CN107130582B - High-frequency vibration disturbs drainage arrangement and its construction method - Google Patents

High-frequency vibration disturbs drainage arrangement and its construction method Download PDF

Info

Publication number
CN107130582B
CN107130582B CN201710545679.6A CN201710545679A CN107130582B CN 107130582 B CN107130582 B CN 107130582B CN 201710545679 A CN201710545679 A CN 201710545679A CN 107130582 B CN107130582 B CN 107130582B
Authority
CN
China
Prior art keywords
vibrating tube
vibrating
drainage arrangement
sleeve
frequency vibration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710545679.6A
Other languages
Chinese (zh)
Other versions
CN107130582A (en
Inventor
陈庚
陈永辉
陈龙
程潇
王波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201710545679.6A priority Critical patent/CN107130582B/en
Publication of CN107130582A publication Critical patent/CN107130582A/en
Application granted granted Critical
Publication of CN107130582B publication Critical patent/CN107130582B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of high-frequency vibration disturbance drainage arrangement and its construction methods, disturbing drainage arrangement includes connection sleeve, vibrating tube and limitation ring, connection sleeve is mounted on the sleeve lower end of plastic draining panel vibration board-plugging device, limitation ring is fixed on connection sleeve, vibrating tube top is rotatably connected by connection louver with sleeve is connect, vibrating tube is the hollow body of bottom end closure, and vibrating spear is equipped in vibrating tube, and the top of vibrating tube is equipped with gasket and fixed block for sealing vibrating tube.The present invention has construction simply, the good feature of disturbance effect, the disturbance stabilization by drainage suitable for structural soft soil.

Description

High-frequency vibration disturbs drainage arrangement and its construction method
Technical field
The present invention relates to a kind of for disturbing the disturbance drainage arrangement and its construction method of discharging consolidation, in particular to a kind of The disturbance drainage arrangement and its construction method of movable high-frequency vibration, the disturbance stabilization by drainage suitable for structural soft soil.
Background technique
With the development of China's Tidal Flat Reclamation building cause, especially propose to promote sea in China's " 12th Five-Year Plan " planning outline After foreign economic development, the requirement for border on the sea land-based area area and development rate is necessarily promoted.And China's Coastal Areas soft clay point Cloth is extensive, high sensitivity, and engineering properties is poor.Therefore, in the Process of Engineering Construction such as road, sea wall, it is necessary to marine soft soil into Row is reinforced.
And the natural of the shallow-layer soft clay of the coastal areas crude sedimentation such as the Tianjin in China, Lianyun Harbour, Ningbo, Zhanjiang contains Water rate is higher than liquid limit, and the engineering accident to come down of collapsing, these engineerings occur frequently for construction of buildings on these Soft Clay Foundations Accident is similar with the engineering problem that Northern Europe and Canadian stream clay area encounter, and is mainly due to sea and generates into regression Marine facies structural soft soil.
This is because many marine clays of Deposits in Eastern Coastal China experienced deposition of the sea into period under briny environment, and It is influenced afterwards in the rear depositional phase by salinity lixiviation, hole water chemistry property is changed.Since salinity subtracts in pore water Few, liquid limit reduces in crude sedimentation soil, and natural moisture content during salinity lixiviation due to the work of soil structure resistance to deformation With variation is nearly free from, it is far longer than soil body liquid limit so as to cause natural moisture content, such result necessarily causes to be subjected to salt The undrained strength of the remodeling sample of the low activity crude sedimentation marine facies structured soils of lixiviation is divided to be greatly lowered, and then significantly Improve the sensitivity of crude sedimentation soil.Highly sensitive crude sedimentation soil necessarily causes soil structures unstable, and soil structures are unstable It is fixed, in external environment(Such as building load, excavation of foundation pit, construction disturbance, traffic loading, earthquake load)Under effect, original state The soil structures of sample are subject to destruction and unstability.
When handling highly sensitive marine facies structured soil ground using conventional discharge concretion technology, necessarily encounters following engineerings and ask Topic:Natural marine intermediate deposits are in long-term deposition and rear deposition process, the work of the consolidation yield stress of the soil body in time effect Increased substantially under, with normal consolidation history natural marine intermediate deposits consolidation yield stress be frequently larger than its it is effective on Cover pressure, imposed load deforms very little when being less than consolidation yield stress, such result is again often such that preloading, vacuum preloading Quite a few in load is used to overcome the consolidation yield stress of the crude sedimentation soil body, so that foundation stabilization effect is unobvious.
Using the technical solution drained again is first disturbed, the disturbance that the soil body is first carried out with mixing pile machine etc. is needed, then set Drain bar, and the project cost of this scheme is huge, claim for eot, it is difficult to it promotes and applies.
Therefore according to current actual conditions and technical conditions, a kind of combinable existing plastic drain board flashboard machine is needed Water discharge technology is disturbed, disturbance effect is obvious, and project cost is cheap, and construction period is reasonable, and makes duration, construction investment, engineering It being capable of reasonable balance between quality.
Summary of the invention
A kind of high-frequency vibration disturbance drainage arrangement and its construction in order to overcome the deficiencies in the prior art, the present invention provides Method.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
A kind of high-frequency vibration disturbance drainage arrangement, including connection sleeve, vibrating tube and limitation ring, the connection sleeve installation In the sleeve lower end of plastic draining panel vibration board-plugging device, the limitation ring is fixed on the connection sleeve, the vibration tube top End is rotatably connected by connection louver with the connection sleeve, and the vibrating tube is the hollow body of bottom end closure, the vibration Vibrating spear is equipped in dynamic pipe, the top of the vibrating tube is equipped with gasket and fixed block for sealing vibrating tube.
Preferably, being filled with fine sand in the interior gap between vibrating spear and vibrating tube of the vibrating tube.
Preferably, the internal diameter of the limitation ring is greater than the outer diameter of the vibrating tube, and when vibrating tube expansion, i.e. vibrating tube When turning to the perpendicular position of sleeve is connect, the end of vibrating tube is located in the limitation ring.
Preferably, the vibrating tube top is also arranged with washer, vibrating tube and limitation when for sealing vibrating tube expansion Gap between ring.
Preferably, the gasket and fixed block are bolted in the vibrating tube.
Preferably, being equipped with through-hole on the gasket and fixed block, and the through-hole on the through-hole and fixed block on gasket Position is corresponding, and the cable of the vibrating spear passes through the through-hole on through-hole and fixed block on gasket.
Preferably, being also cased with cable protection pipe on the cable of the vibrating spear.
Preferably, the material of the vibrating tube uses irony or steel material.
Preferably, welding platform is additionally provided on the outer wall on the vibrating tube top, one end welding of the connection louver In the welding platform.
A kind of construction method using above-mentioned high-frequency vibration disturbance drainage arrangement, includes the following steps:
1)Spacing is set according to drain bar design, selects the length of vibrating tube that corresponding disturbance drainage arrangement is made, and It is mounted on the sleeve of plastic drain board flashboard machine;
2)During setting plastic draining board, vibrating tube can be unfolded under the soil body drag effect of lower part, while opening and vibrating Stick switch carries out high-frequency vibration to the soil body by vibrating spear, destroys the original structure of the soil body;
3)After plastic draining board is set in place, sleeve is above pulled out, vibrating tube can bounce back under the effect of the top soil body at this time, simultaneously Closing is vibrated stick switch, convenient for pulling out on sleeve;
4)After disturbance drainage arrangement extracts ground completely, the plastic draining board of certain length is stayed to expose ground by design requirement Face, convenient for the connection of later period transverse drainage bed course and plastic draining board.
The beneficial effects of the invention are as follows:
(1), the present invention enriches structural soft soil method for processing foundation, compared with traditional draining concretion method, to the soil body Disturbance effect is obvious, convenient for native pore water discharge;Compared with first disturbing drainage again, project cost can be greatly reduced, the duration Shorten.
(2), plastic draining board is set in place, and during above pulling out sleeve, vibrating tube can act on next time in the top soil body at this time Contracting, convenient for pulling out on sleeve, while can reduce plastic draining board rewinds phenomenon.
(3), the sleeve weld that drainage arrangement and plastic drain board flashboard machine need to will be only disturbed in work progress, can be used for institute There are the board-plugging device of type, construction is simple.
Detailed description of the invention
Fig. 1 is main view of the invention;
Fig. 2 is top view of the invention;
Fig. 3 is the sectional view of vibrating tube in the present invention;
Main view when Fig. 4 is vibrating tube of the present invention retraction;
Fig. 5 is the state diagram of the present invention in the construction process.
Reference signs list:
In figure:1- sleeve, 2- connection sleeve, 3- limitation ring, 4- vibrating tube, 5- connection louver, 6- plastic draining board, 7- pad Circle, 8- gasket, 9- bolt, 10- vibrating spear, 11- fine sand, 12- welding platform, 13- fixed block, 14- cable protective tube.
Specific embodiment
Present invention will be further described below with reference to the accompanying drawings and specific embodiments:
As shown in Fig. 1 to Fig. 3, a kind of high-frequency vibration disturbance drainage arrangement, including connection sleeve 2, vibrating tube 4 and limitation Ring 3, connection sleeve 2 are mounted on 1 lower end of sleeve that plastic draining board 6 vibrates board-plugging device, and limitation ring 3 is fixed on connection sleeve 2, 4 top of vibrating tube is rotatably connected by connecting louver 5 with sleeve 2 is connect, and vibrating tube 4 is the hollow body of bottom end closure, vibration Vibrating spear 10 is equipped in dynamic pipe 4, the top of vibrating tube 4 is equipped with gasket 8 and fixed block 13 for sealing vibrating tube 4.Vibrating tube 4 Fine sand 11 is filled in gap between inherent vibrating spear 10 and vibrating tube 4.
The internal diameter of limitation ring is greater than the outer diameter of vibrating tube 4, and when vibrating tube 4 is unfolded, i.e. vibrating tube 4 turns to and connector sleeve When 2 perpendicular position of cylinder, the end of vibrating tube 4 is located in limitation ring.4 top of vibrating tube is also arranged with washer 7, for sealing Gap when vibrating tube 4 is unfolded between vibrating tube 4 and limitation ring 3.Limitation ring is used to limit the position of vibrating tube 4, when vibrating tube 4 When turning to the perpendicular position of sleeve 2 is connect, limitation ring can prevent vibrating tube 4 from continuing up rotation.
Gasket 8 and fixed block 13 are fixed in vibrating tube 4 by bolt 9.It is equipped on gasket 8 and fixed block 13 logical Hole, and the lead to the hole site on the through-hole and fixed block 13 on gasket 8 is corresponding, the cable of vibrating spear 10 passes through logical on gasket 8 Through-hole on hole and fixed block 13.Cable protection pipe 14 is also cased on the cable of vibrating spear 10.The material of vibrating tube 4 uses irony Or steel material.Welding platform 12 is additionally provided on the outer wall on 4 top of vibrating tube, one end of connection louver 5 is welded on welding platform On 12.
Connecting sleeve uses the iron pipe that outer diameter is 22cm for 25cm, internal diameter, length 50cm in this example.3 outer diameter of limitation ring is 8cm, internal diameter 7cm, the iron hoop of length 3cm, vertical welding is in connecting sleeve.
The rubber spacer and cylindrical iron block that diameter is 5cm is respectively adopted in the gasket 8 and fixed block 13 of 4 end of vibrating tube, Blending bolt 9 and vibrating tube 4 are fixed.
Connection louver 5 uses width for the connection louver 5 of 3cm, and both ends are respectively welded on connection sleeve 2 and vibrating tube 4. Wherein, connection louver 5 is welded by welding platform 12 and vibrating tube 4, to increase bonding area.
Washer 7 uses the rubber ring that outer diameter is 4.5cm for 7cm, internal diameter, covers outside the end of vibrating tube 4, for sealing Gap when vibrating tube 4 is unfolded between limitation ring 3.
Fig. 3 is 4 sectional view of vibrating tube provided by the invention.Vibrating tube 4 uses diameter for the iron pipe of 5cm, and inside is cut with The cavity of diameter 4cm, convenient for the installation of vibrating spear 10 and fine sand.Vibrating spear 10 uses electric high-frequency(220Hz)Vibrating spear 10, vibration Width 0.82mm, diameter 3cm.Fine sand uses normal sand, is filled in vibrating spear 10 and 4 cavity of vibrating tube.
Front view when Fig. 4 is the retraction of vibrating tube 4 for disturbing drainage arrangement, when 4 top of vibrating tube receives resistance, meeting The position for bouncing back to vibrating tube 4 as shown in Figure 4, be easy to casing on pull out.
The working condition of the present invention in the construction process is arranged as shown in figure 5, being disturbed using high-frequency vibration provided by the invention The construction method of water installations, includes the following steps:
(1)Spacing is set according to plastic draining board 6, selects the length of vibrating tube 4, corresponding disturbance drainage arrangement is made, Disturbance drainage arrangement is welded on plastic draining board 6 to vibrate on board-plugging device sleeve 1;
(2)Positioning plastic draining board 6 sets position, and plastic draining board 6 is squeezed into ground by sleeve 1.In drain bar During squeezing into, vibrating tube 4 can be unfolded under the resistance of the lower part soil body, while open the switch of vibrating spear 10, make it in vibrating tube 4 High-frequency vibration is inside done, the original structure of surrounding soil is vibrated and destroy;
(3)After plastic draining board 6 is set in place, sleeve 1 is above pulled out.Vibrating tube 4 can act on next time in the top soil body at this time Contracting simultaneously closes off the switch of vibrating spear 10 convenient for pulling out on sleeve 1;
(4)After disturbance drainage arrangement extracts ground completely, the plastic draining board 6 of certain length is stayed to expose by design requirement Ground after setting to plastic draining board 6, is laid with laterally convenient for the connection of later period transverse drainage bed course and plastic draining board 6 Drainage blanket carries out prepressing water discharge.
The technical means disclosed in the embodiments of the present invention is not limited only to technological means disclosed in above embodiment, further includes Technical solution consisting of any combination of the above technical features.It should be pointed out that for those skilled in the art For, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also considered as Protection scope of the present invention.

Claims (9)

1. a kind of high-frequency vibration disturbs drainage arrangement, which is characterized in that including connection sleeve, vibrating tube and limitation ring, the company Female connector cylinder is mounted on the sleeve lower end of plastic draining panel vibration board-plugging device, and the limitation ring is fixed on the connection sleeve outer wall On, the vibrating tube top is rotatably connected by connection louver with the connection sleeve, and the vibrating tube is bottom end closure Hollow body, the vibrating tube is interior to be equipped with vibrating spear, and the top of the vibrating tube is equipped with the gasket for sealing vibrating tube and admittedly Determine block, the internal diameter of the limitation ring is greater than the outer diameter of the vibrating tube, and when vibrating tube expansion, i.e., vibrating tube is turned to and connected When the perpendicular position of sleeve, the end of the vibrating tube is located in the limitation ring.
2. high-frequency vibration as described in claim 1 disturbs drainage arrangement, which is characterized in that in the vibrating tube vibrating spear with Fine sand is filled in gap between vibrating tube.
3. high-frequency vibration as claimed in claim 2 disturbs drainage arrangement, which is characterized in that the vibrating tube top is also arranged with Washer, gap when for sealing vibrating tube expansion between vibrating tube and limitation ring.
4. high-frequency vibration as described in claim 1 disturbs drainage arrangement, which is characterized in that the gasket passes through with fixed block Bolt is fixed in the vibrating tube.
5. high-frequency vibration as described in claim 1 disturbs drainage arrangement, which is characterized in that be all provided on the gasket and fixed block There is through-hole, and the lead to the hole site on the through-hole and fixed block on gasket is corresponding, the cable of the vibrating spear passes through on gasket Through-hole on through-hole and fixed block.
6. high-frequency vibration as claimed in claim 5 disturbs drainage arrangement, which is characterized in that also covered on the cable of the vibrating spear There is cable protection pipe.
7. high-frequency vibration as described in claim 1 disturbs drainage arrangement, which is characterized in that the material of the vibrating tube uses iron Matter or steel material.
8. high-frequency vibration as described in claim 1 disturbs drainage arrangement, which is characterized in that on the outer wall on the vibrating tube top It is additionally provided with welding platform, one end of the connection louver is welded in the welding platform.
9. a kind of construction method using the high-frequency vibration disturbance drainage arrangement as described in claim 1-8 any one, special Sign is, includes the following steps:
1)Spacing is set according to drain bar design, selects the length of vibrating tube that corresponding disturbance drainage arrangement is made, and install On the sleeve of plastic drain board flashboard machine;
2)During setting plastic draining board, vibrating tube can be unfolded under the soil body drag effect of lower part, while opening vibrating spear and opening It closes, high-frequency vibration is carried out to the soil body by vibrating spear, destroys the original structure of the soil body;
3)After plastic draining board is set in place, sleeve is above pulled out, vibrating tube can bounce back under the effect of the top soil body at this time, simultaneously close off Vibrate stick switch, convenient for pulling out on sleeve;
4)After disturbance drainage arrangement extracts ground completely, the plastic draining board of certain length is stayed to basset by design requirement, Convenient for the connection of later period transverse drainage bed course and plastic draining board.
CN201710545679.6A 2017-07-06 2017-07-06 High-frequency vibration disturbs drainage arrangement and its construction method Active CN107130582B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710545679.6A CN107130582B (en) 2017-07-06 2017-07-06 High-frequency vibration disturbs drainage arrangement and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710545679.6A CN107130582B (en) 2017-07-06 2017-07-06 High-frequency vibration disturbs drainage arrangement and its construction method

Publications (2)

Publication Number Publication Date
CN107130582A CN107130582A (en) 2017-09-05
CN107130582B true CN107130582B (en) 2018-11-23

Family

ID=59737664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710545679.6A Active CN107130582B (en) 2017-07-06 2017-07-06 High-frequency vibration disturbs drainage arrangement and its construction method

Country Status (1)

Country Link
CN (1) CN107130582B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867665A (en) * 2018-07-05 2018-11-23 郑惜平 It disturbs silt dilution device and its method and disturbs silt dilution packing sedimentation by throwing stones method
CN114606842A (en) * 2022-03-23 2022-06-10 浙江交工集团股份有限公司港航工程分公司 Construction device and construction method for EPS foam particle mixed light soil roadbed

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2886374B2 (en) * 1991-06-11 1999-04-26 前田建設工業株式会社 Vibration compaction method
CN102226337B (en) * 2011-04-22 2012-07-04 河海大学 Three-dimensional drain and construction method thereof
CN102312425A (en) * 2011-09-02 2012-01-11 宫能和 Vibrating drain board device

Also Published As

Publication number Publication date
CN107130582A (en) 2017-09-05

Similar Documents

Publication Publication Date Title
CN100480475C (en) Controllable one-well lamina precipitation construction method
CN206457819U (en) Anchor pole for slope retaining
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN106836214A (en) Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect treatment
CN103161172B (en) Elevator shaft bottom precipitation construction method
CN107130582B (en) High-frequency vibration disturbs drainage arrangement and its construction method
CN104358252B (en) The bored pile perforation structure of spillage and construction method in water prevention
CN207619996U (en) Precipitation well construction
CN203702071U (en) Water inrush preventing drill ejecting device for water exploration and grouting construction of vertical shaft
CN113250249B (en) Construction method of existing building anti-floating system based on embedded self-advancing anchor rod
CN204401613U (en) The structure of bored pile perforation spillage in water prevention
CN103343537A (en) Drilling machine of high-pressure rotary-spraying anchor rod and construction method of high-pressure rotary-spraying anchor rod
CN211547861U (en) Dry dredging device for building construction
CN107165155B (en) Disturbance device and its construction method for structural soft soil
CN109610476A (en) Steel pipe Larsen sheet pile precipitation building enclosure
CN206956754U (en) A kind of easy device for foundation ditch local dewatering
CN106567397B (en) The control method and control device of deep basal pit underground water
CN114197508B (en) Easy-to-seal water draining device, manufacturing method and using method thereof
CN206916746U (en) High-pressure jet, jetting type are removed obstacles immersed tube
CN202899121U (en) Cohesive force reinforcing type rigid material and flexible material composite pile
CN103334445B (en) Spring mouth water sealing structure under geological conditions of moderately weathered rock and construction method of water sealing structure
CN107604937A (en) The foundation structure of wind-driven generator and its construction method of basic annular type with pre-buried madjack pipe
CN205778661U (en) A kind of device dragging for drill hammer based on stake holes
CN204608811U (en) Ultra-deep-water position drop and drainage structure
CN209669901U (en) Foundation pit and Tunnel Base spring pump drainage plugging device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant