CN107147212A - NMS for transformer station - Google Patents

NMS for transformer station Download PDF

Info

Publication number
CN107147212A
CN107147212A CN201710272155.4A CN201710272155A CN107147212A CN 107147212 A CN107147212 A CN 107147212A CN 201710272155 A CN201710272155 A CN 201710272155A CN 107147212 A CN107147212 A CN 107147212A
Authority
CN
China
Prior art keywords
intelligent terminal
station
real
transformer station
nms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710272155.4A
Other languages
Chinese (zh)
Inventor
冯金敏
廖华
金叶欢
王珏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710272155.4A priority Critical patent/CN107147212A/en
Publication of CN107147212A publication Critical patent/CN107147212A/en
Pending legal-status Critical Current

Links

Classifications

    • H02J13/0013
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides the NMS for transformer station, belong to power system, including five anti-main frames, five anti-main frames are connected by LAN with five anti-servers, five anti-main frames are also connected by LAN with five anti-base stations, and five anti-base stations are also communicated with intelligent terminal.By during grid switching operation and tour power equipment, intelligent terminal passes through electric power wireless private network and five anti-base station real-time communications, the operation information of intelligent terminal can be shown in real time at the interface on five anti-host computer control backstages, and intelligent terminal can the anti-host computer control backstage of real-time reception five feedback information, realize the real-time dynamic check of our station five-preventing system anti-misoperation locking, so as to realize operation maintenance personnel behavioural norm, sequencing, and realization is to the electronic monitoring of operation maintenance personnel, prevent the generation of electric fault-operation accident, ensure the person, power network and equipment safety, reduce maloperation generation rate.

Description

NMS for transformer station
Technical field
The invention belongs to power system, the more particularly to NMS for transformer station.
Background technology
Electric power accident in all parts of the country in recent years takes place frequently, due to the high risk and the importance to industry of high-tension electricity, this A little accidents often cause not serious consequence, not only injure the security of the lives and property of power industry and periphery personnel, Injure the development of national economy.Each grid company puts into a large amount of manpower and materials and builds anti-error system, most using high-tech means Amount avoids the generation of accident.Power system maloperation always " prevented and anti-", can actually " hard to guard against ".The anti-error means of tradition Present integrated automation of transformation stations demand can not have been met.
In order to effectively prevent great serious accident caused by electric power maloperation, nineteen ninety, State Grid's system is according to electrically Operative practice proposes that high voltage electric equipment " five prevent " requires that five prevent specifically including:1st, prevent by mistake point, close breaker, 2, anti-stop-band Load point, close disconnecting switch, 3, prevent band cable address (conjunctions) ground wire (earthed switch), 4, anti-stop-band ground wire power transmission, 5, prevent mistake Entering into charged intervals;By five anti-particular contents, electrically anti-error using priciple is defined in the form of rules and regulations, but currently Computer-lock Device For Preventing Incorrect Operation Used can not still prevent the generation of maloperation.
The content of the invention
In order to solve shortcoming and defect present in prior art, the invention provides for by strengthening between power equipment Information degree of communication, so as to reduce the NMS of maloperation generation rate.
In order to reach above-mentioned technical purpose, the embodiment of the present invention proposes the NMS for transformer station, described NMS, including:
Five anti-main frames, the five anti-main frame is connected by LAN with five anti-servers, and the five anti-main frame is also anti-with five Base station is connected, and the five anti-base station is also communicated with intelligent terminal;
Wherein, it is stored with described five anti-servers and the historical operation of transformer station and tour is recorded, in the intelligence GPS positioning device is installed in terminal.
Optionally, the intelligent terminal is made to carry out real-time communication with described five anti-base stations by electric power wireless private network, in institute State the operation information of the real-time display intelligent terminal on the control backstage of five anti-main frames;
Feedback information of the intelligent terminal real-time reception from the control backstage.
Optionally, described to make intelligent terminal carry out real-time communication with described five anti-base stations, the intelligent terminal can connect in real time The feedback information on described five anti-host computer control backstages is received, including:
The positional information of operation maintenance personnel is obtained by the GPS positioning device built in the intelligent terminal, by the O&M people Member's positional information is sent to described five anti-base stations via communication channel;
The five anti-base station transmits the positional information to described five anti-main frames, and feedback letter is obtained from described five anti-base stations Breath, the intelligent terminal is reached by the feedback information.
Optionally, the intelligent terminal is additionally operable to carry out grid switching operation or equipment-patrolling, including:
When carrying out grid switching operation, operation information is uploaded to described five anti-host computer control backstages in real time, from described five The acquisition feedback information on anti-host computer control backstage;Or
When carrying out equipment-patrolling, the tour content to power equipment is obtained, the power equipment maked an inspection tour in content is extracted Feature, judges whether the power equipment is in failure or precarious position according to the power equipment feature;
If the power equipment is in failure or precarious position, the power equipment is marked, according to mark Content generation for the power equipment defect rank report.
Optionally, described five anti-servers are also connected by LAN with regulation and control server cluster, and are also certainly with comprehensive System and OPEN3000 carry out information sharing.
Optionally, the regulation and control server cluster includes O&M class work station, regulation and control central station, Surveillance center's work Stand.
Optionally, defect rank report is sent to the regulation and control central station, in order to the regulation and control center Work station notifies maintainer to repair the power equipment according to the equipment deficiency level report.
Optionally, the communication channel, including wireless telecommunication or the local communication based on universal system bus.
Optionally, the feedback information includes:The voltage, electric current of this transformer station, and switch, plug-in strip, earthing knife-switch, ground connection The information such as line, secondary pressure plate.
The beneficial effect that the technical scheme that the present invention is provided is brought is:
By operating or making an inspection tour during power equipment, intelligent terminal is communicated with five anti-base stations, and five anti-base stations lead to LAN and five anti-host communications are crossed, the operation information of intelligent terminal is shown in real time on five anti-host computer control backstages, whole process is carried out Electronic monitoring, so as to realize operation maintenance personnel behavioural norm, sequencing, and realizes the electronic monitoring to operation maintenance personnel, prevents The generation of electric fault-operation accident, ensures the person, power network and equipment safety, reduces maloperation generation rate.
Brief description of the drawings
In order to illustrate more clearly of technical scheme, the accompanying drawing used required in being described below to embodiment It is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, general for this area For logical technical staff, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the NMS provided by the present invention for transformer station;
Fig. 2 is the schematic flow sheet for the execution step that the present invention is provided.
Embodiment
To make the structure and advantage of the present invention clearer, the structure of the present invention is made further below in conjunction with accompanying drawing Description.
Embodiment one
The embodiment of the present invention proposes the NMS for transformer station, the NMS, including:
Five anti-main frames, the five anti-main frame is connected by LAN with five anti-servers, and the five anti-main frame is also anti-with five Base station is connected, and the five anti-base station is also communicated with intelligent terminal;
Wherein, it is stored with described five anti-servers and the historical operation of transformer station and tour is recorded, in the intelligence GPS positioning device is installed in terminal.
In force, in order to realize the detection to maloperation in power system, the embodiment of the present invention is proposed for power transformation The NMS stood, the NMS is included entrained by operation maintenance personnel that power equipment is operated or maked an inspection tour Intelligent terminal, and the anti-subbase station of network five that intelligent terminal uploads content is received, receive multiple anti-subbase stations of network five and upload The anti-master base station of network five of content, receives and stores the anti-server of network five for uploading content.
Five anti-servers carry out big data interaction and cloud storage, store the information required for whole transformer station five-preventing system, And it is managed concentratedly, such as voltage, the electric current of this side transformer station and offside transformer station, and switch, plug-in strip, earthing knife-switch, The information such as ground wire, secondary pressure plate.Historical electronic operation order, work ticket and tour record can upload the anti-service of the network five Device, can be preserved, with convenient search for a long time.
Five anti-main frames are connected with regulation and control central station, Surveillance center's station terminal, and real-time number is realized with Intranet system According to synchronization;And resource-sharing is realized with integrated system, OPEN300, carry out big data interaction and cloud eventually through five anti-servers Storage.
Web form and five anti-main frame real-time communications, are led in real time using electric power wireless private network with intelligent terminal within five anti-base stations Letter.
Intelligent terminal can communication modes and five anti-main frames realize real-time Communication for Power Network on the spot with wireless telecommunication or USB.
" five prevent " being mentioned in the present embodiment refers to that State Grid's system proposes high-tension electricity according to electrical operation practice Gas equipment " five prevent " requires that five prevent specifically including:1st, prevent by mistake point, close breaker, 2, prevent on-load point, close disconnecting switch, 3rd, band cable address (conjunction) ground wire (earthed switch) is prevented, 4, anti-stop-band ground wire power transmission, 5, prevent mistakenly entering charged chamber.To electric power Equipment is carried out during actual tour, and by implementing above-mentioned five anti-requirements, power equipment mistake can be avoided the occurrence of as far as possible The possibility of operation.
In order to ensure that operation maintenance personnel can be operated, it is necessary to be held at the moment during actually making an inspection tour according to five anti-requirements Row step as shown in Figure 2, including:
201st, make intelligent terminal be communicated with five anti-base stations, intelligence can be shown in real time at the interface on five anti-host computer control backstages Can terminal operation information, and intelligent terminal can the anti-main frame of real-time reception five feedback information, realize that our station five-preventing system is anti-error The real-time dynamic check of locking.
202nd, the positional information of operation maintenance personnel is obtained in real time at five anti-host computer control backstages, by the operation maintenance personnel position Information is sent to described five anti-base stations via communication channel, and the five anti-base station transmits the positional information to described five anti-masters Machine.
Feedback information in step 201 includes:Voltage, the electric current of transformer station, and switch, plug-in strip, earthing knife-switch, ground wire, The information such as secondary pressure plate.
In force, step 201 includes:
2011st, the positional information of operation maintenance personnel is obtained by the GPS positioning device built in intelligent terminal, positional information is passed through Sent by communication channel to five nearest anti-base stations, five anti-base stations are transmitted positional information to five anti-main frames by LAN;
2012nd, five anti-main frames obtain the five anti-base stations nearest apart from operation maintenance personnel present position, by five according to positional information The information on anti-host computer control backstage is sent to intelligent terminal.
Here the communication channel used in step 2011 includes wireless telecommunication or based on the local of universal system bus Communication.
Step 202 includes:
2021st, during grid switching operation, the operation information of the intelligent terminal is uploaded to described five anti-main frame controls in real time Backstage processed, and the feedback information on the five anti-host computer control backstage is sent to intelligent terminal in real time, realizes that our station five-preventing system is prevented Miss the real-time dynamic check of locking;
When the 2022nd, making an inspection tour equipment, the power equipment feature maked an inspection tour in content is extracted, according to the power equipment feature Judge whether the power equipment is in failure or precarious position;
If the 2023, the power equipment is in failure or precarious position, the power equipment is marked, pin is generated To the defect rank of the power equipment.
GPS positioning device built in intelligent terminal obtains the positional information of operation maintenance personnel, and the operation maintenance personnel position is believed Breath is sent to described five anti-base stations via communication channel, and five anti-base stations are transmitted the positional information to described five by LAN Anti- main frame.Had a question as operated or making an inspection tour, words input, many recording modes such as upload, live recording of taking pictures can be used, in time Reach five anti-host computer control backstages to hold a consultation together for administrative staff, technical staff, operator on duty, measure can pass through immediately after the consultation of doctors The mode of voice or word reaches the intelligent terminal.
Optionally, the intelligent terminal is made to carry out real-time communication with described five anti-base stations by electric power wireless private network, in institute The control backstage for stating five anti-main frames shows the operation information of intelligent terminal in real time;
Feedback information of the intelligent terminal real-time reception from the control backstage.
In force, the intelligent terminal is made to carry out real-time communication with described five anti-base stations by electric power wireless private network, The interface on five anti-host computer control backstages can show the operation information of intelligent terminal in real time;
The intelligent terminal can five anti-host computer control backstages described in real-time reception feedback information, realize our station five-preventing system The real-time dynamic check of anti-misoperation locking.
Optionally, described to make intelligent terminal carry out real-time communication with described five anti-base stations, the intelligent terminal can connect in real time The feedback information on described five anti-host computer control backstages is received, including:
The positional information of operation maintenance personnel is obtained by the GPS positioning device built in the intelligent terminal, by the O&M people Member's positional information is sent to described five anti-base stations via communication channel;
The five anti-base station is transmitted the positional information to described five anti-main frames by LAN, from described five anti-base stations Feedback information is obtained, the feedback information is reached into the intelligent terminal.
In force, five anti-main frames are respectively provided with intelligent function of making out an invoice with intelligent terminal, can be in the case where five anti-main frames are drawn up after ticket Reach intelligent terminal, also can directly hand-written on intelligent terminal or voice intend ticket, operation maintenance personnel can directly carry intelligent terminal and arrive Scene, which is scanned after device name, realizes whole voice automatic checking, step-by-step operation of rehearsing automatically, realizes electronic monitoring.
The operation information of intelligent terminal can be shown in real time at the interface on five anti-host computer control backstages, and intelligent terminal can be real-time The feedback information of five anti-main frames is received, the real-time dynamic check of our station five-preventing system anti-misoperation locking is realized.
The positional information of operation maintenance personnel is obtained by the GPS positioning device built in the intelligent terminal, by the O&M people Member's positional information is sent to described five anti-base stations via communication channel, and the five anti-base station is by LAN by the positional information Transmit to described five anti-main frames.Had a question as operated or making an inspection tour, can be many using words input, take pictures upload, live recording etc. Recording mode, reaches five anti-host computer control backstages and is held a consultation together for administrative staff, technical staff, operator on duty, after the consultation of doctors in time Measure can reach intelligent terminal by way of voice or word immediately.The communication channel, including wireless telecommunication or Local communication based on universal system bus.The feedback information includes:The voltage, electric current of this transformer station, and switch, lock The information such as knife, earthing knife-switch, ground wire, secondary pressure plate.
Optionally, the intelligent terminal is additionally operable to carry out grid switching operation or equipment-patrolling, including:
When carrying out grid switching operation, operation information is uploaded to described five anti-host computer control backstages in real time, from described five The acquisition feedback information on anti-host computer control backstage;Or
When carrying out equipment-patrolling, the tour content to power equipment is obtained, the power equipment maked an inspection tour in content is extracted Feature, judges whether the power equipment is in failure or precarious position according to the power equipment feature;
If the power equipment is in failure or precarious position, the power equipment is marked, according to mark Content generation for the power equipment defect rank report.
In force, during grid switching operation, the operation information of the intelligent terminal is uploaded to described five anti-masters in real time Machine controls backstage, and the feedback information on the five anti-host computer control backstage is sent to intelligent terminal in real time, realizes the anti-system of our station five The system real-time dynamic check of anti-misoperation locking;
When making an inspection tour equipment, the power equipment feature maked an inspection tour in content is extracted, is judged according to the power equipment feature Whether the power equipment is in failure or precarious position;
If the power equipment is in failure or precarious position, the power equipment is marked, generation is directed to institute State the defect rank of power equipment.
Optionally, described five anti-servers are also connected by LAN with regulation and control server cluster, and are also certainly with comprehensive System and OPEN3000 carry out information sharing.
In force, in force, the open-3000 dispatch automated systems based on iec 61970, possess and meet the world The system integration framework and real time information system platform of standard.The system administration that is there is provided, commercial data base, real-time data base, The comprehensively services such as man-machine interface, rights management, alarming processing, polymorphic support, case management, are upper strata application functions at different levels Realize and provide powerful technical support, it is possible to individually or simultaneously support the application systems such as ems, dms, wams/warmap It is integrated, system is had in terms of opening, reliability, convenience and be obviously improved.Meanwhile, open-3000 systems it is each Level application has also all carried out research of technique for conventional difficult point, and the subsystems at different levels such as fes, scada, agc, pas, dts all exist Have in terms of application function, software performance, operation convenience and significantly break through.It is public that the system obtained state's net in 2006 respectively The scientific and technological progress first prize is taken charge of, Jiangsu Province's scientific and technological progress first prize is obtained within 2006, obtains national science and technology progress second prize within 2007. Open-3000 systems are applied to net, provincial large-scale dispatch automated system, are also applied for big-and-middle-sized Di Tiaoyudi counties integration system System.Its advance, maturity, reliability, practicality and convenience are as mark post new in the industry.Open-3000 has condensed southern auspicious The technology inside information in more than 30 years of people and the engineering experience of hundreds of sets of national systems, saved as numerous domestic net reconcile it is big-and-middle-sized While the first choice of tune, successively control and successfully put into operation in state of the Sudan tune, state of Philippine tune, Brazil's collection, successfully open international market Gate.
Optionally, the regulation and control server cluster includes O&M class work station, regulation and control central station, Surveillance center's work Stand.
In force, the equipment deficiency is sent to the regulation and control central station, in order to regulation and control center work The levels characteristic stood according to the equipment deficiency, notifies maintainer to repair the power equipment in time.
Optionally, defect rank report is sent to the regulation and control central station, in order to the regulation and control center Work station is reported according to the defect rank of the equipment deficiency, notifies maintainer to repair the power equipment.
In addition, the result for operating with making an inspection tour to power equipment is prevented via five anti-base stations, five by operation maintenance personnel except above-mentioned Main frame is uploaded, in addition to issues the information for being operated and being maked an inspection tour to power equipment by five anti-main frames, including:
Five anti-main frames reach intelligent terminal under drawing up after ticket.Five anti-main frames have the function that multi-task parallel is operated, simultaneously Multi-mode operation task is outputed, different operation tasks are carried out simultaneously using different intelligent terminals by multidigit operation maintenance personnel.
It is noted that the NMS for transformer station that the present embodiment is proposed, collects cost application in substations All kinds of accessory systems, including anti-intrusion system, video monitoring system, fire alarm and fire-fighting system, heating and ventilation system, give Drainage system, GIS rooms SF6 leakages on-line monitoring system, switch room temperature humidity on-line monitoring system, transformer station's indoor and outdoor lighting prison Control system, transformer station's Gate-ban Monitoring System etc..Also can reserve communication interface in the NMS, it is final realize with it is above-mentioned All kinds of accessory system information sharings.
In actual use, in order to realize intelligent terminal and five anti-base station real-time communications, using wireless technology, for example ZigBee technology (has the advantages that low-power consumption, low cost, transmission range are up to 1~3km or even farther), passes through the special 4G of electric power Card and data encoded card, realize electric power wireless private network, it can be ensured that the safety of intranet data.
After the name of intelligent terminal camera aligning equipment can automatic identification, and judge whether position correct, if position is just Really, " XX positions are correct " voice is sent out, if positional fault, " positional fault " voice is sent out.The amplification of current operation step font-weight is red Color shows, has often operated one, it is necessary to operation maintenance personnel is confirmed after carrying out live detailed inspection, and System self-test remote measurement, distant After believing that signal is normal, intelligent terminal can just do " √ " mark in time, and voice message " this step end of operation, all goes well, Come in row next-step operation:XXXXXX”.Ensure the correctness of operation equipment position, realize that (that manually guards is auxiliary for whole electronic monitoring Help, one kind is supplemented), really realize operation maintenance personnel behavioural norm, sequencing, it is to avoid go to the wrong way interval, and improve operating efficiency.
, can also be in the following way in addition to the method for scanning device title in order to realize intelligent grid switching operation:Scene Electric power once, secondary device make the Quick Response Code supporting with intelligent terminal, bar code or RFID etc..By the two dimension made Code, bar code or RFID are first printed, after plastic packaging, and being then pasted onto using waterproof glue in corresponding equipment can be long-term Use.
Before the operation such as grid switching operation or work permit, O&M/maintainer can obtain work from intelligent terminal Content, flow, operation equipment whether there is defect, kit, points for attention and risk management and control, come help and instruct O&M/ Maintainer understands the dangerous spot of whole workflow and presence.For example:1. secure voice prompting is carried out in operating:Electrical verification and behaviour Insulating glove is worn in prompting when making plug-in strip, wears insulating boot etc..2. pointed out before electrical verification:On relevant voltage grade charging equipment or power frequency Electroscope is tested on high pressure generator intact, the telescopic insulating bar of electroscope should be pulled to most long, the shifting after checking electroscope is intact The electroscope telescopic insulating bar that to retract is pointed out during dynamic electroscope position.3. operation terminates prompting:Prompting shuts door and window, puts back to peace Full Work tool and key, transformer station's indoor and outdoor lighting monitoring system, switch room temperature humidity on-line monitoring system and transformer station gate inhibition Monitoring system etc..The moment reminds its safety notice in operating process, and safety in production is ensure that significantly.
As optimization, the NMS can carry GPS module by intelligent terminal and realize intelligent patrol detection function.Profit When making an inspection tour equipment with intelligent terminal, GPS is automatically positioned operation maintenance personnel position, while inspection position can show five anti-main frame controls in real time Backstage processed, is such as being had a question, and can use words input, many recording modes such as upload, live recording of taking pictures, and backstage confession is reached in time Administrative staff, technical staff, operator on duty hold a consultation together, so as to realize the real-time control and security response to inspection content.
As optimization, the NMS can realize All-in-One function.Can be in the NMS collection cost power transformation Stand all kinds of accessory systems of application, including anti-intrusion system, video monitoring system, fire alarm and fire-fighting system, heating and ventilation System, supply and drain water system, GIS rooms SF6 leakages on-line monitoring system, switch room temperature humidity on-line monitoring system, in transformer station room Outer illumination monitoring system, transformer station's Gate-ban Monitoring System etc..Also communication interface can be reserved in the NMS, it is final real Now with above-mentioned all kinds of accessory system information sharings.
The ground wire of our station and secondary pressure plate are thrown to move back and added into five prevention logic, the typical operation ticket of our station and five Anti- logic has been directed under present networks management system in smart electronicses operation order, realizes the real-time of ground wire and secondary pressure plate It has been shown that, solves the blind area of current micro_computer five_proof device.
As optimization, five anti-main frames, intelligent terminal can intelligently make out an invoice.Ground wire and secondary pressure plate are added to intelligence and opened In bill system.When open the NMS under intelligently make out an invoice interface after, by voice or association can be manually selected successively The scheduling order of each, system can automatically generate electronic operational ticket, and atypia can allow to increase, delete or change electricity when operating Child-operation ticket content.Certainly operation task can be further added by after generation operation task (than operating if any several intervals simultaneously, to adjust Degree one synthesis of hair makes), realize that intelligence is made out an invoice.The automatic five anti-each steps of detection can be carried out by automatically generating electronic operational ticket, i.e., " five anti-previews ".Network five is anti-once not passing through, and electronic operational ticket can-not be automatically generated.Work(of recording can be selected before the procedure Energy (default logging function is not turned on).
As optimization, the intelligent terminal need to be only carried during operation, is operated without carrying computer key to scene.The intelligence Energy terminal has one and our station computer key accordant interface, and five preventing keys are opened during for operating, former power transformation is effectively reduced Stand the improvement cost of five-preventing system.
As optimization, operation time started and operation end time automatically generate, by electric power wireless private network in real time or USB interface transmits electronic operational ticket, and without keeping a record again, (such as papery operation order is backfilled, earthing switch blade, ground wire division record Deng), on the premise of safety operation is ensured, substantially increase operating efficiency.
As optimization, the intelligent terminal is specific products, has carried out rain-proof waterproof, sun-proof, shatter-resistant, dust-proof, the anti-place that divulges a secret Reason, substantially increases its life-span.
This is used in the NMS of transformer station, due to introducing internet+technology of Internet of things, and takes full advantage of Existing network channel, only need to realize intelligent terminal and five anti-base station communications, reduce development cost.With this simultaneously, fill Divide and make use of the existing device name of transformer station, without increasing the management of smart grounding line generalization and intelligent pressure plate system, i.e., need not Again under input soft and hardware cost reasons, realize ground wire, the display of secondary pressure plate and be added into network five it is anti-in, The blind area of micro_computer five_proof is solved, and reduces popularization and application cost.Secondly, the NMS is associated with scheduling order, real The substation network for having showed complete set is intelligently made out an invoice.Solve due to traditional papery operation order may bring Lou item, jump item, The drawback such as modification, correction, advance operation, realizes whole electronic monitoring without authorization, has prevented the mistake of rehearsing of people, has gone to the wrong way interval etc. Behavior, improves safety in production.Also solve due to the waste for the paper and ink powder that traditional papery operation order is brought, rainy day quilt Drench even damaged, the problems such as night time operation is inconvenient.Again, the NMS can carry GPS module by intelligent terminal Realize intelligent patrol detection function.Such as had a question during grid switching operation or inspection, can using words input, take pictures on Many recording modes such as biography, live recording, reach backstage and are held a consultation together for administrative staff, technical staff, operator on duty in time, so that Realize the real-time control and security response to inspection content.Finally, the NMS can also realize All-in-One function, integrated All kinds of accessory systems of this application in substations, including anti-intrusion system, video monitoring system, fire alarm and fire-fighting system, adopt HVAC wind system, supply and drain water system, GIS rooms SF6 leakages on-line monitoring system, switch room temperature humidity on-line monitoring system, power transformation Indoor and outdoor lighting of standing monitoring system, transformer station's Gate-ban Monitoring System etc..It is finally reached and really realizes that intelligent substationization is managed.
Beneficial effect:
Based on the NMS for transformer station, achievable ground wire is shown in real time.Operated using intelligent terminal After earthing switch blade/ground wire divide-shut brake, by real-time communication, earthing switch blade/ground wire opening and closing state is at once on five anti-backstages And monitoring backstage is shown, it is to make out an invoice next time and ready for operation, improves its anti-error locking system, prevent conjunction with ground Lock phenomenon.At the same time, without increasing smart grounding line generalization management system, i.e., without putting into soft and hardware cost again, significantly Reduce application cost.
Based on the NMS for transformer station, achievable secondary pressure plate is shown in real time, and adds the anti-error system of network In system.Throw/move back after secondary pressure plate using intelligent terminal, by real-time communication, secondary pressure plate throw state of moving back it is anti-five at once after Platform and monitoring backstage are shown, are to make out an invoice next time and ready for operation, are prevented pressing plate throwing and are moved back maloperation, without increasing intelligence Energy pressing plate management system, i.e., without putting into soft and hardware cost again, greatly reduce application cost.
Based on the NMS for transformer station, it can be achieved to prevent mistake point, falsely close circuit breaker.It is i.e. anti-by network five Master base station is connected with regulation and control central station, Surveillance center's station terminal, auto-associating scheduling order, intelligent locking breaker Divide, close, be connected to scheduling and make and just allow remote operation breaker in five anti-intelligent bills after date, operation is not otherwise allowed.
It is used for the NMS of transformer station based on internet+Internet of Things, five anti-Real-time Logics can be achieved and judge. Device physical status is obtained by intelligent terminal wireless data transfer module in real time and anti-misoperation locking judgement is constantly carried out, solved The blind area that current micro_computer five_proof device is present, substantially increases the security of operation.
Based on the NMS for transformer station, electronic monitoring operation can be achieved.Set using intelligent terminal operation When standby, go to automatic identification after only the camera aligning equipment of intelligent terminal need to be named before relevant device, call out the names of those voted for while counting ballot-slips automatically, enter for Current operation project, and judge whether position is correct, if position is correct, " XX positions are correct " voice is sent out, if positional fault, hair " positional fault " voice, it is ensured that the correctness of operation equipment position, realizes electronic monitoring, really realizes operation maintenance personnel behavioural norm Change, sequencing, it is to avoid go to the wrong way interval.
Based on the NMS for transformer station, the whole early warning of dangerous spot can be achieved.In grid switching operation or work License etc. is before operation, and O&M/maintainer can obtain action, flow, operation equipment from intelligent terminal and whether there is Defect, kit, points for attention and risk management and control, come help and instruct O&M/maintainer understand whole workflow and The dangerous spot of presence.
Based on the NMS for transformer station, the convenience of operation can be achieved.I.e. typical operation ticket and five is prevented patrolling Volume imported the intelligent terminal, can associate scheduling order realize intelligence make out an invoice (NMS possesses automatic five anti-detections, That is " five anti-previews ").The intelligent terminal need to be only carried during operation, is operated without carrying computer key to scene.During operation Automatic checking device name, realizes whole electronic monitoring, operation is simple.By wireless power specialized network in real time or USB interface transmits electronic operational ticket, and operation information can be shown in five anti-main frames in real time.Operate time started and operation end time Automatically generate, without keeping a record again, (such as papery operation order is backfilled, earthing switch blade, ground wire division record after operation terminates Deng), on the premise of safety operation is ensured, substantially increase operating efficiency.
The invention provides the NMS for transformer station, including five anti-main frames, five anti-main frames pass through LAN It is connected with five anti-servers, five anti-main frames are also connected by LAN with five anti-base stations, five anti-base stations are also carried out with intelligent terminal Communication.By the way that during grid switching operation and tour power equipment, intelligent terminal passes through electric power wireless private network and five anti-base stations Real-time communication, the operation information of intelligent terminal can be shown in real time at the interface on five anti-host computer control backstages, and intelligent terminal can be real When receive five anti-host computer control backstages feedback information, realize the real-time dynamic check of our station five-preventing system anti-misoperation locking, so as to Operation maintenance personnel behavioural norm, sequencing are realized, and realizes the electronic monitoring to operation maintenance personnel, electric fault-operation accident is prevented Occur, ensure the person, power network and equipment safety, reduce maloperation generation rate.
Each sequence number in above-described embodiment is for illustration only, and the elder generation during the assembling or use of each part is not represented Afterwards sequentially.
Embodiments of the invention are the foregoing is only, are not intended to limit the invention, it is all in the spirit and principles in the present invention Within, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (9)

1. the NMS for transformer station, it is characterised in that the NMS, including:
Five anti-main frames, the five anti-main frame is connected by LAN with five anti-servers, the five anti-main frame also with five anti-base stations Connection, the five anti-base station is also communicated with intelligent terminal;
Wherein, it is stored with described five anti-servers and the historical operation of transformer station and tour is recorded, in the intelligent terminal GPS positioning device is inside installed.
2. the NMS according to claim 1 for transformer station, it is characterised in that:
The intelligent terminal is made to carry out real-time communication with described five anti-base stations by electric power wireless private network, in described five anti-main frames Control backstage shows the operation information of intelligent terminal in real time;
Feedback information of the intelligent terminal real-time reception from the control backstage.
3. the NMS according to claim 2 for transformer station, it is characterised in that it is described make intelligent terminal with The five anti-base station carries out real-time communication, the intelligent terminal can five anti-host computer control backstages described in real-time reception feedback letter Breath, including:
The positional information of operation maintenance personnel is obtained by the GPS positioning device built in the intelligent terminal, by operation maintenance personnel position Confidence breath is sent to described five anti-base stations via communication channel;
The five anti-base station transmits the positional information to described five anti-main frames, and feedback information is obtained from described five anti-base stations, The feedback information is reached into the intelligent terminal.
4. the NMS according to claim 2 for transformer station, it is characterised in that the intelligent terminal is also used In progress grid switching operation or equipment-patrolling, including:
When carrying out grid switching operation, operation information is uploaded to described five anti-host computer control backstages in real time, from described five anti-masters Machine controls the acquisition feedback information on backstage;Or
When carrying out equipment-patrolling, the tour content to power equipment is obtained, the power equipment feature maked an inspection tour in content is extracted, Judge whether the power equipment is in failure or precarious position according to the power equipment feature;
If the power equipment is in failure or precarious position, the power equipment is marked, according in mark The defect rank for holding generation for the power equipment is reported.
5. the NMS according to claim 4 for transformer station, it is characterised in that the five anti-server is also It is connected by LAN with regulation and control server cluster, and also carries out information sharing with integrated system and OPEN3000.
6. the NMS according to claim 5 for transformer station, it is characterised in that the regulation and control server set Group includes O&M class work station, regulation and control central station, Surveillance center's work station.
7. the NMS according to claim 5 for transformer station, it is characterised in that:
Defect rank report is sent to the regulation and control central station, in order to which the regulation and control central station is according to institute Equipment deficiency level report is stated, notifies maintainer to repair the power equipment.
8. the NMS according to claim 3 for transformer station, it is characterised in that the communication channel, bag Include wireless telecommunication or the local communication based on universal system bus.
9. the NMS according to claim 4 for transformer station, it is characterised in that the feedback information bag Include:The voltage, electric current of this transformer station, and the information such as switch, plug-in strip, earthing knife-switch, ground wire, secondary pressure plate.
CN201710272155.4A 2017-04-24 2017-04-24 NMS for transformer station Pending CN107147212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710272155.4A CN107147212A (en) 2017-04-24 2017-04-24 NMS for transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710272155.4A CN107147212A (en) 2017-04-24 2017-04-24 NMS for transformer station

Publications (1)

Publication Number Publication Date
CN107147212A true CN107147212A (en) 2017-09-08

Family

ID=59774440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710272155.4A Pending CN107147212A (en) 2017-04-24 2017-04-24 NMS for transformer station

Country Status (1)

Country Link
CN (1) CN107147212A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109491355A (en) * 2017-09-13 2019-03-19 上海申通地铁集团有限公司 The monitoring method and its system of rail traffic grid switching operation
CN111917179A (en) * 2020-07-02 2020-11-10 江苏胜太电力系统有限公司 Real-time online anti-misoperation system of transformer substation based on multimode internet of things
CN112436605A (en) * 2020-11-24 2021-03-02 国网山东省电力公司菏泽供电公司 Artificial intelligence interaction platform based on computer science
CN113507653A (en) * 2021-07-07 2021-10-15 中国电建集团河北省电力勘测设计研究院有限公司 Power plant booster station electric five-prevention system and method based on intelligent identification
CN113964705A (en) * 2020-07-21 2022-01-21 南京南瑞继保电气有限公司 Intelligent five-prevention system of transformer substation
CN114155634A (en) * 2021-12-08 2022-03-08 广东电网有限责任公司东莞供电局 Anti-misoperation intelligent management and control method based on visual intelligent lock

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101668252B (en) * 2009-07-31 2012-06-27 深圳市保利天同通讯设备有限公司 Digital cluster communication system for private network communication
CN104167821A (en) * 2014-08-28 2014-11-26 国家电网公司 Transformer substation five-prevention communication system and method based on GPRS
CN104240322A (en) * 2014-09-26 2014-12-24 中国能源建设集团广东省电力设计研究院 Online mobile inspection system and method for substation equipment based on wireless private power network
CN105449867A (en) * 2015-12-25 2016-03-30 国网浙江省电力公司丽水供电公司 Visual operation process monitoring mistake precaution system and control method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101668252B (en) * 2009-07-31 2012-06-27 深圳市保利天同通讯设备有限公司 Digital cluster communication system for private network communication
CN104167821A (en) * 2014-08-28 2014-11-26 国家电网公司 Transformer substation five-prevention communication system and method based on GPRS
CN104240322A (en) * 2014-09-26 2014-12-24 中国能源建设集团广东省电力设计研究院 Online mobile inspection system and method for substation equipment based on wireless private power network
CN105449867A (en) * 2015-12-25 2016-03-30 国网浙江省电力公司丽水供电公司 Visual operation process monitoring mistake precaution system and control method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109491355A (en) * 2017-09-13 2019-03-19 上海申通地铁集团有限公司 The monitoring method and its system of rail traffic grid switching operation
CN111917179A (en) * 2020-07-02 2020-11-10 江苏胜太电力系统有限公司 Real-time online anti-misoperation system of transformer substation based on multimode internet of things
CN111917179B (en) * 2020-07-02 2024-04-30 江苏胜太电力系统有限公司 Real-time online misoperation prevention system of transformer substation based on multimode internet of things
CN113964705A (en) * 2020-07-21 2022-01-21 南京南瑞继保电气有限公司 Intelligent five-prevention system of transformer substation
CN112436605A (en) * 2020-11-24 2021-03-02 国网山东省电力公司菏泽供电公司 Artificial intelligence interaction platform based on computer science
CN113507653A (en) * 2021-07-07 2021-10-15 中国电建集团河北省电力勘测设计研究院有限公司 Power plant booster station electric five-prevention system and method based on intelligent identification
CN113507653B (en) * 2021-07-07 2023-09-26 中国电建集团河北省电力勘测设计研究院有限公司 Intelligent identification-based electric five-prevention system and method for booster station of power plant
CN114155634A (en) * 2021-12-08 2022-03-08 广东电网有限责任公司东莞供电局 Anti-misoperation intelligent management and control method based on visual intelligent lock
CN114155634B (en) * 2021-12-08 2024-03-05 广东电网有限责任公司东莞供电局 Misoperation-preventing intelligent control method based on visual intelligent lock

Similar Documents

Publication Publication Date Title
CN107147212A (en) NMS for transformer station
CN107121606A (en) For Substation Operating and the intelligent terminal of tour
CN101692524B (en) Method and device for preventing faulty operation of electric power system based on wireless communication
CN202840641U (en) Electric automobile charging facilities
CN202940643U (en) Comprehensive anti-misoperation system for power distribution network
CN205305194U (en) Street lamp automatic monitoring system
CN202720264U (en) Remote monitoring system for electricity consumption
CN106026400B (en) A kind of substation's anti-misoperation locking device
CN102497034B (en) Smart power grid junction station
CN102547215A (en) Intelligent visual identification system capable of preventing wrong operation
CN201498885U (en) Electric power system faulty operation preventing device based on wireless communication
CN204144912U (en) A kind of high voltage generating station electrical verification alarm block sytem
CN106655523A (en) Smart electric service system
CN107069967A (en) For the NMS between transformer station and transformer station
CN108923475A (en) A kind of communication for transmission line polling robot and online energy supply base station
CN108303924A (en) Based on shared photovoltaic information collection cloud platform monitoring system and monitoring method
CN203932716U (en) Electric energy metrical, load are controlled integrated cabinet
CN201138498Y (en) Theft-resisting early alarming apparatus of distributing transformer based on GSM technique
CN204203318U (en) Terminal box of transformer substation and electric supply meter case alarm system for abnormal opening
CN207096346U (en) A kind of online phase checking device of high-tension switch cabinet
CN104300515A (en) Live part verification information recognition and intelligent protection device for transformer substation
CN102209231A (en) Equipment information output method and system
CN202110432U (en) Remote monitoring feeder terminal
CN116191209A (en) Intelligent meter box
CN202856454U (en) Five prevention system capable of positioning working personnel and temporary grounding wire

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170908

RJ01 Rejection of invention patent application after publication