CN1070840A CN 92110918 CN92110918A CN1070840A CN 1070840 A CN1070840 A CN 1070840A CN 92110918 CN92110918 CN 92110918 CN 92110918 A CN92110918 A CN 92110918A CN 1070840 A CN1070840 A CN 1070840A
Authority
CN
China
Prior art keywords
tower
adsorption
towers
pressure
hydrogen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 92110918
Other languages
Chinese (zh)
Other versions
CN1025110C (en
Inventor
曹寿康
梁福忠
刘中捷
王文彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petrochemical Corp
Sinopec Luoyang Guangzhou Engineering Co Ltd
Original Assignee
Sinopec Luoyang Petrochemical Engineering Corp
China Petrochemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Luoyang Petrochemical Engineering Corp, China Petrochemical Corp filed Critical Sinopec Luoyang Petrochemical Engineering Corp
Priority to CN 92110918 priority Critical patent/CN1025110C/en
Publication of CN1070840A publication Critical patent/CN1070840A/en
Application granted granted Critical
Publication of CN1025110C publication Critical patent/CN1025110C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Gases By Adsorption (AREA)

Abstract

The invention provides a kind of ten tower process that are applicable to from hydrogeneous unstripped gas with pressure-changed adsorption concentrating hydrogen, i.e. L10-4-4 technology.It by absorption, regenerate and the step of boosting constitutes, be characterized in that four towers are in adsorption step simultaneously, adopted and all pressed for four times, rise and the pressurising of product hydrogen for four times.Improved the processing power of device, made product hydrogen increase the yield of 1~2% (body).

Description

The technology of pressure-changed adsorption concentrating hydrogen
The invention belongs to the gas delivery field, relate in particular to transformation absorption (PSA) process of separating hydrogen gas from hydrogen-containing gas.Its international Patent classificating number is B01D53/04.
As everyone knows, in many oil refining and chemical plant installations dispensing gas, all contain hydrogen, for example: devices such as hydrofining, hydrocracking, catalytic cracking, synthetic ammonia, hydrocarbon cracking system alkene, synthesizing methanol, catalytic reforming.That is discharged out contains hydrogen mixed gas, also contains N usually 2, CO, CO 2, H 2O, Ar and C 1-C 4Hydrocarbon etc.
About the separation of gas, as far back as U.S.P3 in 1969,430,418 disclosed the PSA technology of once all pressing; U.S.P.3 in 1971,564,816 disclose the PSA technology that four tower secondaries are all pressed, and this technology is widely used in separates hydrogeneous gas mixture, and its hydrogen purity reaches 99.999%.Be expansion instrument throughput, improve hydrogen recovery rate, U.S.P.3,986,849[1] multitower PSA technology disclosed.[1] be 10 adsorption tower technical process, all pressures are arranged in a loop cycle three times, each constantly always has three adsorption towers to be in adsorption step, and other seven towers are in the different regeneration stages respectively.This technology is called for short 10-3-3 flow process (referring to accompanying drawing 1), and the working routine of adsorption tower is seen accompanying drawing 2.Found out that by figure this technology is promptly carried out all pressing for three times, forward put pressures, reversely puts pressure, washes after certain tower adsorption step finishes, a loop cycle is finished in three pressurisings, the pressurising of product hydrogen.USP4402712[2] new 10 tower PSA technologies (seeing accompanying drawing 3,4) are disclosed.It is three all pressure, the absorption of four towers, abbreviates the 10-3-4 technical process as.Its goal of the invention is to solve the method that can handle two kinds of unstripped gass simultaneously.After certain tower adsorption step finishes, begin to carry out all to press for three times, forward put pressure, reversely then put pressures, wash.Regeneration step finishes.Then, enter the step of boosting, i.e. three pressurisings, the pressurising of product hydrogen has entered adsorption step again.Document [2] is compared with [1], and its difference is that [2] can adopt two kinds of unstripped gass, and two feeding lines are arranged, two waste lines, and four towers are in adsorbed state simultaneously.When processing power was identical, [2] wanted littler than the adsorption tower size of [1].The weak point of document [2] is: when the hydrogen richness of two kinds of unstripped gass differs bigger, if by hydrogeneous high unstripped gas design adsorption time, the absorb leading-edge of then handling in the low adsorption tower of hydrogen richness will penetrate, and can not guarantee the purity of product hydrogen; If by low hydrogeneous unstripped gas design adsorption time, the sorbent material of then handling in the high hydrogenous adsorption tower can not make full use of, and will reduce the yield of product hydrogen.Moreover, when one of unstripped gas flow changes, then can not adjust adsorption cycle automatically, thereby make it can not be in optimal operational condition with fluctuations in discharge.
The present invention proposes a kind of improved being used for from containing ten tower pressure swing adsorption techniques of hydrogen mixed gas separating and concentrating hydrogen.The yield of the hydrogen product of this technology is than prior art height, and under the same treatment ability, its sorbent material lacks than the consumption of 10-3-3 flow process, and the adsorption tower size is littler than 10-3-3.
Ten tower flow processs of the present invention are four all pressures, and four towers adsorb simultaneously, abbreviate the L10-4-4 technical process as.This technology at any time in, always have four towers to be in adsorption step, other six towers then are in the different regeneration and the step of boosting respectively.This technology by absorption, regenerate and three steps of boosting constitute a loop cycle.Separated unstripped gas enters adsorption tower through feed line, and through adsorbents adsorb, product hydrogen is delivered to the hydrogen basin by the product pipeline.After adsorption step is finished, enter regeneration step.Regeneration step comprises all presses, forward puts pressure four times, reversely puts pressures, washes.After regeneration step finishes, enter (also claiming pressurising, the down together) step of boosting.The step of boosting comprises: four pressurisings and the pressurising of product hydrogen.So just finished a loop cycle.L10-4-4 technology of the present invention always has four towers to be in adsorption step in arbitrary moment of operation, and all the other each towers are in the regeneration and the step of boosting respectively.
Adopt the present invention can bring into play the effect of sorbent material to greatest extent, can improve hydrogen yield 1-2%(body).
Accompanying drawing 1-8 and nomenclature thereof:
Accompanying drawing 1 is the PSA10-3-3 schema;
Accompanying drawing 2 is each tower working routine of PSA10-3-3 flow process;
Accompanying drawing 3 is PSA10-3-4 schemas;
Accompanying drawing 4 is each tower working routine of PSA10-3-4 flow process;
Accompanying drawing 5 is PSAL10-4-4 schemas;
Accompanying drawing 6 is each tower working routine of PSAL10-4-4 flow process;
Accompanying drawing 7 is each tower working routine of PSA L8-2-3 flow process;
Accompanying drawing 8 is each tower working routine of PSA L5-2-2 flow process.
Symbol in the accompanying drawing:
A-absorption, E1D-once all presses,
The E2D-secondary is all pressed, and E3D-all presses for three times,
E4D-all presses for four times, and PP-is forward put pressure,
The reverse pressure of putting of D-, the P-flushing,
A pressurising of E1R-(promptly boosting, down together), the pressurising of E2R-secondary,
Three pressurisings of E3R-, four pressurisings of E4R-,
The pressurising of R-product gas, the Ff-unstripped gas,
Wg-waste gas, P H-product hydrogen;
The numbering of adsorption tower is respectively with Arabic numerals 1,2,3,4,5,6,7,8,9,10 expressions; Dated digital valve among the figure (
Figure 921109180_IMG1
) be stopping valve.
PSA L10-4-4 technology of the present invention is that 10 adsorption towers are divided into odd number (being tower 1,3,5,7,9) series and two series of even number (being tower 2,4,6,8,10) series, their shared feed line, an exhaust pipe and a product pipeline respectively.
Below by accompanying drawing 5-8 PSAL10-4-4 technology of the present invention is carried out concrete description.
Now take tower 1 as example. Unstripped gas enters adsorption tower 1 by valve 11, and product hydrogen is delivered to product storage tank by valve 12 by shared product line, and impurity is adsorbed by the adsorbent in the tower. The absorption step of tower 1 enters the regeneration step after finishing, and the adsorbent of tower 1 is regenerated. Tower 1 is once all pressed (E1D) by valve 16,66 pairs of towers 6, (this moment tower 6 be the 4th time boost), by valve 16,76 pairs of towers 7 carry out secondary and all press (E2D) (tower 7 is to boost for the third time), undertaken three times and all press (E3D) by valve 13,83 pairs of towers 8, (tower 8 be boost for the second time) all presses (E4D) to be by valve 13,93, tower 9 is once boosted the 4th time. All press the hydrogen that to store in the tower 1 to be recovered in tower 6,7,8,9 four towers by above-mentioned four times, improved simultaneously their pressure, impurity on tower 1 adsorbent obtains the part desorb, tower 1 after all pressing for four times forward bleeds off pressure (PP) by valve 15,105,104, to tower 10 flushings, the impurity on desorber 10 adsorbents. Afterwards, tower 1 carries out reverse bleeding off pressure (D) by valve 14, makes the further desorb of impurity on tower 1 adsorbent, and the exhaust pipe discharger by sharing. Then, forward bleed off pressure gas with tower 2 and wash (P) by valve 25,15,14 pairs of towers 1. Tower 1 regeneration step finishes. The gas of then, all pressing for the 4th time with tower 3 carries out pressurising (E one time by valve 33,13 pairs of towers 11R); The body of all calming the anger for the third time with tower 4 passes through valve 43,13 couples of tower 1 for the second time pressurising (E2R); Pass through with the body of all calming the anger the second time of tower 5 Valve 56, the 16 pairs of towers 1 be pressurising (E for the third time1R); All calm the anger for the first time body by valve 66, the 4th pressurising of 16 pairs of towers 1 with tower 6, use at last product hydrogen that adsorptive pressure is arrived in tower 1 pressurising (R). Finished a cycle period of absorption divided gas flow.
When tower 1 had been finished absorption (A) step, tower 5 had entered the absorption step. Enter the tower 1 of regeneration step when having finished the second time when all pressing, tower 2 has been finished the absorption step, and tower 6 has entered the absorption step. This shows two adjacent adsorption towers ( tower 1,2,3 for example ...) between differed for two steps (seeing accompanying drawing 6), whenever carrying out two step regeneration then has a tower to finish the absorption step, has simultaneously another adsorption tower to finish to boost step and enters the absorption step.
PSA L10-4-4 technology of the present invention, in operational process, parts under certain tower break down, when causing this tower not run well, then can (automatically or manually) switch to the operation of eight towers by the operation of ten towers, promptly become secondary and all press, eight tower flow processs of three towers absorption abbreviate PSA L8-2-3 flow process as.
Switch the operation of 8 towers by the operation of 10 towers, respectively cut away a tower in Ying Congqi, two series of idol, and should from a series, not cut away two adsorption towers.10 towers become 8 towers, and five kinds of handover schemes can be arranged, and each tower working routine of these five kinds of schemes is seen accompanying drawing 7.Suppose that now tower 9 breaks down, then cut away tower 9, tower 10, become tower 1,2,3,4,5,6,7,8 and be in running status.Be that example illustrates the L8-2-3 technical process now with tower 1.That is:
Unstripped gas enters tower 1 by valve 11, and product hydrogen is delivered to the hydrogen basin by valve 12 by shared pipeline, and impurity is attracted on tower 1 sorbent material.Tower 1 adsorption step is once all pressed (E by 16,56 pairs of towers 5 of valve after finishing 1D), tower 5 is secondary booster (E 2R), tower 1 once all presses the back forward to put pressure (PP) by valve 15,75, and tower 7 is washed (P), makes the impurity desorb on tower 7 sorbent materials.Afterwards, carry out secondary by valve 15,75 and all press (E 2D), to the tower 7 (E that once boosts 1R).Secondary carries out the reverse pressure (D) of putting by valve 14 after all pressing, and makes impurity desorb further on the sorbent material in the tower 1, and by shared waste line discharger.Then, pressure (PP) gas of forward putting by valve 35,15 usefulness towers 3 washes (P) to the reverse tower of putting after the pressure 1, makes the impurity on its sorbent material obtain desorb, then all presses (E with the secondary of tower 3 2D) gas advances once (the E that boosts by 35,15 pairs of towers 1 of valve 1R), once all press (E with tower 5 1D) gas carries out secondary booster (E by 56,16 pairs of towers 1 of valve 2R).Afterwards, arrive adsorptive pressure with product hydrogen by 12 pairs of tower 1 pressurisings of valve.Finish a fractionation by adsorption loop cycle.
When being switched to 8 towers (L8-2-3) flow process by 10 towers, its processing power remains unchanged substantially, and just yield slightly reduces, and the 10-3-3 of document [1] is when switching to 8-2-2, and its processing power descends about 20%, and yield slightly descends.
L10-4-4 flow process of the present invention is in operation, if the synergic system parts in odd number series or the even number series, perhaps break down simultaneously with two or more adsorption towers in a series of, then can (automatic or manual) switching fall out of order adsorption tower series, make trouble free series continue operation.At this moment operational scheme is the L5-2-2 flow process, and promptly secondary is all pressed (E 1D, E 2D), two towers adsorb simultaneously.The working routine of this each tower of flow process is shown in accompanying drawing 8.Here suppose that even number series is cut off, become tower 1,3,5,7,9 these five tower operations.Be that example illustrates the L5-2-2 flow process still now with tower 1.As follows:
Unstripped gas enters adsorption tower 1 by valve 11, and product hydrogen is delivered to the hydrogen basin by valve 12 by shared pipeline, and impurity is attracted on the sorbent material in the tower 1.After tower 1 adsorption step (A) finished, tower 1 was once all pressed (E by 16,76 pairs of towers 7 of valve 1D), (this moment, tower 7 was to boost for the second time).After once all pressing, tower 1 is forward put pressure (PP) by valve 15,95, and tower 9 is washed (P), makes the impurity desorb on tower 9 sorbent materials.Then, tower 1 carries out secondary and all presses (E 1D) gas once boosts by 15,95 pairs of towers 9 of valve.Tower 1 after secondary is all pressed carries out the reverse pressure (D) of putting through valve 14, makes the impurity desorb further on tower 1 sorbent material, and by shared waste line discharger.The gas of forward putting pressure (PP) with tower 3 washes (P) to tower 1 then, with the impurity on its sorbent material of desorb.Afterwards, all press (E with tower 3 secondaries 2D) gas carries out pressurising (E one time by 35,15 pairs of towers 1 of valve 1R), once all press (E with tower 5 1D) gas carries out secondary pressurising (E by 56,16 pairs of towers 1 of valve 2R), use product hydrogen to arrive adsorptive pressure then through 12 pairs of tower 1 pressurisings of valve (R).Finish a fractionation by adsorption loop cycle.
The 10-3-3 flow process ratio of the same document of L10-4-4 flow process [1], when all switching to the operation of five towers, L5-2-2 flow process of the present invention is bigger than the treatment capacity of the 5-2-1 flow process of document [1].
Embodiment
Example 1, unstripped gas composed as follows, its pressure is 2.45MPa.Requiring the purity of product hydrogen is 99.99%
Form H 2 CO CH 4 CO 2
The %(body) 70.91 2.96 6.5 19.56
(V), CO content is not higher than 10ppm, CO 2Content is not higher than 10ppm.Examination is the long-pending and hydrogen yield of tower body of 10-3-3, L10-4-4 flow process relatively.It the results are shown in table 1:
Figure 921109180_IMG2
Be not difficult to find out that from table 1 the present invention exceeds at the hydrogen yield under 1% the situation, the cumulative volume of its 10 towers is littler 35.3 meters than 10-3-3 3, be equivalent to save sorbent material 25%.This is very favourable to the cost, the saving sorbent material that reduce adsorption tower.
The composition of example 2, unstripped gas and its pressure are with example 1.Purity and foreign matter content to product hydrogen require identical with example 1.Examination relatively switches to the 8-2-2 of 8 towers operation, the difference of L8-2-3 flow process by the operation of 10 towers, the results are shown in Table 2.
Table 2
Process indicator 8 - 2 - 2 L8 - 2 - 3
Loop cycle, second 779 640
Adsorption time, second 180 240
Processing power (comparing) with 10 towers Descend 20% Substantially do not descend
The result shows that the processing power of L8-2-3 flow process is originally identical with original 10 column foots, can not influence the hydrogen supply amount of downstream unit.
Equally, technical process of the present invention, when switching to the operation of five towers, promptly still the 5-2-1 flow process than document [1] is superior for the L5-2-2 flow process, and its processing power is big more a lot of than the latter.

Claims (4)

1, a kind of ten tower process that are applicable to from hydrogeneous unstripped gas with pressure-changed adsorption concentrating hydrogen, form a loop cycle by adsorption step, regeneration step and the step of boosting, the time there are four towers to be in adsorption step simultaneously in operation, it is characterized in that the L10-4-4 process using all presses (E four times 1D, E 2D, E 3D, E 4D), forward put pressure (PP), the reverse pressure (D) of putting, flushing (P); Adopt four times the (E that boosts 1R, E 2R, E 3R, E 4R) and product hydrogen pressurising (R), improve the yield of product hydrogen.
2, L10-4-4 technology according to claim 1, it is characterized in that when a certain adsorption tower of having finished adsorption step enters regeneration step, whenever carry out two step regeneration and enter adsorption step, just have a tower to finish adsorption step with regard to having a tower to finish to boost step.
3, L10-4-4 technology according to claim 1, when this technology can not normally be moved because the parts of a certain adsorption tower break down in operational process, changeable one-tenth eight tower flow processs turn round, it is characterized in that this eight tower process flow process is L8-2-3, promptly always have three towers to be in adsorption step at any one time; Adopt secondary all to press (E 1D, E 2D), secondary booster (E 1R, E 2R) and the pressurising of product hydrogen to adsorptive pressure.
4, L10-4-4 technology according to claim 1, synergic system parts in odd number series or even number series, when perhaps breaking down with the two or more adsorption towers in a series of, changeablely fall out of order series, becoming five tower flow processs moves, it is characterized in that this five tower process flow process is L5-2-2, promptly always have two towers to be in adsorption step at any one time; Adopt secondary all to press (E 1D, E 2D), secondary booster (E 1R, E 2R) and product hydrogen pressurising (R) to adsorptive pressure.
CN 92110918 1992-09-24 1992-09-24 Pressure-changed adsorption concentrating hydrogen technology Expired - Fee Related CN1025110C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92110918 CN1025110C (en) 1992-09-24 1992-09-24 Pressure-changed adsorption concentrating hydrogen technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92110918 CN1025110C (en) 1992-09-24 1992-09-24 Pressure-changed adsorption concentrating hydrogen technology

Publications (2)

Publication Number Publication Date
CN1070840A true CN1070840A (en) 1993-04-14
CN1025110C CN1025110C (en) 1994-06-22

Family

ID=4945039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92110918 Expired - Fee Related CN1025110C (en) 1992-09-24 1992-09-24 Pressure-changed adsorption concentrating hydrogen technology

Country Status (1)

Country Link
CN (1) CN1025110C (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1088443C (en) * 1997-01-09 2002-07-31 中国科学院大连化学物理研究所 Method for producing high-purity hydrogen
CN101314098B (en) * 2008-02-05 2010-08-18 四川亚连科技有限责任公司 Purification method for polysilicon tail gas and purifier employing the method
CN102344119A (en) * 2011-06-23 2012-02-08 莱芜钢铁集团电子有限公司 Method for automatically switching a plurality of towers in pressure swing adsorption (PSA) hydrogen production system
CN103523749A (en) * 2013-10-16 2014-01-22 西南化工研究设计院有限公司 Process for producing hydrogen by use of burning carbon black tail gas
CN105268282A (en) * 2015-09-18 2016-01-27 北京环宇京辉京城气体科技有限公司 Method for preparing ultra pure hydrogen by low-temperature pressure-swing adsorption
CN105664667A (en) * 2016-03-11 2016-06-15 西安华江环保科技股份有限公司 Hydrogen recycling device and technology for LNG cryogenic separation hydrogen-rich exhaust
CN106517092A (en) * 2015-09-09 2017-03-22 苏州恒大净化设备有限公司 Ammonia decomposition hydrogen-production purification equipment
CN107434242A (en) * 2017-07-13 2017-12-05 大连中鼎化学有限公司 Purifying hydrogen of hydrogen prepares high-purity and superelevation pure hydrogen process from coal gas
CN111375288A (en) * 2018-12-27 2020-07-07 中国石油化工股份有限公司 Memory, optimization method, device and equipment of pressure swing adsorption device

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1088443C (en) * 1997-01-09 2002-07-31 中国科学院大连化学物理研究所 Method for producing high-purity hydrogen
CN101314098B (en) * 2008-02-05 2010-08-18 四川亚连科技有限责任公司 Purification method for polysilicon tail gas and purifier employing the method
CN102344119A (en) * 2011-06-23 2012-02-08 莱芜钢铁集团电子有限公司 Method for automatically switching a plurality of towers in pressure swing adsorption (PSA) hydrogen production system
CN103523749A (en) * 2013-10-16 2014-01-22 西南化工研究设计院有限公司 Process for producing hydrogen by use of burning carbon black tail gas
CN103523749B (en) * 2013-10-16 2015-10-28 西南化工研究设计院有限公司 A kind of technique utilizing carbon black tail gas hydrogen manufacturing
CN106517092A (en) * 2015-09-09 2017-03-22 苏州恒大净化设备有限公司 Ammonia decomposition hydrogen-production purification equipment
CN105268282A (en) * 2015-09-18 2016-01-27 北京环宇京辉京城气体科技有限公司 Method for preparing ultra pure hydrogen by low-temperature pressure-swing adsorption
CN105664667A (en) * 2016-03-11 2016-06-15 西安华江环保科技股份有限公司 Hydrogen recycling device and technology for LNG cryogenic separation hydrogen-rich exhaust
CN107434242A (en) * 2017-07-13 2017-12-05 大连中鼎化学有限公司 Purifying hydrogen of hydrogen prepares high-purity and superelevation pure hydrogen process from coal gas
CN111375288A (en) * 2018-12-27 2020-07-07 中国石油化工股份有限公司 Memory, optimization method, device and equipment of pressure swing adsorption device
CN111375288B (en) * 2018-12-27 2022-04-05 中国石油化工股份有限公司 Memory, optimization method, device and equipment of pressure swing adsorption device

Also Published As

Publication number Publication date
CN1025110C (en) 1994-06-22

Similar Documents

Publication Publication Date Title
CN1080136C (en) Improved pressure swing absorption process
CN1195570C (en) Optimal pressure swing adsorption refluxing
CN1080135C (en) Pressure-changing absorption method for gas in circulating space
CN1031660A (en) Pressure swing adsorption control method and equipment
CN100423811C (en) Pressure-variation absorption method for separating and recovering adsorbed phase products from mixed gas
CN1051518A (en) The absorption recovery system of non-constant pressure absorption
CN101371966A (en) Pressure-swing adsorption novel art for recovering ethylene and hydrogen from dry gas of oil-extraction plant
CN1025110C (en) Pressure-changed adsorption concentrating hydrogen technology
CN1800308A (en) Stripped gas method for recovering C2 and higher carbon content hydrocarbon constituent
CN202569906U (en) Dry gas pressure swing adsorption (PSA) ethylene-and-hydrogen recycling device in oil refinery
CN1151957C (en) Process for extracting high-purity hydrogen from coke oven gas
CN100358849C (en) Pressure-variation adsorption separation recovering method for mixd gas containing chloroethylene and acetylene
CN1215624A (en) Multi-bed vacuum pressure swing adsorption process for extracting hydrogen from hydrogen-contg. mixed gas
CN1329103C (en) Pressure-varying adsorption method for recovering vinyl chloride and acetylene from gas mixture
CN1279006C (en) Method for purification and recovery of methane from refuse landfill gas
CN1044470C (en) Method for separating m-xylene and ortho-xylene from mixed xylene and ethyl benzene
CN1063095C (en) Six-tower vacuum adsorption gas separating technology
CN102921271B (en) Improved process for recovering non-methane alkane in polyolefin tail gas by adsorption method
CN1215625A (en) Pressure swing adsorption process for extracting carbon monooxide as fuel from blast furnace waste gas
CN100434409C (en) Method for separating and recovering chloroethylene by pressure swing adsorption method
CN105169888A (en) Improved technology and device for polyethylene device tail gas complete recycling
CN1215627A (en) Pressure swing adsorption process for separating carbon monooxide from carbon monooxide contg. mixed gas
CN1029552C (en) Pressure swing adsorption process for removing carbon dioxide from ammonia plant shift gas
CN2448438Y (en) Improved double-tower pressure-changing adsorption oxygen generator
CN1269550C (en) Modified method of pressure swing adsorption

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
OR01 Other related matters
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: China Petrochemical Corporation (SINOPEC)

Document name: payment instructions

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: China Petrochemical Corporation (SINOPEC)

Document name: Notification of Termination of Patent Right

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee