CN107102106B - 流量-压力两控式室内试验注浆装置 - Google Patents

流量-压力两控式室内试验注浆装置 Download PDF

Info

Publication number
CN107102106B
CN107102106B CN201710408960.5A CN201710408960A CN107102106B CN 107102106 B CN107102106 B CN 107102106B CN 201710408960 A CN201710408960 A CN 201710408960A CN 107102106 B CN107102106 B CN 107102106B
Authority
CN
China
Prior art keywords
slurry
inlet valve
container
air
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710408960.5A
Other languages
English (en)
Other versions
CN107102106A (zh
Inventor
龚晓南
朱旻
单通
刘世明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
Zhejiang University ZJU
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU, China Railway Tunnel Group Co Ltd CRTG filed Critical Zhejiang University ZJU
Priority to CN201710408960.5A priority Critical patent/CN107102106B/zh
Publication of CN107102106A publication Critical patent/CN107102106A/zh
Application granted granted Critical
Publication of CN107102106B publication Critical patent/CN107102106B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N13/00Investigating surface or boundary effects, e.g. wetting power; Investigating diffusion effects; Analysing materials by determining surface, boundary, or diffusion effects
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N13/00Investigating surface or boundary effects, e.g. wetting power; Investigating diffusion effects; Analysing materials by determining surface, boundary, or diffusion effects
    • G01N2013/003Diffusion; diffusivity between liquids

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明公开了一种流量‑压力两控式室内试验注浆装置,包括钢制浆液容器、法兰盘、支架、进浆阀门、进气阀门、出浆阀门、浆液漏斗;还包括可拆卸的气囊、压力表、进水阀门、柱塞泵和空气压缩机;本发明通过不同的连接方式和进浆阀门、进气阀门和进水阀门的不同开关形式,实现流量控制和压力控制两种不同的室内注浆试验方式。将气囊通过气囊接口与柱塞泵连接,将调制好的浆液通过进浆阀门将容器注满,关闭进气阀门,通过柱塞泵向气囊内以恒定流量注水实现恒定流量的注浆方式。将气囊卸下,关闭气囊接口,将定量浆液注入容器内,进气阀门连接空气压缩机,通过空气压缩机提供的恒压气体实现恒定压力的注浆方式。

Description

流量-压力两控式室内试验注浆装置
技术领域
本发明涉及一种流量-压力两控式室内试验注浆装置。
背景技术
注浆技术在岩土工程中具有加固土体,抬升建筑,补偿土体损失等诸多作用,在建筑物纠倾,盾构隧道掘进,地基土加固等领域应用广泛。但工程中注浆参数的选取,浆体材料的配比等控制因素及注浆与土层的适应性大多依赖于已有的工程经验,注浆的理论研究落后于工程实践。而室内试验研究可以精确控制模型的边界条件,土体的应力状态,浆液的配比等参数,对于研究注浆在土体中的扩散形式以及对周围土体的影响机理具有重要意义。
注浆根据其控制方式可分为流量控制和压力控制。目前注浆室内试验中,国内研究以压力控制注浆方式为主,国外研究以流量控制注浆方式为主,试验配套的设备仍不完善,同时对于压力控制和流量控制两种注浆方式的对比研究也很匮乏。目前,能够实现流量与压力双重控制的伺服加载系统成本高昂,而且较难改造成合适的注浆设备。在此基础上,开发一套流量-压力两控式室内注浆试验装置,对于推动注浆理论的进一步发展,指导实际工程中注浆参数的合理选取,都具有十分重要的意义。
发明内容
本发明的目的在于提供一种流量-压力两控式室内试验注浆装置,能够在室内试验中实现压力控制和流量控制两种注浆方式,并分别对注浆的压力和流量进行控制。
本发明采用的技术方案如下:
一种流量-压力两控式室内试验注浆装置,包括钢制浆液容器、法兰盘、支架、进浆阀门、进气阀门、出浆阀门、浆液漏斗;
钢制浆液容器固定于支架上,底部设有出浆阀门,容器开口处与法兰盘通过螺栓固连,在法兰盘上开有三个与浆液容器相连通的开孔,其中一个开孔通过进浆阀门与浆液漏斗的出口连通,另一个开孔连接进气阀门,第三个开孔可根据装置工作需要与压力表或进水阀门相连;
所述的装置还包括气囊、柱塞泵、空气压缩机;
当上述第三个开孔连接压力表时,该装置用于压力控制注浆,在向浆液容器内注入浆液完毕后,进气阀门需与空气压缩机相连;当上述第三个开孔与进水阀门相连,该装置用于流量控制注浆,气囊设于浆液容器内,且气囊入口与进水阀门连通,当气囊中无空气后,进水阀门需通过管路连接柱塞泵。
上述技术方案中,当第三个开孔连接压力表时,控制方式如下:
保持出浆阀门关闭,打开进浆阀门和进气阀门,通过浆液漏斗向浆液容器内注入浆液,完毕后,关闭进浆阀门,将进气阀门用软管与空气压缩机相连,向浆液容器内注入空气至压力表示数达到指定压力后,打开出浆阀门输出浆液。此种控制方式下,向浆液容器内注入浆液时,浆液不可充满整个浆液容器。
当第三个开孔连接进水阀门时,控制方式如下:
保持出浆阀门关闭,打开进浆阀门及进气阀门,通过浆液漏斗向钢制浆液容器注入浆液,完毕后,关闭进气阀门及进浆阀门,打开进水阀门向气囊中灌水直至将气囊中的剩余空气全部赶出,将进水阀门连接到柱塞泵上,柱塞泵以恒定流量向气囊内注水,打开出浆阀门,通过气囊扩张将浆液挤出。此种控制方式下,向浆液容器内注入浆液时,浆液需充满整个浆液容器。
本发明具有的有益效果是:
本发明通过空气压缩机提供恒定压力的气体,将浆液从容器中压出,实现压力控制的室内注浆方法;通过柱塞泵将恒定流量的水注入气囊中使之膨胀,将外围的浆液挤出容器,实现流量控制的室内注浆方法。通过对空气压缩机压力阀和柱塞泵功率的调节,实现注浆压力和注浆流量的控制,可以在室内试验中进行两种方式控制下的浆液扩散机理及加固、顶升效果的研究,为注浆理论的发展提供试验支撑,为现场注浆参数的选择和注浆的土层适应性提供技术指导。同时,试验装置便于清洁和重复使用。
附图说明
图1是本发明的注浆装置示意图。
图2是压力控制注浆示意图;
图3是流量控制注浆示意图;
图4是法兰盘结构示意图。
图中:1、钢制浆液容器,2、法兰盘,3、支架,4、连接螺栓,5、气囊,6、浆液,7、进浆阀门,8、进水阀门,9、进气阀门,10、出浆阀门,11、浆液漏斗,12、柱塞泵,13、空气压缩机,14、压力表。
具体实施方式
下面结合附图和实施例对本发明作进一步说明。
试验装置图如图1所示。当进行压力控制式注浆时,按照图2所示对装置进行组装,具体操作为:卸下气囊5,将进水阀门8替换为压力表14,打开进浆阀门7和进气阀门9,通过浆液漏斗11向浆液容器1内注入适量浆液,关闭进浆阀门7后,将进气阀门9用软管与空气压缩机13相连,向容器内注入空气至压力表14达到指定压力后,打开出浆阀门10输出浆液。
当进行流量控制式注浆时,按照图3所示对装置进行组装,具体操作为:将气囊5和进水阀门8安装好,打开进气阀门9,通过浆液漏斗11向钢制浆液容器1注满拌好的水泥浆液6,然后关闭进气阀门9,将气囊5的剩余空间用水填满,将进水阀门8连接到柱塞泵12上,柱塞泵12以恒定流量向气囊5内注水,打开出浆阀门10,通过气囊扩张将浆液挤出。
本发明的工作过程如下:
在使用本设备进行室内注浆试验研究时,首先根据试验要求配置给定水灰比的浆液(水灰比不小于0.5,避免发生离析)。如果采用压力控制的注浆方式,首先根据浆液密度和需要注浆的体积计算出所需注出的浆液质量。卸下气囊5,将进水阀门8替换为压力表14,将出浆阀门10通过塑料管连接到需要注浆的模型装置上,保持出浆阀门10的关闭。检查密封性能完好后,将装置置于电子秤上,打开进浆阀门7和进气阀门9,通过浆液漏斗11向浆液容器1内注入定量浆液,使浆液面高度约为容器总高度的1/2。关闭进浆阀门7后,将进气阀门9用软管与空气压缩机13相连,打开进气阀门7,启动空气压缩机13,调节调压阀至设定的注浆压力,待法兰盘2上的压力表14达到设定的注浆压力时,读取电子秤的读数,匀速打开出浆阀门10,使浆液均匀流出。观察电子秤的读数达到设定值时,关闭出浆阀门10,将空气压缩机13的调压阀完全放松,排空浆液容器1中的压缩空气,使气压降到正常大气压值,用扳手拧开连接螺栓4,取下法兰盘2,打开出浆阀门10,向注浆容器1内注入足量清水进行冲洗。
如果采用流量控制注浆方式,将气囊5和进水阀门8安装好,关闭出浆阀门10,检查装置密封性。打开进气阀门9,通过浆液漏斗11向钢制浆液容器1注入拌好的水泥浆液6至完全充满,然后关闭进气阀门9和进浆阀门7,用漏斗向气囊5内注水,填满气囊的剩余空间后,将进水阀门8通过塑料管连接到柱塞泵12上,柱塞泵12的进水口浸入水中,打开柱塞泵12将塑料管内充满水。注浆时,通过柱塞泵额定流量和所需注浆量计算需要的注浆时间,开启柱塞泵12,同时打开出浆阀门10,规定时间后注浆完成,关闭柱塞泵。用扳手拧开连接螺栓4,取下法兰盘2,打开出浆阀门10,向注浆容器1内注入足量清水进行冲洗。

Claims (5)

1.一种流量-压力两控式室内试验注浆方法,其特征在于:采用如下装置实现,所述装置包括钢制浆液容器(1)、法兰盘(2)、支架(3)、进浆阀门(7)、进气阀门(9)、出浆阀门(10)、浆液漏斗(11);
钢制浆液容器(1)固定于支架(3)上,底部设有出浆阀门(10),容器开口处与法兰盘(2)通过螺栓(4)固连,在法兰盘(2)上开有三个与浆液容器(1)相连通的开孔,其中一个开孔通过进浆阀门(7)与浆液漏斗(11)的出口连通,另一个开孔连接进气阀门(9),第三个开孔可根据装置工作需要与压力表(14)或进水阀门(8)相连;
所述的装置还包括气囊(5)、柱塞泵(12)、空气压缩机(13);
当上述第三个开孔连接压力表(14)时,该装置用于压力控制注浆,在向浆液容器(1)内注入浆液完毕后,进气阀门(9)需与空气压缩机(13)相连;当上述第三个开孔与进水阀门(8)相连,该装置用于流量控制注浆,气囊(5)设于浆液容器(1)内,且气囊入口与进水阀门(8)连通,当气囊中无空气后,进水阀门(8)需通过管路连接柱塞泵(12)。
2.根据权利要求1所述的流量-压力两控式室内试验注浆方法,其特征在于:当第三个开孔连接压力表(14)时,控制方式如下:
保持出浆阀门(10)关闭,打开进浆阀门(7)和进气阀门(9),通过浆液漏斗(11)向浆液容器(1)内注入浆液,完毕后,关闭进浆阀门(7),将进气阀门(9)用软管与空气压缩机(13)相连,向浆液容器(1)内注入空气至压力表(14)示数达到指定压力后,打开出浆阀门(10)输出浆液。
3.根据权利要求2所述的流量-压力两控式室内试验注浆方法,其特征在于:向浆液容器(1)内注入浆液时,浆液不可充满整个浆液容器(1)。
4.根据权利要求1所述的流量-压力两控式室内试验注浆方法,其特征在于:当第三个开孔连接进水阀门(8)时,控制方式如下:
保持出浆阀门10关闭,打开进浆阀门(7)及进气阀门(9),通过浆液漏斗(11)向钢制浆液容器(1)注入浆液,完毕后,关闭进气阀门(9)及进浆阀门(7),打开进水阀门(8)向气囊(5)中灌水直至将气囊(5)中的剩余空气全部赶出,将进水阀门(8)连接到柱塞泵(12)上,柱塞泵(12)以恒定流量向气囊(5)内注水,打开出浆阀门(10),通过气囊扩张将浆液挤出。
5.根据权利要求4所述的流量-压力两控式室内试验注浆方法,其特征在于:向浆液容器(1)内注入浆液时,浆液需充满整个浆液容器(1)。
CN201710408960.5A 2017-06-02 2017-06-02 流量-压力两控式室内试验注浆装置 Active CN107102106B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710408960.5A CN107102106B (zh) 2017-06-02 2017-06-02 流量-压力两控式室内试验注浆装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710408960.5A CN107102106B (zh) 2017-06-02 2017-06-02 流量-压力两控式室内试验注浆装置

Publications (2)

Publication Number Publication Date
CN107102106A CN107102106A (zh) 2017-08-29
CN107102106B true CN107102106B (zh) 2023-12-12

Family

ID=59659455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710408960.5A Active CN107102106B (zh) 2017-06-02 2017-06-02 流量-压力两控式室内试验注浆装置

Country Status (1)

Country Link
CN (1) CN107102106B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108593038B (zh) * 2017-11-24 2023-09-26 昆明理工大学 一种可实时监测灌入被注介质注浆量的装置及监测方法
CN108572124B (zh) * 2018-07-19 2023-10-24 郑州大学 高聚物浆液自膨胀特性测试装置及其测试方法
CN114592551A (zh) * 2022-03-10 2022-06-07 上海大学 一种室内模型试验用的灌注桩一体机

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1203396A (fr) * 1957-09-26 1960-01-18 British Thermostat Co Ltd Appareil de réglage de débit de fluide
FR2174317A5 (zh) * 1970-12-04 1973-10-12 Ceramic Engineering Ltd
JPS63165612A (ja) * 1986-12-26 1988-07-08 Furonto Eng Kk グラウト注入制御装置
JPH07148123A (ja) * 1993-11-29 1995-06-13 Kawasumi Lab Inc ダブルセンサーカテーテル
JPH11175164A (ja) * 1997-12-15 1999-07-02 Taisei Corp 流体の注入・排出流量または注入・排出圧力の自動制御装置
WO2003000476A1 (de) * 2001-06-22 2003-01-03 Josef Wagner Verfahren und vorrichtung zum schlickergiessen unter druckeinwirkung
JP2004251043A (ja) * 2003-02-21 2004-09-09 Nittoc Constr Co Ltd 二液混合グラウチングにおける流量圧力の自動制御システム
CN202870056U (zh) * 2012-09-26 2013-04-10 山东大学 一种软弱堤坝注浆加固模型试验装置
CN203515458U (zh) * 2013-09-09 2014-04-02 河南理工大学 双孔管注浆封孔装置
CN103760083A (zh) * 2014-01-15 2014-04-30 长沙理工大学 松散地层灌浆实验装置
CN105572322A (zh) * 2016-01-13 2016-05-11 中南大学 一种气囊控制式室内注浆仪器
CN105696599A (zh) * 2016-02-06 2016-06-22 北京市勘察设计研究院有限公司 一种通过利用气囊封堵装置的加压注浆方法
CN205483943U (zh) * 2016-03-14 2016-08-17 北京交通大学 一种模拟泥水盾构中泥浆浸入地层形成泥膜的实验装置
CN106049557A (zh) * 2016-05-24 2016-10-26 同济大学 一种模拟灌注桩桩端后注浆的室内试验装置和试验方法
CN206034448U (zh) * 2016-08-31 2017-03-22 中国水利水电第五工程局有限公司 一种气压式注浆器
KR20170034456A (ko) * 2015-09-10 2017-03-29 허옹 압력조절부재가 구비된 그라우팅 장치
CN106644836A (zh) * 2017-03-01 2017-05-10 山东大学 一种可视化劈裂注浆模型试验装置及其试验方法
CN206930645U (zh) * 2017-06-02 2018-01-26 浙江大学 一种流量‑压力两控式室内试验注浆装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110110727A1 (en) * 2009-11-06 2011-05-12 Thomas Plahert Jet grouting apparatus for confined spaces and rapid mobilization requirements

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1203396A (fr) * 1957-09-26 1960-01-18 British Thermostat Co Ltd Appareil de réglage de débit de fluide
FR2174317A5 (zh) * 1970-12-04 1973-10-12 Ceramic Engineering Ltd
JPS63165612A (ja) * 1986-12-26 1988-07-08 Furonto Eng Kk グラウト注入制御装置
JPH07148123A (ja) * 1993-11-29 1995-06-13 Kawasumi Lab Inc ダブルセンサーカテーテル
JPH11175164A (ja) * 1997-12-15 1999-07-02 Taisei Corp 流体の注入・排出流量または注入・排出圧力の自動制御装置
WO2003000476A1 (de) * 2001-06-22 2003-01-03 Josef Wagner Verfahren und vorrichtung zum schlickergiessen unter druckeinwirkung
JP2004251043A (ja) * 2003-02-21 2004-09-09 Nittoc Constr Co Ltd 二液混合グラウチングにおける流量圧力の自動制御システム
CN202870056U (zh) * 2012-09-26 2013-04-10 山东大学 一种软弱堤坝注浆加固模型试验装置
CN203515458U (zh) * 2013-09-09 2014-04-02 河南理工大学 双孔管注浆封孔装置
CN103760083A (zh) * 2014-01-15 2014-04-30 长沙理工大学 松散地层灌浆实验装置
KR20170034456A (ko) * 2015-09-10 2017-03-29 허옹 압력조절부재가 구비된 그라우팅 장치
CN105572322A (zh) * 2016-01-13 2016-05-11 中南大学 一种气囊控制式室内注浆仪器
CN105696599A (zh) * 2016-02-06 2016-06-22 北京市勘察设计研究院有限公司 一种通过利用气囊封堵装置的加压注浆方法
CN205483943U (zh) * 2016-03-14 2016-08-17 北京交通大学 一种模拟泥水盾构中泥浆浸入地层形成泥膜的实验装置
CN106049557A (zh) * 2016-05-24 2016-10-26 同济大学 一种模拟灌注桩桩端后注浆的室内试验装置和试验方法
CN206034448U (zh) * 2016-08-31 2017-03-22 中国水利水电第五工程局有限公司 一种气压式注浆器
CN106644836A (zh) * 2017-03-01 2017-05-10 山东大学 一种可视化劈裂注浆模型试验装置及其试验方法
CN206930645U (zh) * 2017-06-02 2018-01-26 浙江大学 一种流量‑压力两控式室内试验注浆装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
俞建霖,曾开华,龚晓南,岳原发.高速公路拓宽工程硬路肩下土体注浆加固试验研究.中国公路学报.(第03期),全文. *
松软地层灌浆实验装置研制;张贵金;张聪;梁经纬;杨东升;潘烨;;工程地质学报(第06期);第1177-1181页 *

Also Published As

Publication number Publication date
CN107102106A (zh) 2017-08-29

Similar Documents

Publication Publication Date Title
CN107102106B (zh) 流量-压力两控式室内试验注浆装置
CN106049557B (zh) 采用模拟灌注桩桩端后注浆的室内试验装置的试验方法
CN105625149A (zh) 一种用于道路基层病害修复的设备和方法
CN113404323B (zh) 钢筋套筒灌浆连接饱满度缺陷修复装置及方法
CN109868850A (zh) 施工质量检测系统、补强施工工艺及补强施工装置
CN110439286A (zh) 一种内衬加劲连接钢管混凝土柱减阻消振一次顶升施工方法
CN103215922A (zh) 高压力大流量集中渗漏灌浆堵漏方法
CN111733707B (zh) 一种桥梁预应力孔道补压浆装置及施工方法
CN103174135B (zh) 不达标后注浆灌注桩的修补方法
CN207130734U (zh) 一种装配式地铁车站预制构件榫槽注浆设备
CN219061768U (zh) 一种隧道回填灌浆密实质量监测装置
CN206930645U (zh) 一种流量‑压力两控式室内试验注浆装置
CN217304700U (zh) 一种多功能岩体裂隙注浆试验装置
CN216284809U (zh) 一种模拟地应力和地下渗流场耦合的隧道二次注浆模型试验装置
CN114703878A (zh) 一种降水井封堵排水装置及施工方法
CN209400383U (zh) 一种测定岩体渗透系数的压水装置
CN102242639A (zh) 压风注浆装置
CN210315555U (zh) 一种适用于双液单系统化学注浆的比例混合器
CN111764393A (zh) 一种水下混凝土灌注用导管测压检验装置及灌注方法
CN201687512U (zh) 压风注浆装置
CN217811045U (zh) 一种双管注浆装置
CN218643374U (zh) 一种微型桩分布式注浆成桩装置
CN114563319B (zh) 一种基于水材料研究的溶洞充填试验装置及方法
CN220559982U (zh) 一种充填管路清洗装置
CN219060024U (zh) 一种可应用于太阳能光伏的扩大头后注浆预制管桩

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20231114

Address after: 310058 Yuhang Tang Road, Xihu District, Hangzhou, Zhejiang 866

Applicant after: ZHEJIANG University

Applicant after: CHINA RAILWAY TUNNEL GROUP Co.,Ltd.

Address before: 310058 Yuhang Tang Road, Xihu District, Hangzhou, Zhejiang 866

Applicant before: ZHEJIANG University

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant