Summary of the invention
Technical problem to be solved by the invention is to provide a kind of no inner support basement construction method for supporting, solve to omit
The problem of basement safety after inner support.
Cast-in-situ bored pile is arranged as support pile, from drilling in basement outer edge in technical solution provided by the invention thus
Frozen soil wall is arranged in the position 1~1.3m on the outside of bored concrete pile, and pressure relief vent, each freezing hole is arranged in the position 50~60cm on the outside of freezing hole
Two pressure relief vents of corresponding arrangement, release bore dia are 25~30cm.Frozen soil arch springing is arranged every 8m~12m in frozen soil wall.
Freezing pipe is arranged according to soil property in frozen soil wall, Computer Numerical Simulation has been carried out to basement supporting, in computer number
Be worth in simulation process, following parameter determined according to isothermal distribution trend: for muck soil, freeze tube spacing be greater than or
Equal to 0.9m and it is less than 1m;For silt, freezing tube spacing is more than or equal to 1m and to be less than 1.05m;For clay, freezing pipe
Spacing be more than or equal to 1.05m, and be less than or equal to 1.1m.Frozen soil wall on the outside answered by curved scissors pressure by passive earth pressure effect
Power, frozen soil wall every 3 across horizontal prestressing apparatus is arranged, to alleviate frozen soil wall curved scissors compressive stress state.
Capping beam is set at the top of frozen soil wall and frozen soil arch springing, and capping beam is using two channel steel Two bors d's oeuveres welding, from frozen soil wall
Floor stringer is arranged in the mandrel position 0.8~1m of line, and floor stringer uses channel steel, and floor stringer is supported on above engineering pile, at the top of floor stringer
Absolute altitude is identical as frozen soil wall elevation of top, and steel strand wires support is arranged at the top of floor stringer, and steel strand wires support uses I-steel, steel strand wires
Support is vertically arranged with floor stringer, the two weld connection, and steel strand wires support one end is shelved on above frozen soil wall, and steel strand wires support is another
One end overhangs floor stringer out, and steel strand wires support overhangs direction top and preformed hole is arranged, and steel strand wires pass through capping beam preformed hole and steel
Twisted wire support preformed hole is fixed the steel strand wires after tensioning by anchorage.
Room cutting depth is chosen under frozen soil wall thickness base area, when being greater than or equal to 8m for basement depth, freezes
The control of cob wall amount of deflection is basement cutting depth in 0.015H, H;When being less than 8m for basement depth and be greater than or equal to 6m,
Frozen soil wall amount of deflection is controlled in 0.012H;When being less than 6m for basement depth, the control of frozen soil wall amount of deflection is in 0.01H and is not less than
50cm.Surrounding enviroment require basement supporting, frozen soil wall thickness to carry out it is following adjust, for basement 10m
There is the frozen soil wall deflection value of building multiplied by 1.2 in range;For there is the frozen soil wall of building within the scope of basement 10m to 20m
Deflection value is multiplied by 1.1.
Frozen soil wall mean temperature is chosen according to soil property, and for muck soil, mean temperature is more than or equal to -12 DEG C and small
In -10 DEG C;For silt, mean temperature is more than or equal to -10 DEG C and less than -9 DEG C, and for clay, mean temperature is average
Temperature is more than or equal to -9 DEG C and to be less than -8 DEG C.
Frozen soil arch springing mean temperature is chosen according to soil property, for muck soil, mean temperature be more than or equal to -16 DEG C and
Less than -14 DEG C;For silt, mean temperature is more than or equal to -14 DEG C and less than -13 DEG C, and for clay, mean temperature is flat
Equal temperature is more than or equal to -13 DEG C and to be less than -12 DEG C.Frozen soil arch springing is the region of high stress, reduces the temperature of this part soil body, with
Increase its intensity, becomes the variable strength arch ring of reasonable stress in this way, can save and largely freeze required energy consumption.
As basement excavates, the exposure of frozen soil wall is gradually increased and loss of refrigeration capacity increases, especially true in summer.Temperature
Degree, which increases, causes strength of wall body to reduce, and accelerates the development of creep.Therefore the adiabatic heat-insulation of wall is extremely important, or even can become work
The key of journey success or failure.Frozen soil wall top surface selects following measure to carry out insulated heat:
(1) plastic covering film or insulation foam plate is nailed on;
(2) top surface gunite concrete, concrete ejection layer make a part of bearing structure simultaneously;
(3) polyurethane foam heat-insulation layer is sprayed in top surface;
(4) cement mixing pile is set outside frozen soil wall, and cement mixing pile diameter is 500~600mm, adjacent cement mixing pile
It is mutually twisted, length of action 200mm, cement mixing piling wall not only can be heat-insulated, while combining retaining wall with frozen soil wall.
Frost line develops to non-frozen soil direction when soil freezes, while moisture is reversely migrated to freezing face, at this moment non-frozen soil hole
Gap hydraulic pressure reduces, and effective stress increases, and the non-frozen soil contraction caused by consolidating counteracts part frost heave.In order to reduce frost heave to neighbour
Intermittent freezing method is taken in the influence closely built, and the frost heave generated when freezing is thus reduced, to reduce freeze-off time and save
Freeze expense.Intermittent freezing parameter is as follows: every freeze-off time 30min interval 10min.
The present invention is adaptable, and water isolating is good and does not pollute to ambient enviroment, and social benefit is good;On the other hand the present invention
Construction speed is fast, and economic benefit is also very considerable.
Specific embodiment
Certain basement a length of 67m, width 48m, depth 6.8m, support pile use the cast-in-situ bored pile of diameter 1.4m, along ground
Lower room periphery lays 136, spacing 1.6m, and the long 28m of stake, freezing hole is apart from supporting pile center 1.1m.Freezing hole number is 132
A, freezing tube spacing is 1.05m.Pressure relief vent is on the outside of freezing hole, each freezing hole two pressure relief vents of corresponding arrangement.
As shown, capping beam 3 is arranged at the top of frozen soil wall 1 and frozen soil arch springing 2 in the present embodiment, capping beam 3 uses two
Floor stringer 4 is arranged from 1 position 0.8~1m of central axis of frozen soil wall in the welding of channel steel Two bors d's oeuveres, and floor stringer 4 uses channel steel, floor stringer 4
It is supported on above engineering pile 7,4 elevation of top of floor stringer is identical as 1 elevation of top of frozen soil wall, and steel strand wires are arranged at the top of floor stringer 4
Support 5, steel strand wires support 5 use I-steel, and 6 support of steel strand wires is vertically arranged with floor stringer 4, the two weld connection, steel strand wires
5 one end of support is shelved on above frozen soil wall 1, and 5 other end of steel strand wires support overhangs floor stringer 4 out, and steel strand wires support 5 overhangs direction
Preformed hole is arranged in top, and steel strand wires 6 are complete by tensioning by anchorage 8 by 5 preformed hole of 3 preformed hole of capping beam and steel strand wires support
Steel strand wires 6 after finishing are fixed.Frozen soil wall 1 is curved to alleviate frozen soil wall every 3 bracing means across setting basement supporting capping beam
Cut compressive stress state.
1 mean temperature of frozen soil wall is -9 DEG C.Frozen soil arch springing is -13 DEG C.
1 top surface of frozen soil wall selects following measure to carry out insulated heat: plastic covering film nails on insulation foam plate;
Using intermittent freezing method, every freeze-off time 30min interval 10min.
This engineering sets 16 deviational survey holes, 32 horizontal displacement monitoring points, it was found from monitoring result: from soil mass displacement at the deep layer altogether
Monitoring situation sees that 16 deviational survey hole maximum displacements are much smaller than alarming value 50mm, illustrates that soil mass displacement at the deep layer is little, goes along with sb. to guard him knot
Soil stabilization on the outside of structure, building enclosure are safe and reliable.In terms of underground ceiling and surrounding building horizontal displacement monitoring situation, 32
Horizontal displacement monitoring point is both less than alarming value 40mm, illustrates that building enclosure deformation is smaller, work progress is safe and reliable.