CN107139319A - The concrete segment of a kind of inside with relatively independent bubble and preparation method thereof - Google Patents

The concrete segment of a kind of inside with relatively independent bubble and preparation method thereof Download PDF

Info

Publication number
CN107139319A
CN107139319A CN201710269461.2A CN201710269461A CN107139319A CN 107139319 A CN107139319 A CN 107139319A CN 201710269461 A CN201710269461 A CN 201710269461A CN 107139319 A CN107139319 A CN 107139319A
Authority
CN
China
Prior art keywords
bubble
concrete segment
concrete
relatively independent
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710269461.2A
Other languages
Chinese (zh)
Inventor
王秋爽
凌攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Huilong Technology Co Ltd
Original Assignee
Guangxi Huilong Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Huilong Technology Co Ltd filed Critical Guangxi Huilong Technology Co Ltd
Priority to CN201710269461.2A priority Critical patent/CN107139319A/en
Publication of CN107139319A publication Critical patent/CN107139319A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/50Producing shaped prefabricated articles from the material specially adapted for producing articles of expanded material, e.g. cellular concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C1/00Building elements of block or other shape for the construction of parts of buildings

Abstract

The invention discloses the concrete segment that a kind of inside carries relatively independent bubble, including brick body and concrete feeding module, notch board is set in brick body, and setting connects roller aperture on the notch board, the roller aperture side that connects sets recessed junction, and neck is set above the recessed junction, the neck side sets convex clip face, and the gas steams bubble in the setting of mouth side.Enter the beneficial effects of the invention are as follows several blebbing roller grafting in the concrete material of brick, drive the rotation of blebbing roller by motor and steam mouth from gas and blow heat steam, so as to which concrete generates separated foam, by grinding, bucket is rotary to be sealed to bubble turnery while being heated to concrete segment, avoid it from crushing, so as to which the concrete segment that this kind of inside carries relatively independent bubble is made, this kind of concrete segment has several the interior bubbles differed in size, greatly reduces the manufacturing cost of concrete building brick;The convex bubble of building block side agrees with groove clamping, improves the fastness connected between building block.

Description

The concrete segment of a kind of inside with relatively independent bubble and preparation method thereof
Technical field
The present invention relates to concrete segment technical field, and in particular to a kind of inside carries the concrete of relatively independent bubble Building block and preparation method thereof.
Background technology
With the fast development of people's living standard, concrete uses more and more wider model in building trade, and concrete is Refer to the general designation of the cementing integral engineered composite material of aggregate by binder materials.The word of concrete one generally said refers to use cement Make binder materials, sand, masonry aggregate;Coordinate by a certain percentage with water, it is agitated obtained by cement concrete, also referred to as common coagulation Soil, it is widely used in civil engineering.
Concrete intensity after heat hardening is very high, the ratio of mud, cement type and consumption, the kind gathered materials and consumption with And stirring, shaping, maintenance, the intensity of concrete is all directly affected, and concrete segment is exactly to be carried out by concrete heating cutting One kind of preparation is laid bricks, and the concrete segment of in the market substantially includes normal concrete small hollow block, light aggregate concrete Small-sized hollow building block, autoclave aerated concrete building block, foam concrete block.Concrete segment etc., these building block generally existings Being connected not enough firmly between big using material quantity during preparation, preparation cost height, concrete segment, is used after building The shortcoming of security difference.
The content of the invention
It is an object of the invention to provide the concrete segment of a kind of inside with relatively independent bubble and preparation method thereof, To solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides following technical scheme:
The concrete segment of a kind of inside with relatively independent bubble and preparation method thereof, including brick body and concrete feeding Set to set on notch board, and the notch board in module, brick body and connect roller aperture, the roller aperture side that connects sets recessed junction, and institute State and neck is set above recessed junction, the neck side sets convex clip face, and the plate that inclines is set on the convex clip face, it is described to incline on plate Convex bubble is set, and groove is set in the recessed junction, brick body lower section is set sets angle to steep on clamp, and the clamp, institute State setting inside brick body and wear roller circle, and described wear sets gas to steam mouth on roller circle, the gas steams mouth side and sets interior bubble.
It is as further scheme of the invention:The concrete feeding module connection brickmaking storehouse module, the brickmaking storehouse Module connects pre-heating module, brickmaking storehouse module connection blebbing roller plug-in module, and the blebbing roller plug-in module and connected Motor transmission module, the blebbing roller plug-in module connection heat steam blowing bubble module, and brickmaking storehouse module connection mill bucket Envelope rotation module, the mill bucket envelope rotation module connection card holder fixes moulding module, and the mill bucket envelope rotation module connection cooling discharging Module.
It is as further scheme of the invention:Set on several interior bubbles, the convex clip face and set inside brick body Several convex bubbles are put, the angle bubble is triangular structure.
It is as further scheme of the invention:Described wear sets several gas to steam mouth on roller circle.
It is as further scheme of the invention:The recessed junction is symmetrical set with the convex clip face.
It is as further scheme of the invention:The inside carries the concrete segment preparation method of relatively independent bubble It is as follows:
Concrete is in mould needed for taking and carries out puddling, and bubble processed is carried out by the grafting of blebbing roller after stirring and evenly mixing, Heating building block processed, 1000~1200 DEG C of heating-up temperature heating-up temperature while system bubble;
Steel plate is heated to 1500 ± 20 DEG C and is incubated 5~6 hours, starts forging.
It is as further scheme of the invention:Concrete segment heat treatment step of the inside with relatively independent bubble Rapid and technological parameter is as follows:Method is as follows:
After the abundant heat setting of building block, 8 hours are incubated.Poured water and cooled,
It is as further scheme of the invention:The inside carries the concrete segment soaking time of relatively independent bubble Poured water and cooled after end, and be cooled to room temperature.
Enter the beneficial effects of the invention are as follows several blebbing roller grafting in the concrete material of brick, drive blebbing roller to revolve by motor Turn and blow heat steam from gas steaming mouth, so that concrete generates separated foam, pass through mill while being heated to concrete segment Bucket is rotary to be sealed to bubble turnery, it is to avoid it is crushed, and is built so that concrete of this kind of inside with relatively independent bubble is made Block, this kind of concrete segment has several the interior bubbles differed in size, greatly reduces the manufacturing cost of concrete building brick, section About raw material;The convex bubble of building block side agrees with groove clamping, improves the fastness connected between building block, it is ensured that build Security and steadiness.
Brief description of the drawings
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is recessed junction front view of the invention;
Fig. 3 is side view of the invention;
Fig. 4 is sectional view of the invention;
Fig. 5 is the structural representation of preparation method of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Refer in Fig. 1-Fig. 5, the embodiment of the present invention, a kind of inside with relatively independent bubble concrete segment and its Set to set on notch board 2, and notch board 2 in preparation method, including brick body 1 and concrete feeding module 15, brick body 1 and connect roller aperture 3, connect The side of roller aperture 3 sets recessed junction 4, and the top of recessed junction 4 sets neck 5, and the side of neck 5 sets convex clip face 6, and on convex clip face 6 Setting is inclined plate 7, is set on the plate 7 that inclines and groove 9 is set on convex bubble 8, and recessed junction 4, and the lower section of brick body 1 sets clamp 10, and clamp 10 Upper setting angle bubble 11, the inside of brick body 1, which is set, wears roller circle 12, and wears setting gas steaming mouth 13 on roller circle 12, and gas steams the side of mouth 13 and set Interior bubble 14.
The connection brickmaking of the concrete feeding module 15 storehouse module 16, the connection pre-heating module 17 of brickmaking storehouse module 16, system The connection blebbing roller of brick storehouse module 16 plug-in module 18, and the connection motor of blebbing roller plug-in module 18 transmission module 19, blebbing roller is inserted The connection heat steam blowing bubble module 20 of connection module 18, and the connection mill bucket envelope rotation module 21 of brickmaking storehouse module 16, mill bucket envelope rotation module 21 connection card holders fix moulding module 22, and the mill bucket envelope rotation connection cooling discharging of module 21 module 23.
The inside of brick body 1, which is set, sets several convex bubbles 8 on several interior bubbles 14, convex clip face 6, angle bubble 11 is triangle Shape structure.
Described wear sets several gas to steam mouth 13 on roller circle 12.
The recessed junction 4 is symmetrical set with convex clip face 6.
Concrete segment preparation method of the inside with relatively independent bubble is as follows:
Concrete is in mould needed for taking and carries out puddling, and bubble processed is carried out by the grafting of blebbing roller after stirring and evenly mixing, Heating building block processed, 1000~1200 DEG C of heating-up temperature while system bubble;
Steel plate is heated to 1500 ± 20 DEG C and is incubated 5~6 hours, starts forging.
Concrete segment heat treatment step and technological parameter of the inside with relatively independent bubble are as follows:Method is such as Under:
After the abundant heat setting of building block, 8 hours are incubated.Poured water and cooled,
Concrete segment soaking time of the inside with relatively independent bubble is poured water after terminating and cooled, and It is cooled to room temperature.
The present invention the course of work be:Step 1:Bubble is prepared inside concrete segment.Pass through concrete feeding module 15 Brickmaking storehouse module 16 is carried out to load building block raw material, heating firing is carried out to brickmaking storehouse by pre-heating module 17, passes through blebbing Roller plug-in module 18 is to accessing blebbing roller in concrete material, motor transmission module 19 drives the turn of blebbing roller and blebbing simultaneously is mixed Inside is passed through heat steam blowing bubble module 20, and being passed through heat steam by gas steaming mouth 13 makes concrete segment producing bubbles inside.
Step 2:Concrete segment is moulding and prepares.It is close to brick body and bubble progress turnery by grinding bucket envelope rotation module 21 Envelope, prevents bubble breaking, fixes moulding module 22 by card holder and concrete segment is punchinged and fixed, by grinding bucket envelope rotation Module 21 carries out turnery sealing to brick body and bubble, prevents bubble breaking, by cooling down brick output module 23 that concrete segment is cold But discharge afterwards.
Step 3:The use of concrete segment.Several interior bubbles that the concrete segment is differed in size by having inside it 14, the manufacturing cost of concrete building brick is greatly reduced, raw material has been saved;Convex bubble 8 and the clamping of groove 9 by building block side Agree with, improve the fastness connected between building block, it is ensured that the security and steadiness of construction.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit is required rather than described above is limited, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as to the claim involved by limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It may be appreciated other embodiment.

Claims (7)

1. a kind of inside carries the concrete segment of relatively independent bubble, including brick body (1), it is characterised in that brick body (1) Upper setting notch board (2), and setting connects roller aperture (3) on the notch board (2), described roller aperture (3) side that connects sets recessed junction (4), and Neck (5) is set above the recessed junction (4), and neck (5) side sets convex clip face (6), and is set on the convex clip face (6) Put to set on the plate that inclines (7), the plate that inclines (7) and set on convex bubble (8), and the recessed junction (4) under groove (9), brick body (1) Side sets clamp (10), and sets angle to steep (11) on the clamp (10), is set inside brick body (1) and wears roller circle (12), and Described wear sets gas to steam mouth (13) on roller circle (12), the gas steams mouth (13) side and sets interior bubble (14).
2. a kind of inside according to claim 1 carries the concrete segment of relatively independent bubble, it is characterised in that described Set inside brick body (1) and several convex bubbles (8) are set on several interior bubbles (14), the convex clip face (6), (11) are steeped at the angle For triangular structure.
3. a kind of inside according to claim 1 carries the concrete segment of relatively independent bubble, it is characterised in that described Wear and set several gas to steam mouth (13) on roller circle (12).
4. a kind of inside according to claim 1 carries the concrete segment of relatively independent bubble, it is characterised in that described Recessed junction (4) is symmetrical set with the convex clip face (6).
5. a kind of inside carries the concrete segment preparation method of relatively independent bubble, it is characterised in that the inside carries phase Concrete segment preparation method to separated foam is as follows:
Concrete needed for taking is in mould and carries out puddling, after stirring and evenly mixing after carry out bubble processed by the grafting of blebbing roller, in system bubble While heating building block processed, 1000~1200 DEG C of heating-up temperature;
Steel plate is heated to 1500 ± 20 DEG C and is incubated 5~6 hours, starts forging.
6. a kind of inside according to claim 6 carries the concrete segment preparation method of relatively independent bubble, its feature It is, concrete segment heat treatment step and technological parameter of the inside with relatively independent bubble are as follows:Method is as follows:
After the abundant heat setting of building block, 8 hours are incubated, is poured water and cooled.
7. a kind of inside according to claim 6 carries the concrete segment preparation method of relatively independent bubble, its feature It is, concrete segment soaking time of the inside with relatively independent bubble is poured water after terminating and cooled, and cold But to room temperature.
CN201710269461.2A 2017-04-21 2017-04-21 The concrete segment of a kind of inside with relatively independent bubble and preparation method thereof Pending CN107139319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710269461.2A CN107139319A (en) 2017-04-21 2017-04-21 The concrete segment of a kind of inside with relatively independent bubble and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710269461.2A CN107139319A (en) 2017-04-21 2017-04-21 The concrete segment of a kind of inside with relatively independent bubble and preparation method thereof

Publications (1)

Publication Number Publication Date
CN107139319A true CN107139319A (en) 2017-09-08

Family

ID=59773954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710269461.2A Pending CN107139319A (en) 2017-04-21 2017-04-21 The concrete segment of a kind of inside with relatively independent bubble and preparation method thereof

Country Status (1)

Country Link
CN (1) CN107139319A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1451523A (en) * 2003-05-13 2003-10-29 江门天风墙体材料有限公司 Process for producing air-entraining cement concrete block
KR100723929B1 (en) * 2006-06-05 2007-06-04 박문식 Concrete block of multi-fun ction for structure wall
CN201459994U (en) * 2009-07-17 2010-05-12 张建兴 Porous foaming building block for heat preservation of wall body
CN205976193U (en) * 2016-08-03 2017-02-22 江苏建筑职业技术学院 Contain haydite phase change material's light woodbox building block

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1451523A (en) * 2003-05-13 2003-10-29 江门天风墙体材料有限公司 Process for producing air-entraining cement concrete block
KR100723929B1 (en) * 2006-06-05 2007-06-04 박문식 Concrete block of multi-fun ction for structure wall
CN201459994U (en) * 2009-07-17 2010-05-12 张建兴 Porous foaming building block for heat preservation of wall body
CN205976193U (en) * 2016-08-03 2017-02-22 江苏建筑职业技术学院 Contain haydite phase change material's light woodbox building block

Similar Documents

Publication Publication Date Title
CN101007723A (en) Concrete water-permeable brick using steel slag as aggregate
CN102325736A (en) The Geopolymer compsn
CN109265180B (en) High-compression-resistance pervious concrete brick and preparation method thereof
CN105924057B (en) A kind of water conservation water-permeable brick and preparation method thereof
CN103864455A (en) Method for yellow phosphorus slag base aerated building blocks
CN107140915A (en) A kind of light heat-resisting tailings hollow brick and its preparation
CN104371703A (en) Method for preparing oil fracturing proppant from high-aluminum fly ash
CN108178581A (en) A kind of composite heat insulation block and preparation method thereof
CN107352973A (en) A kind of preparation method of environment friendly brick
CN107139319A (en) The concrete segment of a kind of inside with relatively independent bubble and preparation method thereof
CN107266018A (en) A kind of modified bauxite hollow brick and preparation method thereof
CN106630862A (en) 3D substrate dry-mixed mortar raw material ratio and production technology
CN106699127A (en) Hot wind erosion-resistant refractory brick and preparation process thereof
CN108373276A (en) A kind of composite enhanced cement of environmental protection and preparation method thereof
CN105604236B (en) A kind of building block
CN108996970A (en) A kind of ultra-fine earth concrete and preparation method thereof
CN102505058B (en) Metallurgical slag ladle bottom protecting material as well as preparation method and spray repairing method thereof
CN108546070A (en) A kind of blast-furnace cinder environmental protection brick and preparation method thereof
CN107139312B (en) It is a kind of to use industrial residue and foaming agent self heat-preserving concrete building block preparation method
CN207958160U (en) A kind of composite heat insulation block
CN104058703A (en) Anti-crack air entrapping brick
CN103833314A (en) Anti-cracking aerated brick
CN108129161A (en) Composite aerated brick and preparation method
CN106631067A (en) Special refractory brick for chimney and preparation technology thereof
CN108467278A (en) A kind of water-granulated slag environmental protection brick and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170908

WD01 Invention patent application deemed withdrawn after publication