CN107128772A - Construction elevator can be made to reach platform attachment structure and the connection method in working platform face - Google Patents

Construction elevator can be made to reach platform attachment structure and the connection method in working platform face Download PDF

Info

Publication number
CN107128772A
CN107128772A CN201710575120.8A CN201710575120A CN107128772A CN 107128772 A CN107128772 A CN 107128772A CN 201710575120 A CN201710575120 A CN 201710575120A CN 107128772 A CN107128772 A CN 107128772A
Authority
CN
China
Prior art keywords
elevator
construction elevator
guider
frame
directive wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710575120.8A
Other languages
Chinese (zh)
Inventor
徐永亮
丁云波
陈跃熙
刘�东
张锐
龙绍章
韩宇
崔苗
任鹏程
胡宁
刘炫辰
章伟
夏超
徐帅
周可
刘奕
陈舜
毛伟
赵立春
樊钊甫
李军
杨开华
罗苓隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN HUASHI GROUP COOPERATION Ltd
China Huashi Enterprises Co Ltd
Original Assignee
SICHUAN HUASHI GROUP COOPERATION Ltd
China Huashi Enterprises Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN HUASHI GROUP COOPERATION Ltd, China Huashi Enterprises Co Ltd filed Critical SICHUAN HUASHI GROUP COOPERATION Ltd
Priority to CN201710575120.8A priority Critical patent/CN107128772A/en
Publication of CN107128772A publication Critical patent/CN107128772A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/04Riding means, e.g. Shoes, Rollers, between car and guiding means, e.g. rails, ropes
    • B66B7/046Rollers

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a kind of platform attachment structure that construction elevator can be made to reach working platform face and connection method, including the supporting frame being fixed on workbench bottom surface, support frame as described above body is internally provided with several guiders, elevator frame is through inside supporting frame and simultaneously close with all guiders, and it is moved along elevator frame outer wall in guider is with workbench moving process.The simple support that can be slided along elevator standard part that the structures and methods pass through design, the cantilever end of construction elevator is set to be changed into sliding support, the jib-length of construction elevator is set to add one times, sliding support still keeps slidably supporting to elevator standard section after the completion of each backform jacking, elevator is set to come into operation in time, i.e., operating personnel will not also impact during backform jacking to the use of elevator.

Description

Construction elevator can be made to reach platform attachment structure and the connection method in working platform face
Technical field
The present invention relates to a kind of construction of super highrise building elevator attachment structure, and in particular to one kind can reach construction elevator The platform attachment structure in working platform face and connection method.
Background technology
Country's construction of super highrise building is generally used at present and occuping the formwork system of world technology has Shanghai to build work Entirety climb the big backform formwork system of steel platform formwork system and Chinese architecture.The cantilever height of general elevator standard section is 7.5 meters, and their more than ten meters at most twenties meters at least general of backform height, the construction elevator transported as personnel exists In the connected mode of two kinds of formwork systems, the jacking of each backform is required for using following two processing to construction elevator standard knot Construction elevator can be run after one of method is handled:
First method:Other specially treateds are not done to construction elevator, according to normal construction electricity after the completion of backform jacking The method of increasing of ladder is handled, and conventional construction elevator, which is increased, once needs time half a day, and before construction elevator increases completion Construction elevator, i.e. personnel can not be used to have time half a day can not reach backform working face, backform platform operations personnel will waste more The activity duration of half a day.
Second method:The topmost portion of elevator of constructing is needed to make special Special support support body and mould bases and The standard knot of construction elevator is attached, then is connected using special steel framework with Special support support body, makes elevator standard section Cantilever height within 7.5 meters, meet construction elevator safe operation.Special support support body is high as mould bases and fabrication and installation Trouble, disposable input is big.
The content of the invention
The technical problems to be solved by the invention are that elevator increases that time-consuming and personnel can not go directly in this period backform Working face and cause the time to waste, or by meeting construction elevator safe operation after being handled, but cause support frame system Make that trouble is installed and cost is high, its object is to provide a kind of platform attachment structure that construction elevator can be made to reach working platform face And connection method, the structures and methods by design can along elevator standard part slide simple support, make construction elevator Cantilever end is changed into sliding support, the jib-length of construction elevator is added one times, sliding support after the completion of each backform jacking Still elevator standard section is kept slidably supporting, elevator is come into operation in time, i.e., operating personnel is in backform jacking process In the use of elevator will not also be impacted.
The present invention is achieved through the following technical solutions:
Construction elevator can be made to reach the platform attachment structure in working platform face, including the branch being fixed on workbench bottom surface Support body, support frame as described above body is internally provided with several guiders, elevator frame through inside supporting frame and simultaneously with institute Some guiders are close, and it is moved along elevator frame outer wall in guider is with workbench moving process.Apply at present If work elevator is according to conventional design, as floor is constructed the increase of the number of plies and height, to increase the consuming time long for elevator each time, Workmen has the time of half a day can not reach backform working face at least, waste in the middle of stand-by period, its frame after being handled Although body can be connected with standard knot so that standard knot can be installed additional quickly, construction elevator safe operation, support body sheet are met Body fabrication and installation trouble and cost height, and this programme is then by the fixing support rack body on workbench bottom surface, in support frame Body is internally provided with several guiders, elevator frame through inside supporting frame and simultaneously close with all guiders, It is moved along elevator frame outer wall in guider is with workbench moving process.By this structure, with construction electricity Terraced standard knot is installed additional, and guider is moved along standard knot surface all the time, makes the cantilever end of construction elevator be changed into sliding Bearing, makes the jib-length of construction elevator add one times, sliding support is still to elevator standard after the completion of each backform jacking Section keeps sliding support, elevator is come into operation in time, i.e., operating personnel also will not be to elevator during backform jacking Use impact.
In order to ensure the harmony and security of stress, preferably it is directed to device and is symmetrical arranged, be i.e. guider In each guider and another guider set respectively along the Central Symmetry of elevator frame.
And the concrete structure of guider has two ways, one of which is that each guider is wrapped in guider Directive wheel and installing plate are included, installing plate is vertical with supporting frame inwall to be fixed, bearing pin is provided with directive wheel, bearing pin is passed through and led Fixed after to the center of wheel with installing plate, and directive wheel can be rotated around bearing pin, the wheel face of directive wheel and the supervisor of elevator frame Outer wall is close.Another is that each guider includes directive wheel and two pieces of installing plates, same guider in guider In installing plate be parallel to each other and it is vertical with the same inwall of supporting frame fix, directive wheel is arranged in same guider Two pieces of installing plates between, be provided with bearing pin on directive wheel, bearing pin is solid with installing plate respectively through two ends behind the center of directive wheel Determine, and directive wheel can be rotated around bearing pin, the wheel face of directive wheel and supervisor's outer wall of elevator frame are close.Enter according to the actual requirements Row selection.
Gap wherein between supervisor's outer wall of the wheel face of directive wheel and elevator frame is preferably 0.5mm.Under this gap, Precise match can be realized, makes still to form reliable support to elevator standard section after the completion of backform jacking.
It is two to be preferably directed in device with the same close guider of supervisor's outer wall, and two guiders Directive wheel be vertically arranged.So same supervisor is by two directive wheel holding actions, and its action can be consistent, mobile steady It is qualitative higher.
Each connecting portion is provided with four high-strength bolts in supporting frame and workbench, and high-strength bolt is equal It is connected, can also be attached by bearing pin with supporting frame and workbench simultaneously, is set according to construction concrete condition, As long as ensure that supporting frame and the fixed stably solidity of workbench.
Construction elevator can be made to reach the platform connection methods in working platform face, comprised the following steps:
The first step:It is ready, the attachment device topmost between one of construction elevator and building body is installed in advance;
Second step:The top cover at top surface construction elevator standard knot is opened, the level elevator standard of jacking will be wanted with backform Section is passed through at top cover and connected with elevator frame before, while checking between sliding support roller and construction elevator standard knot Whether gap is within 0.5 millimeter, and it is flexible to ensure that roller is rotated;
3rd step:The jacking of backform is carried out according to the standardization program of backform jacking;
4th step:Checked after the completion of backform jacking support roller and construction elevator standard knot whether secure support, and check Whether the gap between them is in 0.5 millimeter, and inspection finishes top cover plate, and construction elevator can normal operation;
5th step:After the completion of each backform jacking, construction elevator just can synchronously put into operation.
By the above method, due to being that port is opened up at the top of workbench, then the standard knot that installs additional will be needed through end Mouthful and carry out Fast Installation, interference will not be caused with other parts, can be with close port after the completion of jacking, platform remains unchanged structure Into an entirety, the safety of protection article and workmen, and also this programme is that whole building is continuous as jacking process is completed Building and increasing the stage can continue to add, and to high level, it gets over the convenience for construction that can embody this programme and right The saving of time, can form the support to elevator frame surface and spacing, and the mutual booster action of jacking, improve the stabilization of structure Property.
The present invention compared with prior art, has the following advantages and advantages:The structures and methods pass through design The support that can be slided along elevator standard part, makes the top cantilever arm end of construction elevator be changed into sliding support, makes the outstanding of construction elevator Arm lengths add one times, and guider still keeps slidably supporting to elevator standard section after the completion of each backform jacking, makes electricity Ladder can come into operation in time, i.e., operating personnel will not also impact during backform jacking to the use of elevator.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is schematic structural view of the invention;
Fig. 2 is partial top view of the invention;
Fig. 3 is enlarged drawing at Fig. 2 A;
Fig. 4 is the preparatory stage schematic diagram of connection method;
Fig. 5 is standard knot scheme of installation;
Fig. 6 is the schematic diagram for starting jacking;
Fig. 7 is the schematic diagram that jacking is completed.
Mark and corresponding parts title in accompanying drawing:
1- walls, 2- connecting rods, 3- elevator framves, 4- supporting frames, 5- workbenches, 6- guiders, 7- supervisors, 8- is led To wheel, 9- installing plates, 10- bearing pins.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this Invention is described in further detail, and exemplary embodiment and its explanation of the invention is only used for explaining the present invention, does not make For limitation of the invention.
Embodiment 1:
As shown in Figure 1 to Figure 3, construction elevator can be made to reach the platform attachment structure in working platform face, including be fixed on work Make the supporting frame 4 on the bottom surface of platform 5, support frame as described above body 4 is internally provided with several guiders 6, and elevator frame 3 passes through branch The inside of support body 4 simultaneously simultaneously close with all guiders 6, its edge in guider 6 is with the moving process of workbench 5 The movement of the outer wall of elevator frame 3.This programme is that supporting frame 4 is fixed on into the bottom surface of workbench 5, and its specific fixed form can be with It is high-strength bolt or bearing pin, keeps fixed reliability, also allow for later stage dismounting, is put down using guider 6 with work Platform 5 is moved when moving along the outer wall of elevator frame 3, so that standard knot be installed additional quickly, workmen is only needed after short time wait just Constructing operation on workbench 5 can be gone up again, and the time that reduces wastes, and shortens the construction period of whole project.After moving into place, Elevator frame 3 can also be attached by connecting rod 2 and wall, form the connection with building, more be stablized and safety.For existing With the presence of the deficiency of scheme, the support that the design can be slided along elevator standard part makes the cantilever end of construction elevator be changed into sliding Bearing, makes the jib-length of construction elevator add one times, sliding support is still to elevator standard after the completion of each backform jacking Section keeps sliding support, elevator is come into operation in time, i.e., operating personnel also will not be to elevator during backform jacking Use impact.
Embodiment 2:
As shown in Figure 1 to Figure 3, on the basis of embodiment 1, each guider 6 is distinguished with another guider 6 Set along the Central Symmetry of elevator frame 3, each side wall can be supported when so enabling to move, and play certain Anti-bias effect.
The concrete structure of guider 6 has two kinds, is used according to building actual demand, one of which is guider 6 Include directive wheel 8 and installing plate 9, installing plate 9 is vertical with the inwall of supporting frame 4 to be fixed, and bearing pin is provided with directive wheel 8 10, bearing pin 10 is fixed after passing through the center of directive wheel 8 with installing plate 9, and directive wheel 8 can be rotated around bearing pin 10, directive wheel 8 Wheel face and elevator frame 3 the outer wall of supervisor 7 it is close.That is directive wheel 8 and one piece of installing plate 9 is connected by bearing pin 10, this structure Suitable for inner space more narrow region, its lateral stressed deficiency easily produces skew.
Another structure is that each guider 6 includes in directive wheel 8 and two pieces of installing plates 9, same guider 6 Installing plate 9 be parallel to each other and it is vertical with the same inwall of supporting frame 4 fix, directive wheel 8 is arranged in same guider 6 Two pieces of installing plates 9 between, be provided with bearing pin 10 on directive wheel 8, bearing pin 10 through two ends behind the center of directive wheel 8 respectively with peace Dress plate 9 is fixed, and directive wheel 8 can be rotated around bearing pin 10, and the wheel face of directive wheel 8 and the outer wall of supervisor 7 of elevator frame 3 are close. I.e. each directive wheel 8 is arranged between two pieces of installing plates 9 and connected by bearing pin 10, lateral stressed stabilization, but relative occupancy Space it is larger.
The gap being directed to simultaneously between the wheel face of wheel 8 and the outer wall of supervisor 7 of elevator frame 3 is designed as 0.5mm, guider It is two to be responsible for the close guider 6 of 7 outer walls with same in 6, and the directive wheel 8 of two guiders 6 is vertically arranged.
This programme is reliable, easy along the accurate rolling support slided of construction elevator standard knot supervisor by designing one, The cantilever end of elevator standard section is set to be changed into slidably supporting end, the bearing height of elevator standard section is increased by 15 meters, five operations The backform total height in face is 12 meters, and bearing height is not required to appoint elevator in the case of being no more than 15 meters after the completion of the backform jacking Where is managed, and just can be put into operation immediately.The rolling support of design such as Fig. 1, is responsible for by accurate slider roller and elevator standard section Between 0.5 millimeter of gap precise match, make still to form reliable support to elevator standard section after the completion of backform jacking.
Supporting frame 4 is made using 100*100*5mm square steel, from heavy and light and stressed effect is good, support body and backform girder Each high strength exploitation using four 8.8 grades of M20 is often held, it is convenient and swift;Guide roller is determined using elevator manufacturer Type standard roller, precision high reliability is good.
As shown in Figures 4 to 7, construction elevator can be made to reach the platform connection methods in working platform face, its backform and construction Elevator synchronization of jacking up step is as follows:
The first step:It is ready, the attachment device topmost between one of construction elevator and building body is installed in advance;
Second step:The top cover at top surface construction elevator standard knot is opened, backform is wanted into the level elevator standard section of jacking Connect, while whether the gap between inspection sliding support roller and construction elevator standard knot is within 0.5 millimeter, and ensure Roller rotates flexible;
3rd step:The jacking of backform is carried out according to the standardization program of backform jacking;
4th step:Checked after the completion of backform jacking support roller and construction elevator standard knot whether secure support, and check Whether the gap between them is in 0.5 millimeter, and inspection finishes top cover plate, and construction elevator can normal operation.
After the completion of each backform jacking, construction elevator can synchronously put into operation.
The great advantage of this programme be after the completion of each backform jacking, construction elevator without specially treated just can immediately with Backform synchronously comes into operation, and substantially increases the efficiency of construction operation, whole slide holder body is equivalent to servo-actuated attached wall branch Seat, the steel of making as the support body of standard attachment device, be not required to it is special get the raw materials ready, than one standard attachment of rolled steel dosage Put more, the slider roller of use is also the standard component of elevator producer, because the selection of material is the common used material of construction elevator, Can quickly it be customized in manufacturer, whole movable supporting frame body is simply applicable, reliability is high, cheap, effectively Overcome the problem of existing two methods are present.
Above-described embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc. all should be included Within protection scope of the present invention.

Claims (9)

1. construction elevator can be made to reach the platform attachment structure in working platform face, it is characterised in that including being fixed on workbench (5) supporting frame (4) on bottom surface, support frame as described above body (4) is internally provided with several guiders (6), and elevator frame (3) is worn Supporting frame (4) is crossed internal and simultaneously close with all guiders (6), in guider (6) as workbench (5) is moved It is moved along elevator frame (3) outer wall during dynamic.
2. the platform attachment structure according to claim 1 that construction elevator can be made to reach working platform face, it is characterised in that The center pair of each guider (6) and another guider (6) respectively along elevator frame (3) in the guider (6) Claim to set.
3. the platform attachment structure according to claim 1 that construction elevator can be made to reach working platform face, it is characterised in that In the guider (6) each guider (6) include directive wheel (8) and installing plate (9), installing plate (9) with support Support body (4) inwall is vertically fixed, and is provided with bearing pin (10) on directive wheel (8), bearing pin (10) through behind the center of directive wheel (8) with Installing plate (9) is fixed, and directive wheel (8) can be rotated around bearing pin (10), the wheel face of directive wheel (8) and the master of elevator frame (3) Manage (7) outer wall close.
4. the platform attachment structure according to claim 1 that construction elevator can be made to reach working platform face, it is characterised in that Each guider (6) includes directive wheel (8) and two pieces of installing plates (9), same guider in the guider (6) (6) installing plate (9) in be parallel to each other and it is vertical with the same inwall of supporting frame (4) fix, directive wheel (8) is arranged on together Between two pieces of installing plates (9) in one guider (6), bearing pin (10) is provided with directive wheel (8), bearing pin (10), which is passed through, to be oriented to Take turns two ends behind the center of (8) fixed with installing plate (9) respectively, and directive wheel (8) can be rotated around bearing pin 10, directive wheel (8) Wheel face and elevator frame (3) supervisor (7) outer wall it is close.
5. can make the platform attachment structure in construction elevator arrival working platform face according to claim 3 or 4, its feature exists In the gap between the wheel face of the directive wheel (8) and supervisor (7) outer wall of elevator frame (3) is 0.5mm.
6. the platform attachment structure according to claim 5 that construction elevator can be made to reach working platform face, it is characterised in that It is two to be responsible for the close guider (6) of (7) outer wall with same in the guider (6), and two guiders (6) directive wheel (8) is vertically arranged.
7. the platform that construction elevator can be made to reach working platform face connection knot as claimed in any of claims 1 to 6 Structure, it is characterised in that support frame as described above body (4) is provided with four high-strength bolts with workbench (5) in each connecting portion, And high-strength bolt is connected with supporting frame (4) and workbench (5) simultaneously.
8. the platform that construction elevator can be made to reach working platform face connection knot as claimed in any of claims 1 to 6 Structure, it is characterised in that be provided with several bearing pins on support frame as described above body (4), and bearing pin simultaneously with supporting frame (4) and work Make platform (5) connection.
9. construction elevator can be made to reach the platform connection methods in working platform face, it is characterised in that comprise the following steps:
The first step:It is ready, the attachment device topmost between one of construction elevator and building body is installed in advance;
Second step:Open top surface construction elevator standard knot at top cover, will be wanted with backform the level elevator standard section of jacking from Through being connected with elevator frame before at top cover, while checking the gap between sliding support roller and construction elevator standard knot Whether within 0.5 millimeter, and it is flexible to ensure that roller is rotated;
3rd step:The jacking of backform is carried out according to the standardization program of backform jacking;
4th step:Checked after the completion of backform jacking support roller and construction elevator standard knot whether secure support, and check them Between gap whether in 0.5 millimeter, inspection finish top cover plate, construction elevator can normal operation;
5th step:After the completion of each backform jacking, construction elevator is synchronous puts into operation.
CN201710575120.8A 2017-07-14 2017-07-14 Construction elevator can be made to reach platform attachment structure and the connection method in working platform face Pending CN107128772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710575120.8A CN107128772A (en) 2017-07-14 2017-07-14 Construction elevator can be made to reach platform attachment structure and the connection method in working platform face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710575120.8A CN107128772A (en) 2017-07-14 2017-07-14 Construction elevator can be made to reach platform attachment structure and the connection method in working platform face

Publications (1)

Publication Number Publication Date
CN107128772A true CN107128772A (en) 2017-09-05

Family

ID=59738039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710575120.8A Pending CN107128772A (en) 2017-07-14 2017-07-14 Construction elevator can be made to reach platform attachment structure and the connection method in working platform face

Country Status (1)

Country Link
CN (1) CN107128772A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060000173A1 (en) * 2004-06-18 2006-01-05 Edstrom Brian D Composite structures having the appearance of knotty wood and methods of making such structures
CN103334583A (en) * 2013-07-18 2013-10-02 中国华西企业有限公司 Integrated core-tube inner mould base system
CN103979383A (en) * 2014-04-29 2014-08-13 山东腾飞建设机械工程有限公司 Multi-layer lifting platform for building construction
CN104310165A (en) * 2014-09-29 2015-01-28 中建三局集团有限公司 Guide rail type adhesion construction lifter and construction method thereof
CN207030673U (en) * 2017-07-14 2018-02-23 四川华西集团有限公司 Construction elevator can be made to reach the platform attachment structure in working platform face

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060000173A1 (en) * 2004-06-18 2006-01-05 Edstrom Brian D Composite structures having the appearance of knotty wood and methods of making such structures
CN103334583A (en) * 2013-07-18 2013-10-02 中国华西企业有限公司 Integrated core-tube inner mould base system
CN103979383A (en) * 2014-04-29 2014-08-13 山东腾飞建设机械工程有限公司 Multi-layer lifting platform for building construction
CN104310165A (en) * 2014-09-29 2015-01-28 中建三局集团有限公司 Guide rail type adhesion construction lifter and construction method thereof
CN207030673U (en) * 2017-07-14 2018-02-23 四川华西集团有限公司 Construction elevator can be made to reach the platform attachment structure in working platform face

Similar Documents

Publication Publication Date Title
CN106354950A (en) Steel structure pre-splicing method and system
CN106869489A (en) Super High Core Walls Structure level and vertical synchronous construction top module system and construction method
CN102094489B (en) Double-layer bidirectional prestressed cable truss and construction method thereof
CN104088467B (en) A kind of large Steel Cantilever truss structure high-altitude construction Deformation monitoring method
CN103352564B (en) Horizontal structure shuttering system and construction method
Simonsson et al. ‘Learning to see’the effects of improved workflow in civil engineering projects
CN103669665B (en) The elevation difference node construction technique of steel bar truss floor support plate construction
CN207030673U (en) Construction elevator can be made to reach the platform attachment structure in working platform face
CN103410333A (en) Construction method of special-shaped irregular steel structure
CN107128772A (en) Construction elevator can be made to reach platform attachment structure and the connection method in working platform face
Jarkas Buildability factors influencing formwork labour productivity of isolated foundations
CN103470036A (en) Overhanging structure construction method
CN113818362A (en) Non-landing super-long assembly type bracket and hanging basket integrated structure and construction method
CN101709571A (en) Preparation method of set of datum lines of bridge steel box girder
CN204311622U (en) A kind of shape of a saddle prestressed cable net
CN101752017A (en) Modularization construction method for nuclear power station nuclear island
CN103104112A (en) Movable production system
CN104265001B (en) A kind of steel construction is hinged with construction method without moulding bed
CN116181079A (en) Integral lifting device and method for heavy steel truss and large-diameter aluminum alloy reticulated shell structure
CN206244293U (en) A kind of large-tonnage large-span concrete box girder lifting means
KR101271370B1 (en) A switchboard production system
Bernardi Industrial steel storage racks subjected to static and seismic actions: an experimental and numerical study
CN107975148B (en) Primary system component pre-introduced method
CN202023349U (en) Safety device with hard covering plate and turnover plate of climbing type scaffolding platform
Asomiddinovich et al. ANALYSIS OF CASES OF DEFORMATION OF THE CYLINDRICAL CORE OF SKYSCRAPERS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination