Prior art keywords
fixed mount
mobile
gantry
setting fixed
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710458967.8A
Other languages
Chinese (zh)
Inventor
过伟南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Petrochemical Crane Co Ltd
Original Assignee
Wuxi Petrochemical Crane Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Petrochemical Crane Co Ltd filed Critical Wuxi Petrochemical Crane Co Ltd
Priority to CN201710458967.8A priority Critical patent/CN107128811A/en
Publication of CN107128811A publication Critical patent/CN107128811A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of gantry of two-way installation movement door protection, including gantry body, the gantry body is provided at both ends with setting fixed mount, being set up between first setting fixed mount and the second setting fixed mount top has crossbeam arm, the crossbeam arm bottom end is equipped with sliding rail, steel wire electric block is provided with the sliding rail, the gantry body two bottom sides, which are respectively mounted, is provided with mobile door gear, the mobile door gear is made up of expansion bracket and mobile stake connection, mobile door traveling track is provided with the ground of the first setting fixed mount and the second setting fixed mount both sides, the mobile stake is slidably connected on mobile door traveling track, Tarpauling is also covered with the inside of the expansion bracket.By the above-mentioned means, the lifting work that the present invention can not only be stablized by steel wire electric block, the mobile stake that can install way moving in gantry body bottom end both sides again is protected.

Description

The gantry of two-way installation movement door protection
Technical field
The present invention relates to gantry field, more particularly to a kind of Gantry of two-way installation movement door protection Machine.
Background technology
Gantry is that horizontal bridge frame is arranged on a kind of crane span structure type crane that door frame shape is constituted in two supporting legs.This Plant crane to run on ground rail, be used primarily in the progress of the ground such as outdoor yard, dock, power station, harbour and railway stock Carry and installation exercise.But traditional gantry lacks protection device and carries out reinforcement protection to itself, is running into severe day Bracing means can not be provided when gas and carry out security hardening, the stable degree and degree of safety of gantry is reduced.
The content of the invention
, can the present invention solves the technical problem of a kind of gantry of two-way installation movement door protection is provided The lifting work stablized by steel wire electric block, can install the shifting of way moving in gantry body bottom end both sides again Dynamic stake is protected.
In order to solve the above technical problems, one aspect of the present invention is:A kind of two-way installation movement door is provided The gantry of protection, including gantry body, the gantry body are provided at both ends with setting fixed mount, i.e., first erects Fixed mount and second erects fixed mount, and being set up between the first setting fixed mount and the second setting fixed mount top has horizontal stroke Beam arm, the crossbeam arm bottom end is equipped with sliding rail, the sliding rail and is provided with steel wire electric block, described Steel wire electric block lower end exports wire sling, and the wire sling lower end is fixedly connected with hook gear, the crane sheet Body two bottom sides, which are respectively mounted, is provided with mobile door gear, and the mobile door gear is arranged on described first and erects fixed mount and described Between second setting fixed mount, the mobile door gear is made up of expansion bracket and mobile stake connection, and described expansion bracket one end is fixed Erect described first on fixed mount, the expansion bracket other end is fixedly connected with the mobile stake, described first erects fixed mount Mobile door traveling track is provided with the ground of the described second setting fixed mount both sides, the mobile stake is slidably connected at movement On door traveling track, the expansion bracket erects fixed mount and described second described first by the mobile stake and erects fixed mount Between stretch and block, be also covered with Tarpauling on the inside of the expansion bracket.
In a preferred embodiment of the present invention, the crossbeam arm transverse horizontal, which is installed, is erected at first setting admittedly Determine between frame and the second setting fixed mount, the sliding rail correspondence crossbeam arm level laying, the steel wire electricity Dynamic cucurbit is slidably connected on the sliding rail.
In a preferred embodiment of the present invention, described wire sling one end is connected on the steel wire electric block, institute The wire sling other end connection hook gear is stated to hang from above straight down.
In a preferred embodiment of the present invention, the mobile door traveling track laying described first erect fixed mount and Described second erects fixed mount side frames external sides, and the mobile door gear correspondence erects fixed mount and described the described first Two erect mobile on the outside of fixed mount.
The beneficial effects of the invention are as follows:The lifting work that the present invention can not only be stablized by steel wire electric block, The mobile stake that way moving can be installed in gantry body bottom end both sides again is protected, and thing is stacked below gantry body Movement door by gantry body both sides closed protective, can improve the security of gantry body when providing or running into bad weather.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, it can also obtain other according to these accompanying drawings Accompanying drawing, wherein:
Fig. 1 is the structural representation of the preferred embodiment of gantry one of two-way installation movement door protection of the invention;
The mark of each part is as follows in accompanying drawing:1st, gantry body;2nd, fixed mount is erect;201st, first fixed mount is erect; 202nd, second fixed mount is erect;3rd, crossbeam arm;4th, sliding rail;5th, steel wire electric block;6th, wire sling;7th, hang Hook device;8th, mobile door gear;9th, expansion bracket;10th, mobile stake;11st, mobile door traveling track.
Embodiment
The technical scheme in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation Example is only a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, this area is common All other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected Enclose.
Referring to Fig. 1, the embodiment of the present invention includes:
A kind of gantry of two-way installation movement door protection, including gantry body 1, the two ends of gantry body 1 are set Setting fixed mount 2 is equipped with, i.e., first, which erects fixed mount 201 and second, erects fixed mount 202, and described first erects fixed mount 201 Being set up between the second setting fixed mount 202 top has crossbeam arm 3, and the bottom end of crossbeam arm 3 is equipped with slip Steel wire electric block 5 is provided with track 4, the sliding rail 4, the lower end of steel wire electric block 5 exports wire sling 6, The lower end of wire sling 6 is fixedly connected with hook gear 7, and the two bottom sides of gantry body 1, which are respectively mounted, is provided with movement Door gear 8, the mobile door gear 8 be arranged on described first erect fixed mount 201 and it is described second erect fixed mount 202 it Between, the mobile door gear 8 is made up of expansion bracket 9 and the mobile connection of stake 10, and described one end of expansion bracket 9 is fixed on described first and erected On vertical fixed mount 201, the other end of expansion bracket 9 is fixedly connected with the mobile stake 10, and described first erects fixed mount 201 and institute State the second setting and fix and mobile door traveling track 11 is provided with the ground of 202 frame both sides, the mobile stake 10 is slidably connected at On mobile door traveling track 11, the expansion bracket 9 erects fixed mount 201 and described the by the mobile stake 10 described first Stretch and block between two setting fixed mounts 202, the inner side of expansion bracket 9 is also covered with Tarpauling.
Erected in addition, the transverse horizontal of crossbeam arm 3 installation is erected at the first setting fixed mount 201 and described second Between vertical fixed mount 202, the correspondence of sliding rail 4 level of crossbeam arm 3 laying, the steel wire electric block 5 is slided It is connected on the sliding rail 4.
In addition, described one end of wire sling 6 is connected on the steel wire electric block 5, the other end of wire sling 6 connects The hook gear 7 is connect to hang from above straight down.
In addition, the mobile door traveling track 11, which is laid on described first, erects fixed mount 201 and second setting admittedly Determine the external side of the side frames of frame 202, the mobile correspondence of door gear 8 is erect fixed mount 201 and described second described first and erect The outside of fixed mount 202 is mobile.
The operation principle of the present invention is to set to erect fixed mount 2 at the two ends of gantry body 1, i.e., first erects fixed mount 201 and second erect fixed mount 202, and erection has crossbeam between the first setting fixed mount 201 and second erects the top of fixed mount 202 Arm 3, the bottom end of crossbeam arm 3, which is equipped with sliding rail 4, sliding rail 4, is provided with steel wire electric block 5, crossbeam arm 3 Transverse horizontal, which is installed, to be erected between the first setting fixed mount 201 and the second setting fixed mount 202, the corresponding crossbeam of sliding rail 4 The level of arm 3 is laid, and steel wire electric block 5 is slidably connected on sliding rail 4, and the lower end of steel wire electric block 5 export steel wire is hung Rope 6, the lower end of wire sling 6 is fixedly connected with hook gear 7, and the one end of wire sling 6 is connected on steel wire electric block 5, steel wire The other end connecting shackle device 7 of lifting rope 6 is hung from above straight down, and gantry body 1 passes through hanging that steel wire electric block 5 is stablized Work is filled, steel wire electric block 5 drives hook gear to move lifting goods and materials.
The two bottom sides of gantry body 1, which are respectively mounted, is provided with mobile door gear 8, and mobile door gear 8 is arranged on first and erect Fixed mount 201 and second is erect between fixed mount 202, and mobile door gear 8 is made up of expansion bracket 9 and the mobile connection of stake 10, is stretched The one end of frame 9 is fixed on the first setting fixed mount 201, and the other end of expansion bracket 9 is fixedly connected with mobile stake 10, and first erects fixed mount 201 and second erect and fix mobile door traveling track 11 is provided with the ground of 202 frame both sides, and mobile stake 10 is slidably connected at shifting On dynamic door traveling track 11, mobile door traveling track 11 is laid on the first setting fixed mount 201 and second and erects 202 liang of fixed mount On the outside of side frame body, the mobile correspondence of door gear 8 is mobile in the first 202 outsides of the setting setting of fixed mount 201 and second fixed mount, stretches Frame 9 is stretched by mobile stake 10 between the first setting fixed mount 201 and second erects fixed mount 202 to be blocked, the inner side of expansion bracket 9 Tarpauling is also covered with, the mobile stake 10 that way moving is installed in the bottom end both sides of gantry body 1 is protected, mobile stake 10 Expansion bracket 9 can be driven to block the both sides of gantry body 1, goods and materials are stacked below gantry body 1 or are run into severe Door is moved during weather by the both sides closed protective of gantry body 1, can improve the security of gantry body 1.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair Equivalent structure or equivalent flow conversion that bright description is made, or directly or indirectly it is used in other related technology necks Domain, is included within the scope of the present invention.

Claims (4)

1. a kind of gantry of two-way installation movement door protection, including gantry body, it is characterised in that the crane Body is provided at both ends with setting fixed mount, i.e., first erects fixed mount and the second setting fixed mount, and described first erects fixed mount Being set up between the second setting fixed mount top has crossbeam arm, and the crossbeam arm bottom end is equipped with sliding rail, Steel wire electric block is provided with the sliding rail, the steel wire electric block lower end exports wire sling, and the steel wire is hung Rope lower end is fixedly connected with hook gear, and the gantry body two bottom sides, which are respectively mounted, is provided with mobile door gear, the shifting Dynamic door gear is arranged on described first and erect between fixed mount and the second setting fixed mount, and the mobile door gear is by stretching Frame and mobile stake connection composition, described expansion bracket one end are fixed on described first and erect on fixed mount, the expansion bracket other end The mobile stake is fixedly connected with, the first setting fixed mount and described second are erect is provided with shifting on the ground of fixed mount both sides Dynamic door traveling track, the mobile stake is slidably connected on mobile door traveling track, and the expansion bracket is existed by the mobile stake Stretch and block between the first setting fixed mount and the second setting fixed mount, waterproof is also covered with the inside of the expansion bracket Canvas.
2. the gantry of two-way installation movement door protection according to claim 1, it is characterised in that the crossbeam is hung Arm transverse horizontal, which is installed, to be erected between the first setting fixed mount and the second setting fixed mount, the sliding rail pair The crossbeam arm level is answered to lay, the steel wire electric block is slidably connected on the sliding rail.
3. the gantry of two-way installation movement door protection according to claim 1, it is characterised in that the steel wire is hung Rope one end is connected on the steel wire electric block, and the wire sling other end connects the hook gear and hung down straight down Hang.
4. the gantry of two-way installation movement door protection according to claim 1, it is characterised in that the mobile door Traveling track laying erects fixed mount and described second described first and erects the external side of fixed mount side frames, the mobile door dress Correspondence is put to move on the outside of the described first setting fixed mount and the second setting fixed mount.
CN201710458967.8A 2017-06-16 2017-06-16 The gantry of two-way installation movement door protection Pending CN107128811A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710458967.8A CN107128811A (en) 2017-06-16 2017-06-16 The gantry of two-way installation movement door protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710458967.8A CN107128811A (en) 2017-06-16 2017-06-16 The gantry of two-way installation movement door protection

Publications (1)

Publication Number Publication Date
CN107128811A true CN107128811A (en) 2017-09-05

Family

ID=59734613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710458967.8A Pending CN107128811A (en) 2017-06-16 2017-06-16 The gantry of two-way installation movement door protection

Country Status (1)

Country Link
CN (1) CN107128811A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202249701U (en) * 2011-09-19 2012-05-30 河南雪洋绿色食品有限公司 Electric retractable door
CN204371083U (en) * 2014-12-19 2015-06-03 重庆交联电缆有限公司 A kind of retractable door for cable gear
US20160304326A1 (en) * 2015-04-17 2016-10-20 Mazzella Lifting Technologies, Inc. Overhead crane safety awareness lighting system and method
CN106081926A (en) * 2016-08-18 2016-11-09 无锡石油化工起重机有限公司 Harbour Radix Saposhnikoviae crane with mechanical arm gripping device
CN106115487A (en) * 2016-08-18 2016-11-16 无锡石油化工起重机有限公司 Possesses the gantry of object function of weighing
CN206915603U (en) * 2017-06-16 2018-01-23 无锡石油化工起重机有限公司 The gantry of two-way installation movement door protection

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202249701U (en) * 2011-09-19 2012-05-30 河南雪洋绿色食品有限公司 Electric retractable door
CN204371083U (en) * 2014-12-19 2015-06-03 重庆交联电缆有限公司 A kind of retractable door for cable gear
US20160304326A1 (en) * 2015-04-17 2016-10-20 Mazzella Lifting Technologies, Inc. Overhead crane safety awareness lighting system and method
CN106081926A (en) * 2016-08-18 2016-11-09 无锡石油化工起重机有限公司 Harbour Radix Saposhnikoviae crane with mechanical arm gripping device
CN106115487A (en) * 2016-08-18 2016-11-16 无锡石油化工起重机有限公司 Possesses the gantry of object function of weighing
CN206915603U (en) * 2017-06-16 2018-01-23 无锡石油化工起重机有限公司 The gantry of two-way installation movement door protection

Similar Documents

Publication Publication Date Title
CN202881852U (en) Suspension bridge cable installation system
CN107298388A (en) Bridge crane with suspender maintenance rig
CN107089600A (en) The overhead explosion-proof crane of hanging object anti-rock is played with the flexible wire saws of stretching
CN107476195B (en) Girder transporting pulley system for transporting stiffening girder by suspension bridge
CN206590793U (en) Connect arm assembly and the movable arm tower crane comprising the device in the air
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN206915603U (en) The gantry of two-way installation movement door protection
CN208200194U (en) A kind of loop wheel machine
CN107089602A (en) The double gantries for setting loop wheel machine running of twin beams
CN105752854A (en) Special rope shake preventing gantry crane for port
CN207091932U (en) A kind of equipment of aerial trackless erecting suspension bridge stiff girder
CN206827938U (en) Bridge crane with more suspenders
CN209260583U (en) Suspension bridge wide cut concrete stiffening girder cable crane turns installation structure
CN107128811A (en) The gantry of two-way installation movement door protection
CN209260561U (en) A kind of integration Bridge Erector
CN207061690U (en) Bridge crane with suspender maintenance rig
CN205653063U (en) Gantry crane of hoist and mount container
CN205653066U (en) Take gantry crane of windrow dolly linkage
CN205653067U (en) Gantry crane is prevented rocking by special rope in harbour
CN206915597U (en) The overhead explosion-proof crane of hanging object anti-rock is played with the flexible wire saws of stretching
CN107089604A (en) For the high protection type harbour gantry of suspension hook
CN107235420A (en) Crane OPS with function of keeping off the rain
CN208249731U (en) A kind of double cucurbit gantry cranes
CN209567730U (en) A kind of small-sized lattice dead man steel construction
CN207209263U (en) A kind of truss lifting device of ribbon conveyer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication