CN107100048A - A kind of filling construction method of air bubble mix light-textured soil in the newly-built road in flat country - Google Patents
A kind of filling construction method of air bubble mix light-textured soil in the newly-built road in flat country Download PDFInfo
- Publication number
- CN107100048A CN107100048A CN201710282205.7A CN201710282205A CN107100048A CN 107100048 A CN107100048 A CN 107100048A CN 201710282205 A CN201710282205 A CN 201710282205A CN 107100048 A CN107100048 A CN 107100048A
- Authority
- CN
- China
- Prior art keywords
- air bubble
- mix light
- bubble mix
- textured soil
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/10—Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/35—Toppings or surface dressings; Methods of mixing, impregnating, or spreading them
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/36—Coherent pavings made in situ by subjecting soil to stabilisation
Abstract
The present invention relates to the technical field of construction, more particularly to a kind of air bubble mix light-textured soil is in the filling construction method of the newly-built road in flat country.Construction site, placement, commissioning device are cleared up first;The match ratio index of debugging air bubble mix light-textured soil is required according to road construction;In construction position excavation pit, pour substrate and be fully compacted;Panel basis is poured, and lays panel is installed after blotter;Subsiding crack is set to close mould, fixed reinforced mesh;Pour air bubble mix light-textured soil;Pre-hardening rear top surface covering curing is poured;All pour light soil top surface after completion and re-lay waterproof geotextiles, carry out backfill construction in groove.Conventional earth and stone material is replaced from air bubble mix light-textured soil, because unit weight is lighter, has higher-strength after mitigating load, and air bubble mix light-textured soil hardening.Both sides traffic aisle can be set on ground, solve the problems, such as channel stagnant water, and top can also be filled using air bubble mix light-textured soil, because the unit weight of air bubble mix light-textured soil is low, and caused sedimentation is small.
Description
Technical field
The present invention relates to the technical field of construction, more particularly to a kind of air bubble mix light-textured soil are newly-built in flat country
The filling construction method of road.
Background technology
Plains region physical features is flat, broad view, and basic farmland proportion is higher, and carrying out highway in this region builds
If being the necessary substantial amounts of arable land of occupancy, because region of no relief village is intensive, populous, road network is interlaced, and existing flat land
Area's highway is generally that original ground is built.Original place, which is built, has following some problems:1st, the ponding that both sides resident traffic aisle is present oozes
Water problems, pitch problems and settlement issues;2nd, both sides of highway Drainage Design problem;3rd, highway blocks local Problems of Water Conservancy.Although
More farmland issue can be taken by raising roadbed and reducing highway, but is existed and fetched earth difficult and can increase the bearing capacity to ground
It is required that, and newly-built, enlarging highway faces expropriation of land hardly possible, and removal expense is high, hinder the traffic such as both sides of highway personnel, livestock, equipment
The problems such as dealing.
Existing highway construction is all the land type and structure according to project region, emphasis avoid basic farmland and
The sensitizing ranges such as high yield good farmland, select rational pouring construction method, are the most basic demands of newly-built road.
The content of the invention
The technical problems to be solved by the invention, which are to provide, can mitigate load and with the one of advantages of higher compressive strength and rigidity
Plant filling construction method of the air bubble mix light-textured soil in the newly-built road in flat country.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of air bubble mix light-textured soil is newly-built in flat country
The filling construction method of road, S1:Construction site is cleaned out and flattened, the relevant device of light soil stirring, debugging is laid
Equipment;
S2:The match ratio index of debugging air bubble mix light-textured soil is required according to road construction, the match ratio index includes
Wet density, fluidity and compression strength;
S3:In construction position excavation pit, pour substrate and be fully compacted;Panel basis is poured in substrate, and is laid broken
Panel is installed after stone bed course;
S4:Subsiding crack is set to close mould in foundation ditch, opsition dependent fixes reinforced mesh;
S5:Air bubble mix light-textured soil is poured in foundation ditch;
S6:Pour and poured the top surface covering curing of the air bubble mix light-textured soil of completion after initial set;
S7:Light soil top surface after completion is all poured by form of fracture and re-lays waterproof geotextiles, is then carried out in groove
Backfill construction.
Further:In the S2 unit weight grade of air bubble mix light-textured soil be W3~W15, strength grade be CF0.4~
CF25, fluidity is 180mm ± 20mm.
Further:Multiple compacting operation is carried out in the S3 when pouring substrate.
Further:The single of air bubble mix light-textured soil pours 0.8 meter of thickness in the S5.
Further:The step of S5-S7, is repeated successively from the bottom to top according to the depth of foundation ditch.
Further:The curing time of the S6 is more than 7d.
Based on above-mentioned technical proposal, the beneficial effects of the invention are as follows:
1st, conventional earth and stone material is replaced from air bubble mix light-textured soil, the more native stone backfill material of unit weight of air bubble mix light-textured soil
Low many of unit weight, it is smaller to earthen foundation active force, and have higher-strength after air bubble mix light-textured soil hardening, can be according to road
Design needs to carry out the suitable air bubble mix light-textured soil of selection proportioning.
2nd, both sides traffic aisle can be set on ground, solve the problems, such as channel stagnant water, and top is filled out using air bubble mix light-textured soil
Build, because the unit weight of air bubble mix light-textured soil is low, caused sedimentation is small.
3rd, unit weight is light, and excessive pressure will not be produced to ground, relatively low to foundation requirement.
4th, short time limit, easy construction saves time cost.
5th, road surface will not ponding, both sides of the road draining is easy.
Brief description of the drawings
Fig. 1 is a kind of method stream of the air bubble mix light-textured soil of the invention in the filling construction method of the newly-built road in flat country
Cheng Tu;
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and
It is non-to be used to limit the scope of the present invention.
Embodiment 1
A kind of air bubble mix light-textured soil is in the filling construction method of the newly-built road in flat country, and step is as follows:
S1:Construction site is cleaned out and flattened, lays, debug lightweight soil stirring equipment;
S2:The match ratio index of debugging air bubble mix light-textured soil, the wet density grade of light soil are required according to road construction
For W3, compression strength is CF0.4, and fluidity is 160mm;
S3:In construction position excavation pit, pour substrate and be fully compacted;Panel basis is poured in substrate, and is laid broken
Panel is installed after stone bed course;
S4:Subsiding crack is set to close mould in foundation ditch, opsition dependent fixes reinforced mesh;
S5:Air bubble mix light-textured soil is poured in foundation ditch, thickness is poured every time for 0.8m;
S6:Pour and poured the top surface covering curing of the air bubble mix light-textured soil of completion after initial set, curing time is 8
My god;
S7:Light soil top surface after completion is all poured by form of fracture and re-lays waterproof geotextiles, is then carried out in groove
Backfill construction.
It is finally completed filling construction of the air bubble mix light-textured soil in the newly-built road in flat country.
Embodiment 2
A kind of air bubble mix light-textured soil is in the filling construction method of the newly-built road in flat country, and step is as follows:
S1:Construction site is cleaned out and flattened, lays, debug lightweight soil stirring equipment;
S2:The match ratio index of debugging air bubble mix light-textured soil, the wet density grade of light soil are required according to road construction
For W15, compression strength is CF25, and fluidity is 200mm;
S3:In construction position excavation pit, pour substrate and be fully compacted;Panel basis is poured in substrate, and is laid broken
Panel is installed after stone bed course;
S4:Subsiding crack is set to close mould in foundation ditch, opsition dependent fixes reinforced mesh;
S5:Air bubble mix light-textured soil is poured in foundation ditch, thickness is poured every time for 0.8m;
S6:Pour and poured the top surface covering curing of the air bubble mix light-textured soil of completion after initial set, curing time is 8
My god;
S7:Light soil top surface after completion is all poured by form of fracture and re-lays waterproof geotextiles, is then carried out in groove
Backfill construction.
It is finally completed filling construction of the air bubble mix light-textured soil in the newly-built road in flat country.
The present invention relates to the technical field of construction, more particularly to a kind of air bubble mix light-textured soil are newly-built in flat country
The filling construction method of road.Construction site is cleaned out and flattened first, the relevant device that light soil is mixed and stirred is laid, debugging
Equipment;According to road construction require debugging air bubble mix light-textured soil match ratio index, the match ratio index include wet density,
Fluidity and compression strength;In construction position excavation pit, pour substrate and be fully compacted;Panel basis is poured in substrate, and
Panel is installed after laying blotter;Subsiding crack is set to close mould in foundation ditch, opsition dependent fixes reinforced mesh;Pour bubble mixing
Light soil;Pre-hardening rear top surface covering curing is poured;Light soil top surface after completion is all poured by form of fracture and re-lays waterproof
Geotextiles, then carry out other projects under construction such as backfill construction in groove.Conventional earth and stone material is replaced from air bubble mix light-textured soil,
It is smaller to earthen foundation active force because unit weight is lighter, and have higher-strength after air bubble mix light-textured soil hardening, can be according to road
Design needs to carry out the suitable air bubble mix light-textured soil of selection proportioning.And both sides traffic aisle can be set on ground, passage is solved
Ponding problem, top is filled using air bubble mix light-textured soil, because the unit weight of air bubble mix light-textured soil is low, and caused sedimentation is small.
Presently preferred embodiments of the present invention is these are only, is not intended to limit the invention, it is all in the spirit and principles in the present invention
Within, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.
Claims (6)
1. a kind of air bubble mix light-textured soil is in the filling construction method of the newly-built road in flat country, it is characterised in that:Including following
Step:
S1:Construction site is cleaned out and flattened, the relevant device of light soil stirring, commissioning device is laid;
S2:The match ratio index of debugging air bubble mix light-textured soil is required according to road construction, the match ratio index includes wet hold
Weight, fluidity and compression strength;
S3:In construction position excavation pit, pour substrate and be fully compacted;Panel basis is poured in substrate, and lays rubble pad
Panel is installed after layer;
S4:Subsiding crack is set to close mould in foundation ditch, opsition dependent fixes reinforced mesh;
S5:Air bubble mix light-textured soil is poured in foundation ditch;
S6:Pour and poured the top surface covering curing of the air bubble mix light-textured soil of completion after initial set;
S7:Light soil top surface after completion is all poured by form of fracture and re-lays waterproof geotextiles, then carries out backfilling in groove
Construction.
2. a kind of air bubble mix light-textured soil according to claim 1 is in the filling construction method of the newly-built road in flat country,
It is characterized in that:The unit weight grade of air bubble mix light-textured soil is W3~W15 in the S2, and strength grade is CF0.4~CF25, stream
Dynamic degree is 180mm ± 20mm.
3. a kind of air bubble mix light-textured soil according to claim 1 is in the filling construction method of the newly-built road in flat country,
It is characterized in that:Multiple compacting operation should be carried out in the S3 when pouring substrate.
4. a kind of air bubble mix light-textured soil according to claim 1 is in the filling construction method of the newly-built road in flat country,
It is characterized in that:The single of air bubble mix light-textured soil pours 0.8 meter of thickness in the S5.
5. a kind of air bubble mix light-textured soil according to claim 1 is in the filling construction method of the newly-built road in flat country,
It is characterized in that:The step of S5-S7, is repeated successively from the bottom to top according to the depth of foundation ditch.
6. a kind of air bubble mix light-textured soil according to claim 1 is in the filling construction method of the newly-built road in flat country,
It is characterized in that:The curing time of the S6 is more than 7d.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710282205.7A CN107100048A (en) | 2017-04-26 | 2017-04-26 | A kind of filling construction method of air bubble mix light-textured soil in the newly-built road in flat country |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710282205.7A CN107100048A (en) | 2017-04-26 | 2017-04-26 | A kind of filling construction method of air bubble mix light-textured soil in the newly-built road in flat country |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107100048A true CN107100048A (en) | 2017-08-29 |
Family
ID=59658039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710282205.7A Pending CN107100048A (en) | 2017-04-26 | 2017-04-26 | A kind of filling construction method of air bubble mix light-textured soil in the newly-built road in flat country |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107100048A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111335094A (en) * | 2020-02-26 | 2020-06-26 | 北京市市政工程研究院 | Method for preparing flowing material by using tail dust of asphalt mixing station and backfilling engineering part |
CN114059424A (en) * | 2021-12-16 | 2022-02-18 | 陕西建工机械施工集团有限公司 | Limited space road widening construction method and assembly type foam concrete panel |
CN116535234A (en) * | 2023-04-23 | 2023-08-04 | 中铁二十局集团第五工程有限公司 | Bubble-mixed light filling material and filling soil |
WO2023159712A1 (en) * | 2022-02-24 | 2023-08-31 | 广东盛瑞科技股份有限公司 | In-situ road construction method using in-situ soil |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130008149A (en) * | 2011-07-12 | 2013-01-22 | 주식회사 테크월솔루션 | The piling method of earth for road pavement |
DE102013209592A1 (en) * | 2012-05-25 | 2013-11-28 | Faber Betonpompen B.V. | Preparation of transmissive foamed concrete used for translucent component used as substrate for e.g. sports field, involves mixing water, concrete-strengthening fiber, cement and plasticizer, and foaming mixture with foaming agent |
CN105926393A (en) * | 2016-04-27 | 2016-09-07 | 重庆燕皓建筑材料有限公司 | Method for filling embankments by using bubble mixed light soil |
-
2017
- 2017-04-26 CN CN201710282205.7A patent/CN107100048A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130008149A (en) * | 2011-07-12 | 2013-01-22 | 주식회사 테크월솔루션 | The piling method of earth for road pavement |
DE102013209592A1 (en) * | 2012-05-25 | 2013-11-28 | Faber Betonpompen B.V. | Preparation of transmissive foamed concrete used for translucent component used as substrate for e.g. sports field, involves mixing water, concrete-strengthening fiber, cement and plasticizer, and foaming mixture with foaming agent |
CN105926393A (en) * | 2016-04-27 | 2016-09-07 | 重庆燕皓建筑材料有限公司 | Method for filling embankments by using bubble mixed light soil |
Non-Patent Citations (4)
Title |
---|
李思清等: "气泡混合轻质土技术在高速公路扩建工程中的应用研究", 《公路》 * |
李柏霖等: "气泡轻质混合料在特殊填筑路段施工中的应用", 《中国新技术新产品》 * |
高义: "气泡混合轻质土在沿海地区互通立交工程中的应用", 《城市道桥与防洪》 * |
高义: "气泡混合轻质土在沿海地区互通立交工程中的应用", 《管理施工》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111335094A (en) * | 2020-02-26 | 2020-06-26 | 北京市市政工程研究院 | Method for preparing flowing material by using tail dust of asphalt mixing station and backfilling engineering part |
CN114059424A (en) * | 2021-12-16 | 2022-02-18 | 陕西建工机械施工集团有限公司 | Limited space road widening construction method and assembly type foam concrete panel |
WO2023159712A1 (en) * | 2022-02-24 | 2023-08-31 | 广东盛瑞科技股份有限公司 | In-situ road construction method using in-situ soil |
CN116535234A (en) * | 2023-04-23 | 2023-08-04 | 中铁二十局集团第五工程有限公司 | Bubble-mixed light filling material and filling soil |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107100048A (en) | A kind of filling construction method of air bubble mix light-textured soil in the newly-built road in flat country | |
CN109914173B (en) | Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof | |
CN205874850U (en) | Railway soft soil foundation light soil roadbed structure | |
CN107419630A (en) | A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction | |
CN203960883U (en) | One both wired high embankment is helped wide ruggedized construction | |
CN101634143A (en) | Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay | |
CN206902488U (en) | A kind of soft soil foundation high-filled embankment of effectively control settlement after construction | |
CN107805987A (en) | The hassock layer Foam lightweight soil road structure and construction method in deep soft foundation section | |
CN109972469A (en) | The weak subgrade processing unit and method of modular replacement stone pile composite foundation combination surcharge preloading | |
CN108412016A (en) | Underground tube body assures construction method | |
CN208472893U (en) | Plain stage of slope double-layer drainage ditch structure | |
CN107905249A (en) | A kind of novel earthquake-proof supporting and retaining system backfills composite construction | |
CN105926393A (en) | Method for filling embankments by using bubble mixed light soil | |
CN207295358U (en) | A kind of platform back of the body for preventing bumping at bridge-head and road surface drainage structure | |
CN206815127U (en) | The soft interim sidewalk laying structure in base | |
CN106592363A (en) | Construction method for municipal soft soil roadbed | |
CN107151960A (en) | The soft interim sidewalk laying structure in base and laying method | |
CN212001226U (en) | Backfill miscellaneous soil composite foundation structure | |
CN212248109U (en) | Clay core rock-fill dam built by adopting soil with high liquid limit, high plasticity and high clay particle content | |
CN102839647B (en) | Stirring pile-permeable concrete pile compound foundation and treatment method thereof | |
CN202830673U (en) | Existing embankment heightening structure for limited using land area | |
CN102251499B (en) | Ecological permeability reducing method and ecological permeability reducing soil for river | |
CN208884292U (en) | Soft soil roadbed and normal roadbed intersection anti-settling structure | |
CN104532869A (en) | Method used for improving anti-pulling performance of power transmission line tower foundation in drift sand region | |
CN106836034A (en) | A kind of high roadbed slab culvert flexibility off-load system and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190426 Address after: 409600 Room 2-527, Science and Technology Incubation Building B, Pengshui Miao Tujia Autonomous County, Chongqing Applicant after: Chongqing Obsidian Technology Co., Ltd. Address before: 402260 No. 2 Building, Block 2-7, Anjufang District, Yaohe Valley, Guoba Village, Luohuang Town, Chongqing Applicant before: Chongqing Yanhao Building Material Co., Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170829 |