CN107116381B - A kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting method - Google Patents

A kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting method Download PDF

Info

Publication number
CN107116381B
CN107116381B CN201710513725.4A CN201710513725A CN107116381B CN 107116381 B CN107116381 B CN 107116381B CN 201710513725 A CN201710513725 A CN 201710513725A CN 107116381 B CN107116381 B CN 107116381B
Authority
CN
China
Prior art keywords
riveting
datum mark
riveting point
workpiece
coordinate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710513725.4A
Other languages
Chinese (zh)
Other versions
CN107116381A (en
Inventor
王仲奇
常正平
赵海涛
康永刚
景泽旺
张津铭
王志敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Dagong Xuhang Electromagnetic Technology Co.,Ltd.
Original Assignee
Northwestern Polytechnical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwestern Polytechnical University filed Critical Northwestern Polytechnical University
Priority to CN201710513725.4A priority Critical patent/CN107116381B/en
Publication of CN107116381A publication Critical patent/CN107116381A/en
Application granted granted Critical
Publication of CN107116381B publication Critical patent/CN107116381B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • B23Q3/02Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
    • B23Q3/06Work-clamping means
    • B23Q3/062Work-clamping means adapted for holding workpieces having a special form or being made from a special material
    • B23Q3/065Work-clamping means adapted for holding workpieces having a special form or being made from a special material for holding workpieces being specially deformable, e.g. made from thin-walled or elastic material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

A kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting method.In thin-walled testpieces positioning clamping device, by the sliding of guide rail slide block in positioning mechanism, it can adapt to the case where automatic drill riveter different cards spacing between plates changes, improve the scope of application and flexibility of clamping device.Adjustment mechanism can be mobile by sliding block, for positioning the testpieces of different length.The clamping device on top passes through the type and number for adjusting clamp system, to clamp the testpieces of different shape and width.Thin-walled testpieces automatic Drilling/Riveting clamping device structure is simple, easy to operate, and compared with the riveting of man-hour manually hand-held formula, ± 0.05mm can be increased to from range estimation precision by boring riveting position precision, and efficiency improves 2 times or more.The configuration of the present invention is simple can adapt to different testpieces shapes, be effectively reduced the workload of operator, have stronger adaptability and reconfigurability.

Description

A kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting method
Technical field
It is specifically a kind of to determine for thin-walled testpieces automatic Drilling/Riveting the present invention relates to aircraft manufacturing and technological equipment field Position clamping device and brill rivetting method.
Background technique
Thin-wall construction is the important component of aircraft body structure, such as wing, fuselage and empennage, thin-wall construction are main Assembly is realized by riveting, and assembling process relates generally to each process such as positioning, clamping, drilling and riveting.With Automated water Flat raising is widely applied in thin-wall part assembly using automatic drill riveter as the automation equipment of representative.When new material, New construction starts in type in application, the automatic Drilling/Riveting engineer testing of small size testpieces must be carried out, to determine that technique is joined Several and correlated performance.Current thin-walled testpieces riveting is main to be carried out by hand-held, there are heavy workload, is easily introduced artificial mistake The deficiencies of difference and positioning accuracy are poor and safety problem.
The patent of invention of Patent No. 201310287667.X discloses a kind of small peripheral frame suitable for aircraft target ship assembly Clamper, the clamper can realize that siding quickly and accurately assembles, and be chiefly used in Set and Positioning and the riveting of large scale siding, but To the positioning and clamping of small size thin-walled testpieces, there are limitations.The patent of invention of Patent No. CN201320613580.2 discloses A kind of fastener clamp device for automatic electromagnetic riveting equipment can reduce the cost of automatic Drilling/Riveting riveting, but the clamping Device cannot be used for the clamping of thin-wall part, can not also improve and bore riveting precision and efficiency.Patent No. CN201110155803.0's Patent of invention discloses the agitating friction riveting set and clinching method of a kind of light metal plate, makes rivet and is riveted between plate Mechanical interlocked, the mechanical connection of realization light metal alloys plate is formed, but the riveting set cannot be used for thin-walled testpieces Automatic Drilling/Riveting.Liang Ying etc. is in document the automatic Drilling/Riveting Technology of large thin-wall cabin " study ", Aerospace manufacturing technology, and 2013,10 (8): positioning system of the rocket cabin in automatic Drilling/Riveting is had studied in 38-46, send nail system, motion structure and control system, But said mechanism and system only account for large size, thin walled structure/cabin in automatic Drilling/Riveting the problems such as Set and Positioning.Total comes It says, still lacks the method and clamping device for being directed to small size thin-walled testpieces automatic Drilling/Riveting both at home and abroad at present, riveted in thin-wall part When test, carried out yet by hand-held.On the one hand, due to the factor of manual operation, the clamping that testpieces cannot be stable is caused Riveting quality fluctuation is larger, a degree of deviation caused by theoretically rivet point-blank is understood because of hand-held reason, and The position of drilling and riveting fully relies on worker and is determined by experience and visual observation, and position precision is difficult to ensure;On the other hand, Man-hour manually hand-held carries out the automatic Drilling/Riveting of testpieces, and great work intensity, working efficiency is low, therefore need to realize testpieces mechanization and oneself The brill riveting of dynamicization improves efficiency.
Summary of the invention
To overcome the position precision of drilling and riveting existing in the prior art to be difficult to ensure, great work intensity and work effect The low deficiency of rate, the invention proposes a kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting methods.
The present invention includes peripheral frame component, positioning mechanism and testpieces clamping device, and the positioning mechanism has two groups, respectively Positioned at the both ends of the upper surface of the peripheral frame component, it is mounted on two guide rails of positioning mechanism by guide rod sliding block, institute Two guide rails stated are separately fixed at the upper surface of two long sides of peripheral frame;Two groups of testpieces clamping devices are set in respectively On the guide rod of the positioning mechanism.The clamping device is divided into plane clamping device and curved surface according to the shape of clamped workpiece Clamping device.
The peripheral frame component includes peripheral frame, a pair of of peripheral frame package traces, four peripheral frame positioning mechanisms and four guide rail slide blocks. A pair of of peripheral frame package traces are fixed on the peripheral frame lower surface, and are located at two short sides of the peripheral frame.In the pair of peripheral frame component It is each on guide rail that there are two guide rail slide blocks.Four peripheral frame positioning mechanisms are separately fixed on each guide rail slide block.
The peripheral frame positioning mechanism includes connecting plate, grip block and mandril.The grip block is fixed on the following table of connecting plate There is "u"-shaped groove in face on the grip block, and in the "u"-shaped groove side, the inner surface of siding has the rubber cushion blocks for protruding the surface, The inner surface of another sidewall paneling of "u"-shaped groove has the screw hole for installing mandril;The rubber cushion blocks and the screw hole Coaxially.Mandril spinning enters in the screw hole, and makes the end face for being located at the rubber jacking block of the mandril one end and the rubber cushion blocks End face is corresponding;There is the through-hole of installation handle in the circumferential surface of the mandril other end.Connection is distributed on the connecting plate The connecting plate is fixed on the lower surface of each guide rail slide block by bolt by hole.
The positioning mechanism includes two guide rails, two guide rods, two fixing seats, two fulcrum bearings and four guide rods Sliding block.The guide rod sliding block is divided into two groups, and two groups of guide rod sliding blocks are separately mounted on described two guide rails.Institute Two fixing seats and two fulcrum bearings stated are installed on the guide rail, and make two fixed seatings in the one of the peripheral frame Side makes two fulcrum bearings be located at the other side of the peripheral frame.One end of two guide rods is placed in table in the fulcrum bearing In the circular groove in face, the other end is fixed on the fixing seat by key;Two are respectively installed on each guide rod A fixing card, and each fixing card is made to be located at the inside of the fixing seat and the inside of fulcrum bearing, it is fixed by the fixing card Relative position between the guide rod and fixing seat or fulcrum bearing to achieve the effect that fixed guide pole, while can also limit Relative position between the fixed fixing and holding mechanism and fixing seat or fulcrum bearing.
The plane clamping device includes grip slipper 17, clamping mandril and rotational handle.The grip slipper is rectangular block Groove for clamping workpiece is arranged at shape, the top of the grip slipper, keeps the top of the grip slipper " U "-shaped;Three of the groove Inner surface is plane.There is the tapped through hole for penetrating through the notch board in the upper surface of the grip slipper, for installing clamping mandril. There is the mounting hole of guide rod in the lower part of the grip slipper.The clamping mandril position threaded rod, spinning enter in the tapped through hole, And the clamping mandril is made to have rubber pad one end to be located in the groove;The other end of the clamping mandril is equipped with rotational handle again.
The curved surface clamping device includes curved surface grip slipper, round end mandril, outer location nut and interior fastening nut.It is described Curved surface grip slipper be bulk, the curved surface grip slipper upper surface have protrude the surface grip block, the inner surface of the grip block and Outer surface is arc;The type face block on the surface is also protruded in the curved surface grip slipper upper surface;The grip block and type face block It is located at two symmetrical side edges of the curved surface grip slipper upper surface.Have on the grip block for installing the round end top The strip through-hole of bar, the length direction of grip block of length direction and place of the strip through-hole are consistent.The round end mandril dress Enter in the strip through-hole, and the sphere end of the round end mandril is made to be located at the inside of the grip block, it is corresponding with the type face block.
The interior surface curvature of the grip block is 1/80, interior surface curvature 1/100, and the floor projection of the grip block For rectangle;Type face block is spherical in 1/4, and the radius of the type face block is 15mm.
It is set with outer location nut and interior fastening nut on the round end mandril, and being located at the outer location nut should The outside of grip block makes the interior fastening nut be located at the inside of the grip block.
The detailed process of automatic Drilling/Riveting proposed by the present invention using the thin-walled testpieces positioning clamping device is:
Step 1: determining the initial position of riveting point on workpiece.
Initial O-XYZ coordinate system is determined on workpiece, and the origin of the O-XYZ coordinate system is made to be located at the several of the workpiece What center.
According to ten nail double riveting deformation test requirements, datum mark D1 is set in the first quartile of workpiece, in workpiece Datum mark D2 is set in the second quadrant.Using the D1 and D2 as brill riveting as the datum mark for determining riveting point position.
The center of the first datum mark D1 away from the distance at workpiece X-direction edge be W1, the edge away from workpiece Y-direction away from From for L1;The center of the second datum mark D2 is also W1 away from the distance at workpiece -X direction edge, away from workpiece Y-direction edge away from From also be L1.Using the center of the first datum mark D1 and the center of the second datum mark D2 as the benchmark of determining riveting point position Point.
Riveting point is determined on the workpiece.The quantity of the riveting point is determined according to design requirement.Riveting point is equal It is divided into two rows, and two rows of riveting points is made to be located at the two sides of X-axis in the X0Y coordinate system;First row riveting point is evenly arranged on institute Between the first datum mark D1 and the second datum mark D2 stated;Center in second row riveting point respectively with each riveting of first row The center of contact is corresponding.The center of the first row riveting point is L1 away from the distance at the edge of the Y-direction of workpiece, described The distance at the edge of -Y direction of the center of second row riveting point away from workpiece is also L1.Center between adjacent riveting point is away from basis Design requirement determines.
Step 2: installation peripheral frame positioning mechanism.
Step 3: positioning and clamping workpiece.
Step 4: the initial position of riveting point on amendment workpiece.
The detailed process of riveting point initial position is on the amendment workpiece:
Step 1: the Cutter coordinate system O'-X'Y'Z' of boring and riveting machine is adjusted.Make the Cutter coordinate system O'-X'Y' of the boring and riveting machine The origin of Z' is overlapped with the origin for determining initial O-XYZ coordinate system on workpiece and change in coordinate axis direction is identical.
Step 2: coordinate letter of the riveting point initial position in the Cutter coordinate system O'-X'Y'Z' of the boring and riveting machine is extracted Breath.
Extracted by CATIA software and record the datum mark initial coordinate information and each riveting point initial position Coordinate information.
The initial coordinate information of extracted datum mark isIt include the first datum mark D1 and the second base The initial coordinate information of D2 on schedule;D therein is workpiece datum mark, and n indicates n-th of datum mark, n=1,2 ..., l.
The coordinate information of extracted each riveting point initial position isR therein is the riveting on workpiece Point, m indicate m-th of riveting point, m=1,2 ..., k.
Step 3: amendment coordinate information.
The coordinate information include the first datum mark D1 and the second datum mark D2 coordinate information and each riveting point at the beginning of The coordinate information of beginning position.
Specifically:
Correct datum mark
I datum mark D1 amendment:
A, the determination of datum mark D1 deviation.
The bit central of boring and riveting machine is moved since design determination is to knife point M, after the mobile w1 in the direction-X ', along-Y ' To mobile L1, boring and riveting machine obtains coordinate position of the boring and riveting machine bit central t in current Cutter coordinate system O'-X'Y'Z' automatically (Xt,Yt,Zt), and the changing coordinates (X for the boring and riveting machine bit central t that will acquiret,Yt,Zt) with the initial seat of the first datum mark D1 Mark informationIt compares, determines grid deviation value between the twoIt is inclined in the coordinate DifferenceIn, because the deviation of Z-direction can adaptively be adjusted by boring and riveting machine, without amendment, therefore Z-direction deviation is taken Value is 0.
B, the amendment of datum mark D1 coordinate.
Judge whether the deviation of the initial coordinate of datum mark D1 meetsWherein δ is to allow Error.
If not satisfied, then by the position deviation of obtained datum mark D1In deviation be included in base respectively D1 initial coordinate on scheduleIn, make the revised coordinate of datum mark D1If Meet, then the initial coordinate of datum mark D1 meets design requirement, without amendment.
The amendment of II datum mark D2
A, the determination of datum mark D2 deviation.
The bit central of boring and riveting machine is moved since design determination is to knife point M, along the mobile w1+u distance in the direction-X ' Afterwards, along-Y ' Xiang Yidong L1, boring and riveting machine obtains the present co-ordinate position (X of boring and riveting machine bit central t automaticallyt,Yt,Zt);U therein Center between D1 and D2 away from.
Present co-ordinate position (the X for the riveter bit central that boring and riveting machine will acquiret,Yt,Zt) initial with the second datum mark D2 Coordinate informationComparison, determines grid deviation value between the twoIn the grid deviation ValueIn, because the deviation of Z-direction can adaptively be adjusted by boring and riveting machine, without correcting, therefore Z-direction deviation value It is 0.
B, the amendment of datum mark D2 coordinate.
The modification method of the datum mark D2 coordinate is identical as the method for said reference point D1 coordinate modification.
In the amendment to each datum mark coordinate, if the grid deviation of the first datum mark D1 and the second datum mark D2 are equal MeetIt then can directly be riveted, go to step 5;Otherwise, riveting point coordinate is repaired Just.
The amendment of III riveting point grid deviation
According to design requirement, the distance between datum mark and adjacent riveting point are equal to rivet pitch.It is inclined because of riveting point Z-direction Difference can adaptively be adjusted by boring and riveting machine, therefore, the deviation of Z-direction without amendment, only need to X to and the deviation of Y-direction repair Just.
A, the determination of riveting point grid deviation.
It is i to the riveting point r number consecutively between the first datum mark D1 and the second datum mark D2, is denoted as ri, i= 1......k/2, k therein is the number of riveting point.
Each riveting point between the first datum mark D1 and the second datum mark D2 is successively labeled as r1、r2…rk/2, and advise The fixed riveting point r adjacent with the first datum mark D11For the first riveting point.
Calculate the deviation of the first datum mark D1With the deviation of the second datum mark D2 Between difference, obtain the deviation increment △ between two datum marks.
The deviation increment △ is divided into 1+k/2 parts, obtains the average increment of each riveting point.By obtained each riveting The average increment of point increases respectively to each riveting point r1、r2…rk/2Coordinate value on to get arrive each riveting point r1、r2…rk/2It repairs Coordinate value after just.
In conjunction with the grid deviation value of the first datum mark D1 and the second datum mark D2, the first datum mark D1 and the second datum mark D2 Between riveting point i X to grid deviation value beCoordinate of the riveting point i in Y-direction Deviation is
B, the amendment of riveting point grid deviation.
By riveting point riX to grid deviation valueWith Y-direction grid deviation valueIt is included in riveting point r respectivelyiInitial coordinateIn, then revised seat Mark
The process for repeating the amendment riveting point initial coordinate, is successively modified the initial coordinate of each riveting point, directly To the amendment for completing all riveting point initial coordinates, the position coordinates of all riveting points are obtained.
Step 5: workpiece automatic Drilling/Riveting.Implement automatic Drilling/Riveting according to the position coordinates of revised riveting point.
Step 6: after riveting, boring and riveting machine is returned to original state, workpiece undercarriage, completes the brill riveting to workpiece.
The present invention is made of peripheral frame component, positioning mechanism, testpieces clamping device.Wherein, peripheral frame component by main body frame, Y-direction guide rail, X direction guiding rail form, wherein each two of Y-direction guide rail, X direction guiding rail;Positioning mechanism includes support location structure and clamping Structure;Testpieces clamping device includes guiding device and clamp system, and wherein guiding device is supported by pass positioning seat, load The compositions such as seat, band groove guide rod, positioning key and axial restraint set, clamp system are suitable for different clampings requirement by a series of Clamping head composition.Positioning mechanism and testpieces clamping device all pass through bolt and connect with peripheral frame component.The configuration of the present invention is simple, It can adapt to different testpieces shapes, be effectively reduced the workload of operator, there is stronger adaptability and restructural Property.
Compared with prior art, the beneficial effect that the present invention obtains is:
By the sliding of guide rail slide block in positioning mechanism, it can adapt to the feelings of automatic drill riveter different cards spacing between plates variation Condition improves the scope of application and flexibility of clamping device;Adjustment mechanism can be mobile by sliding block, for positioning different length Testpieces;The clamping device on top, can be by the type and number of adjusting clamp system, to clamp the examination of different shape and width Test part.Thin-walled testpieces automatic Drilling/Riveting clamping device structure is simple, easy to operate, compared with the riveting of man-hour manually hand-held formula, bores riveting Position precision can be increased to ± 0.05mm from range estimation precision, and efficiency improves 2 times or more.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram of peripheral frame;
Fig. 3 is the structural schematic diagram of positioning mechanism;
Fig. 4 is the cooperation schematic diagram of positioning mechanism and locating clamp plate;
Fig. 5 is the cooperation schematic diagram of fixing card and guide rod, fixing seat;
Fig. 6 is the structural schematic diagram of guiding mechanism;
Fig. 7 is the structural schematic diagram of fixing seat;
Fig. 8 is the structural schematic diagram of fulcrum bearing;
Fig. 9 is the structural schematic diagram of plane clamping device, wherein 9a is side view;9b is the signal of clamping plane testpieces Figure;
Figure 10 is the structural schematic diagram of curved surface clamping device, wherein 10a is main view;10b is side view;10c is section view Figure;10d is clamping surface experimental part schematic diagram;
Figure 11 is the structural schematic diagram of thin-walled testpieces;
Figure 12 is that brill riveting point of the invention determines flow chart;In figure:
1. peripheral frame positioning mechanism;2. guide rail slide block;3. peripheral frame;4. guide rail;5. guiding mechanism;6. testpieces clamping device; 7. grip block;8. mandril;9. connecting plate;10. fixing card;11. fixing seat;12. flat key;13. guide rod;14. fulcrum bearing;15. Rotational handle;16. clamping mandril;17. grip slipper;18. outer location nut;Fastening nut in 19.;20. round end mandril;21. bent Face grip slipper;22. flat test part;23. surface experimental part;24. locating clamp plate.
Specific embodiment
The present embodiment is a kind of 7075-T651 aluminum alloy thin wall pieces automatic Drilling/Riveting test method, to determine the thin-wall part riveting Deformation caused by termination process.Since thin-walled testpieces shape, size are not fixed, in order to not only convenient and efficient but also accurately carry out thin-walled Part riveting test is tested using the positioning clamping device that the present embodiment proposes.
The thin-walled testpieces automatic Drilling/Riveting clamping device includes peripheral frame component, positioning mechanism and testpieces clamping device, The positioning mechanism has two groups, is located at the both ends of the upper surface of the peripheral frame component, is pacified by guide rod sliding block 22 On the guide rail 4 of the positioning mechanism;Testpieces clamping device 6 described in two groups is set in leading for each positioning mechanism To on bar.The testpieces clamping device is divided into plane clamping device and curved surface clamping device according to the shape of clamped workpiece.
The peripheral frame component includes that peripheral frame 3, a pair of of peripheral frame package traces, four peripheral frame positioning mechanisms 1 and four guide rails are sliding Block 2.The peripheral frame 3 is the frame section of rectangle, and a pair of of peripheral frame package traces are fixed on the peripheral frame lower surface, and are located at the peripheral frame two At a short side.It is each in the pair of peripheral frame package traces that there are two guide rail slide blocks 2.Four peripheral frame positioning mechanisms 1 are fixed respectively On each guide rail slide block.The peripheral frame positioning mechanism 1 includes connecting plate 9, grip block 7 and mandril 8.The grip block is fixed There is "u"-shaped groove on the lower surface of connecting plate, the grip block, the inner surface of siding, which has, in the "u"-shaped groove side protrudes the table The rubber cushion blocks in face have the screw hole for installing mandril in the inner surface of another sidewall paneling of the "u"-shaped groove;The rubber pad Block and the screw hole are coaxial.8 spinning of mandril enters in the screw hole, and make positioned at the mandril one end rubber jacking block end face with The end face of the rubber cushion blocks is corresponding;There is the through-hole of installation handle in the circumferential surface of the mandril other end.In the connection Connecting hole is distributed on plate 9, which is fixed on to the lower surface of each guide rail slide block 2 by bolt.
The positioning mechanism includes two 4, two, guide rail, 11, two fulcrum bearings 14 and four of fixing seat of guide rod 13, two A guide rod sliding block 22.Two guide rails 4 are separately fixed at the upper surface of 3 two long sides of peripheral frame.The guiding Bar sliding block 22 is divided into two groups, and two groups of guide rod sliding blocks are separately mounted on described two guide rails.Two fixations Seat 11 and two fulcrum bearings 14 are installed on the guide rail 4, and make two fixed seatings in the side of the peripheral frame, make two Fulcrum bearing is located at the other side of the peripheral frame.One end of two guide rods 13 is placed in the circular arc of the fulcrum bearing upper surface In connected in star, the other end is fixed in the fixing seat 11 by key;It is fixed there are two being set on each guide rod Card 10, and each fixing card is made to be located at the inside of the fixing seat and the inside of fulcrum bearing, by the fixing card, fixes this and lead To the relative position between bar and fixing seat or fulcrum bearing, to achieve the effect that fixed guide pole 13, while can also limit Relative position between the fixing and holding mechanism and fixing seat or fulcrum bearing.
The plane clamping device includes grip slipper 17, clamping mandril 16 and rotational handle 15.The grip slipper is square Shape is blocky, and there is the groove for clamping workpiece on the top of the grip slipper, keeps the top of the grip slipper " U "-shaped;The groove Three inner surfaces are plane.There is the tapped through hole for penetrating through the notch board in the upper surface of the grip slipper, for installing clamping Mandril 16.There is the mounting hole of guide rod 5 in the lower part of the grip slipper.Described 16 threaded rods of clamping mandril, spinning enter described In tapped through hole, and the clamping mandril is made to have rubber pad one end to be located in the groove;The other end dress of the clamping mandril again There is rotational handle 15.
The curved surface clamping device includes curved surface grip slipper 21, round end mandril 20, outer location nut 18 and interior fastening spiral shell Mother 19.The curved surface grip slipper 21 is bulk, which has the grip block for protruding the surface, the grip block The inner surface and the outer surface be arc;The type face block on the surface is also protruded in the curved surface grip slipper upper surface;The clamping Plate and type face block are located at two symmetrical side edges of the curved surface grip slipper upper surface.The interior surface curvature of the grip block It is 1/80, interior surface curvature 1/100, and the floor projection of the grip block is rectangle;Type face block is spherical in 1/4, should The radius of type face block is 15mm.There is the strip through-hole for installing the round end mandril 20 on the grip block, the strip through-hole Length direction it is consistent with the length direction of the grip block at place.The round end mandril 20 is packed into the strip through-hole, and makes this The sphere end of round end mandril is located at the inside of the grip block, corresponding with the type face block.It is set on the round end mandril 20 There are outer location nut 18 and interior fastening nut 19, and the outer location nut is made to be located at the outside of the grip block, makes described interior tight Gu nut is located at the inside of the grip block.
In the present embodiment, peripheral frame positioning mechanism 1 is bolted with lower guide sliding block 2, is being led by adjusting slider The distance between two positioning mechanisms of position change on rail, to adapt to different snap-gauge types;Upper/lower guide passes through with peripheral frame 3 It is bolted;Guiding mechanism is connect by bolt with upper rall sliding block;Testpieces clamping device passes through groove and guiding mechanism 5 Guide rod 13 be connected, and can be free to slide along guide rod.
Attached drawing 2 is peripheral frame schematic diagram, and attached drawing 3 is guide rail, slide block schematic diagram, the wherein big ting model one of upper and lower rails sliding block It causes, for upper and lower rails in addition to length is different, other parameters are consistent.Attached drawing 4 is positioning mechanism structure, and wherein grip block 7 is localization machine The primary structure of structure, lower section and snap-gauge contact portion are processed as column, make stress when can be in different angles with snap-gauge groove Direction is used to clamping positioning mechanism perpendicular to groove floor, mandril 8 and handle 9.Attached drawing 5 is fixing card 10, there are two types of purposes, One is the relative position of fixed guide pole 13 and fixing seat 11, to achieve the effect that fixed guide pole 13;Secondly being fixing clamp The relative position of mechanism Yu guide rod 13 is held, to achieve the effect that fixing and holding mechanism.Fig. 6 is that guiding mechanism is integrally illustrated Figure, fixing seat 11 is connected by bolt with Y-direction slide rail sliding block respectively with fulcrum bearing 14, guide rod 13 pass through flat key 12 and Fixing seat 11 is connected, it is ensured that it can only slide axially, and cannot rotate.Fig. 7 and Fig. 8 is respectively fixing seat 11 and fulcrum bearing 14 detailed structure views.
Fig. 9 is flat test part clamping device, and flat test part plane is placed on clamping device platform 17, by using Clamping mandril 16 is contacted and is clamped with flat test part by rotational handle 15.Wherein, clamping mandril 16 passes through screw thread and clamping machine Structure platform 17 is connected, rotational handle 15 and clamping 16 clearance fit of mandril, and axis is mutually perpendicular to.By rotational handle 15, 16 forward direction of clamping mandril or counter-rotating may be implemented, and then moved up and down relative to clamping device platform 17, reach clamping not Stack pile testpieces and the effect for applying different size clamping force.
Figure 10 is surface experimental part clamping device, and usage mode is similar with flat test part clamping device, wherein round end top Bar 20 can be moved along the through slot on curved surface grip slipper 21, adjust its angle between surface experimental part, guarantee that it can vertically be applied Power realizes fixed 20 position of round end mandril and clamps surface experimental in surface experimental part, outer location nut 18 and interior fastening nut 19 The effect of part.Wherein, outer location nut 18 and interior fastening nut 19 are connected and are revolved with round end mandril 20 by screw thread respectively Turn to clamp.20 top of round end mandril be it is hemispherical, can realize point-to-point clamping with 1/4 sphere on curved surface grip slipper 21, guarantee Clamping force is vertical with surface experimental part.
The present embodiment also proposed a kind of method for carrying out the test of thin-wall part automatic Drilling/Riveting using the positioning clamping device, The thin-wall part is long 220mm × wide 120mm × thickness 2mm 7075-T651 alloy plate material, hereinafter referred to as workpiece.
The present embodiment is ten nail double rivetings, and the rivet used is diameter 5mm, follows closely the flat conehead riveting of 2A10-T4 of long 10mm Nail, according to assembly technology demand, nail hole nominal diameter is 5.08mm, rivet pitch 25mm.
The automatic Drilling/Riveting test method the following steps are included:
Step 1: determining the initial position of riveting point on workpiece.
Initial O-XYZ coordinate system is determined on workpiece, and the origin of the O-XYZ coordinate system is made to be located at the several of the workpiece What center.
According to ten nail double riveting deformation test requirements, the workpiece is divided into four quadrants, wherein in first quartile There is the first datum mark D1, has the second datum mark D2 in the second quadrant;The center of the first datum mark D1 is away from workpiece X-direction edge Distance be W1, the distance at the edge away from workpiece Y-direction is L1;The center of the second datum mark D2 is away from workpiece -X direction edge Distance be also W1, the distance away from workpiece Y-direction edge is also L1.With the center of the first datum mark D1 and the second datum mark The center of D2 is as the datum mark for determining riveting point position.
Riveting point is determined on the workpiece.The quantity of the riveting point is determined according to design requirement.Riveting point is equal It is divided into two rows, and two rows of riveting points is made to be located at the two sides of X-axis in the X0Y coordinate system;First row riveting point is evenly arranged on institute Between the first datum mark D1 and the second datum mark D2 stated;Each hole in second row riveting point respectively with each riveting point of first row Position it is corresponding.The center of the first row riveting point is L1, the second row riveting away from the distance at the edge of the Y-direction of workpiece The distance at the edge of -Y direction of the center of contact away from workpiece is also L1.Center between adjacent riveting point is away from according to design requirement It determines.
In the present embodiment, the quantity of riveting point is 10, and the center between adjacent riveting point is away from for 25mm.
Step 2: installation peripheral frame positioning mechanism.Peripheral frame 3 is navigated into locating clamp plate by the locating rod 8 in location structure On, four handles of peripheral frame pedestal are tightened, positioning of the peripheral frame on locating clamp plate is completed.
Step 3: positioning and clamping workpiece.Plane clamping device is selected according to the shape of the ten double workpiece of nail, by piece-holder Mechanism 6 is moved to the middle position of the guide rod along guide rod, and clamped workpiece is made to be located at 3 middle part of peripheral frame;Workpiece is passed through Rotational handle 15 and clamping mandril 16 in clamping device 6 clamp.
Step 4: the initial position of riveting point on amendment workpiece.
Since workpiece has processing and position error, the physical location of workpiece is deposited with scheduled theoretical position after positioning and clamping In deviation, so that the deviation is eliminated, it need to can determine that final Working position by following several stages.
Step 1: the Cutter coordinate system O'-X'Y'Z' of boring and riveting machine is adjusted.Make the Cutter coordinate system O'-X'Y' of the boring and riveting machine The origin of Z' is overlapped with the origin for determining initial O-XYZ coordinate system on workpiece and change in coordinate axis direction is identical.
Step 2: coordinate letter of the riveting point initial position in the Cutter coordinate system O'-X'Y'Z' of the boring and riveting machine is extracted Breath.
Extracted by CATIA software and record the datum mark initial coordinate information and each riveting point initial position Coordinate information.
The initial coordinate information of extracted datum mark isIt include the first datum mark D1 and the second base The initial coordinate information of D2 on schedule;D therein is workpiece datum mark, and n indicates n-th of datum mark, n=1,2 ..., l.
The coordinate information of extracted each riveting point initial position isR therein is the riveting on workpiece Point, m indicate m-th of riveting point, m=1,2 ..., k.
In the present embodiment, n=2, k=10.
Step 3: amendment coordinate information.
The coordinate information include the first datum mark D1 and the second datum mark D2 coordinate information and each riveting point at the beginning of The coordinate information of beginning position.
Since there are error, the theoretical coordinate values and practical seat of datum mark and riveting point during positioning clamping for workpiece There are deviations between scale value, it is therefore desirable to be modified to initial coordinate values.
Correct datum mark
I datum mark D1 amendment:
1, the determination of datum mark D1 deviation.
The bit central of boring and riveting machine is moved since design determination is to knife point M, after the mobile w1 in the direction-X ', along-Y ' To mobile L1, boring and riveting machine obtains coordinate position of the boring and riveting machine bit central t in current Cutter coordinate system O'-X'Y'Z' automatically (Xt,Yt,Zt), and the changing coordinates (X for the boring and riveting machine bit central t that will acquiret,Yt,Zt) with the initial seat of the first datum mark D1 Mark informationIt compares, determines grid deviation value between the twoIt is inclined in the coordinate DifferenceIn, because the deviation of Z-direction can adaptively be adjusted by boring and riveting machine, without amendment, therefore Z-direction deviation is taken Value is 0.In the present embodiment ,-the w1=15mm ,-L1=25mm.
2, the amendment of datum mark D1 coordinate.
Judge whether the deviation of the initial coordinate of datum mark D1 meetsWherein δ is to allow Error, δ value is 0.5mm in the present embodiment.
If not satisfied, then by the position deviation of obtained datum mark D1In deviation be included in base respectively D1 initial coordinate on scheduleIn, make the revised coordinate of datum mark D1If Meet, then the initial coordinate of datum mark D1 meets design requirement, without amendment.
The amendment of II datum mark D2
1, the determination of datum mark D2 deviation.
The bit central of boring and riveting machine is moved since design determination is to knife point M, along the mobile w1+u distance in the direction-X ' Afterwards, along-Y ' Xiang Yidong L1, boring and riveting machine obtains the present co-ordinate position (X of boring and riveting machine bit central t automaticallyt,Yt,Zt);U therein Center between D1 and D2 away from.
Present co-ordinate position (the X for the riveter bit central that boring and riveting machine will acquiret,Yt,Zt) initial with the second datum mark D2 Coordinate informationComparison, determines grid deviation value between the twoIn the grid deviation ValueIn, because the deviation of Z-direction can adaptively be adjusted by boring and riveting machine, without correcting, therefore Z-direction deviation value It is 0.In the present embodiment, the w1=15mm, the L1=25mm.
2, the amendment of datum mark D2 coordinate.
The modification method of the datum mark D2 coordinate is identical as the method for said reference point D1 coordinate modification.
In the amendment to each datum mark coordinate, if the grid deviation of the first datum mark D1 and the second datum mark D2 are equal MeetIt then can directly be riveted, go to step 5;Otherwise, riveting point coordinate is repaired Just.
The amendment of III riveting point grid deviation
According to design requirement, the distance between datum mark and adjacent riveting point are equal to rivet pitch.It is inclined because of riveting point Z-direction Difference can adaptively be adjusted by boring and riveting machine, therefore, the deviation of Z-direction without amendment, only need to X to and the deviation of Y-direction repair Just.
1, the determination of riveting point grid deviation.
It is i to the riveting point r number consecutively between the first datum mark D1 and the second datum mark D2, is denoted as ri, i= 1......k/2, k therein is the number of riveting point.
Each riveting point between the first datum mark D1 and the second datum mark D2 is successively labeled as r1、r2…rk/2, and advise The fixed riveting point r adjacent with the first datum mark D11For the first riveting point.
Calculate the deviation of the first datum mark D1With the deviation of the second datum mark D2 Between difference, obtain the deviation increment △ between two datum marks.
The deviation increment △ is divided into 1+k/2 parts, obtains the average increment of each riveting point.By obtained each riveting The average increment of point increases respectively to each riveting point r1、r2…rk/2Coordinate value on to get arrive each riveting point r1、r2…rk/2It repairs Coordinate value after just.
In conjunction with the grid deviation value of the first datum mark D1 and the second datum mark D2, the first datum mark D1 and the second datum mark D2 Between riveting point riX to grid deviation value beRiveting point riIn the seat of Y-direction Marking deviation is
In the present embodiment, the riveting point between the first datum mark D1 and the second datum mark D2 is 5 total, is denoted as respectively r1、r2…r5
Riveting point r1X to grid deviation value beThe grid deviation value of Y-direction isRiveting point r2X to grid deviation value beY-direction Grid deviation value isRiveting point r3X to grid deviation value beThe grid deviation value of Y-direction isRiveting point r4X to Grid deviation value isThe grid deviation value of Y-direction isRiveting Point r5X to grid deviation value beThe grid deviation value of Y-direction is
Caused by can be considered translation of rigid body and rotation because of the grid deviation of riveting point on workpiece, therefore the riveting point in second row X to Y-direction drift correction value and first row in correspond to the X of riveting point to identical with the drift correction value difference of Y-direction.In this reality It applies in example, riveting point r6Deviation and riveting point r1It is identical, riveting point r7Deviation and riveting point r2It is identical, riveting point r8's Deviation and riveting point r3It is identical, riveting point r9Deviation and riveting point r4It is identical, riveting point r10Deviation and riveting point r5 It is identical.
2, the amendment of riveting point grid deviation.
By riveting point riX to grid deviation valueWith Y-direction grid deviation valueIt is included in riveting point r respectivelyiInitial coordinateIn, then revised seat Mark
In the present embodiment, riveting point r1Initial coordinateIn, then revised coordinate
So far the r to riveting point is completed1The amendment of initial coordinate.
Repeat the r of the amendment riveting point1The process of initial coordinate successively carries out the initial coordinate of remaining each riveting point Amendment, until completing the amendment of all riveting point initial coordinates.
Other riveting points r2~r10Coordinates compensation method with riveting point r1.Save riveting point r2~r10Revised coordinate Information is
Step 5: workpiece automatic Drilling/Riveting.After the error of workpiece datum mark D1 and D2 are met the requirements, riveting point r2~r10It repairs Coordinate value after just isThe coordinate is workpiece in boring and riveting machine Cutter coordinate system Working position.Boring and riveting machine rivets dot position information according to testpieces and starts to process, until all riveting point completion of processing.The workpiece Brill riveting parameter from database existing parameter directly call in, be specifically provided that the speed of mainshaft: 11000r/min, feeding Speed 400mm/min, the power that presses 20000N, press process time 0.15s, and press residence time 0.05s, clamping force 3.05Mpa.
Step 6: after riveting, boring and riveting machine is returned to original state, workpiece undercarriage, completes the brill riveting to workpiece.

Claims (5)

1. a kind of thin-walled testpieces positioning clamping device, which is characterized in that clamped including peripheral frame component, positioning mechanism and testpieces Mechanism, two fixing seats and two fulcrum bearings in the positioning mechanism are located at the two of the upper surface of the peripheral frame component End, is mounted on two guide rails of positioning mechanism by guide rod sliding block, and two guide rails are separately fixed at described enclose The upper surface of two long sides of frame;Two groups of testpieces clamping devices are set on the guide rod of each positioning mechanism;It is described Clamping device is divided into plane clamping device and curved surface clamping device according to the shape of clamped workpiece;
The plane clamping device includes grip slipper, clamping mandril and rotational handle;The grip slipper is rectangular block shape, the folder Groove for clamping workpiece is arranged at the top for holding seat, keeps the top of the grip slipper " U "-shaped;Three inner surfaces of the groove are equal For plane;There is the tapped through hole for penetrating through the notch board in the upper surface of the grip slipper, for installing clamping mandril;In the folder The mounting hole of guide rod is arranged at the lower part for holding seat;The clamping mandril is threaded rod, and spinning enters in the tapped through hole, and makes the folder Holding mandril has rubber pad one end to be located in the groove;Rotational handle is housed in the other end of the clamping mandril;
The peripheral frame component includes peripheral frame, a pair of of peripheral frame package traces, four peripheral frame positioning mechanisms and four guide rail slide blocks;It is a pair of Peripheral frame package traces are fixed on the peripheral frame lower surface, and are located at two short sides of the peripheral frame;In the pair of peripheral frame package traces It is upper that respectively there are two guide rail slide blocks;Four peripheral frame positioning mechanisms are separately fixed on each guide rail slide block;
The curved surface clamping device includes curved surface grip slipper, round end mandril, outer location nut and interior fastening nut;The song Face grip slipper is bulk, which has the grip block for protruding the surface, the inner surface and appearance of the grip block Face is arc;The type face block on the surface is also protruded in the curved surface grip slipper upper surface;The interior surface curvature of the grip block It is 1/80, outer surface curvature 1/100, and the floor projection of the grip block is rectangle;Type face block is in 1/4 spherical, type face The radius of block is 15mm.
2. thin-walled testpieces positioning clamping device as described in claim 1, which is characterized in that the peripheral frame positioning mechanism includes connecting Fishplate bar, grip block and mandril;The grip block is fixed on the lower surface of connecting plate, has "u"-shaped groove on the grip block, described The inner surface of "u"-shaped groove side siding has the rubber cushion blocks for protruding the surface, in the inner surface of another sidewall paneling of the "u"-shaped groove There is the screw hole for installing mandril;The rubber cushion blocks and the screw hole are coaxial;Mandril spinning enters in the screw hole, and makes End face positioned at the rubber jacking block of the mandril one end is corresponding with the end face of the rubber cushion blocks;In the circumference of the mandril other end There is the through-hole of installation handle on surface;Connecting hole is distributed on the connecting plate, which is fixed on by each institute by bolt State the lower surface of guide rail slide block.
3. thin-walled testpieces positioning clamping device as described in claim 1, which is characterized in that the positioning mechanism, which includes two, leads Rail, two guide rods, two fixing seats, two fulcrum bearings and four guide rod sliding blocks;The guide rod sliding block is divided into two Group, and two groups of guide rod sliding blocks are separately mounted on described two guide rails;Two fixing seats and two fulcrum bearings are equal It is mounted on the guide rail, and makes two fixed seatings in the side of the peripheral frame, two fulcrum bearings is made to be located at the peripheral frame The other side;One end of two guide rods is placed in the circular groove of the fulcrum bearing upper surface, and the other end passes through key It fixes on the fixing seat;Fixing card there are two being set on each guide rod, and it is located at each fixing card The inside of the fixing seat and the inside of fulcrum bearing pass through the fixing card fixed guide pole and the phase between fixing seat or fulcrum bearing To position.
4. thin-walled testpieces positioning clamping device as described in claim 1, which is characterized in that the grip block and type face block are distinguished Two side edges symmetrical positioned at the curved surface grip slipper upper surface;Have on the grip block for installing the round end mandril Strip through-hole, the length direction of grip block of length direction and place of the strip through-hole are consistent;The round end mandril is packed into should In strip through-hole, and the sphere end of the round end mandril is made to be located at the inside of the grip block, it is corresponding with the type face block.
5. a kind of automatic Drilling/Riveting method using thin-walled testpieces positioning clamping device described in claim 1, which is characterized in that tool Body process is:
Step 1: determining the initial position of riveting point on workpiece;
Initial O-XYZ coordinate system is determined on workpiece, and is located at the origin of the O-XYZ coordinate system in the geometry of the workpiece The heart;
According to ten nail double riveting deformation test requirements, the first datum mark D1 is set in the first quartile of workpiece, in workpiece Second datum mark D2 is set in the second quadrant;Using the D1 and D2 as brill riveting as the datum mark for determining riveting hole site;
Distance of the center of first datum mark D1 away from workpiece X-direction edge is W1, and the distance at the edge away from workpiece Y-direction is L1; Distance of the center of second datum mark D2 away from workpiece -X direction edge is also W1, and the distance away from workpiece Y-direction edge is also L1;With The center of the first datum mark D1 and the center of the second datum mark D2 are as the datum mark for determining riveting point position;
Riveting point is determined on the workpiece;The quantity of the riveting point is determined according to design requirement;Riveting point is divided into Two rows, and two rows of riveting points is made to be located at the two sides of X-axis in O-XYZ coordinate system;First row riveting point is evenly arranged on described the Between one datum mark D1 and the second datum mark D2;Center in second row riveting point respectively with each riveting point of first row Center is corresponding;The center of the first row riveting point is L1, the second row away from the distance at the edge of the Y-direction of workpiece The distance at the edge of -Y direction of the center of riveting point away from workpiece is also L1;Center between adjacent riveting point according to design away from wanting Ask determining;
Step 2: installation peripheral frame positioning mechanism;
Step 3: positioning and clamping workpiece;
Step 4: the initial position of riveting point on amendment workpiece;
The detailed process of riveting point initial position is on the amendment workpiece:
Step 1: the Cutter coordinate system O'-X'Y'Z' of boring and riveting machine is adjusted;Make the Cutter coordinate system O'-X'Y'Z''s of the boring and riveting machine Origin is overlapped with the origin for determining initial O-XYZ coordinate system on workpiece and change in coordinate axis direction is identical;
Step 2: coordinate information of the riveting point initial position in the Cutter coordinate system O'-X'Y'Z' of the boring and riveting machine is extracted;It is logical It crosses CATIA software and extracts and record the initial coordinate information of the datum mark and the coordinate information of each riveting point initial position;
The initial coordinate information of extracted datum mark isIt include the first datum mark D1 and the second datum mark D2 Initial coordinate information;D therein is workpiece datum mark, and n indicates n-th of datum mark, n=1,2 ..., l;Extracted each riveting The coordinate information of contact initial position isR therein is the riveting point on workpiece, and m indicates m-th of riveting point, M=1,2 ..., k;
Step 3: amendment coordinate information;
The coordinate information include the first datum mark D1 and the second datum mark D2 coordinate information and each riveting point initial bit The coordinate information set;
Specifically:
Correct datum mark
I first datum mark D1 amendment:
A, the determination of the first datum mark D1 deviation;
By the bit central of boring and riveting machine since design it is determining to knife point M move, after the mobile w1 in the direction-X ', along-Y ' to shifting Dynamic L1, boring and riveting machine obtain coordinate position (X of the boring and riveting machine bit central t in current Cutter coordinate system O'-X'Y'Z' automaticallyt,Yt, Zt), and the changing coordinates (X for the boring and riveting machine bit central t that will acquiret,Yt,Zt) with the initial coordinate information of the first datum mark D1It compares, determines grid deviation value between the twoIn the grid deviation valueIn, because the deviation of Z-direction can adaptively be adjusted by boring and riveting machine, without amendment, therefore Z-direction deviation value is 0;
B, the amendment of the first datum mark D1 coordinate;
Judge whether the deviation of the initial coordinate of the first datum mark D1 meetsWherein δ is to allow Error;
If not satisfied, then by the position deviation of the first obtained datum mark D1In deviation be included in the first base respectively D1 initial coordinate on scheduleIn, make the first revised coordinate of datum mark D1 If satisfied, then the initial coordinate of first datum mark D1 meets design requirement, without amendment;
The amendment of II second datum mark D2
A, the determination of the second datum mark D2 deviation;
The bit central of boring and riveting machine is moved since design determination is to knife point M, after the mobile w1+u distance in the direction-X ', along- Y ' Xiang Yidong L1, boring and riveting machine obtain the present co-ordinate position (X of boring and riveting machine bit central t automaticallyt,Yt,Zt);U therein be D1 with Center between D2 away from;
Present co-ordinate position (the X for the riveter bit central that boring and riveting machine will acquiret,Yt,Zt) with the initial coordinate of the second datum mark D2 InformationComparison, determines grid deviation value between the twoIn the grid deviation valueIn, because the deviation of Z-direction can adaptively be adjusted by boring and riveting machine, without amendment, therefore Z-direction deviation value is 0;
B, the amendment of the second datum mark D2 coordinate;
The modification method of the second datum mark D2 coordinate is identical as the method for above-mentioned first datum mark D1 coordinate modification;
In the amendment to each datum mark coordinate, if the grid deviation of the first datum mark D1 and the second datum mark D2 are all satisfiedIt then can directly be riveted, go to step 5;Otherwise, riveting point coordinate is modified;
The amendment of III riveting point grid deviation
According to design requirement, the distance between datum mark and adjacent riveting point are equal to rivet pitch;Because of the deviation energy of riveting point Z-direction Enough adaptively adjusted by boring and riveting machine, therefore, the deviation of Z-direction without amendment, only need to X to and the deviation of Y-direction be modified;
A, the determination of riveting point grid deviation;
It is i to the riveting point r number consecutively between the first datum mark D1 and the second datum mark D2, is denoted as ri, i=1......k/2, K therein is the number of riveting point;
Each riveting point between the first datum mark D1 and the second datum mark D2 is successively labeled as r1、r2…rk/2, and provide with First datum mark D1 adjacent riveting point r1For the first riveting point;
Calculate the deviation of the first datum mark D1With the deviation of the second datum mark D2Between Difference, obtain the deviation increment △ between two datum marks;
The deviation increment △ is divided into 1+k/2 parts, obtains the average increment of each riveting point;By obtained each riveting point Average increment increases respectively to each riveting point r1、r2…rk/2Coordinate value on to get arrive each riveting point r1、r2…rk/2After amendment Coordinate value;
In conjunction with the grid deviation value of the first datum mark D1 and the second datum mark D2, between the first datum mark D1 and the second datum mark D2 Riveting point riX to grid deviation value beRiveting point riIt is inclined in the coordinate of Y-direction Difference is
B, the amendment of riveting point grid deviation;
By riveting point riX to grid deviation valueWith Y-direction grid deviation valueIt is included in riveting point r respectivelyiInitial coordinateIn, then revised seat MarkRepeat institute The process for stating amendment riveting point initial coordinate, is successively modified the initial coordinate of each riveting point, until completing all rivetings The amendment of point initial coordinate, obtains the position coordinates of all riveting points;
Step 5: workpiece automatic Drilling/Riveting;Implement automatic Drilling/Riveting according to the position coordinates of revised riveting point;
Step 6: after riveting, boring and riveting machine is returned to original state, workpiece undercarriage, completes the brill riveting to workpiece.
CN201710513725.4A 2017-06-29 2017-06-29 A kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting method Active CN107116381B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710513725.4A CN107116381B (en) 2017-06-29 2017-06-29 A kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710513725.4A CN107116381B (en) 2017-06-29 2017-06-29 A kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting method

Publications (2)

Publication Number Publication Date
CN107116381A CN107116381A (en) 2017-09-01
CN107116381B true CN107116381B (en) 2019-04-19

Family

ID=59719749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710513725.4A Active CN107116381B (en) 2017-06-29 2017-06-29 A kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting method

Country Status (1)

Country Link
CN (1) CN107116381B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108145481B (en) * 2017-12-22 2019-07-09 中电科技集团重庆声光电有限公司 A kind of thin cover board milling chamber universal fixturing
CN108177100B (en) * 2017-12-27 2020-06-23 绍兴市侨陆智能科技有限公司 Multi-angle adjusting type hardware clamp
CN108673176A (en) * 2018-04-25 2018-10-19 西安飞机工业(集团)有限责任公司 A kind of aircraft class titanium alloy component processing tool sewing platform base adjustment fixed mechanism
CN108655976A (en) * 2018-05-10 2018-10-16 四川九洲电器集团有限责任公司 A kind of assembled tool fixture for array antenna test
CN110814755A (en) * 2019-10-30 2020-02-21 广东省特浩迪金属制品有限公司 Multifunctional metal product processing device
CN110877258A (en) * 2019-11-13 2020-03-13 河源市树熊超硬磨具有限公司 High-efficient processing grinding apparatus of precision parts
CN112045229B (en) * 2020-08-26 2021-12-31 厦门市鑫汇雅工贸有限公司 Sheet clamp for numerical control machining center
CN112045230B (en) * 2020-08-26 2021-12-31 广东智目科技有限公司 Numerical control machining clamp for thin plate
CN112453222B (en) * 2020-10-30 2023-01-17 中国船舶重工集团公司第七0七研究所 Pressure riveting device capable of realizing accurate positioning and pressure riveting method
CN116140534A (en) * 2020-12-25 2023-05-23 北京航星机器制造有限公司 Automatic drilling and riveting device for drilling and riveting wallboard parts
CN115338938A (en) * 2022-08-16 2022-11-15 成都简爱家具制造有限公司 Furniture production fixture with adjustable action surface

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103341833B (en) * 2013-07-09 2015-04-22 西北工业大学 Clamp holder for small enclosure frame in aircraft panel assembly
CN103978386A (en) * 2014-06-05 2014-08-13 赵夫超 Device for fixing manual drilling machine for drilling thin sheet
CN204277475U (en) * 2014-11-25 2015-04-22 刘桂财 Plate-like workpieces processing work platform
CN204397410U (en) * 2014-12-22 2015-06-17 潘宇强 The cutting clamper of mask plate
DE202015106176U1 (en) * 2015-11-16 2016-04-01 Leantechnik Ag Device for clamping components in an assembly line
CN105290842A (en) * 2015-11-28 2016-02-03 谭华 Tapping device for curved plate

Also Published As

Publication number Publication date
CN107116381A (en) 2017-09-01

Similar Documents

Publication Publication Date Title
CN107116381B (en) A kind of thin-walled testpieces positioning clamping device and automatic Drilling/Riveting method
CN107253084B (en) Efficient high-precision robot milling automatic system in aircraft digital assembly
CN102294589B (en) Automated positioning and alignment method and system for aircraft structures using robots
CN104889775B (en) Clamp for processing vertical positioning surface of tail wing of airplane
CN106514343A (en) Positioning tool and method for automatic drilling and riveting of aircraft panels
CN103072700B (en) Method for flexibly assembling leading edge flap
CN105537653B (en) A kind of guide structure and adjustment method of inclined hole combination drill jig
CN1213998A (en) Determinant wing assembly
CN203448979U (en) Automatic gesture regulating and positioning device for assembling wing wall plate
Mei et al. Accurate positioning of a drilling and riveting cell for aircraft assembly
WO2013152440A1 (en) Automated percussive riveting system
CN107471171B (en) The posture adjustment positioning system and its numerical control posture adjustment positioning device of large aircraft wing wallboard
CN111331431B (en) Contact type curved surface wall plate normal measurement and dimple depth compensation device and measurement method
CN103386600A (en) Boeing aircraft airtight support plate nut installation process device and process
CN105698678A (en) Base coordinate system calibration method of aircraft panel horizontal automatic drill riveter
CN109204871A (en) One kind being used for aircraft wing integral panel posture adjustment positioning system and its application method
CN105690057A (en) Process joint for aircraft panel component assembly, and assembly method
CN109822422A (en) A kind of burnishing machine rotating shaft geometric error measuring device and method of adjustment
CN107553345A (en) The aircraft target ship pre stress shot peen frock and ball blasting method that a kind of multiple spot actively loads
CN102554821A (en) Outer front flap positioner
EP1221353A1 (en) Determinant passively-located pogo machine
Zhang et al. Design of drilling and riveting multi-functional end effector for CFRP and aluminum components in robotic aircraft assembly
CN206378077U (en) Distillation enters pipe assembly synchronous correction device before automotive air-conditioning system
CN111618231A (en) Stepping type plate clamping and positioning device of self-punching riveting machine
Holt et al. Robotic drilling and countersinking on highly curved surfaces

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200707

Address after: Room 406, block B, innovation and technology building, northwest Polytechnic University, 127 Youyi West Road, Beilin District, Xi'an City, Shaanxi Province 710072

Patentee after: Shaanxi Dagong Xuhang Electromagnetic Technology Co.,Ltd.

Address before: 710072 Xi'an friendship West Road, Shaanxi, No. 127

Patentee before: Northwestern Polytechnical University

TR01 Transfer of patent right