CN107143352A - 一种预埋注浆管注浆加固围岩松动区方法 - Google Patents
一种预埋注浆管注浆加固围岩松动区方法 Download PDFInfo
- Publication number
- CN107143352A CN107143352A CN201710215780.5A CN201710215780A CN107143352A CN 107143352 A CN107143352 A CN 107143352A CN 201710215780 A CN201710215780 A CN 201710215780A CN 107143352 A CN107143352 A CN 107143352A
- Authority
- CN
- China
- Prior art keywords
- shelf
- grouting pipe
- steel arch
- slip casting
- grouting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011435 rock Substances 0.000 title claims abstract description 26
- 238000007569 slipcasting Methods 0.000 title claims abstract description 19
- 238000000034 method Methods 0.000 title claims abstract description 11
- 230000002787 reinforcement Effects 0.000 title claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 21
- 239000010959 steel Substances 0.000 claims abstract description 21
- 239000004567 concrete Substances 0.000 claims abstract description 13
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 8
- 239000011378 shotcrete Substances 0.000 claims abstract description 7
- 238000005520 cutting process Methods 0.000 claims abstract description 5
- 238000003466 welding Methods 0.000 claims abstract description 5
- 238000010276 construction Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710215780.5A CN107143352A (zh) | 2017-04-05 | 2017-04-05 | 一种预埋注浆管注浆加固围岩松动区方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710215780.5A CN107143352A (zh) | 2017-04-05 | 2017-04-05 | 一种预埋注浆管注浆加固围岩松动区方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107143352A true CN107143352A (zh) | 2017-09-08 |
Family
ID=59773605
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710215780.5A Pending CN107143352A (zh) | 2017-04-05 | 2017-04-05 | 一种预埋注浆管注浆加固围岩松动区方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107143352A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111706361A (zh) * | 2020-06-04 | 2020-09-25 | 中铁大桥勘测设计院集团有限公司 | 一种隧道内钢架背后填充设备及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101614125A (zh) * | 2009-07-23 | 2009-12-30 | 中铁九局集团有限公司 | V级围岩隧道施工方法 |
CN104100280A (zh) * | 2014-07-07 | 2014-10-15 | 中冶交通工程技术有限公司 | 一种双翼挑梁初期支护结构及其隧道施工方法 |
CN104533451A (zh) * | 2014-12-05 | 2015-04-22 | 中国电建集团成都勘测设计研究院有限公司 | 在散体碎石土及破碎围岩中的隧道超前预支护技术 |
CN105298517A (zh) * | 2015-11-21 | 2016-02-03 | 中铁二十局集团第二工程有限公司 | 软弱围岩隧道超前加强支护施工方法 |
CN106246204A (zh) * | 2016-08-08 | 2016-12-21 | 山东大学 | 一种车载式防止隧道拱顶围岩塌方的系统及使用方法 |
-
2017
- 2017-04-05 CN CN201710215780.5A patent/CN107143352A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101614125A (zh) * | 2009-07-23 | 2009-12-30 | 中铁九局集团有限公司 | V级围岩隧道施工方法 |
CN104100280A (zh) * | 2014-07-07 | 2014-10-15 | 中冶交通工程技术有限公司 | 一种双翼挑梁初期支护结构及其隧道施工方法 |
CN104533451A (zh) * | 2014-12-05 | 2015-04-22 | 中国电建集团成都勘测设计研究院有限公司 | 在散体碎石土及破碎围岩中的隧道超前预支护技术 |
CN105298517A (zh) * | 2015-11-21 | 2016-02-03 | 中铁二十局集团第二工程有限公司 | 软弱围岩隧道超前加强支护施工方法 |
CN106246204A (zh) * | 2016-08-08 | 2016-12-21 | 山东大学 | 一种车载式防止隧道拱顶围岩塌方的系统及使用方法 |
Non-Patent Citations (3)
Title |
---|
孙延宗 等: "《岩巷工程施工 掘进工程》", 31 May 2011, 冶金工业出版社, pages: 411 - 412 * |
秦茂军;: "高速公路长大隧道施工塌方及处理方案研究", 建筑技术, no. 10, pages 73 - 75 * |
罗进: "浅谈隧道仰拱与下台阶开挖初支成环施工技术", 《中国高新技术企业》, no. 8, pages 103 - 104 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111706361A (zh) * | 2020-06-04 | 2020-09-25 | 中铁大桥勘测设计院集团有限公司 | 一种隧道内钢架背后填充设备及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104790873B (zh) | 松软岩土层射流导向成孔‑扩孔‑防塌孔一体化钻进方法 | |
CN107605498B (zh) | 富水砂卵石地层盾构隧道端头水平注浆加固结构施工方法 | |
CN103510957A (zh) | 一种组合式石门揭煤方法 | |
CN108203983A (zh) | 一种深基坑支护结构和方法 | |
CN103089276B (zh) | 深浅孔与高低压耦合注浆工艺 | |
CN108915736A (zh) | 强富水弱胶结含水层下掘进巷道的水害防治方法 | |
CN108661650A (zh) | 一种富水岩浆岩地区深大竖井井筒施工方法 | |
CN108979644A (zh) | 一种富水隧道溶洞坍塌处理及隧道开挖施工方法 | |
CN104895072A (zh) | 一种预应力锚索以及预应力锚索一次成型施工方法 | |
CN107989620A (zh) | 一种三洞小间距隧道的施工方法 | |
CN105735283A (zh) | 圆弧插扣十字桩制造设备 | |
CN107338790B (zh) | 旋喷搅拌复合桩施工方法 | |
JP3927842B2 (ja) | 二重管掘り小径杭の構築方法 | |
CN103741723A (zh) | 地下变电站地下连续墙接缝防水结构 | |
CN114233374B (zh) | 用于突泥涌水后斜井井筒塌腔区加固的地面注浆施工方法 | |
CN103031847A (zh) | 变径搭接组合式孔口管灌浆法 | |
CN207406345U (zh) | 富水砂卵石地层盾构隧道端头水平注浆加固结构 | |
CN203639952U (zh) | 地下变电站地下连续墙接缝防水结构 | |
CN107143352A (zh) | 一种预埋注浆管注浆加固围岩松动区方法 | |
CN210918893U (zh) | 一种用于桩孔孔壁快速修复的钻头 | |
CN201513182U (zh) | 破碎岩体超前帷幕注浆双通道分段注浆器 | |
CN208472716U (zh) | 裂隙地质防漏浆钻孔灌注桩结构 | |
CN105862725A (zh) | 地下工程预注浆防水防渗支护技术 | |
CN206957765U (zh) | 一种竖井掘砌涌水治理结构 | |
CN102733386B (zh) | 采用预应力锚固控制坝基岩体开挖松弛的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: No. 113 West Street, Nangang District, Harbin City, Heilongjiang Province, 150001 Applicant after: CHINA RAILWAY 22ND CONSTRUCTION BUREAU 1ST ENGINEERING Co.,Ltd. Applicant after: China Railway 22nd Bureau Group Co.,ltd. Applicant after: Lanzhou Jiaotong University Address before: No. 113 West Street, Nangang District, Harbin City, Heilongjiang Province, 150001 Applicant before: HARBIN RAILWAY CONSTRUCTION GROUP CO.,LTD. OF CHINA RAILWAY 22ND CONSTRUCTION BUREAU CO.,LTD. Applicant before: China Railway 22nd Bureau Group Co.,ltd. Applicant before: Lanzhou Jiaotong University |