CN107119702A - The fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder - Google Patents

The fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder Download PDF

Info

Publication number
CN107119702A
CN107119702A CN201710366965.6A CN201710366965A CN107119702A CN 107119702 A CN107119702 A CN 107119702A CN 201710366965 A CN201710366965 A CN 201710366965A CN 107119702 A CN107119702 A CN 107119702A
Authority
CN
China
Prior art keywords
cylinder
well body
concrete
fixed
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710366965.6A
Other languages
Chinese (zh)
Inventor
叶志青
陈敏
鲍岳祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huafeng New Materials Ltd By Share Ltd
Original Assignee
Zhejiang Huafeng New Materials Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huafeng New Materials Ltd By Share Ltd filed Critical Zhejiang Huafeng New Materials Ltd By Share Ltd
Priority to CN201710366965.6A priority Critical patent/CN107119702A/en
Publication of CN107119702A publication Critical patent/CN107119702A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/16Jointing caissons to the foundation soil, specially to uneven foundation soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder, including being linked together the well body constituted and well body fixed seat by several cylinders, it is connected two-by-two between described cylinder and cylinder, three groups of compositions of described cylinder point, including bottom cylinder, several middle cylinders and top cylinder, described well body fixed seat include agent on crack resistance of concrete floating roof seat and well body firm banking, the present invention, structural strength is high, and open caisson construction speed is fast, and anti-floating effect is good;The fixed performance of the easy construction of well body base and well body is high, and well body integral sinking can be achieved;Greatly improve efficiency of construction.

Description

The fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder
【Technical field】
Patent of the present invention is related to pipeline open caisson field, and what is be related specifically to is galss fiber reinforced resin concrete open caisson cylinder The fixed structure and construction method of body.
【Background technology】
The anti-anticorrosion permeance property of well body of current cement open caisson is relatively low, because cement is met for a long time can go out crackle after water, The water capacity is easily penetrated into cement well body from crackle, makes crackle increasing;And cement inherently has water imbibition, the meeting of time length Causing the weight of well body increases, and base is due to the increase of well body weight, the problems such as being likely to result in the sinking of base, so that shadow Well body anti-floating and unsinkability energy are rung;And the cycle of cement open caisson is longer, it can reach 2 months or so;Cause low construction efficiency The problems such as;In view of the above-mentioned problems, the present invention proposes the fixed structure of galss fiber reinforced resin concrete open caisson cylinder and applied Work method.
【The content of the invention】
The problem of in order to solve in above-mentioned background technology, the present invention proposes galss fiber reinforced resin concrete open caisson cylinder The fixed structure and construction method of body, including the well body and well body fixed seat being made up of 1~3 group of cylinder, described cylinder and cylinder It is connected two-by-two between body, the connected mode being connected two-by-two using cylinder can improve well body sinking efficiency, and can also prevent from Process middle cylinder body and cylinder come off or misplaced inclination;First group of the cylinder be bottom cylinder, second group be in the middle of several Cylinder, the 3rd group be top cylinder, the inner side bottom and top of one week of described bottom cylinder, middle cylinder and top cylinder It is both provided with pre-buried steel part built in 2~10, the inner side top of described bottom cylinder, middle cylinder and top cylinder is all also welded 2~6 suspension ring are connected to, its purpose is to can keep poised state during cylinder lifting;Described suspension ring are welded on built-in pre- Bury on steel part, described cylinder and the junction of cylinder are provided with adapter sleeve connection, and described cylinder and the junction of cylinder are also It is connected with dowel;Described dowel and the built-in pre-buried steel part on top, suspension ring on the inside of the cylinder of bottom and be arranged on it is described in Between cylinder inner lower edge built in pre-buried steel part weld together;Bottom cylinder is set to be connected two-by-two with middle cylinder;Described company Muscle is connect also with pre-buried steel part, suspension ring built in top on the inside of middle cylinder and being arranged on built in the inner lower edge of the top cylinder Pre-buried steel part welds together, and middle cylinder is connected two-by-two with top cylinder;Finally make bottom cylinder, middle cylinder and top Cylinder is fixed together composition well body, it is therefore an objective to disposed beneficial to the common sinking for realizing whole well body;Outside the top cylinder It is provided with side on several external pre-buried steel parts, the outside of the top cylinder and is additionally provided with anti-heavy fixed steel;Described is anti- Heavy fixed steel will be by anticorrosion process processing;Anti-floating square steel is provided with the inner side of the bottom cylinder;Described anti-floating square steel its Appearance coats processing or other anticorrosion process with fiberglass, and purpose makes anti-floating square steel directly not exposed;Described well body fixed seat Including armored concrete anti-heavy footstock and well body firm banking, described anti-heavy fixed steel is fixed on the anti-heavy footstock of armored concrete On;The effect of described well body firm banking is to prevent well body from floating and sinking, and described well body firm banking includes several The anti-settling support quincuncial pile of timber composition, is equipped with robust structure layer, described robust structure layer between the timber and timber On be equipped be equipped with back cover reinforcing structure layer, described back cover reinforcing structure layer by reinforcing bar and coagulation local soil type into reinforcing bar mix Solidifying soil enhancement layer, the armored concrete enhancement layer is fixed support jail by anti-floating square steel, while anti-floating effect is played, it is described Armored concrete enhancement layer on be equipped with top anti-corrosion permeable formation;Described back cover reinforcing structure layer, armored concrete are strengthened Layer and top anti-corrosion permeable formation are arranged in the cylinder of bottom;Described robust structure layer is not arranged in cylinder or part is set In cylinder.
Fixed preferably, being also both provided with equipment on the inner side of described bottom cylinder, middle cylinder and top cylinder Use pre-buried steel part;Described bottom cylinder and the junction of middle cylinder are provided with water-swellable cushion rubber and sealed;In described Between the junction of cylinder and top cylinder be also equipped with water-swellable cushion rubber and sealed;Described water-swellable cushion rubber plays close The effect of envelope, and also act as the effect for stepping up fixed operating sleeve.
Preferably, built-in pre-buried steel part, external pre-buried steel part, suspension ring, anti-heavy fixed steel and anti-floating square steel material it is equal For carbon steel or stainless steel;Described adapter sleeve material is stainless steel or carbon steel or fiberglass;Described adapter sleeve sinks in well body Before installed in the top of bottom cylinder and the top of middle cylinder, described dowel is reinforcing bar or steel plate, the dowel Material be carbon steel or stainless steel.
Preferably, described anti-heavy fixed steel is welded on the external pre-buried steel part of top cylinder;Described anti-floating square steel It is welded on the built-in pre-buried steel part of bottom cylinder.
Preferably, the material of described timber is pine, the effect of timber is mainly firm sub-surface, and well body is risen To support, the effect of fixed position;Described robust structure layer is 20~80cm stone robust structure layer, and it act as strengthening Stability, support strength and the anti-settling performance of timber, improve the firm performance of the soil layer of well body bottom and prevent well body continue by Continue to sink to producing dislocation or displacement in own wt;Described back cover reinforcing structure layer is stone concrete back cover reinforced structure Layer, it act as bottom cylinder carrying out back cover, while playing further firm effect to whole well body;The composition reinforcing bar is mixed If its paving mode of reinforcing bar of solidifying soil enhancement layer constitutes dried layer net-shaped to intersect dislocation, its effect makes armored concrete enhancement layer Structure more stablize, play good anti-floating and sinking effect;Described top anti-corrosion permeable formation permeates for Corrosion Protection of Fiber Reinforced Plastics Layer, effect is to prevent the immersion of water from causing after well body firm banking is corroded, to reduce anti-floating performance, cause under well body It is heavy, so as to have impact on the service life of well body.
The fixed structure and construction method of described galss fiber reinforced resin concrete open caisson cylinder, its construction method step Suddenly it is:
The first step, preparation need to prepare neat following construction tool, long-armed digging machine, lifting machine;Electric welding machine (contains welding rod); Generator, sewage pump, pine, ratchel, reinforcing bar, concrete etc..
Second step, arranges platform, accurate open caisson position, it is therefore an objective to prevent ground uneven, causes cylinder to occur after placing askew Tiltedly not just;Lifting rope is fixed on the bottom cylinder suspension ring for having installed water-swellable cushion rubber and adapter sleeve using hoisting machine after smooth On, by bottom cylinder insert platform place it is smooth after, using long-armed digging machine to bottom inner barrel implement excavate, with excavation Progress, bottom cylinder is voluntarily sunk due to the weight of itself;Adapter sleeve on the cylinder of bottom will be higher by 5~40cm of platform, sink During to specified location, just stop excavating;
3rd step, is fixed on lifting rope using hoisting machine and has installed the middle cylinder of water-swellable cushion rubber and adapter sleeve and hang On ring, the water-swellable cushion rubber on the bottom set of middle cylinder is then coated with lubricating oil, is so easy to middle cylinder to enter bottom Adapter sleeve on cylinder, is linked together the bottom of middle cylinder with bottom cylinder using adapter sleeve;Then in bottom cylinder The built-in pre-buried steel part and suspension ring on inner side top make bottom with being welded to connect muscle on the built-in pre-buried steel part of middle cylinder inner lower edge End cylinder is connected two-by-two with middle cylinder;Install after middle cylinder, the height at measurement record cylinder upper end Haikou is found out minimum Point and peak, calculate its drop, drop is not more than 5cm, to be rectified a deviation more than after 5cm;Then carried out using long-armed digging machine Excavate, with the progress excavated, bottom cylinder is sunk jointly with middle cylinder, the adapter sleeve of middle cylinder will be higher by platform 5 ~40cm, due to the quantity of middle cylinder 2 can be caused under different well body depth profiles different, but a upper section middle cylinder with When next section middle cylinder installs connection, a section middle cylinder should be made to be arranged on next section middle cylinder adapter sleeve, then The pre-buried steel part built in top on the inside of pre-buried steel part built in upper one section middle cylinder inner lower edge with next section middle cylinder With on suspension ring on be welded to connect muscle, make one section middle cylinder with it is next save middle cylinder be connected two-by-two;
4th step, it is using hoisting machine that lifting rope is solid on the cylinder suspension ring of top, meet water on the bottom set of top cylinder Cushion rubber is expanded, and coats lubricating oil, top cylinder is loaded on the adapter sleeve on middle cylinder, by top cylinder and middle cylinder Link together, then on the inside of middle cylinder built in pre-buried steel part and suspension ring built in top and top cylinder inner lower edge Muscle is welded to connect on pre-buried steel part, middle cylinder is connected two-by-two with top cylinder, and whole well body is fixed together; Install after the cylinder of top, the height at measurement record cylinder upper end Haikou finds out minimum point and peak, calculates its drop, fall Difference is not more than 5cm, long-armed digging machine is being utilized more than after being rectified a deviation after 5cm, to well body inner excavation;Now whole well body Because the progress and own wt of excavation can be sunk together;Until whole well body sinks to finishing;
5th step, underground is inserted using long-armed digging machine by timber, and its timber will basset 20~80cm, to strengthen timber Stress strength and stability 20~80cm stone can be filled between timber and timber, and smash flat using equipment, Strengthen the exposed timber stress strength and stability energy in ground surface, improve the firm performance of the soil layer of well body bottom;Prevent well Body continues to sink to producing dislocation or displacement due to own wt;
6th step, lays stone concrete back cover reinforcing structure layer, and mixed stone with vibrator on robust structure layer Removal of bubbles in solidifying grave bottom reinforcing structure layer, can combine concrete compaction, eliminate voids and pits of concrete etc. existing As to improve its intensity, it is ensured that the quality of concrete component;
7th step, starts to lay reinforcing bar, the laying of reinforcing bar should be noted that between reinforcing bar and reinforcing bar in the upper and lower side of anti-floating square steel If intersecting dislocation laying dried layer, net-shaped is constituted;Casting concrete after the completion of reinforcing steel bar laying;And with vibrator by stone concrete Removal of bubbles in back cover reinforcing structure layer, combines concrete compaction, eliminates the phenomenons such as the voids and pits of concrete, to improve Its intensity, it is ensured that the quality of concrete component;Then Corrosion Protection of Fiber Reinforced Plastics permeable formation is laid on reinforcing bar armored concrete enhancement layer, Prevent the permeating corrosion of water;
8th step, finally after well body firm banking is built up, the anti-heavy footstock of one week armored concrete is laid around top cylinder, And anti-heavy fixed steel is fixed in anti-heavy footstock, prevent cylinder from sinking.
Patent of the present invention, improves the performances such as steadiness, anti-floating and the anticorrosion infiltration of well body, strengthens cylinder and cylinder The stability of body connection, has ensured that a upper section cylinder will not fall off or misplace partially with next section cylinder in cylinder sinking watching Move, accelerate the speed of open caisson, improve open caisson quality;And shorten construction man-hour significantly, improve operating efficiency.
【Brief description of the drawings】
Fig. 1 is assembly structure diagram of the invention;
Fig. 2 is the well body structural representation that 2 groups of cylinders of the invention are constituted;
Fig. 3 is the well body structural representation that 1 group of cylinder of the invention is constituted;
1- bottoms cylinder, 2- middle cylinders, 3- tops cylinder, 4- timbers, 5 stone robust structure layers, 6- stones are mixed in figure Solidifying grave bottom reinforcing structure layer, 7- reinforcing bar armored concrete enhancement layer, 8- tops anti-corrosion permeable formation, the anti-heavy top of 9- armored concrete Pre-buried steel part, 103- suspension ring, 104- dowels, 105- anti-floatings square steel, 106- are external pre-buried built in seat, 101- adapter sleeves, 102- The anti-heavy fixed steel of steel part, 107-, 108- equipment are fixed and use pre-buried steel part.
Embodiment
Embodiment 1
1. refering to Fig. 1, the present invention proposes fixed structure and the construction of galss fiber reinforced resin concrete open caisson cylinder Method, including the well body and well body fixed seat being made up of 1~3 group of cylinder, are connected two-by-two between described cylinder and cylinder, use The connected mode that cylinder is connected two-by-two can improve well body sinking efficiency, and can also prevent sinking watching middle cylinder body from being come off with cylinder Or dislocation is tilted;First group of the cylinder be bottom cylinder 1, second group be several intermediate cylinders 2, the 3rd group be top cylinder 3;Described bottom cylinder 1, middle cylinder 2 and the inner side top of one week of top cylinder 3 and bottom are both provided with 2~10 Put pre-buried steel part 102;The inner side of described bottom cylinder 1, middle cylinder 2 and top cylinder 3 is all additionally provided with 2~6 suspension ring 103, its purpose is to can keep poised state during cylinder lifting;Described suspension ring 103 are welded on built-in pre-buried steel part 102 On;Described cylinder and the junction of cylinder are provided with adapter sleeve 101 and connected, and described cylinder and the junction of cylinder are also connected with There is dowel 104;Described dowel 104 and the built-in pre-buried steel part 102 on the inner side top of bottom cylinder 1, suspension ring 103 and setting Pre-buried steel part 102 welds together built in inner lower edge in the middle cylinder 2;Make bottom cylinder 1 and middle cylinder 2 two-by-two It is connected;Described dowel is also with pre-buried steel part 102, suspension ring 103 built in the inner side top of middle cylinder 2 and being arranged on the top Pre-buried steel part 102 built in holding the inner lower edge of cylinder 3 welds together;Middle cylinder 2 is set to be connected two-by-two with top cylinder 3;Most After bottom cylinder 1, middle cylinder 2 and top cylinder 3 is fixed together composition well body, it is therefore an objective to beneficial to realizing whole well body It is common to sink to disposing;Several external pre-buried steel parts 106 are provided with the outside of the top cylinder 3, the top cylinder 3 Anti- heavy fixed steel 107 is additionally provided with outside;Described anti-heavy fixed steel 107 will be by anticorrosion process processing;The bottom cylinder 1 Inner side on be provided with anti-floating square steel 105;Described its appearance of anti-floating square steel 105 coats processing or other anti-corrosion works with fiberglass Skill, purpose makes anti-floating square steel directly not exposed;Described well body fixed seat includes the anti-heavy footstock 9 of armored concrete and well body is fixed Base, described anti-heavy fixed steel 107 is fixed on the anti-heavy footstock 9 of armored concrete;The effect of described well body firm banking It is to prevent well body from floating and sinking, described well body firm banking includes the anti-settling support quincuncial pile that several timbers 4 are constituted, institute State and robust structure layer is equipped between timber 4 and timber 4, back cover reinforcing structure layer, institute are equipped with described robust structure layer Be equipped with the back cover reinforcing structure layer stated by reinforcing bar and coagulation local soil type into armored concrete enhancement layer 7, the reinforced concrete Soil strengthens 8 layers and is fixed support jail by anti-floating square steel 105, while playing anti-floating effect, described armored concrete enhancement layer 7 On be equipped with top anti-corrosion permeable formation 9;Described back cover reinforcing structure layer, armored concrete enhancement layer and top anti-corrosion permeable formation It is arranged in the cylinder of bottom, described robust structure layer is not arranged in the cylinder of bottom or part is arranged in the cylinder of bottom.
In the present embodiment, equipment is also both provided with the inner side of described bottom cylinder 1, middle cylinder 2 and top cylinder 3 Fix with pre-buried steel part 108;It is close that described bottom cylinder 1 and the junction of middle cylinder 2 are provided with the progress of water-swellable cushion rubber Envelope;The junction of the middle cylinder 2 and top cylinder 3 is also equipped with water-swellable cushion rubber and sealed;Described chance water is swollen Swollen cushion rubber plays sealed effect, and also acts as the effect for stepping up fixed operating sleeve 101.
In the present embodiment, built-in pre-buried steel part 102, external pre-buried steel part 106, suspension ring 103, anti-sink fix steel 107 and anti- The material of floating square steel 105 is carbon steel;Described adapter sleeve material is stainless steel;Described adapter sleeve 101 sinks it in well body It is preceding installed in the top of bottom cylinder 1 and the top of middle cylinder 2, described dowel 104 is reinforcing bar, the material of the dowel Matter is carbon steel.
In the present embodiment, described anti-heavy fixed steel 107 is welded on the external pre-buried steel part 106 of top cylinder 3;It is described Anti-floating square steel 105 be welded on the built-in pre-buried steel part 102 of bottom cylinder 1.
In the present embodiment, the material of described timber 4 is pine, and the effect of timber is mainly firm sub-surface, to well Body plays a part of support, fixed position;Described robust structure layer is 20~80cm stone robust structure layer 5, and it is acted on To strengthen stability, support strength and the anti-settling performance of timber, improve the firm performance of the soil layer of well body bottom and prevent well body Continue because own wt continues to sink to producing dislocation or displacement;Described back cover reinforcing structure layer is mended for stone concrete back cover Strong structure layer 6, it act as bottom cylinder 1 carrying out back cover, while playing further firm effect to whole well body;Described group If constituting dried layer net-shaped into its paving mode of the reinforcing bar of armored concrete enhancement layer 7 to intersect dislocation, it, which is acted on, mixes reinforcing bar The structure of solidifying soil enhancement layer is more stablized, and plays good anti-floating and sinking effect;Described top anti-corrosion permeable formation 9 is glass Steel anti-corrosion permeable formation, effect is to prevent the immersion of water from causing after well body firm banking is corroded, to reduce anti-floating performance, lead Well body is caused to sink, so as to have impact on the service life of well body.
Embodiment 2
Refering to Fig. 1, the present invention proposes the fixed structure and construction party of galss fiber reinforced resin concrete open caisson cylinder Method, including the well body and well body fixed seat being made up of 1~3 group of cylinder, are connected two-by-two between described cylinder and cylinder, the cylinder First group of body be bottom cylinder 1, second group be several intermediate cylinders 2, the 3rd group be top cylinder 3;Described bottom cylinder 1st, the inner side bottom of one week and top of middle cylinder 2 and top cylinder 3 are both provided with pre-buried steel part 102 built in 2~10;Institute The inner side of bottom cylinder 1, middle cylinder 2 and the top cylinder 3 stated all is additionally provided with 2~6 suspension ring 103, its purpose is to Cylinder can keep poised state when lifting by crane;Described suspension ring 103 are welded on built-in pre-buried steel part 102, described cylinder with The junction of cylinder is provided with adapter sleeve 101 and connected,;Described dowel 104 is built-in pre-buried with the inner side top of bottom cylinder 1 Steel part 102, suspension ring 103 and it is arranged on pre-buried steel part 102 built in the inner lower edge of the middle cylinder 2 and welds together;Make bottom End cylinder 1 is connected two-by-two with middle cylinder 2;Described dowel also with pre-buried steel part built in the inner side top of middle cylinder 2 102nd, suspension ring 103 and it is arranged on pre-buried steel part 102 built in the inner lower edge of the top cylinder 3 and welds together;Make intermediate cylinder Body 2 is connected two-by-two with top cylinder 3, bottom cylinder 1, middle cylinder 2 and top cylinder 3 is fixed together composition well Body, it is therefore an objective to disposed beneficial to the common sinking for realizing whole well body;It is external that several are provided with the outside of the top cylinder 3 Anti- heavy fixed steel 107 is additionally provided with pre-buried steel part 106, the outside of the top cylinder 3;Described anti-heavy fixed steel 107 will Handled by anticorrosion process;Anti-floating square steel 105 is provided with the inner side of the bottom cylinder 1;Described its appearance of anti-floating square steel 105 Processing or other anticorrosion process are coated with fiberglass, purpose makes anti-floating square steel directly not exposed;Described well body fixed seat includes Armored concrete anti-heavy footstock 9 and well body firm banking, described anti-heavy fixed steel 107 are fixed on the anti-heavy footstock of armored concrete On 9;The effect of described well body firm banking is to prevent well body from floating and sinking, and described well body firm banking includes several The anti-settling support quincuncial pile that timber 4 is constituted, is equipped with robust structure layer, described robust structure between the timber 4 and timber 4 Be equipped with layer be equipped with back cover reinforcing structure layer, described back cover reinforcing structure layer by reinforcing bar and coagulation local soil type into reinforcing bar Concrete enhancement layer 7, the armored concrete strengthens 8 layers and is fixed support jail by anti-floating square steel 105, while playing anti-floating work With being equipped with top anti-corrosion permeable formation 9 on described armored concrete enhancement layer 7;Described back cover reinforcing structure layer, reinforcing bar are mixed Solidifying soil enhancement layer and top anti-corrosion permeable formation are arranged in bottom cylinder 1;Described robust structure layer is not arranged in cylinder Or part is arranged in cylinder.
In the present embodiment, equipment is also both provided with the inner side of described bottom cylinder 1, middle cylinder 2 and top cylinder 3 Fix with pre-buried steel part 108;It is close that described bottom cylinder 1 and the junction of middle cylinder 2 are provided with the progress of water-swellable cushion rubber Envelope;The junction of the middle cylinder 2 and top cylinder 3 is also equipped with water-swellable cushion rubber and sealed;Described chance water is swollen Swollen cushion rubber plays sealed effect, and also acts as the effect for stepping up fixed operating sleeve 101.
In the present embodiment, built-in pre-buried steel part 102, external pre-buried steel part 106, suspension ring 103, anti-sink fix steel 107 and anti- The material of floating square steel 105 is stainless steel or iron castings;Described adapter sleeve material is carbon steel or fiberglass;Described adapter sleeve 101 are arranged on the top of bottom cylinder 1 and the top of middle cylinder 2 before well body sinking, and described dowel 104 is steel Plate, the material of the dowel is stainless steel or iron castings.
In the present embodiment, described anti-heavy fixed steel 107 is welded on the external pre-buried steel part 106 of top cylinder 3;It is described Anti-floating square steel 105 be welded on the built-in pre-buried steel part 102 of bottom cylinder 1.
In the present embodiment, the material of described timber 4 is pine, and the effect of timber is mainly firm sub-surface, to well Body plays a part of support, fixed position;Described robust structure layer is 20~80cm stone robust structure layer 5, and it is acted on To strengthen stability, support strength and the anti-settling performance of timber, improve the firm performance of the soil layer of well body bottom and prevent well body Continue because own wt continues to sink to producing dislocation or displacement;Described back cover reinforcing structure layer is mended for stone concrete back cover Strong structure layer 6, it act as bottom cylinder 1 carrying out back cover, while playing further firm effect to whole well body;Described group If constituting dried layer net-shaped into its paving mode of the reinforcing bar of armored concrete enhancement layer 7 to intersect dislocation, it, which is acted on, mixes reinforcing bar The structure of solidifying soil enhancement layer is more stablized, and plays good anti-floating and sinking effect;Described top anti-corrosion permeable formation 9 is glass Steel anti-corrosion permeable formation, effect is to prevent the immersion of water from causing after well body firm banking is corroded, to reduce anti-floating performance, lead Well body is caused to sink, so as to have impact on the service life of well body.
Embodiment 3
Refering to Fig. 3, the present invention proposes the fixed structure and construction party of galss fiber reinforced resin concrete open caisson cylinder Method, including the well body and well body firm banking being made up of 1 group of cylinder, described cylinder are bottom cylinder 1, described bottom cylinder The 1 inner side bottom of one week and top are provided with pre-buried steel part 102 built in 2~10;The inner side of described bottom cylinder 1 is all also 2~6 suspension ring 103 are provided with, its purpose is to can keep poised state during cylinder lifting;Described suspension ring 103 are welded On built-in pre-buried steel part 102;Anti-floating square steel 105, described anti-floating square steel 105 are provided with the inner side of the bottom cylinder 1 Its appearance coats processing or other anticorrosion process with fiberglass, and purpose makes anti-floating square steel directly not exposed;Described anti-floating square steel 105 are welded on built-in pre-buried steel part 102;Described well body firm banking, the effect of described well body firm banking is to prevent Well body floats and sunk, and described well body firm banking includes the anti-settling support quincuncial pile that several timbers 4 are constituted, the timber It is equipped between 4 and timber 4 on robust structure layer, described robust structure layer and is equipped with back cover reinforcing structure layer, described envelope Be equipped with the reinforcing structure layer of bottom by reinforcing bar and coagulation local soil type into armored concrete enhancement layer 7, the armored concrete strengthens 8 Layer is fixed support jail by anti-floating square steel 105, is laid while playing on anti-floating effect, described armored concrete enhancement layer 7 There is top anti-corrosion permeable formation 9;Described back cover reinforcing structure layer, armored concrete enhancement layer and top anti-corrosion permeable formation is respectively provided with In bottom cylinder 1;Described robust structure layer is not arranged in cylinder or part is arranged in cylinder.
In the present embodiment, equipment fixation is additionally provided with the bottom cylinder stated and uses pre-buried steel part;
In the present embodiment, the material of described timber 4 is pine, and supported anti-settling effect is played to well body, is had simultaneously To the fixation of well body position and prevent the position of well body from occurring to move partially;The stone that described robust structure layer is 20~80cm Robust structure layer 5, it act as stability, support strength and the anti-settling performance of strengthening timber, improves the soil layer of well body bottom Consolidate performance and prevent well body from continuing because own wt continues sink generation dislocation or displacement;Described back cover reinforcing structure layer For stone concrete back cover reinforcing structure layer 6, it act as bottom cylinder 1 carrying out back cover, at the same whole well body is played into One step firm effect;If its paving mode of reinforcing bar of the composition armored concrete enhancement layer 7 constitutes dried layer net to intersect dislocation Shape shape, it, which is acted on, makes the structure of armored concrete enhancement layer more stablize, and plays good anti-floating and sinking effect;Described top Portion's anti-corrosion permeable formation 9 is Corrosion Protection of Fiber Reinforced Plastics permeable formation, and effect is to prevent the immersion of water from causing well body firm banking to be corroded Afterwards, anti-floating performance is reduced, causes well body to be sunk, so as to have impact on the service life of well body.
Embodiment 4
Refering to Fig. 2, the present invention proposes the fixed structure and construction party of galss fiber reinforced resin concrete open caisson cylinder Method, including the well body and well body fixed seat being made up of 2 groups of cylinders, are connected two-by-two between described cylinder and cylinder, the cylinder First group be bottom cylinder 1, second group be top cylinder 3;Described bottom cylinder 1 and the inner side of top cylinder 3 one week Top and bottom are both provided with pre-buried steel part 102 built in 2~10;Described bottom cylinder 1 and the inner side of top cylinder 3 are all also 2~6 suspension ring 103 are provided with, its purpose is to can keep poised state during cylinder lifting;Described suspension ring 103 are welded On built-in pre-buried steel part 102, described cylinder and the junction of cylinder are provided with adapter sleeve 101 and connected, described dowel 104 with built-in pre-buried steel part 102, suspension ring 103 and the inner side bottom for being arranged on the top cylinder 2 on the inner side top of bottom cylinder 1 The built-in pre-buried steel part 102 in end welds together;Bottom cylinder 1 is set to be connected two-by-two with top cylinder 3;Finally make the He of bottom cylinder 1 Top cylinder 3 is fixed together composition well body, it is therefore an objective to disposed beneficial to the common sinking for realizing whole well body;The top cylinder It is provided with 3 outside on several external pre-buried steel parts 106, the outside of the top cylinder 3 and is additionally provided with anti-heavy fixed steel 107;Described anti-heavy fixed steel 107 will be by anticorrosion process processing;Anti-floating square steel is provided with the inner side of the bottom cylinder 1 105;Described its appearance of anti-floating square steel 105 coats processing or other anticorrosion process with fiberglass, and purpose makes anti-floating square steel not straight Connect exposed;Described well body fixed seat includes armored concrete anti-heavy footstock 9 and well body firm banking, described anti-heavy fixed steel 107 are fixed on the anti-heavy footstock 9 of armored concrete;The effect of described well body firm banking is to prevent well body from floating and sinking, Described well body firm banking includes the anti-settling support quincuncial pile that several timbers 4 are constituted, and is spread between the timber 4 and timber 4 Provided with robust structure layer, it is equipped with described robust structure layer in back cover reinforcing structure layer, described back cover reinforcing structure layer Be equipped with by reinforcing bar and coagulation local soil type into armored concrete enhancement layer 7, the armored concrete strengthens 8 layers and passes through anti-floating square steel 105 are fixed support jail, and top anti-corrosion infiltration is equipped with anti-floating effect, described armored concrete enhancement layer 7 while playing Layer 9;Described back cover reinforcing structure layer, armored concrete enhancement layer and top anti-corrosion permeable formation is arranged in bottom cylinder 1;
In the present embodiment, equipment is also both provided with described bottom cylinder 1, the inner side of top cylinder 3 and is fixed with pre-buried Steel part 108;Described bottom cylinder 1 and the junction of top cylinder 3 are provided with water-swellable cushion rubber and sealed;Described chance Water expansion glue encloses sealed effect, and also acts as the effect for stepping up fixed operating sleeve 101.
In the present embodiment, built-in pre-buried steel part 102, external pre-buried steel part 106, suspension ring 103, anti-sink fix steel 107 and anti- The material of floating square steel 105 is stainless steel or carbon steel;Described adapter sleeve material is stainless steel or carbon steel or fiberglass;Described Adapter sleeve 101 is arranged on the top of bottom cylinder 1 before well body sinking, and described dowel 104 is reinforcing bar or steel plate, described The material of dowel is stainless steel or carbon steel.
In the present embodiment, described anti-heavy fixed steel 107 is welded on the external pre-buried steel part 106 of top cylinder 3;It is described Anti-floating square steel 105 be welded on the built-in pre-buried steel part 102 of bottom cylinder 1.
In the present embodiment, the material of described timber 4 is pine, and the effect of timber is mainly firm sub-surface, to well Body plays a part of support, fixed position;Described robust structure layer is 20~80cm stone robust structure layer 5, and it is acted on To strengthen stability, support strength and the anti-settling performance of timber, improve the firm performance of the soil layer of well body bottom and prevent well body Continue because own wt continues to sink to producing dislocation or displacement;Described back cover reinforcing structure layer is mended for stone concrete back cover Strong structure layer 6, it act as bottom cylinder 1 carrying out back cover, while playing further firm effect to whole well body;Described group If constituting dried layer net-shaped into its paving mode of the reinforcing bar of armored concrete enhancement layer 7 to intersect dislocation, it, which is acted on, mixes reinforcing bar The structure of solidifying soil enhancement layer is more stablized, and plays good anti-floating and sinking effect;Described and top anti-corrosion permeable formation 9 is glass Glass steel anti-corrosion permeable formation, effect be in order to prevent the immersion of water from causing after well body firm banking is corroded, to reduce anti-floating performance, Well body is caused to be sunk, so as to have impact on the service life of well body.
Refering to embodiment 1,2,3 and 4, the fixed structure of described galss fiber reinforced resin concrete open caisson cylinder and apply Work method, step is:
The first step, preparation need to prepare neat following construction tool, long-armed digging machine, lifting machine;Electric welding machine (contains welding rod); Generator, sewage pump, pine, ratchel, reinforcing bar, concrete etc..
Second step, arranges platform, accurate open caisson position, it is therefore an objective to prevent ground uneven, causes cylinder to occur after placing askew Tiltedly not just;Lifting rope is fixed on the bottom cylinder 1 for having installed water-swellable cushion rubber and adapter sleeve 101 using hoisting machine after smooth On suspension ring 103, by bottom cylinder 1 insert platform place it is smooth after, the inside of bottom cylinder 1 is implemented to excavate using long-armed digging machine, With the progress of excavation, bottom cylinder 1 is voluntarily sunk due to the weight of itself;When sinking to specified location, just stop excavating;Bottom Adapter sleeve 101 on the cylinder 1 of end will be higher by 5~40cm of platform;
3rd step, is fixed on lifting rope using hoisting machine the intermediate cylinder for having installed water-swellable cushion rubber and adapter sleeve 101 On the suspension ring 103 of body 2, the water-swellable cushion rubber on the bottom set of middle cylinder 2 is then coated with lubricating oil, is so easy to intermediate cylinder The bottom of middle cylinder 2, is connected to by the adapter sleeve 101 that body 2 enters on the cylinder of bottom using adapter sleeve 101 with bottom cylinder 1 Together;Then in pre-buried steel part 102 and suspension ring 103 built in the inner side top of bottom cylinder 1 and the inner lower edge of middle cylinder 2 Put and be welded to connect muscle 104 on pre-buried steel part 102, bottom cylinder 1 is connected two-by-two with middle cylinder 2;Install middle cylinder 2 Afterwards, the height at measurement record cylinder upper end Haikou, finds out minimum point and peak, calculates its drop, drop is not more than 5cm, greatly In being rectified a deviation after 5cm;Then excavated using long-armed digging machine, with the progress excavated, make bottom cylinder and intermediate cylinder Body sinks jointly, and the adapter sleeve of middle cylinder 2 will be higher by 5~40cm of platform;But a upper section middle cylinder and next section intermediate cylinder When body installs connection, a section middle cylinder should be made to be arranged on next section middle cylinder adapter sleeve, then in the middle of upper one section The built-in pre-buried steel part of cylinder inner lower edge is welded with upper on the built-in pre-buried steel part and suspension ring on top on the inside of next section middle cylinder Dowel is connect, a section middle cylinder is connected two-by-two with next section middle cylinder;Well body is made up of 2 groups of cylinders, by this Middle cylinder in step is top cylinder;Well body is made up of 1 group of cylinder, just can omit this step.
4th step, it is using hoisting machine that lifting rope is solid on the suspension ring 103 of top cylinder 3, on the bottom set of top cylinder 3 Water-swellable cushion rubber, and lubricating oil is coated, top cylinder 3 is loaded on the adapter sleeve 101 on middle cylinder 3, by top cylinder 3 Linked together with middle cylinder 2, then on pre-buried steel part 102 and suspension ring 103 and top built in the inner side top of middle cylinder 2 Muscle 104 is welded to connect on the built-in pre-buried steel part 102 of the inner lower edge of cylinder 3, middle cylinder 2 is connected two-by-two with top cylinder 3, And whole well body is fixed together;Install after top cylinder 3, the height at measurement record cylinder upper end Haikou is found out Minimum point and peak, calculate its drop, and drop is not more than 5cm, and long-armed digging is being utilized more than after being rectified a deviation after 5cm Machine, to well body inner excavation;Now whole well body can be sunk due to the progress and own wt of excavation together;Until whole well body Sinking is finished;
5th step, underground is inserted using long-armed digging machine by timber 4, and its timber will basset 20~80cm, to strengthen wood The stress strength and stability energy of stake 4;Between timber 4 and timber 4 fill 20~80cm stone, and using equipment by its Smash flat, be to strengthen the exposed timber stress strength and stability energy in ground surface, improve the steadiness of the soil layer of well body bottom Energy;Prevent well body from continuing to sink to producing dislocation or displacement due to own wt;
6th step, the laying stone concrete back cover reinforcing structure layer 6 on robust structure layer 5, and with vibrator by stone Removal of bubbles in concrete sealing bottom reinforcing structure layer, can combine concrete compaction, eliminate the voids and pits etc. of concrete Phenomenon, to improve its intensity, it is ensured that the quality of concrete component;
7th step, starts to lay reinforcing bar, the laying of reinforcing bar should be noted that reinforcing bar and reinforcing bar on the upper and lower side of anti-floating square steel 105 If between intersect dislocation laying dried layer, constitute net-shaped;Casting concrete after the completion of reinforcing steel bar laying;And mixed stone with vibrator Removal of bubbles in solidifying grave bottom reinforcing structure layer, combines concrete compaction, eliminates the phenomenons such as the voids and pits of concrete, with Improve its intensity, it is ensured that the quality of concrete component;Then Corrosion Protection of Fiber Reinforced Plastics is laid on reinforcing bar armored concrete enhancement layer to ooze Permeable layers, prevent the permeating corrosion of water;
8th step, after last well body firm banking is built up, the anti-heavy footstock of one week armored concrete is laid around top cylinder, and Anti- heavy fixed steel is fixed in anti-heavy footstock, prevents cylinder from sinking.
Above-described embodiment is the description of the invention, is not limitation of the invention, it is any to simple transformation of the present invention after Scheme belong to protection scope of the present invention.

Claims (6)

1. the fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder, including be made up of 1~3 group of cylinder Well body and well body fixed seat, be connected two-by-two between described cylinder and cylinder, the connected mode being connected two-by-two using cylinder can Improve well body sinking efficiency, and can also prevent that sinking watching middle cylinder body and cylinder from coming off or misplacing inclination;The of the cylinder One group be bottom cylinder, second group be several middle cylinders, the 3rd group be top cylinder, described bottom cylinder, intermediate cylinder The inner side bottom of one week of body and top cylinder and top are both provided with pre-buried steel part built in 2~10;Described bottom cylinder, The inner side top of middle cylinder and top cylinder is all also welded with 2~6 suspension ring, and its purpose is to can be protected during cylinder lifting Hold poised state;Described suspension ring are welded on built-in pre-buried steel part;Described cylinder and the junction of cylinder are provided with connection Set connection;Described cylinder and the junction of cylinder are also associated with dowel;Described dowel and top on the inside of the cylinder of bottom Built-in pre-buried steel part, suspension ring and be arranged on pre-buried steel part built in the inner lower edge of the middle cylinder and weld together;Make bottom End cylinder is connected two-by-two with middle cylinder;Described dowel also with pre-buried steel part, suspension ring built in top on the inside of middle cylinder Be arranged on the inner lower edge of the top cylinder built in pre-buried steel part weld together, make middle cylinder and top cylinder two-by-two It is connected, bottom cylinder, middle cylinder and top cylinder is fixed together composition well body, it is therefore an objective to beneficial to realizes whole well The common sinking placement of body;Several external pre-buried steel parts are provided with the outside of the top cylinder, the top cylinder Anti- heavy fixed steel is additionally provided with outside;Described anti-heavy fixed steel will be by anticorrosion process processing;The inner side of the bottom cylinder On be provided with anti-floating square steel;Described its appearance of anti-floating square steel coats processing or other anticorrosion process with fiberglass, and purpose makes to resist Floating square steel is not directly exposed;Described well body fixed seat includes armored concrete anti-heavy footstock and well body firm banking, described Anti- heavy fixed steel is fixed on the anti-heavy footstock of armored concrete;The effect of described well body firm banking be prevent well body float and Sink, described well body firm banking includes the anti-settling support quincuncial pile that several timbers are constituted, between the timber and timber It is equipped with robust structure layer, described robust structure layer and is equipped with back cover reinforcing structure layer, described back cover reinforcing structure layer On be equipped with by reinforcing bar and coagulation local soil type into armored concrete enhancement layer, the armored concrete enhancement layer passes through anti-floating square steel Support jail is fixed, top anti-corrosion permeable formation is equipped with anti-floating effect, described armored concrete enhancement layer while playing;Institute Back cover reinforcing structure layer, armored concrete enhancement layer and the top anti-corrosion permeable formation stated are arranged in the cylinder of bottom, described Robust structure layer is not arranged in the cylinder of bottom or part is arranged in the cylinder of bottom.
2. the fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder as claimed in claim 1, its It is characterised by:Equipment fixation pre-buried steel is also both provided with the inner side of described bottom cylinder, middle cylinder and top cylinder Part;Described bottom cylinder and the junction of middle cylinder are provided with water-swellable cushion rubber and sealed;The middle cylinder with The junction of top cylinder is also equipped with water-swellable cushion rubber and sealed;Described water-swellable cushion rubber plays sealed work With, and also act as the effect for stepping up fixed operating sleeve.
3. the fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder as claimed in claim 1, its It is characterised by:Built-in pre-buried steel part, external pre-buried steel part, suspension ring, the material of anti-heavy fixed steel and anti-floating square steel be carbon steel or Stainless steel or iron castings;Described adapter sleeve material is stainless steel or carbon steel or fiberglass;Described adapter sleeve sinks in well body Before installed in the top of bottom cylinder and the top of middle cylinder, described dowel is reinforcing bar or steel plate, the dowel Material be carbon steel or stainless steel or iron castings.
4. the fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder as claimed in claim 3, its It is characterised by:Described anti-heavy fixed steel is welded on the external pre-buried steel part of top cylinder;Described anti-floating square steel is welded on bottom On the built-in pre-buried steel part for holding cylinder.
5. the fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder as claimed in claim 1, its It is characterised by:The material of described timber is pine, and the effect of timber is mainly firm sub-surface, well body is played support, The effect of fixed position;Described robust structure layer is 20~80cm stone robust structure layer, and it act as strengthening timber Stability, support strength and anti-settling performance, improve the firm performance of the soil layer of well body bottom and prevent well body due to own wt Continue to sink to producing dislocation or displacement;Described back cover reinforcing structure layer is stone concrete back cover reinforcing structure layer, and it is acted on For bottom cylinder is carried out into back cover, while playing further firm effect to whole well body;The composition armored concrete is strengthened If its paving mode of the reinforcing bar of layer constitutes dried layer net-shaped to intersect dislocation, it acts on reinforcing bar and concrete enhancement layer obtains structure more Plus stably, play good anti-floating and sinking effect;Described and top anti-corrosion permeable formation is Corrosion Protection of Fiber Reinforced Plastics permeable formation, effect It is to prevent the immersion of water from causing after well body firm banking is corroded, to reduce anti-floating performance, cause well body to be sunk, so that shadow The service life of well body is rung.
6. the fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder as claimed in claim 1, its It is characterised by:As claimed in claim 1 galss fiber reinforced resin concrete open caisson is connected and its construction method, its Construction method step is:
The first step, preparation need to prepare neat following construction tool, long-armed digging machine, lifting machine;Electric welding machine (contains welding rod);Generate electricity Machine, sewage pump, pine, ratchel, reinforcing bar, concrete etc..
Second step, arranges platform, accurate open caisson position, it is therefore an objective to prevent that ground is uneven, cause cylinder occur after placing it is crooked not Just;Lifting rope is fixed on the bottom cylinder suspension ring for having installed water-swellable cushion rubber and adapter sleeve using hoisting machine after smooth, By bottom cylinder insert platform place it is smooth after, using long-armed digging machine to bottom inner barrel implement excavate, with entering for excavation Exhibition, bottom cylinder is voluntarily sunk using the weight of itself;Adapter sleeve on the cylinder of bottom will be higher by 5~40cm of platform, sink to During specified location, just stop excavating;
3rd step, is fixed on lifting rope using hoisting machine on the middle cylinder suspension ring for having installed water-swellable cushion rubber and adapter sleeve On, the water-swellable cushion rubber on the bottom set of middle cylinder is then coated with lubricating oil, is so easy to middle cylinder to enter bottom cylinder Adapter sleeve on body, is linked together the bottom of middle cylinder with bottom cylinder using adapter sleeve;Then in the cylinder of bottom The built-in pre-buried steel part and suspension ring on side top make bottom with being welded to connect muscle on the built-in pre-buried steel part of middle cylinder inner lower edge Cylinder is connected two-by-two with middle cylinder;Install after middle cylinder, the height at measurement record cylinder upper end Haikou finds out minimum point And peak, its drop is calculated, drop is not more than 5cm, to be rectified a deviation more than after 5cm;Then opened using long-armed digging machine Dig, with the progress excavated, bottom cylinder is sunk jointly with middle cylinder, the adapter sleeve on middle cylinder will be higher by platform 5 ~40cm, but it is upper one section middle cylinder with it is next section middle cylinder install be connected when, should make one save middle cylinder be arranged on down On one section middle cylinder adapter sleeve, then in pre-buried steel part and next section intermediate cylinder built in upper one section middle cylinder inner lower edge Muscle is welded to connect on the built-in pre-buried steel part and suspension ring on internal side top, makes a section middle cylinder and next section middle cylinder It is connected two-by-two;
4th step, using hoisting machine that lifting rope is solid on the cylinder suspension ring of top, the water-swellable on the bottom set of top cylinder Cushion rubber, and lubricating oil is coated, top cylinder is loaded on the adapter sleeve on middle cylinder, top cylinder is connected with middle cylinder Together, then on the inside of middle cylinder pre-buried steel part and suspension ring built in top with it is pre-buried built in the cylinder inner lower edge of top Muscle is welded to connect on steel part, middle cylinder is connected two-by-two with top cylinder, and whole well body is fixed together;Install After the cylinder of good top, the height at measurement record cylinder upper end Haikou finds out minimum point and peak, calculates its drop, drop is not More than 5cm, long-armed digging machine is being utilized more than after being rectified a deviation after 5cm, to well body inner excavation;Now whole well body due to The progress and own wt of excavation can sink together;Until whole well body sinks to finishing;
5th step, underground is inserted using long-armed digging machine by timber, and its timber will basset 20~80cm, with strengthen timber by Force intensity and stability;20~80cm robust structure layer is filled between timber and timber, and is smash using equipment It is flat, it is therefore an objective to strengthen the exposed timber stress strength and stability energy in ground surface, improve the steadiness of the soil layer of well body bottom Energy;Prevent well body from continuing to sink to producing dislocation or displacement due to own wt;
6th step, lays stone concrete back cover reinforcing structure layer on robust structure layer, and with vibrator by stone concrete Removal of bubbles in back cover reinforcing structure layer, combines concrete compaction, eliminates the phenomenons such as the voids and pits of concrete, to improve Its intensity, it is ensured that the quality of concrete component;
7th step, starts to lay reinforcing bar, the laying of reinforcing bar should be noted that to intersect between reinforcing bar and reinforcing bar in the upper and lower side of anti-floating square steel If dislocation laying dried layer, constitutes net-shaped;Casting concrete after the completion of reinforcing steel bar laying;And with vibrator by stone concrete back cover Removal of bubbles in reinforcing structure layer, combines concrete compaction, eliminates the phenomenons such as the voids and pits of concrete, strong to improve its Degree, it is ensured that the quality of concrete component;Then Corrosion Protection of Fiber Reinforced Plastics permeable formation is laid on reinforcing bar armored concrete enhancement layer, is prevented The permeating corrosion of water;
8th step, finally after well body firm banking is built up, the anti-heavy footstock of one week armored concrete is laid around top cylinder, and will Anti- heavy fixed steel is fixed in anti-heavy footstock, prevents cylinder from sinking.
CN201710366965.6A 2017-05-23 2017-05-23 The fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder Pending CN107119702A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710366965.6A CN107119702A (en) 2017-05-23 2017-05-23 The fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710366965.6A CN107119702A (en) 2017-05-23 2017-05-23 The fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder

Publications (1)

Publication Number Publication Date
CN107119702A true CN107119702A (en) 2017-09-01

Family

ID=59729971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710366965.6A Pending CN107119702A (en) 2017-05-23 2017-05-23 The fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder

Country Status (1)

Country Link
CN (1) CN107119702A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111332990A (en) * 2019-11-20 2020-06-26 中国铁建重工集团股份有限公司 Barrel hoisting equipment
CN114197510A (en) * 2022-01-05 2022-03-18 朱庆华 Height-adjustable open caisson barrel fixing structure for installing integrated prefabricated pump station and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164578A (en) * 1999-12-09 2001-06-19 Nishimatsu Constr Co Ltd Caisson over-settlement prevention device and caisson immersion method
CN102234979A (en) * 2010-04-30 2011-11-09 华泰(南通)船务有限公司 Main pier steel sinking well for bridge and process for integrally hoisting and installing steel sinking well sections thereof
CN102635124A (en) * 2012-04-23 2012-08-15 浙江省建工集团有限责任公司 Construction method aiming to large open caisson in weak soil area
CN103556647A (en) * 2013-11-15 2014-02-05 中冶赛迪工程技术股份有限公司 #-shaped reinforced open caisson for soft soil geological rotational flow tank and construction method
CN105369857A (en) * 2015-12-04 2016-03-02 上海耀华玻璃钢有限公司 Integrated prefabricated pump station glass fiber reinforced resin concrete tube
CN205776670U (en) * 2016-04-12 2016-12-07 中冶长天国际工程有限责任公司 A kind of frame-type gully

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164578A (en) * 1999-12-09 2001-06-19 Nishimatsu Constr Co Ltd Caisson over-settlement prevention device and caisson immersion method
CN102234979A (en) * 2010-04-30 2011-11-09 华泰(南通)船务有限公司 Main pier steel sinking well for bridge and process for integrally hoisting and installing steel sinking well sections thereof
CN102635124A (en) * 2012-04-23 2012-08-15 浙江省建工集团有限责任公司 Construction method aiming to large open caisson in weak soil area
CN103556647A (en) * 2013-11-15 2014-02-05 中冶赛迪工程技术股份有限公司 #-shaped reinforced open caisson for soft soil geological rotational flow tank and construction method
CN105369857A (en) * 2015-12-04 2016-03-02 上海耀华玻璃钢有限公司 Integrated prefabricated pump station glass fiber reinforced resin concrete tube
CN205776670U (en) * 2016-04-12 2016-12-07 中冶长天国际工程有限责任公司 A kind of frame-type gully

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
铁道部第二勘测设计院: "实用土力学及地基处理实例", 西安电子科技大学出版社, pages: 274 - 182 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111332990A (en) * 2019-11-20 2020-06-26 中国铁建重工集团股份有限公司 Barrel hoisting equipment
CN111332990B (en) * 2019-11-20 2022-01-25 中国铁建重工集团股份有限公司 Barrel hoisting equipment
CN114197510A (en) * 2022-01-05 2022-03-18 朱庆华 Height-adjustable open caisson barrel fixing structure for installing integrated prefabricated pump station and construction method

Similar Documents

Publication Publication Date Title
CN100564700C (en) The job practices of lattice type steel column tower crane pedestal
CN102277867B (en) Construction method for collapsible loess foundation
CN101864773B (en) Deep foundation pit support process
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
US6796098B2 (en) Building block, system and method
CN105951616B (en) Major diameter assembling type steel corrugated culvert cavity construction method
CN109505229A (en) Highway high gradient slope stress equilibrium and vibration damping are taken precautions against natural calamities high bridge pier structure and construction method
CN102758458B (en) Underground continuous wall repairing method
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN108661069A (en) Close on the wall piled anchor composite structure and method of old Retaining Wall Reinforcement under the load of river road surface
CN106812150A (en) A kind of mountain area steep slope region Road Bridge Pile Foundation construction method
CN106812153A (en) Beam and slab type construction elevator foundation construction engineering method in a kind of backfill
CN102400462A (en) Secondary pressure grouting small pile construction process in seismic strengthening treatment of foundation
CN106988305A (en) A kind of pile-column pier construction method of underground integrated molding
CN106065668B (en) A kind of construction techniques
CN107119702A (en) The fixed structure and construction method of galss fiber reinforced resin concrete open caisson cylinder
CN102733407A (en) Two-ring grouted single pile foundation
US20050055944A1 (en) Corner building block, system and method
CN105239573B (en) The interplantation tube anchor rock construction method of shaped steel trestle
CN206752486U (en) Galss fiber reinforced resin concrete open caisson cylinder fixed structure
CN104153356B (en) The constructing device of concrete-pile and construction method thereof
US20080292410A1 (en) Methods and apparatus for foundation systems
CN105256848A (en) Coordinating and controllable soil digging and slant rectifying method in roadway
CN109183828A (en) A kind of steel tube-concrete series connection stake combination multi-column pier foundation and its construction method
CN108252303A (en) A kind of tier building basic engineering method based on anchor jacked pile technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Chen Min

Inventor after: Bao Yuexiang

Inventor after: Ye Zhiqing

Inventor before: Ye Zhiqing

Inventor before: Chen Min

Inventor before: Bao Yuexiang

CB03 Change of inventor or designer information
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination