 3rd branch pipe be used for Newly plus seal for pipe joints is affixed;
The special clamping plate can just take out for blocking old pipeline through the connecting flange ring.
Optionally, the tightening device include screw rod, the screw rod pass through the second clamping plate after with the first clamping plate Side it is vertically affixed;Nut is bolted on the screw rod, the nut is connected to the second clamping plate and the first clamping plate Opposite one side.
Optionally, the screw rod is located at the center of the first clamping plate.
Optionally, more leads are provided between the first clamping plate and the second clamping plate.
Based on above-mentioned second purpose, the present invention provides a kind of band oil hot work method, the band oil hot work sides Method includes the following steps,
Step 1 carries out perforate, the relief tube carried after perforate using hole making drill by hole making drill to the pipeline of required transformation Pressure release is carried out, removes hole making drill after pressure release, is extracted out the aviation fuel in pipeline with oil pump;
Step 2, when oil pick-up tube can not extract aviation fuel out again, stop oil pumping, with the iron filings, carefully clear in magnet cleaning pipeline The burr of cut surface is managed, polishing is clean;
Step 3 carries out disconnected pipe in designated position;
After step 4, pipeline disconnect, oil resistant rubber isolation air bag is placed into pipe immediately, into oil resistant rubber isolation air bag Aerating makes oil resistant rubber isolation air bag reach sealing effect full of pipeline;
Step 5 installs special clamping plate as described above into pipeline, by the tightening device, squeezes the fire prevention bullet Property body, its is made to fill full packages road;
Step 6, with the gas concentration in gas concentration detector inspection opening pipeline, confirm gas concentration not in explosion model In enclosing, isometrical special three are then installed as described above and passes to precalculated position;
Step 7, progress Pipeline butt connect;
Step 8 isolates air bag by the special clamping plate in isometrical special threeway taking-up pipeline and the oil resistant rubber Afterwards, the sealing plate of isometrical special threeway, welding tee closing end socket are installed.
Optionally, among step 4, the oil resistant rubber isolation air bag should be left beyond the point 1m that gets angry.
Optionally, among step 7, during welding constantly into pipe weld inflated with nitrogen into line replacement.
Optionally, among step 7, into oil resistant rubber isolation air bag, aerating is to 0.2mpa.
Optionally, among step 8, after the completion of pipeline welding, weld seam is carried out non-destructive testing, is further taken out after detection is qualified The special clamping plate and oil resistant rubber isolation air bag.
Optionally, among step 8, after welding tee closing end socket, to weld seam non-destructive testing, carried out after qualified at anti-corrosion Reason.
The diameter of the pipeline modification device provided by the invention, the first clamping plate and the second clamping plate is applied with needs The diameter of the pipeline of work is roughly the same, in use, old pipeline is disconnected, special clamping plate is filled in pipeline, clamping plate is perpendicular to pipe Road by the tightening device, constantly reduces the distance between first clamping plate and second clamping plate, squeezes positioned there between Refractory flexible body.Refractory flexible body can be the sealing material of the flexible fire prevention oil removal such as dough.Its by the clamping plates of both sides not Disconnected extruding, is constantly expanded around, finally, is expanded the full entire pipeline of filling, the seal isolation to pipeline is completed, after being Continuous hot work is ready.Whole device is simple in structure, and application method is very easy, and sealing effect is good, elastomer Entire pipeline can be fully expanded to, sealing is not in gap, very convenient.Then welding etc. is through threeway at disconnected pipe, so The new pipe and three-way welding that connect will be needed afterwards.At this moment, due to the closure of special clamping plate, thus Mars will not be contacted with oil gas, Therefore can get angry welding.After Deng welding, special clamping plate is taken out, is then sealed by sealing plate, complete transformation.
The band oil hot work method provided by the invention, by modes such as oil extraction and dual resisteances, provides one The method that the safe and reliable band oil of kind is got angry, avoids the generation of the situations such as on fire, reduces the risk of construction.
Based on this, the present invention has the advantages that high safety, risk are low etc. compared with original technology.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in describing below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the front view of special clamping plate provided in an embodiment of the present invention;
Fig. 2 is the left view of special clamping plate shown in FIG. 1;
Fig. 3 is the structure diagram of isometrical special threeway;
Fig. 4 is threeway schematic view of the mounting position in band oil hot work method provided in an embodiment of the present invention.
Icon:1- first clamping plates;2- second clamping plates;3- refractory flexible bodies;4- screw rods;5- nuts;6- pipelines;7- oil resistant rubbers Glue isolates air bag;The isometrical special threeways of 8-;End socket is closed in 9- threeways;10- oil pumping hole;81- connecting flange rings;82- threaded holes.
Specific embodiment
Technical scheme is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's all other embodiments obtained without making creative work, belong to the scope of protection of the invention.
In the description of the present invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instructions such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to Convenient for the description present invention and simplify description rather than instruction or imply signified device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " the 3rd " is only used for description purpose, and it is not intended that instruction or hint relative importance.
In the description of the present invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or be integrally connected;It can To be mechanical connection or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
Pipeline modification device embodiment
As shown in Figure 1, 2, a kind of pipeline modification device is provided in the present embodiment, including special clamping plate and isometrical special Threeway;The special clamping plate includes tightening device, circular first clamping plate 1 and second clamping plate 2, the first clamping plate 1 and described Second clamping plate 2 is stacked;Refractory flexible body 3 is provided between the first clamping plate 1 and the second clamping plate 2;
The tightening device is used to reduce the distance between the first clamping plate 1 and described second clamping plate 2 and fix;
The isometrical special threeway 8 includes threeway body and sealing plate;
A circle connecting flange ring 81 is welded in wherein the first branch pipe of the threeway body;The connecting flange ring 81 with The sealing plate is detachably connected;Second branch pipe of the threeway body is used for and original seal for pipe joints is affixed connects, and the 3rd effective Yu Yuxin adds seal for pipe joints affixed;
The special clamping plate can just take out for blocking old pipeline through the connecting flange ring.
The diameter and needs of the pipeline modification device provided by the invention, the first clamping plate 1 and the second clamping plate 2 The diameter of the pipeline of construction is roughly the same, in use, special clamping plate is filled in pipeline, clamping plate is perpendicular to pipeline, by described Tightening device constantly reduces the distance between first clamping plate 1 and second clamping plate 2, squeezes refractory flexible positioned there between Body 3.Refractory flexible body 3 can be the sealing material of the flexible fire prevention oil removal such as dough.It is constantly squeezed by the clamping plate of both sides Pressure, is constantly expanded around, finally, is expanded the full entire pipeline of filling, is completed the seal isolation to pipeline, is subsequent dynamic Fire construction is ready.Whole device is simple in structure, and application method is very easy, and sealing effect is good, and elastomer can be abundant Entire pipeline is expanded to, sealing is not in gap, very convenient.Then welding etc. through threeway, then need at disconnected pipe The new pipe and three-way welding to be connected.At this moment, due to the closure of special clamping plate, thus Mars will not be contacted with oil gas, therefore can With welding of getting angry.After Deng welding, special clamping plate is taken out, is then sealed by sealing plate, complete transformation.
Based on this, the present invention has the advantages that mechanism is simple, sealing effect is good compared with original technology.
Such as Fig. 2, in the alternative of the present embodiment, the tightening device includes screw rod 4, and the screw rod 4 is through described the It is vertical affixed with the side of the first clamping plate 1 after second splint 2;Nut 5 is bolted on the screw rod 4, the nut 5 is connected to The second clamping plate 2 one side opposite with the first clamping plate 1.
The mode of 4 nut 5 of screw rod is simple and practical, and easy to process at low cost, operating method is also easy to, and tightens and consolidate It is strong to determine effect, can effectively squeeze the refractory flexible body 3.
Such as Fig. 1,2, in the alternative of the present embodiment, the screw rod 4 is located at the center of the first clamping plate 1.
The screw rod 4 is arranged at the center of two clamping plates, is conducive to uniformly inwardly squeeze the refractory flexible body 3, Refractory flexible body 3 is made uniformly to external diffusion, to be covered with entire space, so as to all seal entire pipeline, sealing effect is more preferable.
In the alternative of the present embodiment, more guiding are provided between the first clamping plate 1 and the second clamping plate 2 Column.
By setting the more leads, second clamping plate 2 would not deflect during movement, Neng Goujun Even lineal extrusion refractory flexible body 3.
The oily hot work embodiment of the method for band
As shown in Figure 3,4, this embodiment offers a kind of band oil hot work method, the band oil hot work method, The band oil hot work method includes the following steps,
Step 1 carries out perforate, the pressure release carried after perforate using hole making drill by hole making drill to the pipeline 6 of required transformation Pipe carries out pressure release, removes hole making drill after pressure release, extracts the aviation fuel in pipeline 6 out with oil pump, is delivered to specified containers.
Step 2, the liquid level for observing aviation fuel in pipeline 6 at any time when oil pick-up tube can not extract aviation fuel out again, stop taking out Oil, with iron filings, the burr of careful cleaning cut surface in magnet cleaning pipeline 6, polishing is clean;
Step 3 carries out disconnected pipe in designated position;Usable manually or electrically tube brake implement carries out disconnected pipe in designated position.
After step 4, pipeline 6 disconnect, oil resistant rubber isolation air bag 7 is placed into pipe immediately, isolates air bag 7 to oil resistant rubber Interior aerating makes oil resistant rubber isolation air bag 7 reach sealing effect full of pipeline 6;Necessary measure should be taken to fix air bag, prevented Only under 6 negative pressure of pipeline, oil resistant rubber isolation air bag 7 is inhaled into pipeline 6.
Step 5, special clamping plate of the installation as described in claim 1-4 into pipeline 6 by the tightening device, squeeze The refractory flexible body 3 makes it fill full packages road 6;
Step 6, with the gas concentration in gas concentration detector inspection opening pipeline 6, confirm that gas concentration does not explode In the range of, then isometrical special threeway 8 is installed to precalculated position;Such as Fig. 3, when isometrical special threeway 8 is new old pipeline connection Critical component carries out preprocessing according to former 6 specification of pipeline, and the both ends of threeway are mainly connected with new old pipeline, are mainly at threeway Facilitate being put into and taking out for oil resistant rubber isolation air bag 7, clamping plate and dry ice and other items, flange ring is welded to connect in advance on the inside of threeway 81, set on connecting flange ring 81 the multiple threaded holes 82 of circle, after treating the welding of threeway both sides, oil resistant rubber is taken out from threeway Isolate air bag 7, clamping plate and other items, the connecting flange ring 81 in sealing plate and threeway plus rubber asbestos gasket are sealed installation, used Bolt is fixed with threaded hole 82, and the oil gas in pipe is isolated from the outside, and finally welding tee closes end socket 9 at threeway, is completed Pipeline 6 it is totally-enclosed.
Step 7 carries out 6 butt welding of pipeline;
Step 8 isolates air bag by the special clamping plate in isometrical special threeway taking-up pipeline 6 and the oil resistant rubber After 7, the sealing plate of isometrical special threeway, welding tee closing end socket 9 are installed.
This method will first need 6 perforate of pipeline of constructing, and interior aviation fuel is taken away.Then break pipe in the place for needing to transform, Then make use of oil resistant rubber isolation air bag 7 and special clamping plate at disconnected pipe, the remaining oil gas in pipeline 6 has been carried out every From.After isolation, you can weld special threeway, then take out oil resistant rubber by the opening of the external branch of threeway and isolate air bag 7 and special clamping plate.Then recycle the sealing plate closing threeway that special grade carries through threeway, isolate oil gas, then again subsequently into The operations such as row Welding Modification.
The present processes during hot work, are isolated with oil gas, are welded, are isolated by oil resistant rubber for the first time Air bag 7 and the isolation of special clamping plate, second of welding are isolated using sealing plate of the special grade through threeway, have all completely cut off oil gas, construction ten Point safety, will not cause on fire etc., need not also oil gas be waited completely to volatilize, save the duration.
Wherein, before construction, to carry out
1. pipeline is investigated:
To need to block or the trend of the pipeline that blocks, the gradient, flow direction, buried depth, duct length, control valve position, open On-site inspection is wanted in position of hole connection construction etc., and records.Calculating job step may need to extract the volume of aviation fuel out.
2. carry out preparation of construction:
2.1 pipelines are relocated material identical of the purchased pipeline preferably with operation segment pipe.
2.2. welding procedure guiding book is worked out according to pipe material and welding material, evaluates and close in welding procedure guiding book On the basis of lattice, welding procedure specification (WPS) is worked out.
The required threeway of 2.3 constructions, pipeline material should all have material list, quality certificate, survey report, product to close Lattice card, product identification etc..
2.4 oil resistant rubbers isolation air bag 7 is (in weld job, for a little isolating oil (gas) with getting angry in pipeline Rubber pneumatic bag) should be inflated in advance, pressure be not less than 0.2Mpa, check for leaks.
2.5 plants are intact, and motor device ground connection is by checking, qualification.
2.6 construction sites should have enough Active workings and operating space, the coast is clear.
2.7 are equipped with enough fire-fighting equipments, arrange fire fighting truck on duty if necessary.
(w is working width to the width w=D+k of the operating pit of 2.8 buried operation pipelines, and D is pipe diameter, and K takes 2.6m- 3.2m)。
Security alert area outside 2.9 operation areas should be set, and apparent mark is set.
2.10 operation hole planted agents set uplink and downlink ladder.
Ground stud is nearby installed in the oily perforate of 2.11 operation pipeline sections, band, and ground resistance is not more than 4 Ω.
2.12 pipe diameters are greater than or equal to the helix tube of 500mm, and anti-packing should be welded before perforate.
2.13 pipeline pressure releases close the nearest isolating valve in fire operation both sides.
2.14 containers for getting out to unload aviation fuel, container should check its clean situation, and container is non-using preceding unloading at this Aviation kerosine should be cleaned.
2.15 installation ground studs simultaneously check ground resistance, and resistance value is not more than 4 Ω,
The requirement of 2.16 perforate short circuits welding:
The size of 1 stiffening ring should perform the regulation of JB/T 4736.
2 welding sequences
It should be carried out non-destructive testing after the completion of 3 welding.
In the first step, manually or electrically hole making drill can be used in hole making drill, to carry the perforate machinery of milling cutter and centre drill, The device for needing to be connected to the short tube welded in advance on pipeline 6 and ball valve composition completes the oily perforate operation of band.What the first step was opened For hole 10 of pumping, oil pumping hole 10 is the device of a flange short tube ball adding valve, and on the day of fire operation or the previous day welds in advance It is connected on pipeline 6, then with drill perforate, aperture determines that normal conditions opening diameter is 50- regarding 6 specification size of main pipeline 200mm, aviation fuel are mainly extracted out from this hole.
If oil pumping hole 10 pump after, due to the valve for a both sides of getting angry be not closed completely or pipeline 6 in excess oil it is more in short-term In when can not be all drained, need to be led in an oil extraction aperture apparatus of short tube and the valve composition that coming oil side ducts 6 are additionally arranged at the bottom It is the excess oil in discharge conduit 6 in the welding process to want function, prevents the excessive pressure rising of excess oil from oil resistant rubber being caused to isolate gas Capsule 7 fails and accident occurs, and operation to be welded carries out Seal treatment after being fully completed.The setting of outage should be flexible.
Among step 4, the oil resistant rubber isolation air bag 7 should be left beyond the point 1m that gets angry.
Among step 7, during welding constantly into pipe weld inflated with nitrogen into line replacement.Carry out more effectively guarantor on fire Shield.
Among step 7, into oil resistant rubber isolation air bag 7, aerating is to 0.2mpa.
Among step 8, after the completion of pipeline 6 welds, weld seam is carried out non-destructive testing, the spy is further taken out after detection is qualified Clamping plate processed and oil resistant rubber isolation air bag 7.
Among step 8, after welding tee closing end socket 9, to weld seam non-destructive testing, preservative treatment is carried out after qualified.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe is described in detail the present invention with reference to foregoing embodiments, it will be understood by those of ordinary skill in the art that:Its according to Can so modify to the technical solution recorded in foregoing embodiments either to which part or all technical characteristic into Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is not made to depart from various embodiments of the present invention technology The scope of scheme.

Claims (9)

  1. A kind of 1. band oil hot work method, which is characterized in that the band oil hot work method includes the following steps,
    Step 1 carries out perforate by hole making drill to the pipeline of required transformation, and the relief tube carried after perforate using hole making drill is carried out Pressure release removes hole making drill after pressure release, is extracted out the aviation fuel in pipeline with oil pump;
    Step 2, when oil pick-up tube can not extract aviation fuel out again, stop oil pumping, with magnet cleaning pipeline in iron filings, carefully cleaning cut The burr of face, polishing are clean;
    Step 3 carries out disconnected pipe in designated position;
    After step 4, pipeline disconnect, oil resistant rubber isolation air bag is placed into pipe immediately, the aerating into oil resistant rubber isolation air bag, Oil resistant rubber isolation air bag is made to reach sealing effect full of pipeline;
    Step 5 installs special clamping plate into pipeline, and the special clamping plate includes tightening device, circular first clamping plate and second Clamping plate, the first clamping plate and the second clamping plate are stacked;It is provided between the first clamping plate and the second clamping plate Refractory flexible body;By the tightening device, the refractory flexible body is squeezed, it is made to fill full packages road;
    The tightening device is used to reduce the distance between the first clamping plate and the second clamping plate and fix;
    Step 6, with the gas concentration in gas concentration detector inspection opening pipeline, confirm gas concentration not in explosive range It is interior, it then installs isometrical special three and passes to precalculated position;The isometrical special threeway includes threeway body and sealing plate;
    A circle connecting flange ring is welded in wherein the first branch pipe of the threeway body;The connecting flange ring and the sealing plate It is detachably connected;Second branch pipe of the threeway body is for affixed with original seal for pipe joints, and the 3rd branch pipe is used for and new plus pipe Road sealing is affixed;
    The special clamping plate may pass through the connecting flange ring and take out for blocking original pipeline;
    Step 7, progress Pipeline butt connect;
    Step 8 isolates air bag by the special clamping plate in the isometrical special threeway taking-up pipeline and the oil resistant rubber Afterwards, the sealing plate of isometrical special threeway, welding tee closing end socket are installed.
  2. 2. band oil hot work method according to claim 1, which is characterized in that among step 4, the oil resistant rubber Isolation air bag should be left beyond the point 1m that gets angry.
  3. 3. band oil hot work method according to claim 1, which is characterized in that among step 7, during welding constantly to Weld inflated with nitrogen is into line replacement in pipe.
  4. 4. band oil hot work method according to claim 1, which is characterized in that among step 7, to oil resistant rubber every From aerating in air bag to 0.2mpa.
  5. 5. band oil hot work method according to claim 1, which is characterized in that among step 8, pipeline welding is completed Afterwards, weld seam is carried out non-destructive testing, the special clamping plate and oil resistant rubber isolation air bag is further taken out after detection is qualified.
  6. 6. band oil hot work method according to claim 1, which is characterized in that among step 8, welding tee closing After end socket, to weld seam non-destructive testing, preservative treatment is carried out after qualified.
  7. 7. band oil hot work method according to claim 1, which is characterized in that the tightening device includes screw rod, institute Screw rod is stated through vertical with the side of the first clamping plate affixed after the second clamping plate;Nut, institute are bolted on the screw rod It states nut and is connected to the second clamping plate one side opposite with the first clamping plate.
  8. 8. band oil hot work method according to claim 7, which is characterized in that the screw rod is located at the first clamping plate Center at.
  9. 9. band oil hot work method according to claim 1, which is characterized in that the first clamping plate and second folder More leads are provided between plate.
CN201710409863.8A 2017-06-02 2017-06-02 Pipeline modification device and with oily hot work method Active CN107152578B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710409863.8A CN107152578B (en) 2017-06-02 2017-06-02 Pipeline modification device and with oily hot work method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710409863.8A CN107152578B (en) 2017-06-02 2017-06-02 Pipeline modification device and with oily hot work method

Publications (2)

Publication Number Publication Date
CN107152578A CN107152578A (en) 2017-09-12
CN107152578B true CN107152578B (en) 2018-05-25

Family

ID=59795941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710409863.8A Active CN107152578B (en) 2017-06-02 2017-06-02 Pipeline modification device and with oily hot work method

Country Status (1)

Country Link
CN (1) CN107152578B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113932081A (en) * 2021-11-05 2022-01-14 安徽马钢气体科技有限公司 Plugging method for gas pipeline partition operation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4344460A (en) * 1980-11-28 1982-08-17 Advance Valve Installations Apparatus for plugging a pressure piping system
CN2628843Y (en) * 2003-05-27 2004-07-28 李奎民 Pipe fast expansion plug
CN103912758A (en) * 2014-04-22 2014-07-09 钊田 High-performance online pipeline plugging device and plugging method thereof
CN205315944U (en) * 2015-12-01 2016-06-15 重庆科众机械有限公司 Water pipe shutoff head
CN105987250A (en) * 2016-07-29 2016-10-05 大庆天润德石油工程技术有限公司 Blocking component for hot tapping process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4344460A (en) * 1980-11-28 1982-08-17 Advance Valve Installations Apparatus for plugging a pressure piping system
CN2628843Y (en) * 2003-05-27 2004-07-28 李奎民 Pipe fast expansion plug
CN103912758A (en) * 2014-04-22 2014-07-09 钊田 High-performance online pipeline plugging device and plugging method thereof
CN205315944U (en) * 2015-12-01 2016-06-15 重庆科众机械有限公司 Water pipe shutoff head
CN105987250A (en) * 2016-07-29 2016-10-05 大庆天润德石油工程技术有限公司 Blocking component for hot tapping process

Also Published As

Publication number Publication date
CN107152578A (en) 2017-09-12

Similar Documents

Publication Publication Date Title
US10900861B2 (en) Pipeline element leak detection system and method
US4314577A (en) Installation, hydrostatic testing, repair and modification of large diameter fluid transmission lines
US4756338A (en) Pipe repair assemblies to repair pipe when fluids therein are under high pressure
JP6012901B2 (en) Pipe closure device for separating tanks, pipes or sets of tanks and pipes
CN105987253B (en) Oil-gas pipeline method for blocking
US6467811B2 (en) Flanged connection repair device and method
CN101862883A (en) Fuel gas pipeline leakage pressurized blocking welding method
CN107152578B (en) Pipeline modification device and with oily hot work method
EP2706021A1 (en) A method for making an inner metal wall inside a tank and a tank having a double wall
CN102937225B (en) A kind of rapid link blocking method with pressure and device
US7938136B1 (en) Method for sealing taps
US9636787B2 (en) Non-welding apparatus for repair of an enclosure wall and methods for use thereof
CN206988683U (en) A kind of explosion-proof pipe plugging erecting device
JP6370450B1 (en) Double seal piping closing jig
EP3497364B1 (en) System and method for secondary containment of products conveyed by pipeline transport
KR102157841B1 (en) Damage replacement device and replacement method of the damaged pipe using the same
RU181250U1 (en) Device for sealing the internal cavity of the main pipeline
RU2198340C1 (en) Method of repair of main pipe lines
CN208043564U (en) A kind of metal containment integrality test pressure protective device
CN219142103U (en) Simple and convenient DBB double-closing double-breaking valve aviation kerosene pressure test device
US3380762A (en) Insulated pipe joint
CN112618990B (en) Emergency conveying and transferring method for leaked materials of dangerous chemical tank truck
RU2601782C1 (en) Method for pipeline restoration and device for implementation thereof
CN217234869U (en) Pressurized drainage leak-stopping welding band for liquid medium pipeline
KR200479377Y1 (en) Device for preventing leakage scatter on vertical pipe flange

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.2, section 3, middle Renmin Road, Chengdu, Sichuan 610000

Patentee after: Sichuan Industrial Equipment Installation Group Co.,Ltd.

Address before: No.2, section 3, middle Renmin Road, Chengdu, Sichuan 610014

Patentee before: SICHUAN PROVINCIAL INDUSTRIAL EQUIPMENT INSTALLATION Co.

CP03 Change of name, title or address