CN110042828A CN201910413843.7A CN201910413843A CN110042828A CN 110042828 A CN110042828 A CN 110042828A CN 201910413843 A CN201910413843 A CN 201910413843A CN 110042828 A CN110042828 A CN 110042828A
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
locating piece
round
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910413843.7A
Other languages
Chinese (zh)
Inventor
崔国昌
高辉
何志文
庞俊刚
翁宏
杨凯
张小刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRSC Engineering Group Co Ltd
Urban Construction Engineering Co Ltd of CRSC Engineering Group Co Ltd
Original Assignee
CRSC Engineering Group Co Ltd
Urban Construction Engineering Co Ltd of CRSC Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRSC Engineering Group Co Ltd, Urban Construction Engineering Co Ltd of CRSC Engineering Group Co Ltd filed Critical CRSC Engineering Group Co Ltd
Priority to CN201910413843.7A priority Critical patent/CN110042828A/en
Publication of CN110042828A publication Critical patent/CN110042828A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Abstract

The invention discloses a kind of positioning device for filling pile reinforcement cage and its application methods;The positioning device includes locating piece, and locating piece is fixed by the connecting rod in the outside of filling pile cage of reinforcement, and locating piece is lower with grout pile and surrounding is uniformly distributed;The locating piece is round concrete hollow block.Round concrete hollow block is between stake holes side wall and steel reinforcement cage in steel reinforcement cage decentralization process, round concrete hollow block is fixed by the connecting rod on steel reinforcement cage, in steel reinforcement cage decentralization process, round concrete hollow block plays the role of idler wheel by directly contacting with stake holes side wall, facilitates steel reinforcement cage and smoothly transfers.Idler wheel is played the role of in the use of positioning device of the present invention, reduces the friction between steel reinforcement cage and hole wall, plays a very good protection;Adjustment steel reinforcement cage positioning time is saved, mechanical efficiency is improved, reduces cost.

Description

A kind of positioning device for filling pile reinforcement cage and its application method
Technical field
The present invention relates to a kind of positioning device for filling pile reinforcement cage and its application methods, belong to the realm of building construction.
Background technique
With the update in epoch, scientific and technological progress, the continuous development of building field, the structure and function of building increasingly increase It is more.The local environment of building is different, and corresponding construction is also different.Building basis is done according to different geological conditions different Scheme processing.Currently, in the majority with pile foundation form.
For original construction technology in steel reinforcement cage decentralization process, mechanical handling is difficult control steel reinforcement cage amplitude of fluctuation, leads to steel Muscle cage protective layer thickness is uneven, needs to carry out machinery and adjusts repeatedly.Time-consuming and laborious, machine wastes are serious.
Summary of the invention
The present invention is intended to provide a kind of positioning device for filling pile reinforcement cage and its application method, round concrete hollow is built Block is fixed by the connecting rod around steel reinforcement cage, and above and below pile body and surrounding is evenly distributed.It is round in steel reinforcement cage decentralization process Concrete hollow block plays the role of idler wheel by directly contacting with stake holes side wall, facilitates steel reinforcement cage and smoothly transfers.
The present invention provides a kind of positioning device for filling pile reinforcement cage, including locating piece, locating piece is fixed by the connecting rod In the outside of filling pile cage of reinforcement, locating piece is lower with grout pile and surrounding is uniformly distributed;The locating piece is round mixed Solidifying soil building-block.
In above-mentioned apparatus, the locating piece is arranged between two vertical main reinforcements of steel reinforcement cage, and connecting rod passes through locating piece Centre bore, the both ends of connecting rod are separately fixed in vertical main reinforcement.Further, the connecting rod uses round steel material, long Degree is determined according to the vertical main reinforcement spacing d of steel reinforcement cage, connects pole length >=d+40mm.
In above-mentioned apparatus, the locating piece with a thickness of 20-30mm, the thickness phase of radius and steel reinforcement cage main reinforcement protective layer Together.Locating piece around pile body up and down be uniformly distributed (horizontal space control in 300mm-500mm, vertical interval 2000mm, plum blossom Arrangement), spacing makes the appropriate adjustments according to bored concrete pile size, smoothly transfers and weighs with stake holes center as long as meeting filling pile cage of reinforcement Conjunction.
In above-mentioned apparatus, the connecting rod is round steel, and connecting rod enables locating piece to be freely rotated centered on connecting rod. Further, the diameter of the round steel is 12mm.
The present invention provides the application methods of above-mentioned positioning device for filling pile reinforcement cage, comprising the following steps:
Round concrete hollow block is between stake holes side wall and steel reinforcement cage in steel reinforcement cage decentralization process, due to round concrete Building-block is uniformly distributed along pile body, can guarantee to avoid steel reinforcement cage from shaking on the inside of stake holes in mechanical handling steel reinforcement cage decentralization process It is dynamic that steel reinforcement cage is caused to be biased to stake holes side.Round concrete hollow block is fixed by the connecting rod on steel reinforcement cage, under steel reinforcement cage During putting, round concrete hollow block plays the role of idler wheel by directly contacting with stake holes side wall, and it is suitable to facilitate steel reinforcement cage Benefit decentralization.
Above-mentioned application method, specifically includes the following steps:
(1) steel reinforcement cage is completed according to design requirement;
(2) round concrete hollow block is installed: firstly, going out round concrete hollow block according to pile body diameter and the calculation of the length of bored pile Distributing position;Secondly, penetrate round concrete hollow block hollow part with round steel, by tied silk wiring by round concrete hollow Building block facade is fixed on steel reinforcement cage outer periphery perpendicular to steel reinforcement cage direction;
(3) steel reinforcement cage handling is transferred: stake holes central cross control point is 1. drawn around stake holes;2. steel reinforcement cage is hung with crane It rises, then slowly decentralization;Concrete circular building-block is directly contacted with stake holes hole wall in decentralization process, round concrete hollow Building block is moved down along the rolling of stake holes side wall, is stopped until being placed into design position;
(4) casting concrete after the completion of steel reinforcement cage handling decentralization.
Beneficial effects of the present invention:
The present invention, as locating piece, is acted on as follows using round concrete hollow cushion block: 1. controlling protective layer thickness;2. playing Idler wheel effect, reduces the friction between steel reinforcement cage and hole wall;3. saving adjustment steel reinforcement cage positioning time, mechanical efficiency, drop are improved Low cost.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention.
Fig. 2 is the top view (amplification) of Fig. 1 of the present invention.
Fig. 3 is the structural schematic diagram of locating piece.
Fig. 4 is the connection relationship diagram of locating piece (side view of Fig. 3) and connecting rod.
In figure: 1 is locating piece, and 2 be connecting rod, and 3 be steel reinforcement cage, and 4 be vertical main reinforcement, and 5 be elongated vertical muscle, and 6 be hoop of putting more energy into, 7 be vertical muscle.
Specific embodiment
The present invention is further illustrated below by embodiment, but is not limited to following embodiment.
Embodiment 1:
As shown in Fig. 1 ~ 4, a kind of positioning device for filling pile reinforcement cage, including locating piece 1, locating piece 1 are fixed on by connecting rod 2 The outside of filling pile cage of reinforcement 3, locating piece 1 is lower with grout pile and surrounding is uniformly distributed;The locating piece 1 is round mixed Solidifying soil building-block.
In above-mentioned apparatus, the locating piece 1 is arranged between two vertical main reinforcements 4 of steel reinforcement cage, and connecting rod 2 passes through positioning The centre bore (as shown in Figure 4) of block 1, the both ends of connecting rod 2 are separately fixed in vertical main reinforcement 4.Further, the connecting rod 2 use round steel material, and length is determined according to the 4 spacing d of vertical main reinforcement of steel reinforcement cage, connect pole length >=d+40mm.
This position main reinforcement distance values design installation drawing illustrates to require to be d=110mm, and connection pole length is 150mm.
In above-mentioned apparatus, the thickness position 20-30mm of the locating piece, radius is identical as the thickness of steel reinforcement cage main reinforcement protective layer.It is fixed Position block around pile body up and down be uniformly distributed (horizontal space control in 300mm-500mm, vertical interval 2000mm, plum blossom cloth Set), spacing makes the appropriate adjustments according to bored concrete pile size, smoothly transfers and is overlapped with stake holes center as long as meeting filling pile cage of reinforcement ?.In the present embodiment, locating piece described in installation first row at 2000mm at the top of office's reinforcing bar, totally 8 pieces;Apart from first row locating piece Locating piece described in second row is installed, totally 8 pieces, blossom type is arranged at 2000mm;
In above-mentioned apparatus, the connecting rod is round steel, and connecting rod enables locating piece to be freely rotated centered on connecting rod.Into one Step ground, the diameter of the round steel are 12mm.
The present invention provides the application methods of above-mentioned positioning device for filling pile reinforcement cage, comprising the following steps:
Round concrete hollow block is between stake holes side wall and steel reinforcement cage in steel reinforcement cage decentralization process, due to round concrete Building-block is uniformly distributed along pile body, can guarantee to avoid steel reinforcement cage from shaking on the inside of stake holes in mechanical handling steel reinforcement cage decentralization process It is dynamic that steel reinforcement cage is caused to be biased to stake holes side.Round concrete hollow block is fixed by the connecting rod on steel reinforcement cage, under steel reinforcement cage During putting, round concrete hollow block plays the role of idler wheel by directly contacting with stake holes side wall, and it is suitable to facilitate steel reinforcement cage Benefit decentralization.
Spiral-digging pore construction process of bored concrete pile is;1. site localization;2. drilling machine pore-forming;3. fabrication of reinforcing cage;4. steel reinforcement cage Handling positioning;5. concreting.Above-mentioned application method, specifically includes the following steps:
(1) steel reinforcement cage is completed according to design requirement;
(2) round concrete hollow block is installed: firstly, going out round concrete hollow block according to pile body diameter and the calculation of the length of bored pile Distributing position;Secondly, penetrate round concrete hollow block hollow part with round steel, by tied silk wiring by round concrete hollow Building block facade is fixed on steel reinforcement cage outer periphery perpendicular to steel reinforcement cage direction;
(3) steel reinforcement cage handling is transferred: stake holes central cross control point is 1. drawn around stake holes;2. steel reinforcement cage is hung with crane It rises, then slowly decentralization;Concrete circular building-block is directly contacted with stake holes hole wall in decentralization process, round concrete hollow Building block is moved down along the rolling of stake holes side wall, is stopped until being placed into design position;
(4) casting concrete after the completion of steel reinforcement cage handling decentralization.
During spiral-digging pore filling pile construction, after the completion of pile hole construction, steel reinforcement cage is carried out in decentralization process, due to rising Steel reinforcement cage weak vibrations are not easy to control thickness of protection tier during hoisting machinery (crane) is hung, and are easy to be biased to steel reinforcement cage In hole wall side, cause protective layer thickness uneven.In conjunction with actual conditions, complete to increase circular hollow protective layer pad in steel reinforcement cage Block both can control protective layer thickness, can also play pulley action, reduce steel bar cage protecting layer machinery adjustment in uneven thickness, Greatly improve construction operation efficiency.
Specific installation method: increasing prefabricated round concrete hollow cushion block on the outside of the steel reinforcement cage to complete, pad Block center penetrates reinforcing bar, binds between steel reinforcement cage two adjacent vertical main reinforcements, and more side directions are uniformly distributed.

Claims (8)

1. a kind of positioning device for filling pile reinforcement cage, it is characterised in that: including locating piece, locating piece, which is fixed by the connecting rod, to be filled The outside of pile cages is infused, locating piece lower and surrounding with grout pile is uniformly distributed;The locating piece is round concrete Building-block.
2. positioning device for filling pile reinforcement cage according to claim 1, it is characterised in that: the locating piece is arranged in reinforcing bar Between the vertical main reinforcement of two of cage, connecting rod passes through the centre bore of locating piece, and the both ends of connecting rod are separately fixed at vertical main reinforcement On.
3. positioning device for filling pile reinforcement cage according to claim 2, it is characterised in that: the length of the connecting rod according to The vertical main reinforcement spacing d of steel reinforcement cage is determining, length >=d+40mm of connecting rod.
4. positioning device for filling pile reinforcement cage according to claim 1, it is characterised in that: the locating piece with a thickness of 20-30mm, locating piece radius are identical as the thickness of steel reinforcement cage main reinforcement protective layer;Locating piece is uniformly distributed up and down around pile body, Horizontal space control arranges that spacing is adjusted according to bored concrete pile size in 300mm-500mm, vertical interval 2000mm in plum blossom It is whole, filling pile cage of reinforcement need to be met and smoothly transfer and be overlapped with stake holes center.
5. positioning device for filling pile reinforcement cage according to claim 1, it is characterised in that: the connecting rod is round steel, even Extension bar enables locating piece to be freely rotated centered on connecting rod.
6. positioning device for filling pile reinforcement cage according to claim 5, it is characterised in that: the diameter of the round steel is 12mm。
7. a kind of application method of the described in any item positioning device for filling pile reinforcement cage of claim 1 ~ 6, it is characterised in that: steel Round concrete hollow block is between stake holes side wall and steel reinforcement cage in muscle cage decentralization process, round concrete hollow block edge Pile body is uniformly distributed, and can guarantee that avoiding steel reinforcement cage from shaking on the inside of stake holes in mechanical handling steel reinforcement cage decentralization process leads to reinforcing bar Cage is biased to stake holes side;Round concrete hollow block is fixed by the connecting rod on steel reinforcement cage, in steel reinforcement cage decentralization process, circle Shape concrete hollow block plays the role of idler wheel by directly contacting with stake holes side wall, facilitates steel reinforcement cage and smoothly transfers.
8. the application method of positioning device for filling pile reinforcement cage according to claim 7, it is characterised in that: including following step It is rapid:
(1) steel reinforcement cage is completed according to design requirement;
(2) round concrete hollow block is installed: firstly, going out round concrete hollow block according to pile body diameter and the calculation of the length of bored pile Distributing position;Secondly, penetrate round concrete hollow block hollow part with round steel, by tied silk wiring by round concrete hollow Building block facade is fixed on steel reinforcement cage outer periphery perpendicular to steel reinforcement cage direction;
(3) steel reinforcement cage handling is transferred: stake holes central cross control point is 1. drawn around stake holes;2. steel reinforcement cage is hung with crane It rises, then slowly decentralization;Concrete circular building-block is directly contacted with stake holes hole wall in decentralization process, round concrete hollow Building block is moved down along the rolling of stake holes side wall, is stopped until being placed into design position;
(4) casting concrete after the completion of steel reinforcement cage handling decentralization.
CN201910413843.7A 2019-05-17 2019-05-17 A kind of positioning device for filling pile reinforcement cage and its application method Pending CN110042828A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910413843.7A CN110042828A (en) 2019-05-17 2019-05-17 A kind of positioning device for filling pile reinforcement cage and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910413843.7A CN110042828A (en) 2019-05-17 2019-05-17 A kind of positioning device for filling pile reinforcement cage and its application method

Publications (1)

Publication Number Publication Date
CN110042828A true CN110042828A (en) 2019-07-23

Family

ID=67282612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910413843.7A Pending CN110042828A (en) 2019-05-17 2019-05-17 A kind of positioning device for filling pile reinforcement cage and its application method

Country Status (1)

Country Link
CN (1) CN110042828A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112355202A (en) * 2020-09-27 2021-02-12 上海宝冶集团有限公司 Cast-in-place pile reinforcement cage main rib mounting and positioning device and using method thereof
CN112431203A (en) * 2020-11-30 2021-03-02 成都悦鉴科技有限公司 Method for lowering super-long prefabricated reinforcement cage
CN112982412A (en) * 2021-01-30 2021-06-18 中交第一航务工程局有限公司 Pile foundation reinforcement cage construction positioning method
CN113216218A (en) * 2021-03-26 2021-08-06 招商局重庆交通科研设计院有限公司 Cutting slope anti-slip structure and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208105245U (en) * 2018-01-11 2018-11-16 李伟 Filling pile cage of reinforcement protective layer cushion block
CN208310007U (en) * 2018-03-30 2019-01-01 上海二十冶建设有限公司 A kind of pore-creating filling pile steel bar cage protecting layer pad device
CN210439282U (en) * 2019-05-17 2020-05-01 通号工程局集团有限公司 Bored concrete pile steel reinforcement cage positioner

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208105245U (en) * 2018-01-11 2018-11-16 李伟 Filling pile cage of reinforcement protective layer cushion block
CN208310007U (en) * 2018-03-30 2019-01-01 上海二十冶建设有限公司 A kind of pore-creating filling pile steel bar cage protecting layer pad device
CN210439282U (en) * 2019-05-17 2020-05-01 通号工程局集团有限公司 Bored concrete pile steel reinforcement cage positioner

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112355202A (en) * 2020-09-27 2021-02-12 上海宝冶集团有限公司 Cast-in-place pile reinforcement cage main rib mounting and positioning device and using method thereof
CN112355202B (en) * 2020-09-27 2022-07-05 上海宝冶集团有限公司 Cast-in-place pile reinforcement cage main rib mounting and positioning device and using method thereof
CN112431203A (en) * 2020-11-30 2021-03-02 成都悦鉴科技有限公司 Method for lowering super-long prefabricated reinforcement cage
CN112982412A (en) * 2021-01-30 2021-06-18 中交第一航务工程局有限公司 Pile foundation reinforcement cage construction positioning method
CN113216218A (en) * 2021-03-26 2021-08-06 招商局重庆交通科研设计院有限公司 Cutting slope anti-slip structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN110042828A (en) A kind of positioning device for filling pile reinforcement cage and its application method
CN106320346B (en) Campshed adds anchor cable grouting behind shaft or drift lining deep foundation pit supporting construction method
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN105089061B (en) Ultra-deep foundation pit supporting method
CN107653884B (en) Steel casing setting device for drilling of sand foundation cast-in-place pile and construction method thereof
CN108222015B (en) Device and method for controlling foundation pit excavation influence by adopting active isolation piles
CN108193608A (en) The cast-in-place road gully of mobile moldbase and construction method
CN108035361A (en) A kind of advanced support supporting construction and its construction method
CN210439282U (en) Bored concrete pile steel reinforcement cage positioner
CN108978644A (en) Energy saving and environment friendly bored pile construction method
CN110847195A (en) Construction method for stable treatment of side and upward slope of large-block-diameter loose rock pile body opening
CN104532843A (en) Method for positioning and straightening steel stand column of stand column pile
CN105839663B (en) On turn over bed course collar tie beam and combine vertical anchor tube reinforcing soft soil foundation ditch method
CN207727608U (en) A kind of fixing device of soft soil foundation tower crane
CN211080280U (en) Large-diameter pile foundation enclosure miniature pile group
CN105155867B (en) A kind of underpinning device of the existing large diameter pile building of Tunnel Passing
CN102660957A (en) Foundation pit supporting construction method for soft soil zone
CN208650088U (en) A kind of street lamp post installation armored concrete prefabricated foundation structure
CN107476293A (en) A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method
CN209384226U (en) A kind of Manual hole pile digging device in shifting sand layers
CN202090357U (en) Pile cap for cluster type pile foundation and immersed tunnel pile foundation
CN207700198U (en) A kind of advanced support supporting construction
CN207176719U (en) Steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch
CN206090570U (en) Rear side grouting device for pile
CN205188950U (en) Bored concrete pile pile cover and stake integrated construction device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination