CN107119693A - Foundation pit supporting construction and its construction method with precipitation function - Google Patents

Foundation pit supporting construction and its construction method with precipitation function Download PDF

Info

Publication number
CN107119693A
CN107119693A CN201710327877.5A CN201710327877A CN107119693A CN 107119693 A CN107119693 A CN 107119693A CN 201710327877 A CN201710327877 A CN 201710327877A CN 107119693 A CN107119693 A CN 107119693A
Authority
CN
China
Prior art keywords
bearing diagonal
precipitation
retaining piles
soil body
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710327877.5A
Other languages
Chinese (zh)
Inventor
王国欣
孙旻
周旻娴
赵中兴
张国峰
罗亚楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201710327877.5A priority Critical patent/CN107119693A/en
Publication of CN107119693A publication Critical patent/CN107119693A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to a kind of foundation pit supporting construction with precipitation function and its construction method, including it is inserted in the interior retaining piles of the peripheral soil body of the foundation ditch;The outer retaining piles of the peripheral soil body of the interior retaining piles are inserted in, soil mass consolidation is formed between the outer retaining piles and the interior retaining piles;Bearing diagonal, wears and is supported in the outer retaining piles, interior retaining piles and soil mass consolidation, and the bottom soil body of the insertion foundation ditch;The part that the bearing diagonal is located in the soil mass consolidation region is provided with precipitation mechanism, and precipitation is carried out to the soil mass consolidation by the precipitation mechanism.Bearing diagonal in foundation ditch is supported in double-row pile, and it is located at the part setting Precipitation Structure between double-row pile in bearing diagonal, bearing diagonal is set to not only act as the effect of supporting double-row pile, precipitation can also be carried out to the soil body between double-row pile, so as to strengthen the soil body between double-row pile, without separately setting dewatering well, and then reach accelerating construction progress, save the effect of construction cost.

Description

Foundation pit supporting construction and its construction method with precipitation function
Technical field
The present invention relates to technical field of building construction, a kind of foundation pit supporting construction with precipitation function and its construction are refered in particular to Method.
Background technology
At present, for soft soil foundation pit supporting construction form typically using Cement-soil Gravity enclosure wall, cast-in-situ bored pile+ Supporting construction is supportted before hole inner support or vertical type steel pipe, but three has respective advantage and disadvantage respectively.
The widely used supporting construction of three of the above is directed in Chinese patent application prospectus, CN105442618A Defect, disclose vertical type foundation pit supporting construction accessible in a kind of hole, its by being obliquely installed supporter, having both plus Muscle, earth-retaining, sealing multiple action, constrain soil deformation, while enhancing foundation ditch crater wall stability, realize in hole without barrier Hinder construction.
But in the scheme of the invention, in order to increase the inter-pile soil intensity of double-row pile, improve the steady of Retaining Structure with Double-row Piles It is qualitative, it is necessary to vertical dewatering well is set between two support piles with reach reduction underground water position purpose.This scheme pole The earth effect progress of foundation pit construction, the cost for increasing foundation pit construction.
The content of the invention
It is an object of the invention to the defect for overcoming prior art, there is provided a kind of foundation pit supporting construction with precipitation function And its construction method, can solve existing foundation pit supporting construction must be in two support piles for the precipitation of the soil body between double-row pile Between dewatering well is set, cause influence construction speed, increase construction cost the problem of.
Realizing the technical scheme of above-mentioned purpose is:
The invention provides a kind of foundation pit supporting construction with precipitation function, including:
It is inserted in the interior retaining piles of the peripheral soil body of the foundation ditch;
The outer retaining piles of the peripheral soil body of the interior retaining piles are inserted in, the outer retaining piles are arranged with the interior supporting Soil mass consolidation is formed between stake;
Bearing diagonal, wears and is supported in the outer retaining piles, interior retaining piles and soil mass consolidation, and the insertion foundation ditch Bottom soil body;The part that the bearing diagonal is located in the soil mass consolidation region is provided with precipitation mechanism, passes through the precipitation mechanism Precipitation is carried out to the soil mass consolidation.
The beneficial effects of the invention are as follows, double-row pile is supported in using by the bearing diagonal in foundation ditch, and in bearing diagonal positioned at double Part between campshed sets Precipitation Structure, bearing diagonal is not only acted as the effect of supporting double-row pile, can also to double-row pile it Between the soil body carry out precipitation, so that the soil body between double-row pile is strengthened, without separately setting dewatering well, it is only necessary to setting sprinkling machine The bearing diagonal insertion soil body of structure can reach the effect of support and precipitation simultaneously, and then reach accelerating construction progress, save construction The effect of cost.
The present invention with precipitation function foundation pit supporting construction further improvement is that, the bearing diagonal is stretched out in described The part of retaining piles is inserted directly into the bottom soil body of the foundation ditch.
The present invention with precipitation function foundation pit supporting construction further improvement is that, the precipitation mechanism includes fixed In the bottom sealing plate inside the bearing diagonal at the close interior retaining piles, it is opened on the bearing diagonal positioned at the compacted soil Permeable hole in body region and the drinking-water pipe being inserted at the top of the bearing diagonal in the bearing diagonal, the drinking-water pipe Bottom is set close to the bottom sealing plate.
The present invention with precipitation function foundation pit supporting construction further improvement is that, the precipitation mechanism also includes bag It is wrapped in the filter layer on the outside of the permeable hole;The filter layer includes being wound in steel wire around the permeable hole, is wrapped in institute State the fie screen on the outside of steel wire, the coarse strainer being wrapped on the outside of the fie screen and the protection being wrapped on the outside of the coarse strainer Net.
The present invention with precipitation function foundation pit supporting construction further improvement is that, the precipitation mechanism also includes rib Plate, the floor is fixedly arranged on the outer surface of the bearing diagonal and is correspondingly placed at the bottom sealing plate.
Present invention also offers a kind of construction method of the foundation pit supporting construction with precipitation function, comprise the following steps:
The interior retaining piles are inserted in the peripheral soil body of the foundation ditch by retaining piles in providing;
Outer retaining piles are provided, the outer retaining piles are inserted in into the peripheral soil body of the interior retaining piles, the outer supporting Soil mass consolidation is formed between campshed and the interior retaining piles;
Bearing diagonal is provided, the bearing diagonal is passed through and it is supported in the outer retaining piles, interior retaining piles and is added Gu the soil body, and the bottom soil body of the insertion foundation ditch;Precipitation mechanism is provided, the precipitation mechanism is arranged on the bearing diagonal Part in the soil mass consolidation region, precipitation is carried out by the precipitation mechanism to the soil mass consolidation.
Foundation pit supporting construction construction method of the present invention with precipitation function further improvement is that, by the oblique branch The part of the support stretching interior retaining piles is inserted directly into the bottom soil body of the foundation ditch.
Foundation pit supporting construction construction method of the present invention with precipitation function further improvement is that, the sprinkling machine Structure includes bottom sealing plate, permeable hole and drinking-water pipe;The bottom sealing plate is fixed on inside the bearing diagonal close to the interior supporting At campshed, the permeable hole is opened on the bearing diagonal and is located in the soil mass consolidation region, by the drinking-water pipe from institute State and be inserted at the top of bearing diagonal in the bearing diagonal, and the bottom of the drinking-water pipe is disposed in proximity at the bottom sealing plate.
Foundation pit supporting construction construction method of the present invention with precipitation function further improvement is that, the sprinkling machine Structure also includes filter layer, and the filter layer is wrapped on the outside of the permeable hole;The filter layer includes steel wire, fie screen, thick Filter screen and catch net;By the steel wire winding around the permeable hole, the fie screen is wrapped in the outer of the steel wire Side, the coarse strainer is wrapped on the outside of the fie screen, the catch net is wrapped on the outside of the coarse strainer.
Foundation pit supporting construction construction method of the present invention with precipitation function further improvement is that, the sprinkling machine Structure also includes floor, and the floor is fixedly arranged on the outer surface of the bearing diagonal and is correspondingly placed at the bottom sealing plate.
Brief description of the drawings
Fig. 1 is foundation pit supporting construction of the present invention with precipitation function and its structural representation of construction method.
Fig. 2 is the structural representation of filter layer in foundation pit supporting construction and its construction method of the present invention with precipitation function Figure.
Fig. 3 is interior retaining piles and outer supporting in foundation pit supporting construction of the present invention with precipitation function and its construction method The top view of campshed.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, the invention provides a kind of foundation pit supporting construction with precipitation function and its construction method, using general Bearing diagonal in foundation ditch is supported in double-row pile, and is located at the part setting Precipitation Structure between double-row pile in bearing diagonal, makes tiltedly branch Support not only acts as the effect of supporting double-row pile, precipitation can also be carried out to the soil body between double-row pile, so as to strengthen double-row pile Between the soil body, without separately setting dewatering well, it is only necessary to set precipitation mechanism bearing diagonal insert the soil body can be while reaching branch Support and the effect of precipitation, and then reach accelerating construction progress, save the effect of construction cost.Solve existing foundation pit supporting construction Dewatering well must be set between two support piles for the precipitation of the soil body between double-row pile, cause influence construction speed, increase to be applied The problem of work cost.Foundation pit supporting construction of the present invention with precipitation function is illustrated below in conjunction with the accompanying drawings.
As shown in figure 1, foundation pit supporting construction of the present invention with precipitation function includes:
Interior retaining piles 11, outer retaining piles 12, bear down on one 14, bearing diagonal 13, suction pump 15, matting layer 16, reinforcing pier 17 With floor load transfering strip 18.
As shown in figure 1, interior retaining piles 11 are inserted in the soil body of the periphery of foundation ditch 10 vertically, and set along the periphery of foundation ditch 10 Put.Outer retaining piles 12 are inserted in the soil body of the periphery of interior retaining piles 11 vertically, outer retaining piles 12 and interior retaining piles 11 it Between be formed with soil mass consolidation, as one preferred embodiment, the center of the center of outer retaining piles 12 and interior retaining piles 11 The distance between be 5000mm, gap between interior retaining piles 11 and foundation ditch 10 is more than 800mm.
As shown in figure 3, as one preferred embodiment, interior retaining piles 11 include support pile in spaced first Support pile 112 in 111 and second, similarly, outer retaining piles 12 are included outside the spaced first outer support pile 121 and second Support pile 122, and it is embedded with I-steel inside the outer support pile 122 of support pile 112 and second in second.Further, first In interior support pile 111, second support pile 112, the first outer support pile 122 of outer support pile 121 and second be a diameter of 850mm, Length is the three axes agitating pile that 17.2m, cement mixing content are 20%, and the I-steel is the 700mm*300mm*13mm* that length is 18m 24mm shaped steel.
As shown in figures 1 and 3,14 are beared down on one for being fixedly connected with interior retaining piles 11 and outer retaining piles 12, bear down on one 14 bags Include be fixedly arranged on first Guan Liang 141 at the top of interior retaining piles 11, be fixedly arranged on the outer top of retaining piles 12 the second Guan Liang 142 and Reinforced concrete cover plate 143 for being fixedly connected with the first Guan Liang 141 and the second Guan Liang 142.Wherein, the first Guan Liang 141 is arranged along interior supporting Stake 11 is set, and the second Guan Liang 142 is set along outer retaining piles 12.As one preferred embodiment, the width of the first Guan Liang 141 It is 800mm for 1200mm, thickness, the width of the second Guan Liang 142 is that 1400mm, thickness are 800mm, and reinforced concrete cover sheet thickness is 400mm。
As shown in figure 1, bearing diagonal 13, which is worn, is supported in interior retaining piles 11 and outer retaining piles 12, and insertion foundation ditch 10 Bottom soil body, the part that bearing diagonal 13 is located in soil mass consolidation region is provided with precipitation mechanism, by the precipitation mechanism to the reinforcing The soil body carries out precipitation, so as to lift the intensity of the soil mass consolidation, improves the stability of supporting construction.Bearing diagonal 13 is arranged from outer supporting The top of stake 12 is obliquely through support pile 111 in the first of interior retaining piles 11, and the top of bearing diagonal 13 is located at the second Guan Liang Protrude out at 142 and slightly ground.The part that bearing diagonal 13 stretches out interior retaining piles 11 is inserted directly into the bottom soil body of foundation ditch 10, this " direct " at place refers to that bearing diagonal 13 stretches out the parts of the interior retaining piles without region more than bottom of foundation ditch, and direct Insert the bottom soil body of foundation ditch 10 so that the inside of foundation ditch 10 is without barrier.
As depicted in figs. 1 and 2, wherein, the precipitation mechanism include bottom sealing plate 131, permeable hole 135, drinking-water pipe 134, closedtop Plate 136, filter layer 132 and floor 133.Bottom sealing plate 131 is fixedly arranged on the inside of bearing diagonal 13 at interior retaining piles 11, underseal The diameter of plate 131 is more than the diameter of bearing diagonal 13.Permeable hole 135, which is opened on bearing diagonal 13, to be located in soil mass consolidation region.Take out The top of water pipe 134 from bearing diagonal 13 is inserted in bearing diagonal 13, and the bottom of drinking-water pipe 134 is set close to bottom sealing plate 131, from And in time extract the water entered inside bearing diagonal out.Top sealing plate 136 is fixedly arranged on the top of bearing diagonal, the impurity for obstructing the external world Into the inside of bearing diagonal 13, the center of top sealing plate 136 offers the through hole passed through for drinking-water pipe 134, plays spacing drinking-water pipe 134 Effect.Filter layer 132 is wrapped in the outside of permeable hole 135, and the bottom of filter layer 132 is placed on bottom sealing plate 131.
As shown in Fig. 2 filter layer 132 includes being wound in steel wire 1321 around permeable hole 135, is wrapped in outside steel wire 1321 The fie screen 1322 of side, the coarse strainer 1323 for being wrapped in the outside of fie screen 1322 and the protection for being wrapped in the outside of coarse strainer 1323 Net 1324.Wherein, catch net 1324 is bar reinforcement net, plays the filter layer 132 to its inside and the protective effect of precipitation mechanism, Prevent bearing diagonal 13 when inserting soil mass consolidation because the friction of soil mass consolidation and filter layer 132 causes filter layer 132 damaged or Displacement.Coarse strainer 1323, for filtering out impurity larger inside soil mass consolidation, prevents soil and impurity as first layer filtration It is in-house into precipitation.Fie screen 1322 is as second layer filtration, for filtering out less impurity inside soil mass consolidation, Prevent soil and impurity from entering precipitation in-house.Steel wire 1321 is wound in around permeable hole 135 along "the" shape, due to steel wire 1321 windings, are formed with certain gap between fie screen 1322 and permeable hole 135, prevent the native and miscellaneous of the outside of fie screen 1322 Matter blocks permeable hole 135.As one preferred embodiment, as shown in figure 1, the top of filter layer 132 and precipitation mechanism The distance between top is 2-3m.
As shown in Fig. 2 floor 133 is triangular plate, it is fixedly arranged on the outer surface of bearing diagonal and is correspondingly placed in bottom sealing plate 131 Convex extension part under, the length that the triangular plate is fixedly arranged on the side of the convex extension part is identical with the width of the convex extension part and be all higher than The thickness of filtering layer 132.Floor 133 is used to reinforcing and protecting precipitation mechanism, and triangular structure can be in bearing diagonal 13 in insertion soil Buffering is formed during body, prevents the soil body is excessive to the active force of the bottom of filter layer 132 from causing filter layer 132 to shift.
Suction pump 15 is connected with the top of drinking-water pipe 134, the inner vacuum of drinking-water pipe 134, by suction pump 15 and drawing water Pipe 134 extracts the water entered inside bearing diagonal 13 out, so as to realize the precipitation to soil mass consolidation.
Matting layer 16 is located at the bottom of foundation ditch 10, at interior retaining piles 11, for increasing the supporting construction for foundation ditch The supporting intensity of 10 bottoms.Preferably, the thickness of matting layer 16 is that 300mm, width are 8m.
Pier 17 is reinforced located at foundation ditch 10 and the corner portion of interior retaining piles 11 formation, for anchoring through interior retaining piles 11 Bearing diagonal 13 part, further increase the supporting intensity of the supporting construction.Preferably, the width of reinforcing pier 17 is 4700mm, highly be 4000mm.
In a preferred embodiment, foundation ditch is used to build the layer garage of underground two.Now, building of constructing is needed inside foundation ditch In plate, gap of the floor load transfering strip 18 located at interior retaining piles 11 with foundation ditch 10, at floor.Preferably, floor load transfering strip 18 thickness are 200mm.
The construction method to foundation pit supporting construction of the present invention with precipitation function is illustrated below in conjunction with the accompanying drawings.
As shown in Figure 1 there is provided interior retaining piles 11, interior retaining piles 11 are inserted in into the peripheral soil body of foundation ditch 10;
Outer retaining piles 12 are provided, outer retaining piles 12 are inserted in into the peripheral soil body of interior retaining piles 11, outer retaining piles 12 Soil mass consolidation is formed between interior retaining piles 11;
Bearing diagonal 13 is provided, bearing diagonal 13 is passed through and it is supported in outer retaining piles 12, interior retaining piles 11 and is added Gu the soil body, and the bottom soil body of insertion foundation ditch 10;Precipitation mechanism is provided, precipitation mechanism is arranged on bearing diagonal 13 to be located at and reinforced Part in soil body region, precipitation is carried out by precipitation mechanism to soil mass consolidation.
The part that bearing diagonal 13 stretches out interior retaining piles 11 is inserted directly into the bottom soil body of foundation ditch 10.
Precipitation mechanism includes bottom sealing plate 131, permeable hole 135 and drinking-water pipe 134;Bottom sealing plate 131 is fixed on bearing diagonal Permeable hole 135 is opened on bearing diagonal 13 and is located in soil mass consolidation region, will draw water at interior retaining piles 11 by 13 inside The top of pipe 134 from bearing diagonal 13 is inserted in bearing diagonal 13, and the bottom of drinking-water pipe 134 is disposed in proximity into bottom sealing plate 131 Place.
Precipitation mechanism also includes filter layer 132, and filter layer 132 is wrapped in into the outside of permeable hole 135;Filter layer 132 includes Steel wire 1321, fie screen 1322, coarse strainer 1323 and catch net 1324;Steel wire 1321 is wound in around permeable hole 135, will Fie screen 1322 is wrapped in the outside of steel wire 1321, coarse strainer 1323 is wrapped in the outside of fie screen 1322, by catch net 1324 It is wrapped in the outside of coarse strainer 1323.
Precipitation mechanism also includes floor 133, and floor 133 is fixedly arranged on the outer surface of bearing diagonal 13 and underseal is correspondingly placed in At plate 131.
The Precipitation Process of foundation pit supporting construction of the present invention with precipitation function is illustrated below.
In suitable part processing precipitation mechanism on bearing diagonal, make bearing diagonal insert outer retaining piles, interior retaining piles and After soil mass consolidation, precipitation mechanism is located in soil mass consolidation region.Contain a large amount of water in soil mass consolidation, water passes through filter layer and permeable Hole enters inside bearing diagonal, and product, on bottom sealing plate, bottom of the tube of drawing water is contacted with water, and will enter bearing diagonal by suction pump Internal water is extracted out, so as to complete the precipitation to soil mass consolidation, increases the intensity of soil mass consolidation, and then reinforce whole supporting knot Structure.
The present invention has having the beneficial effect that for the foundation pit supporting construction of precipitation function:
Double-row pile is supported in using by the bearing diagonal in foundation ditch, and is located at the part between double-row pile in bearing diagonal drop is set Water-bound, makes bearing diagonal not only act as the effect of supporting double-row pile, can also carry out precipitation to the soil body between double-row pile, so that The soil body between double-row pile is strengthened, without separately setting dewatering well, it is only necessary to which the bearing diagonal for setting precipitation mechanism is inserted the soil body i.e. The effect of support and precipitation can be reached simultaneously, and then is reached accelerating construction progress, saved the effect of construction cost.Further, The supporter that supporter of the conventional branch in foundation ditch is changed to be arranged in support pile and insert the soil body below foundation ditch, so that real It is accessible in existing foundation ditch.In addition, bearing diagonal at the precipitation mechanism on the outside of wrap up the filter layer of steel, the filtering soil body and impurity, only The water in the soil body is allowed to penetrate into the in-house space of precipitation, practical and stability is good, filter layer quality can ensure.Finally, Also by setting double supporting pile structure, in support pile burying I-steel, in bearing diagonal and support pile junction add reinforcing Pier, add matting layer under bottom of foundation ditch and the measures such as floor load transfering strip are added at the floor of underground, further enhance The supporting intensity of supporting construction.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State it is bright the present invention is made many variations example.Thus, some of embodiment details should not constitute limitation of the invention, this Invention regard the scope defined using appended claims as protection scope of the present invention.

Claims (10)

1. a kind of foundation pit supporting construction with precipitation function, it is characterised in that including:
It is inserted in the interior retaining piles of the peripheral soil body of the foundation ditch;
Be inserted in the outer retaining piles of the peripheral soil body of the interior retaining piles, the outer retaining piles and the interior retaining piles it Between be formed with soil mass consolidation;
Bearing diagonal, wears and is supported in the outer retaining piles, interior retaining piles and soil mass consolidation, and the bottom of the insertion foundation ditch The soil body;The part that the bearing diagonal is located in the soil mass consolidation region is provided with precipitation mechanism, by the precipitation mechanism to institute State soil mass consolidation and carry out precipitation.
2. there is the foundation pit supporting construction of precipitation function as claimed in claim 1, it is characterised in that the bearing diagonal stretches out institute The part for stating interior retaining piles is inserted directly into the bottom soil body of the foundation ditch.
3. there is the foundation pit supporting construction of precipitation function as claimed in claim 1, it is characterised in that the precipitation mechanism includes Be fixedly arranged on the bottom sealing plate inside the bearing diagonal at the interior retaining piles, be opened on the bearing diagonal be located at it is described plus Gu permeable hole in soil body region and the drinking-water pipe being inserted at the top of the bearing diagonal in the bearing diagonal, described to draw water The bottom of pipe is set close to the bottom sealing plate.
4. there is the foundation pit supporting construction of precipitation function as claimed in claim 3, it is characterised in that the precipitation mechanism is also wrapped Include the filter layer being wrapped on the outside of the permeable hole;The filter layer includes steel wire, the parcel being wound in around the permeable hole Fie screen on the outside of the steel wire, the coarse strainer being wrapped on the outside of the fie screen and it is wrapped on the outside of the coarse strainer Catch net.
5. there is the foundation pit supporting construction of precipitation function as claimed in claim 3, it is characterised in that the precipitation mechanism is also wrapped Floor is included, the floor is fixedly arranged on the outer surface of the bearing diagonal and is correspondingly placed at the bottom sealing plate.
6. a kind of construction method of the foundation pit supporting construction with precipitation function, it is characterised in that comprise the following steps:
The interior retaining piles are inserted in the peripheral soil body of the foundation ditch by retaining piles in providing;
Outer retaining piles are provided, the outer retaining piles are inserted in into the peripheral soil body of the interior retaining piles, the outer retaining piles Soil mass consolidation is formed between the interior retaining piles;
Bearing diagonal is provided, the bearing diagonal is passed through and it is supported in the outer retaining piles, interior retaining piles and compacted soil Body, and the bottom soil body of the insertion foundation ditch;Precipitation mechanism is provided, the precipitation mechanism is arranged on the bearing diagonal and is located at Part in the soil mass consolidation region, precipitation is carried out by the precipitation mechanism to the soil mass consolidation.
7. there is the construction method of the foundation pit supporting construction of precipitation function as claimed in claim 6, it is characterised in that will be described The part of the bearing diagonal stretching interior retaining piles is inserted directly into the bottom soil body of the foundation ditch.
8. there is the construction method of the foundation pit supporting construction of precipitation function as claimed in claim 6, it is characterised in that the drop Water dispenser structure includes bottom sealing plate, permeable hole and drinking-water pipe;The bottom sealing plate is fixed on inside the bearing diagonal close to described interior At retaining piles, the permeable hole is opened on the bearing diagonal and is located in the soil mass consolidation region, by the drinking-water pipe It is inserted at the top of the bearing diagonal in the bearing diagonal, and the bottom of the drinking-water pipe is disposed in proximity to the bottom sealing plate Place.
9. there is the construction method of the foundation pit supporting construction of precipitation function as claimed in claim 8, it is characterised in that the drop Water dispenser structure also includes filter layer, and the filter layer is wrapped on the outside of the permeable hole;The filter layer includes steel wire, fine filtering Net, coarse strainer and catch net;By the steel wire winding around the permeable hole, the fie screen is wrapped in the steel wire Outside, the coarse strainer is wrapped on the outside of the fie screen, the catch net is wrapped on the outside of the coarse strainer.
10. there is the construction method of the foundation pit supporting construction of precipitation function as claimed in claim 8, it is characterised in that described Precipitation mechanism also includes floor, and the floor is fixedly arranged on the outer surface of the bearing diagonal and the bottom sealing plate is correspondingly placed in Place.
CN201710327877.5A 2017-05-11 2017-05-11 Foundation pit supporting construction and its construction method with precipitation function Pending CN107119693A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710327877.5A CN107119693A (en) 2017-05-11 2017-05-11 Foundation pit supporting construction and its construction method with precipitation function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710327877.5A CN107119693A (en) 2017-05-11 2017-05-11 Foundation pit supporting construction and its construction method with precipitation function

Publications (1)

Publication Number Publication Date
CN107119693A true CN107119693A (en) 2017-09-01

Family

ID=59727870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710327877.5A Pending CN107119693A (en) 2017-05-11 2017-05-11 Foundation pit supporting construction and its construction method with precipitation function

Country Status (1)

Country Link
CN (1) CN107119693A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555131A (en) * 2019-01-08 2019-04-02 临沂大学 A kind of Construction of Civil Engineering foundation pit side-wall covering protection device
CN111042147A (en) * 2019-11-20 2020-04-21 天津建岩岩土工程有限公司 Screw-in type steel pile supporting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AUPQ479699A0 (en) * 1999-12-21 2000-02-03 Tristanagh Pty Ltd Earth retention and piling systems
CN103669369A (en) * 2013-12-23 2014-03-26 中国建筑第八工程局有限公司 Supporting structure and supporting method for foundation pit
CN104727319A (en) * 2015-04-07 2015-06-24 兰州理工大学 Slope self-drainage anchor rod and construction method
CN105442618A (en) * 2016-01-08 2016-03-30 上海岩土工程勘察设计研究院有限公司 In-pit obstacle-free vertical retaining structure of foundation pit
CN205242381U (en) * 2015-12-15 2016-05-18 安徽理工大学 Drainage stake is strutted to hollow permeating water

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AUPQ479699A0 (en) * 1999-12-21 2000-02-03 Tristanagh Pty Ltd Earth retention and piling systems
CN103669369A (en) * 2013-12-23 2014-03-26 中国建筑第八工程局有限公司 Supporting structure and supporting method for foundation pit
CN104727319A (en) * 2015-04-07 2015-06-24 兰州理工大学 Slope self-drainage anchor rod and construction method
CN205242381U (en) * 2015-12-15 2016-05-18 安徽理工大学 Drainage stake is strutted to hollow permeating water
CN105442618A (en) * 2016-01-08 2016-03-30 上海岩土工程勘察设计研究院有限公司 In-pit obstacle-free vertical retaining structure of foundation pit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555131A (en) * 2019-01-08 2019-04-02 临沂大学 A kind of Construction of Civil Engineering foundation pit side-wall covering protection device
CN111042147A (en) * 2019-11-20 2020-04-21 天津建岩岩土工程有限公司 Screw-in type steel pile supporting method

Similar Documents

Publication Publication Date Title
AU2018102180A4 (en) Anti-clogging strengthened permeable pile and construction method
CN207314368U (en) Steel cofferdam waterproof/drainage structure
CN102605773B (en) Construction method of slip-casting expanded-base cast-in-situ bored pile and extruding-extending device thereof
CN210066791U (en) A precipitation combined system that is used for foundation ditch pressure release precipitation and dredges precipitation
CN107190727A (en) A kind of new drain consolidation system and method
CN206971229U (en) Foundation pit supporting construction with precipitation function
CN103031834A (en) Low-position vacuum preloading rapid reinforcement method of soft foundation in hydraulic filling and reclamation
CN111749239A (en) Manual hole digging pile hole mechanical high-pressure grouting construction protection device and manual hole digging pile hole construction method
CN107119693A (en) Foundation pit supporting construction and its construction method with precipitation function
CN107700496A (en) The inverse suitable combining construction method of deep basal pit
CN107964969A (en) Stake film is combined cofferdam and its construction method with soil
CN108625894A (en) The waste filling solid grouting construction method of the flat working face of shortwall lane water acquisition
CN107130580A (en) New independent well point integrate draining combined vacuum ground preloading method and hardened system
CN110685272B (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN106168142A (en) The water discharge method of tunnel bedrock underground water
CN216713037U (en) Shallow foundation pit operation equipment
CN207143963U (en) A kind of foundation ditch supporting construction of pile for prestressed pipe
CN207331723U (en) A kind of steel reinforcement cage dewatering well dewatering device
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN110042830A (en) A kind of concrete fills out the stake of core perforated pipe and construction method
CN101182708B (en) Covering type composite vacuum electroosmosis, method for forced ramming reinforcing foundation and device thereof
CN106638646B (en) A kind of construction method of open caisson secondary bottom sealing structure
CN105696611A (en) Foundation pit dewatering device for sand layer with high water permeability
CN105840216A (en) Underground space exploitation excavation construction method
CN105926396B (en) A kind of town road subgrade drainage structure and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170901