一种加固h型钢梁柱及方法 Download PDFInfo
- Publication number
- CN107143152A CN107143152A CN201710550990.XA CN201710550990A CN107143152A CN 107143152 A CN107143152 A CN 107143152A CN 201710550990 A CN201710550990 A CN 201710550990A CN 107143152 A CN107143152 A CN 107143152A
- Authority
- CN
- China
- Prior art keywords
- beam column
- profile steel
- steel beam
- shaped
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710550990.XA CN107143152B (zh) | 2017-07-07 | 2017-07-07 | 一种加固h型钢梁柱及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710550990.XA CN107143152B (zh) | 2017-07-07 | 2017-07-07 | 一种加固h型钢梁柱及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107143152A true CN107143152A (zh) | 2017-09-08 |
CN107143152B CN107143152B (zh) | 2023-06-27 |
Family
ID=59786004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710550990.XA Active CN107143152B (zh) | 2017-07-07 | 2017-07-07 | 一种加固h型钢梁柱及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107143152B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331866A (zh) * | 2019-07-04 | 2019-10-15 | 太原理工大学 | 一种装配式h型钢结构加固系统及其装配方法 |
CN112031488A (zh) * | 2020-09-07 | 2020-12-04 | 浙江正泰新能源开发有限公司 | 一种钢结构厂房加固结构及加固方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1161993A (ja) * | 1997-08-25 | 1999-03-05 | Artes:Kk | 閉鎖形断面柱と梁の接合構造 |
CN102352694A (zh) * | 2011-09-13 | 2012-02-15 | 浙江大学 | 一种钢结构柱的加固方法 |
WO2012105858A1 (en) * | 2011-01-31 | 2012-08-09 | Ramos Proceso P | A fire protection system for wide flange steel columns and beams |
CN103556780A (zh) * | 2013-10-29 | 2014-02-05 | 刘阳 | 一种翼缘防屈曲型钢-混凝土组合梁 |
-
2017
- 2017-07-07 CN CN201710550990.XA patent/CN107143152B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1161993A (ja) * | 1997-08-25 | 1999-03-05 | Artes:Kk | 閉鎖形断面柱と梁の接合構造 |
WO2012105858A1 (en) * | 2011-01-31 | 2012-08-09 | Ramos Proceso P | A fire protection system for wide flange steel columns and beams |
CN102352694A (zh) * | 2011-09-13 | 2012-02-15 | 浙江大学 | 一种钢结构柱的加固方法 |
CN103556780A (zh) * | 2013-10-29 | 2014-02-05 | 刘阳 | 一种翼缘防屈曲型钢-混凝土组合梁 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110331866A (zh) * | 2019-07-04 | 2019-10-15 | 太原理工大学 | 一种装配式h型钢结构加固系统及其装配方法 |
CN112031488A (zh) * | 2020-09-07 | 2020-12-04 | 浙江正泰新能源开发有限公司 | 一种钢结构厂房加固结构及加固方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107143152B (zh) | 2023-06-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Nishiyama et al. | Inelastic force-deformation response of joint shear panels in beam-column moment connections to concrete-filled tubes | |
TWI499707B (zh) | 一種面外變形束制之接合結構 | |
CN207110524U (zh) | 一种加固h型钢梁柱 | |
KR100952404B1 (ko) | 하이브리드 비좌굴 가새 | |
CN105569223B (zh) | 一种高低强度多层钢板组合的自复位耗能墙 | |
CN108517958A (zh) | 一种装配式钢结构耗能型梁柱节点及其装配方法 | |
CN207004146U (zh) | 一种用于高压输电角钢塔主柱角钢的加固装置 | |
CN107143152A (zh) | 一种加固h型钢梁柱及方法 | |
CN105625585A (zh) | 屈曲约束钢结构梁柱连接节点和钢结构建筑 | |
CN208701892U (zh) | 一种下翼缘摩擦式自定心钢框架梁柱节点 | |
CN106638343A (zh) | 阻尼式铁路金属声屏障系统 | |
KR101226766B1 (ko) | 기둥-보 접합 장치 | |
CN107687266A (zh) | 一种输电塔角钢斜材加固装置 | |
CN201184001Y (zh) | 防屈曲耗能支撑结构 | |
CN204040513U (zh) | 一种局部粘钢以加固的受压钢杆件 | |
CN210421987U (zh) | 一种适用于古建筑木结构榫卯节点的耗能减震装置 | |
CN105756365A (zh) | 一种快速加固混凝土梁的方法 | |
WO2020114031A1 (zh) | 外包承压不受拉混凝土内嵌阻尼夹层的双钢板组合剪力墙 | |
CN107178242A (zh) | 一种用于高压输电角钢塔主柱角钢的加固装置 | |
JP2009235730A (ja) | 構造物の補強構造 | |
Sitler et al. | Buckling restrained brace connection and stability performance issues | |
Lin et al. | Seismic behaviour of diaphragm-through bolted-welded joints between CFST column to steel beam | |
CN101787737B (zh) | 同时满足空间不同方向约束要求的结构节点 | |
CN203307934U (zh) | 螺孔增强型大跨度胶合木柱梁连接结构 | |
TWM638935U (zh) | 模組化消能機構 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230529 Address after: 250031 Shandong Province Flyover District of Ji'nan City Road 29. Applicant after: Shandong Academy of Building Science Co.,Ltd. Applicant after: Shandong Jianke Special Construction Engineering Technology Center Co.,Ltd. Applicant after: Shandong Jianyan Technology Development Co.,Ltd. Address before: 250031 Shandong city of Ji'nan province WuYingShan Road No. 29 Applicant before: SHANDONG PROVINCIAL ACADEMY OF BUILDING RESEARCH |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |