CN107119512A - The construction method that a kind of sleeper movement is changed - Google Patents

The construction method that a kind of sleeper movement is changed Download PDF

Info

Publication number
CN107119512A
CN107119512A CN201710442694.8A CN201710442694A CN107119512A CN 107119512 A CN107119512 A CN 107119512A CN 201710442694 A CN201710442694 A CN 201710442694A CN 107119512 A CN107119512 A CN 107119512A
Authority
CN
China
Prior art keywords
sleeper
ballast
plate body
cleaning plate
swing arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710442694.8A
Other languages
Chinese (zh)
Inventor
陈仰江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710442694.8A priority Critical patent/CN107119512A/en
Publication of CN107119512A publication Critical patent/CN107119512A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers
    • E01B29/09Transporting, laying, removing or renewing sleepers under, or from under, installed rails
    • E01B29/10Transporting, laying, removing or renewing sleepers under, or from under, installed rails for inserting or removing sleepers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention discloses the construction method that a kind of movement of sleeper is changed, ballast cleaning is cleared up first with ballast cleaning suspension member, clamp system is driven to open clip tooth again, it is engaged after sleeper and extracts out, rotated by adjusting swing hydraulic pressure oil cylinder, the sleeper of extraction is uniformly put in order in position to be recycled, new sleeper is placed into the sleeper position replaced according to mode of operation contrary to the above, snap fit part is installed;Adjustment ballast cleaning plate body is parallel with sleeper, and the backfilling working for carrying out ballast aggregate is moved forward and backward by ballast cleaning plate body, that is, completes the whole of sleeper and substitute work.The present invention requires that construction space small, operation is quick and convenient, and the cleaning for substituting sleeper and ballast aggregate and backfilling working are continuously finished by plant equipment, it is not necessary to artificial force, it is ensured that the construction safety of operating personnel;Labour is greatlyd save, so as to save cost, the time for changing a sleepers is no more than 1 minute, has saved the engineering time, has improved efficiency.

Description

The construction method that a kind of sleeper movement is changed
Technical field
The present invention relates to the construction method that a kind of movement of sleeper is changed, belong to construction of railways technical field.
Background technology
In rail yard work progress, to the Promotion Transformation of existing equipment into trend of the times, wherein in order to increase line The effective length on road, conventional way is that the type concrte sleeper of sleeper II is replaced with into III a type concrte sleepers at present.Due to pillow Wooden amount and volume are larger, using traditional artificial construction's method, and completion list can just be substituted with 4-5 minutes by generally requiring 6 people Root sleeper, and due between Railways Stations field wire construction space it is narrow and small, workmen can excessively cause the scope of operation compacter, easily make Into personal damage, at the same such as railway main points construct, if the engineering time is long, can directly result in railways train operation it is late and delay, Serious can also bring very big potential safety hazard.
The content of the invention
In view of the above-mentioned problems of the prior art, saving labour, space-consuming it is an object of the invention to provide one kind It is small, ensure that operating personnel safety, can save the engineering time sleeper movement change construction method.
To achieve the above object, the technical solution adopted by the present invention is:The construction method that a kind of sleeper movement is changed, including Following steps:
Step one:Ballast cleaning suspension member is installed on the swing arm of backhoe loader by the connection member at rear portion, adjusted Whole ballast cleaning plate body is parallel with sleeper, symmetrical fluting is stuck on two parallel orbits, passes through backhoe loader Swing arm drive ballast cleaning plate body move forward and backward carry out ballast aggregate cleaning work;
Step 2:After cleaning out, swing arm drives ballast cleaning plate body to be upturned, the oil cylinder rotation of driving swing hydraulic pressure, Sleeper fixture is rotated to the position parallel with sleeper, is placed in above sleeper, driving clamp system opens clip tooth, passes through swing arm Control sleeper fixture is moved downward, and the clip tooth of two pairs of geometrical clamps is located at sleeper both sides respectively, clip tooth occlusion is clamped sleeper, and The swing arm of control backhoe loader drives sleeper fixture to translate sleeper to one end, until sleeper is extracted out;
Step 3:After sleeper is extracted out, rotated by adjusting swing hydraulic pressure oil cylinder, the sleeper of extraction is uniformly put in order and treated back The position of receipts, unclamps clip tooth;
Step 4:New sleeper is placed into the sleeper position replaced according to mode of operation contrary to the above, pacified Install snap fit part;Adjustment ballast cleaning plate body is parallel with sleeper, and the swing arm for passing through backhoe loader drives ballast cleaning plate body The backfilling working for carrying out ballast aggregate is moved forward and backward, that is, completes the whole of sleeper and substitutes work.
As the preferred scheme of the above method, the clamp system is clamping cylinder, the clamping cylinder two ends respectively with The rear end connection of two clip tooths of geometrical clamp.
Further, the lower end of the clip tooth is additionally provided with sleeper anti-slip structure.
The present invention requires that construction space small, operation is quick and convenient, is continuously finished by plant equipment and substitutes sleeper and road The cleaning of slag and backfilling working, it is not necessary to artificial force, it is ensured that the construction safety of operating personnel;Greatly save labour, So as to save cost, the time for changing a sleepers is no more than 1 minute, has saved the engineering time, has improved efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the front view of the present invention;
Fig. 3 be in Fig. 2 A-A to sectional view;
In figure, 1. ballast cleaning plate bodys, 11. flutings, 12. connection members, 2. swing hydraulic pressure oil cylinders, 3. sleeper fixtures, 31. Fixture mount, 32. geometrical clamps, 321. clip tooths, 33. clamping cylinders, 34. sleeper anti-slip structures.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
It is illustrated as the equipment that the present invention is used, including ballast cleaning plate suspension member, swing hydraulic pressure oil cylinder 2 and sleeper fixture 3, the ballast cleaning suspension member includes ballast cleaning plate body 1, and the front end of ballast cleaning plate body 1 is arranged with two wide with track The adaptable fluting 11 of degree;The swing hydraulic pressure oil cylinder 2 is located at the lower surface of ballast cleaning plate body 1, and swing hydraulic pressure oil cylinder 2 can be with 360 ° of rotations, central shaft is perpendicular to the surface of ballast cleaning plate body 1;The sleeper fixture 3 includes fixture mount 31, fixture mount 31 are located at the lower end of swing hydraulic pressure oil cylinder 2, and the both sides of fixture mount 31 are arranged with two pairs of geometrical clamps 32, and the geometrical clamp 32 leads to respectively Cross clamp system driving.
The ballast cleaning plate suspension member of the present invention can customize connected mode according to the structure of existing backhoe loader.Use When, ballast cleaning suspension member is installed on the swing arm of backhoe loader by the connection member 12 at rear portion, ballast cleaning is adjusted Plate body 1 is parallel with sleeper, symmetrical fluting 11 is stuck on two parallel orbits, passes through the swing arm band of backhoe loader Dynamic ballast cleaning plate body 1 moves forward and backward the cleaning work for carrying out ballast aggregate;After cleaning out, swing arm drive ballast cleaning plate body 1 to Upper to tilt, driving swing hydraulic pressure oil cylinder 2 is rotated, and sleeper fixture 3 is rotated to the position parallel with sleeper, is placed in above sleeper, Driving clamp system opens clip tooth 321, controls sleeper fixture 3 to move downward by swing arm, makes the clip tooth of two pairs of geometrical clamps 32 321 are located at sleeper both sides respectively, clip tooth 321 is clamped sleeper, and the swing arm of control backhoe loader drives sleeper fixture 3 will pillow Wood is translated to one end, until sleeper is extracted out;After sleeper is extracted out, rotated by adjusting swing hydraulic pressure oil cylinder 2, by the sleeper of extraction Uniformly put in order in position to be recycled, while new sleeper to be placed into the sleeper replaced according to operation contrary to the above Position, installs snap fit part;Adjustment ballast cleaning plate body 1 is parallel with sleeper, and the swing arm for passing through backhoe loader drives ballast aggregate Cleaning plate body 1 moves forward and backward the backfilling working for carrying out ballast aggregate, that is, completes the whole of sleeper and substitute work.
It is preferred that, the clamp system include clamping cylinder 33, the two ends of clamping cylinder 33 respectively with geometrical clamp 32 The rear end connection of two clip tooths 321.Flexible opening and stepping up for clip tooth 321 can be controlled by control clamping cylinder 33.
It is preferred that, in order to prevent that sleeper is inadvertently fallen off during sleeper is clamped, the lower end of geometrical clamp 32 is provided with pillow Wooden anti-slip structure 34, sleeper anti-slip structure 34 has certain roughness, can play spacing effect, can steadily press from both sides Handle sleeper.

Claims (3)

1. the construction method that a kind of sleeper movement is changed, it is characterised in that comprise the following steps:
Step one:Ballast cleaning suspension member is installed on the swing arm of backhoe loader by the connection member (12) at rear portion, adjusted Whole ballast cleaning plate body (1) is parallel with sleeper, make symmetrically to slot (11) be stuck on two parallel orbits, pass through digging type The swing arm of loading machine drives ballast cleaning plate body (1) to move forward and backward the cleaning work for carrying out ballast aggregate;
Step 2:After cleaning out, swing arm drives ballast cleaning plate body (1) to be upturned, driving swing hydraulic pressure oil cylinder (2) rotation Turn, sleeper fixture (3) is rotated into the position parallel with sleeper, be placed in above sleeper, driving clamp system makes clip tooth (321) Open, control sleeper fixture (3) to move downward by swing arm, the clip tooth (321) of two pairs of geometrical clamps (32) is located at sleeper two respectively Side, makes clip tooth (321) occlusion clamp sleeper, and control the swing arm of backhoe loader to drive sleeper fixture (3) by sleeper to one Hold shifting level with both hands, until sleeper is extracted out;
Step 3:After sleeper is extracted out, rotated by adjusting swing hydraulic pressure oil cylinder (2), the sleeper of extraction is uniformly put in order and treated back The position of receipts, unclamps clip tooth (321);
Step 4:New sleeper is placed into the sleeper position replaced according to mode of operation contrary to the above, installed Snap fit part;Adjustment ballast cleaning plate body (1) is parallel with sleeper, and the swing arm for passing through backhoe loader drives ballast cleaning plate body (1) backfilling working for carrying out ballast aggregate is moved forward and backward, that is, completes the whole of sleeper and substitutes work.
2. the construction method that sleeper movement according to claim 1 is changed, it is characterised in that the clamp system is clamping Oil cylinder (33), rear end of clamping cylinder (33) two ends respectively with two clip tooths (321) of geometrical clamp (32) is connected.
3. the construction method that sleeper movement according to claim 1 is changed, it is characterised in that under the clip tooth (321) End is provided with sleeper anti-slip structure (34).
CN201710442694.8A 2017-06-13 2017-06-13 The construction method that a kind of sleeper movement is changed Pending CN107119512A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710442694.8A CN107119512A (en) 2017-06-13 2017-06-13 The construction method that a kind of sleeper movement is changed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710442694.8A CN107119512A (en) 2017-06-13 2017-06-13 The construction method that a kind of sleeper movement is changed

Publications (1)

Publication Number Publication Date
CN107119512A true CN107119512A (en) 2017-09-01

Family

ID=59729970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710442694.8A Pending CN107119512A (en) 2017-06-13 2017-06-13 The construction method that a kind of sleeper movement is changed

Country Status (1)

Country Link
CN (1) CN107119512A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055837A (en) * 2018-01-19 2019-07-26 山东迈克拉克工程机械有限公司 Crossties of the track more changing device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012067576A1 (en) * 2010-11-19 2012-05-24 Rosenqvist Rail Ab Manually operated arrangement
CN203174449U (en) * 2013-04-15 2013-09-04 昆明中铁大型养路机械集团有限公司 Sleeper fixture
CN204080568U (en) * 2014-09-04 2015-01-07 昆明学院 A kind of sleeper handling apparatus
CN106065550A (en) * 2016-07-29 2016-11-02 徐州徐工特种工程机械有限公司 A kind of sleeper replacement facility
CN106758592A (en) * 2017-03-08 2017-05-31 北京同和时代科技有限公司 A kind of sleeper grabbing device and railway roadbed line construction and attending device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012067576A1 (en) * 2010-11-19 2012-05-24 Rosenqvist Rail Ab Manually operated arrangement
CN203174449U (en) * 2013-04-15 2013-09-04 昆明中铁大型养路机械集团有限公司 Sleeper fixture
CN204080568U (en) * 2014-09-04 2015-01-07 昆明学院 A kind of sleeper handling apparatus
CN106065550A (en) * 2016-07-29 2016-11-02 徐州徐工特种工程机械有限公司 A kind of sleeper replacement facility
CN106758592A (en) * 2017-03-08 2017-05-31 北京同和时代科技有限公司 A kind of sleeper grabbing device and railway roadbed line construction and attending device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055837A (en) * 2018-01-19 2019-07-26 山东迈克拉克工程机械有限公司 Crossties of the track more changing device

Similar Documents

Publication Publication Date Title
CA1044953A (en) Driving of rail clips in making a railway rail-and-fastening assembly
CN106592351B (en) Pillow device and method are changed in a kind of overhaul
CN103696335B (en) Railway sleeper replacement vehicle
CN106638179A (en) Railway ballast sleeper bottom excavation device
CN206408469U (en) Pillow equipment is changed in a kind of overhaul
CN107165006A (en) A kind of sleeper transports installation method
CN107119512A (en) The construction method that a kind of sleeper movement is changed
JP3834116B2 (en) Roadbed compaction machine
CN107059510A (en) Fixture is changed in a kind of sleeper movement
CA1109734A (en) Track tamper
CN208749294U (en) A kind of multifunctional drill and pipe canopy mounting device
CN108797238A (en) Efficiently taking off the tiny fragments of stone, coal, etc. changes pillow machine
CN201344041Y (en) Stepping self-moving type bracket
CN107268350A (en) A kind of sleeper transports erecting device
CN2215506Y (en) Drawing out device for screw spike of concrete track sleeper
CN205529718U (en) Multifunctional excavator
CN208668182U (en) A kind of screen scarifier being suitble to narrow work surface
CN204000502U (en) A kind of railway ballast processor that is applicable to the narrow scope of operation
CN216404937U (en) Sleeper replacer
CN215160846U (en) Plateau belt pumping unit moves quick-witted device
CN105350410A (en) Track panel lifting device
CA2267846A1 (en) A machine having a sleeper crib excavator
CN104368574B (en) pneumatic pipeline dredging machine
CN205929084U (en) A perforating device for high -speed railway ballastless track mud pumping disease treatment
CN211849672U (en) Railway screen cleaning equipment for excavator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170901

RJ01 Rejection of invention patent application after publication