CN107100172B - Without inner support basement construction method for supporting - Google Patents

Without inner support basement construction method for supporting Download PDF

Info

Publication number
CN107100172B
CN107100172B CN201710293005.1A CN201710293005A CN107100172B CN 107100172 B CN107100172 B CN 107100172B CN 201710293005 A CN201710293005 A CN 201710293005A CN 107100172 B CN107100172 B CN 107100172B
Authority
CN
China
Prior art keywords
frozen soil
soil wall
equal
basement
less
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710293005.1A
Other languages
Chinese (zh)
Other versions
CN107100172A (en
Inventor
罗海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tancheng Economic Development Zone Pharmaceutical Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710293005.1A priority Critical patent/CN107100172B/en
Publication of CN107100172A publication Critical patent/CN107100172A/en
Application granted granted Critical
Publication of CN107100172B publication Critical patent/CN107100172B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/11Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
    • E02D3/115Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means by freezing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/14Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against frost heaves in soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Abstract

The invention discloses a kind of no inner support basement construction method for supporting, it is characterized in that cast-in-situ bored pile is arranged as support pile in basement outer edge, from the position 1~1.3m on the outside of cast-in-situ bored pile, frozen soil wall is set, pressure relief vent is arranged in the position 50~60cm on the outside of freezing hole, each freezing hole two pressure relief vents of corresponding arrangement, release bore dia are 25~30cm.Frozen soil arch springing is arranged every 8m~12m in frozen soil wall, and freezing pipe is arranged according to soil property in frozen soil wall.Frozen soil wall is every 3 across the horizontal prestressing apparatus of setting;Capping beam is set at the top of frozen soil wall and frozen soil arch springing.

Description

Without inner support basement construction method for supporting
Technical field
The present invention relates to a kind of no inner support basement construction method for supporting, are suitable for the realm of building construction.
Background technique
Basement support form is many kinds of at present, and various supporting schemes reach its maturity, and different basement support systems are suitable For different situations, when selection, should follow the principle of " safety, economic, feasible ", first according to engineering geology and hydrogeology Condition, basement depth, adjacent buildings and road traffic condition and surrounding enviroment etc., it is comprehensive by calculating, then through technology, economy Final go along with sb. to guard him and supporting form is determined after composition and division in a proportion choosing.The inner support of basement can be excavated to basement and bring larger difficulty, such as Fruit can omit inner support and then can not only accelerate construction progress, and can bring very big economic benefit.But omit underground after inner support The capping beam pressure of room can be very big, on the one hand to try the active earth pressure for reducing soil, on the other hand to reinforce the rigid of capping beam Degree.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of no inner support basement construction method for supporting, solve to omit The problem of basement safety after inner support.
Cast-in-situ bored pile is arranged as support pile, from drilling in basement outer edge in technical solution provided by the invention thus Frozen soil wall is arranged in the position 1~1.3m on the outside of bored concrete pile, and pressure relief vent, each freezing hole is arranged in the position 50~60cm on the outside of freezing hole Two pressure relief vents of corresponding arrangement, release bore dia are 25~30cm.Frozen soil arch springing is arranged every 8m~12m in frozen soil wall.
Freezing pipe is arranged according to soil property in frozen soil wall, Computer Numerical Simulation has been carried out to basement supporting, in computer number Be worth in simulation process, following parameter determined according to isothermal distribution trend: for muck soil, freeze tube spacing be greater than or Equal to 0.9m and it is less than 1m;For silt, freezing tube spacing is more than or equal to 1m and to be less than 1.05m;For clay, freezing pipe Spacing be more than or equal to 1.05m, and be less than or equal to 1.1m.Frozen soil wall on the outside answered by curved scissors pressure by passive earth pressure effect Power, frozen soil wall every 3 across horizontal prestressing apparatus is arranged, to alleviate frozen soil wall curved scissors compressive stress state.
Capping beam is set at the top of frozen soil wall and frozen soil arch springing, and capping beam is using two channel steel Two bors d's oeuveres welding, from frozen soil wall Floor stringer is arranged in the mandrel position 0.8~1m of line, and floor stringer uses channel steel, and floor stringer is supported on above engineering pile, at the top of floor stringer Absolute altitude is identical as frozen soil wall elevation of top, and steel strand wires support is arranged at the top of floor stringer, and steel strand wires support uses I-steel, steel strand wires Support is vertically arranged with floor stringer, the two weld connection, and steel strand wires support one end is shelved on above frozen soil wall, and steel strand wires support is another One end overhangs floor stringer out, and steel strand wires support overhangs direction top and preformed hole is arranged, and steel strand wires pass through capping beam preformed hole and steel Twisted wire support preformed hole is fixed the steel strand wires after tensioning by anchorage.
Room cutting depth is chosen under frozen soil wall thickness base area, when being greater than or equal to 8m for basement depth, freezes The control of cob wall amount of deflection is basement cutting depth in 0.015H, H;When being less than 8m for basement depth and be greater than or equal to 6m, Frozen soil wall amount of deflection is controlled in 0.012H;When being less than 6m for basement depth, the control of frozen soil wall amount of deflection is in 0.01H and is not less than 50cm.Surrounding enviroment require basement supporting, frozen soil wall thickness to carry out it is following adjust, for basement 10m There is the frozen soil wall deflection value of building multiplied by 1.2 in range;For there is the frozen soil wall of building within the scope of basement 10m to 20m Deflection value is multiplied by 1.1.
Frozen soil wall mean temperature is chosen according to soil property, and for muck soil, mean temperature is more than or equal to -12 DEG C and small In -10 DEG C;For silt, mean temperature is more than or equal to -10 DEG C and less than -9 DEG C, and for clay, mean temperature is average Temperature is more than or equal to -9 DEG C and to be less than -8 DEG C.
Frozen soil arch springing mean temperature is chosen according to soil property, for muck soil, mean temperature be more than or equal to -16 DEG C and Less than -14 DEG C;For silt, mean temperature is more than or equal to -14 DEG C and less than -13 DEG C, and for clay, mean temperature is flat Equal temperature is more than or equal to -13 DEG C and to be less than -12 DEG C.Frozen soil arch springing is the region of high stress, reduces the temperature of this part soil body, with Increase its intensity, becomes the variable strength arch ring of reasonable stress in this way, can save and largely freeze required energy consumption.
As basement excavates, the exposure of frozen soil wall is gradually increased and loss of refrigeration capacity increases, especially true in summer.Temperature Degree, which increases, causes strength of wall body to reduce, and accelerates the development of creep.Therefore the adiabatic heat-insulation of wall is extremely important, or even can become work The key of journey success or failure.Frozen soil wall top surface selects following measure to carry out insulated heat:
(1) plastic covering film or insulation foam plate is nailed on;
(2) top surface gunite concrete, concrete ejection layer make a part of bearing structure simultaneously;
(3) polyurethane foam heat-insulation layer is sprayed in top surface;
(4) cement mixing pile is set outside frozen soil wall, and cement mixing pile diameter is 500~600mm, adjacent cement mixing pile It is mutually twisted, length of action 200mm, cement mixing piling wall not only can be heat-insulated, while combining retaining wall with frozen soil wall.
Frost line develops to non-frozen soil direction when soil freezes, while moisture is reversely migrated to freezing face, at this moment non-frozen soil hole Gap hydraulic pressure reduces, and effective stress increases, and the non-frozen soil contraction caused by consolidating counteracts part frost heave.In order to reduce frost heave to neighbour Intermittent freezing method is taken in the influence closely built, and the frost heave generated when freezing is thus reduced, to reduce freeze-off time and save Freeze expense.Intermittent freezing parameter is as follows: every freeze-off time 30min interval 10min.
The present invention is adaptable, and water isolating is good and does not pollute to ambient enviroment, and social benefit is good;On the other hand the present invention Construction speed is fast, and economic benefit is also very considerable.
Detailed description of the invention
Fig. 1 is foundation pit supporting construction schematic diagram.
In each attached drawing: 1, frozen soil wall, 2, frozen soil arch springing, 3, capping beam, 4, floor stringer, 5, steel strand wires support, 6, steel strand wires, 7, engineering pile, 8, anchorage.
Specific embodiment
Certain basement a length of 67m, width 48m, depth 6.8m, support pile use the cast-in-situ bored pile of diameter 1.4m, along ground Lower room periphery lays 136, spacing 1.6m, and the long 28m of stake, freezing hole is apart from supporting pile center 1.1m.Freezing hole number is 132 A, freezing tube spacing is 1.05m.Pressure relief vent is on the outside of freezing hole, each freezing hole two pressure relief vents of corresponding arrangement.
As shown, capping beam 3 is arranged at the top of frozen soil wall 1 and frozen soil arch springing 2 in the present embodiment, capping beam 3 uses two Floor stringer 4 is arranged from 1 position 0.8~1m of central axis of frozen soil wall in the welding of channel steel Two bors d's oeuveres, and floor stringer 4 uses channel steel, floor stringer 4 It is supported on above engineering pile 7,4 elevation of top of floor stringer is identical as 1 elevation of top of frozen soil wall, and steel strand wires are arranged at the top of floor stringer 4 Support 5, steel strand wires support 5 use I-steel, and 6 support of steel strand wires is vertically arranged with floor stringer 4, the two weld connection, steel strand wires 5 one end of support is shelved on above frozen soil wall 1, and 5 other end of steel strand wires support overhangs floor stringer 4 out, and steel strand wires support 5 overhangs direction Preformed hole is arranged in top, and steel strand wires 6 are complete by tensioning by anchorage 8 by 5 preformed hole of 3 preformed hole of capping beam and steel strand wires support Steel strand wires 6 after finishing are fixed.Frozen soil wall 1 is curved to alleviate frozen soil wall every 3 bracing means across setting basement supporting capping beam Cut compressive stress state.
1 mean temperature of frozen soil wall is -9 DEG C.Frozen soil arch springing is -13 DEG C.
1 top surface of frozen soil wall selects following measure to carry out insulated heat: plastic covering film nails on insulation foam plate;
Using intermittent freezing method, every freeze-off time 30min interval 10min.
This engineering sets 16 deviational survey holes, 32 horizontal displacement monitoring points, it was found from monitoring result: from soil mass displacement at the deep layer altogether Monitoring situation sees that 16 deviational survey hole maximum displacements are much smaller than alarming value 50mm, illustrates that soil mass displacement at the deep layer is little, goes along with sb. to guard him knot Soil stabilization on the outside of structure, building enclosure are safe and reliable.In terms of underground ceiling and surrounding building horizontal displacement monitoring situation, 32 Horizontal displacement monitoring point is both less than alarming value 40mm, illustrates that building enclosure deformation is smaller, work progress is safe and reliable.

Claims (1)

1. a kind of no inner support basement construction method for supporting, it is characterized in that: cast-in-situ bored pile conduct is arranged in basement outer edge Frozen soil wall is arranged from the position 1~1.3m on the outside of cast-in-situ bored pile in support pile, and release is arranged in the position 50~60cm on the outside of freezing hole Hole, each freezing hole two pressure relief vents of corresponding arrangement, release bore dia is 25~30cm;Frozen soil wall is arranged every 8m~12m and freezes Freezing pipe is arranged according to soil property in native arch springing, frozen soil wall, and for muck soil, freezing tube spacing is more than or equal to 0.9m and to be less than 1m;For silt, freezing tube spacing is more than or equal to 1m and to be less than 1.05m;For clay, freezing tube spacing is to be greater than or wait In 1.05m, and it is less than or equal to 1.1m;Room cutting depth is chosen under frozen soil wall thickness base area, for basement depth When more than or equal to 8m, the control of frozen soil wall amount of deflection is basement cutting depth in 0.015H, H;8m is less than for basement depth And when being greater than or equal to 6m, frozen soil wall amount of deflection is controlled in 0.012H;When being less than 6m for basement depth, the control of frozen soil wall amount of deflection In 0.01H and it is not less than 50cm;Surrounding enviroment require basement supporting, frozen soil wall thickness will be carried out to lower It is whole, for there is the frozen soil wall deflection value of building multiplied by 1.2 within the scope of basement 10m;For within the scope of basement 10m to 20m There is the frozen soil wall deflection value of building multiplied by 1.1;
Every 3, across horizontal prestressing apparatus is arranged, capping beam is arranged, capping beam uses in frozen soil wall at the top of frozen soil wall and frozen soil arch springing Floor stringer is arranged from the frozen soil wall position 0.8~1m of central axis in two channel steel Two bors d's oeuveres welding, and floor stringer uses channel steel, floor stringer It being supported on above engineering pile, floor stringer elevation of top is identical as frozen soil wall elevation of top, steel strand wires support is set at the top of floor stringer, Steel strand wires support uses I-steel, and steel strand wires support is vertically arranged with floor stringer, and the two weld connection, steel strand wires support one end is put It sets on frozen soil wall, the steel strand wires support other end overhangs floor stringer out, and steel strand wires support overhangs direction top and preformed hole is arranged, Steel strand wires are fixed the steel strand wires after tensioning by anchorage by capping beam preformed hole and steel strand wires support preformed hole;
Frozen soil wall mean temperature is chosen according to soil property, for muck soil, mean temperature be more than or equal to -12 DEG C and is less than - 10℃;For silt, mean temperature is more than or equal to -10 DEG C and less than -9 DEG C, and for clay, mean temperature is mean temperature For more than or equal to -9 DEG C and less than -8 DEG C;
Frozen soil arch springing mean temperature is chosen according to soil property, and for muck soil, mean temperature is more than or equal to -16 DEG C and small In -14 DEG C;For silt, mean temperature is more than or equal to -14 DEG C and less than -13 DEG C, and for clay, mean temperature is average Temperature is more than or equal to -13 DEG C and to be less than -12 DEG C.
CN201710293005.1A 2015-08-31 2015-08-31 Without inner support basement construction method for supporting Active CN107100172B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710293005.1A CN107100172B (en) 2015-08-31 2015-08-31 Without inner support basement construction method for supporting

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710293005.1A CN107100172B (en) 2015-08-31 2015-08-31 Without inner support basement construction method for supporting
CN201510562855.8A CN105200995B (en) 2015-08-31 2015-08-31 Basement construction method for supporting

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510562855.8A Division CN105200995B (en) 2015-08-31 2015-08-31 Basement construction method for supporting

Publications (2)

Publication Number Publication Date
CN107100172A CN107100172A (en) 2017-08-29
CN107100172B true CN107100172B (en) 2018-12-18

Family

ID=54948928

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201710293005.1A Active CN107100172B (en) 2015-08-31 2015-08-31 Without inner support basement construction method for supporting
CN201510562855.8A Active CN105200995B (en) 2015-08-31 2015-08-31 Basement construction method for supporting
CN201710435924.8A Active CN107165171B (en) 2015-08-31 2015-08-31 Basement supporting frozen construction method

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201510562855.8A Active CN105200995B (en) 2015-08-31 2015-08-31 Basement construction method for supporting
CN201710435924.8A Active CN107165171B (en) 2015-08-31 2015-08-31 Basement supporting frozen construction method

Country Status (1)

Country Link
CN (3) CN107100172B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282495A (en) * 1999-03-26 2000-10-10 Tokyo Gas Co Ltd Low-temperature underground tank
CN203361173U (en) * 2013-07-03 2013-12-25 中交第一公路勘察设计研究院有限公司 Anchoring supporting structure for side slope in permafrost region
CN203411994U (en) * 2013-08-12 2014-01-29 中国建筑第四工程局有限公司 Support pile basement outer wall structure
CN204199305U (en) * 2014-11-06 2015-03-11 兰州理工大学 A kind of active refrigeration and self-recoverage are trembled with fear district's slope retaining structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4093670B2 (en) * 1999-02-23 2008-06-04 株式会社大林組 Dismantling method of underground structure
CN1243162C (en) * 2003-04-01 2006-02-22 中国矿业大学 Underground continuous wall frozen construction method
CN101487261B (en) * 2009-01-21 2010-06-09 浙江中成建工集团有限公司 Profiled bar freezing wall foundation ditch combined enclosure method and its structure
CN102839670A (en) * 2011-06-22 2012-12-26 上海市政工程设计研究总院(集团)有限公司 Shallow foundation pit freezing enclosure and construction method thereof
CN103850258B (en) * 2014-03-24 2016-06-29 北京城建勘测设计研究院有限责任公司 A kind of weather freezing method for protecting support
CN104074525B (en) * 2014-07-02 2016-02-24 南京林业大学 Full-face pouring, rectangular horizontal are freezed and pipe canopy joint reinforcement structure and method
CN104832196B (en) * 2015-03-31 2018-08-21 中铁时代建筑设计院有限公司 Pipe curtain freezing process supporting construction and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282495A (en) * 1999-03-26 2000-10-10 Tokyo Gas Co Ltd Low-temperature underground tank
CN203361173U (en) * 2013-07-03 2013-12-25 中交第一公路勘察设计研究院有限公司 Anchoring supporting structure for side slope in permafrost region
CN203411994U (en) * 2013-08-12 2014-01-29 中国建筑第四工程局有限公司 Support pile basement outer wall structure
CN204199305U (en) * 2014-11-06 2015-03-11 兰州理工大学 A kind of active refrigeration and self-recoverage are trembled with fear district's slope retaining structure

Also Published As

Publication number Publication date
CN107100172A (en) 2017-08-29
CN107165171A (en) 2017-09-15
CN105200995B (en) 2018-01-19
CN107165171B (en) 2019-06-07
CN105200995A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN104963689A (en) Three-step seven-procedure excavation method for tunnel
CN101985882A (en) Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel
Su et al. Study on gob-side entry retaining in fully-mechanized longwall with top-coal caving and its application
CN111648387B (en) Construction method of stiffness variable-section high-pressure jet grouting pile slide-resistant wall
CN105951848A (en) Non-intermittent composite transfer structure for super-deep foundation pit support and construction method
JP6279945B2 (en) Soil surface anti-slip method for earth structure
CN102042019A (en) Two-stair five-step excavation construction method for shallow-buried large-span soft plastic clay tunnel
CN110206038B (en) Supporting structure at external corner of concave foundation pit and construction method
CN110656951A (en) Disaster safety control method for full-face tunnel boring machine excavation extrusion deformation card machine
CN101748736A (en) Construction method for rock anchorage beam of underground workshop
CN101748758A (en) Timbering method of foundation ditches for reforming on-line equipment foundations in factory buildings
CN106193047A (en) Big width base pit stand construction
CN110042828A (en) A kind of positioning device for filling pile reinforcement cage and its application method
CN106988333B (en) Prefabricated bearing platform with dowel bar filling core and construction process thereof
CN109931077B (en) Support system for tunnel repair and construction method thereof
CN103541371A (en) Bearing platform for heating pipe channels to stride reserved subway station and construction method thereof
CN107100172B (en) Without inner support basement construction method for supporting
CN211174126U (en) Open cut tunnel structure
KR101531766B1 (en) Method of Pre-supported tunnel costructed in a soft ground
CN201972711U (en) Device for controlling deformation of near metro tunnel caused by super-deep foundation pit evacuation in soft soil areas
CN104805830A (en) Uplift pile construction method without rock blasting
CN210421076U (en) Protective body mold for micro pile to resist bad characteristics of expansive soil
CN103850693A (en) Method for controlling high ground stress roadway heaving floor
CN103953056A (en) Construction method for high-rise foundation
CN111576435B (en) Construction method and structure of column control slip surface of inter-pile soil steel structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201120

Address after: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee after: Gu Yaobin

Address before: Dasan street of Ouhai District 325000 Zhejiang city of Wenzhou province higher education garden building 16 room 1204

Patentee before: Luo Haijun

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230104

Address after: Room 707, Administrative Committee of Tancheng Economic Development Zone, Linyi City, Shandong Province, 276100

Patentee after: Tancheng Economic Development Zone Pharmaceutical Development Co.,Ltd.

Address before: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee before: Gu Yaobin

TR01 Transfer of patent right