CN107067147A - A kind of enterprises economic management cost control system - Google Patents

A kind of enterprises economic management cost control system Download PDF

Info

Publication number
CN107067147A
CN107067147A CN201710026723.2A CN201710026723A CN107067147A CN 107067147 A CN107067147 A CN 107067147A CN 201710026723 A CN201710026723 A CN 201710026723A CN 107067147 A CN107067147 A CN 107067147A
Authority
CN
China
Prior art keywords
data
cost
unit
module
economic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710026723.2A
Other languages
Chinese (zh)
Inventor
李士涛
郑红
钟震宇
宋卓
李子钰
苏畅
董兴羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Shihua University
Original Assignee
Liaoning Shihua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Shihua University filed Critical Liaoning Shihua University
Priority to CN201710026723.2A priority Critical patent/CN107067147A/en
Publication of CN107067147A publication Critical patent/CN107067147A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals

Abstract

The invention discloses a kind of enterprises economic management cost control system of financial cost control technology field, including economic data collecting unit, the output end of the economic data collecting unit is electrically connected with the input of central processing unit, the output end of the risk assessment unit is electrically connected with the input of data transmission unit, the output end of the data transmission unit is electrically connected with the input of central processing unit, pass through the collection of economic data, economic data is carried out comprehensively and the cost analysis of system, the budget of objective cost is carried out by cost budgeting unit, then cost system is gone out by analysis expert and decision-making again, the risk assessment of economic data is carried out again, it ensure that the security of financial cost, The invention also achieves the integration and distribution to data, it ensure that the shared of data, and data distribution is safe, just each stratum of enterprise understands economic data, the invention is easy to use, improve operating efficiency.

Description

A kind of enterprises economic management cost control system
Technical field
The present invention relates to financial cost control technology field, specially a kind of enterprises economic management cost control system System.
Background technology
Cost control, is the cost management target that enterprise pre-establishes according to the regular period, by cost control main body at it In the limits of functions and powers, before production expends generation and during cost control, factors and condition on various influence costs are taken A series of preventions and regulation measure, to ensure the administration behaviour of cost management realization of goal.In the prior art, for cost control System is often by related personnel or relevant departments are manually controlled using various rules and regulations and electrical form, this mode Cost control truly will can not be realized, because manually-operated link will have many leaks, including into one's duty Analysis is not comprehensive enough, and efficiency is low, inconvenient operation, therefore, a kind of it is proposed that enterprises economic management cost control system.
The content of the invention
It is an object of the invention to provide a kind of enterprises economic management cost control system, to solve above-mentioned background skill Proposed in art in the prior art, for cost control often by related personnel or relevant departments using various rules and regulations and Electrical form is manually controlled, and this mode will can not realize cost control truly, because manually-operated Link will have many leaks, including cost analysis is not comprehensive enough, and efficiency is low, the problem of inconvenient operation.
To achieve the above object, the present invention provides following technical scheme:A kind of enterprises economic management cost control system System, including economic data collecting unit, the output end of the economic data collecting unit are electrically connected with the input of central processing unit End, the input of the central processing unit is electrically connected with the output end of system login unit, the output end of the central processing unit The input of data storage cell and cost analysis unit is electrically connected, the output end of the data storage cell electrically connects The input of historical data base is connect, the output end of the historical data base is electrically connected with the input of data acquisition unit, described The output end of cost analysis unit is electrically connected with the input of cost budgeting unit, and the output end of the cost budgeting unit is electrical The input of data analysis comparison unit is connected, the input of the data analysis comparison unit is electrically connected with data analysis contrast The input of unit, the output end of the data analysis comparison unit is electrically connected with the input of analysis expert decision package, institute The output end for stating analysis expert decision package is electrically connected with the input of risk assessment unit, the output of the risk assessment unit End is electrically connected with the input of data transmission unit, and the output end of the data transmission unit is electrically connected with the defeated of central processing unit Enter end, the output end of the central processing unit is electrically connected with the input of Data Integration unit, the Data Integration unit it is defeated Go out the input that end is electrically connected with file distributing unit;
By the economic data collecting unit collection of economic data and economic data is transmitted to central processing unit, passed through The system login unit carries out system login, and the data storage cell is used to storing economic data information, and by economic number It is believed that breath is stored to the historical data base, one's duty is carried out into the economic data information of collection by the cost analysis unit Analysis, then by the budget of cost budgeting unit progress cost, the data acquisition unit is used to capture from historical data base Economic History data, the economic data of history economics data and collection by data analysis comparison unit contrasted and divided Analysis, receives the result after comparative analysis by the analysis expert decision package and makes expert decision-making, the risk assessment list Member makes risk assessment by expert decision-making, and sends data to central processing unit by the data transmission unit, passes through Data Integration unit is integrated to data, and passes through the distribution of file distributing unit progress data.
It is preferred that, the system login unit includes account number cipher login module and fingerprint recognition login module, the account Number password login module is used to be logged in by the form of account and password, and the fingerprint recognition login module is used for by finger The form of line identification carries out the login of system.
It is preferred that, the data storage cell includes data memory module, data backup module and data security protection mould Block, the data memory module is used to store economic data information, and the data backup module is used for the economic data to storage Backup, the data safety protection module be used for economic data security protection.
It is preferred that, the cost analysis unit include manufacturing cost analysis module, quality cost analysis module and manpower into This analysis module, the manufacturing cost analysis module, the manufacturing cost analysis module is used for analysis product in the fabrication process Material cost, cost of labor, selling cost and management cost, the quality cost analysis module be used for analysis product prevention Cost, appraisal cost and failure cost, the human cost analysis module are used to analyze development of manpower cost, manpower use cost Cost is ensured with manpower.
It is preferred that, the cost budgeting unit include objective cost control module, objective cost adjust module and target into This formulation module, the objective cost control module is used to control the plan of cost to pay, and the objective cost is adjusted module and used In adjusting planned costs, the objective cost, which formulates module, to be used to make planned costs by oneself.
It is preferred that, the risk assessment unit includes risk evaluation module and Risk-warning module, the risk assessment mould Block is used for evaluation and assessment to economic data, and the Risk-warning module is used to occur making early warning during fiscal risk.
It is preferred that, the file distributing unit supports the data transfer of image, sound and video multiple format, and each is passed Ciphering unit is provided between defeated unit.
Compared with prior art, the beneficial effects of the invention are as follows:The invention propose a kind of enterprises economic management into This control system, by the collection of economic data, carries out comprehensively and the cost analysis of system to economic data, passes through cost budgeting Unit carries out the budget of objective cost, then goes out cost system by analysis expert and decision-making again, then carry out economic data Risk assessment, it is ensured that the security of financial cost, The invention also achieves the integration and distribution to data, it is ensured that data It is shared, and data distribution is safe, and just each stratum of enterprise understands economic data, and the invention is easy to use, improves Operating efficiency.
Brief description of the drawings
Fig. 1 is principle of the invention block diagram.
In figure:1 economic data collecting unit, 2 central processing units, 3 system login units, 4 cost analysis units, 41 manufactures Cost analysis module, 42 quality cost analysis modules, 43 human cost analysis modules, 5 cost budgeting units, 51 objective cost controls Molding block, 52 objective costs adjust module, 53 objective costs and formulate module, 6 data storage cells, 7 historical data bases, 8 data Acquisition unit, 9 data analysis comparison units, 10 analysis expert decision packages, 11 risk assessment units, 12 data transmission units, 13 Data Integration units, 14 file distributing units.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Referring to Fig. 1, the present invention provides a kind of technical scheme:A kind of enterprises economic management cost control system, bag Economic data collecting unit 1 is included, the output end of economic data collecting unit 1 is electrically connected with the input of central processing unit 2, center The input of processor 2 is electrically connected with the output end of system login unit 3, and the output end of central processing unit 2 is electrically connected The input of data storage cell 6 and cost analysis unit 4, the output end of data storage cell 6 is electrically connected with historical data base 7 Input, the output end of historical data base 7 is electrically connected with the input of data acquisition unit 8, the output of cost analysis unit 4 End is electrically connected with the input of cost budgeting unit 5, and the output end of cost budgeting unit 5 is electrically connected with data analysis comparison unit 9 input, the input of data analysis comparison unit 9 is electrically connected with the input of data analysis comparison unit 9, data analysis The output end of comparison unit 9 is electrically connected with the input of analysis expert decision package 10, the output of analysis expert decision package 10 End is electrically connected with the input of risk assessment unit 11, and the output end of risk assessment unit 11 is electrically connected with data transmission unit 12 Input, the output end of data transmission unit 12 is electrically connected with the input of central processing unit 2, the output of central processing unit 2 End is electrically connected with the input of Data Integration unit 13, and the output end of Data Integration unit 13 is electrically connected with file distributing unit 14 Input;
Transmitted by the collection of economic data of economic data collecting unit 1 and by economic data to central processing unit 2, by being Login unit 3 of uniting carries out system login, and data storage cell 6 is used to store economic data information, and economic data information is deposited Storage carries out cost analysis, then pass through cost to historical data base 7 by the economic data information of 4 pairs of collections of cost analysis unit Budget unit 5 carries out the budget of cost, and data acquisition unit 8 is used to capture Economic History data from historical data base 7, passes through number The economic data of history economics data and collection is contrasted and analyzed according to analysis comparison unit 9, passes through analysis expert decision-making Unit 10 receives the result after comparative analysis and makes expert decision-making, and risk assessment unit 11 is made risk by expert decision-making and commented Valency, and central processing unit 2 is sent data to by data transmission unit 12, data are carried out by Data Integration unit 13 whole Close, and pass through the distribution of the progress data of file distributing unit 14.
Wherein, system login unit 3 includes account number cipher login module and fingerprint recognition login module, and account number cipher is logged in Module is used to be logged in by the form of account and password, and fingerprint recognition login module is used to enter by the form of fingerprint recognition The login of row system, data storage cell 6 includes data memory module, data backup module and data safety protection module, number It is used to store economic data information according to memory module, data backup module is used for the backup to the economic data of storage, data peace Full protection module is used for the security protection of economic data, and cost analysis unit 4 includes manufacturing cost analysis module 41, quality cost Analysis module 42 and human cost analysis module 43, manufacturing cost analysis module 41, manufacturing cost analysis module 41 are used to analyze Material cost, cost of labor, selling cost and the management cost of product in the fabrication process, quality cost analysis module 42 are used for The prevention cost of analysis product, appraisal cost and failure cost, human cost analysis module 43 be used to analyzing development of manpower cost, Manpower use cost and manpower ensure cost, and cost budgeting unit 51 includes objective cost control module 51, objective cost and adjusted Module 52 and objective cost formulate module 52, and objective cost control module 51 is used to control the plan of cost to pay, objective cost Adjusting module 52 is used to adjust planned costs, and objective cost, which formulates module 53, to be used to make planned costs, risk assessment unit 11 by oneself Including risk evaluation module and Risk-warning module, risk evaluation module is used for evaluation and assessment to economic data, and risk is pre- Alert module is used to occur making early warning during fiscal risk, and file distributing unit 14 supports image, sound and a variety of lattice of video Ciphering unit is provided between the data transfer of formula, and each transmission unit, it is ensured that the security of data distribution.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of enterprises economic management cost control system, including economic data collecting unit (1), it is characterised in that:Institute The output end for stating economic data collecting unit (1) is electrically connected with the input of central processing unit (2), the central processing unit (2) Input be electrically connected with the output end of system login unit (3), the output end of the central processing unit (2) is electrically connected The input of data storage cell (6) and cost analysis unit (4), the output end of the data storage cell (6) is electrically connected with The input of historical data base (7), the output end of the historical data base (7) is electrically connected with the input of data acquisition unit (8) End, the output end of the cost analysis unit (4) is electrically connected with the input of cost budgeting unit (5), the cost budgeting list The output end of first (5) is electrically connected with the input of data analysis comparison unit (9), the data analysis comparison unit (9) it is defeated Enter the input that end is electrically connected with data analysis comparison unit (9), the output end of the data analysis comparison unit (9) electrically connects The input of analysis expert decision package (10) is connect, the output end of the analysis expert decision package (10) is electrically connected with risk and commented The input of valency unit (11), the output end of the risk assessment unit (11) is electrically connected with the input of data transmission unit (12) End, the output end of the data transmission unit (12) is electrically connected with the input of central processing unit (2), the central processing unit (2) output end is electrically connected with the input of Data Integration unit (13), and the output end of the Data Integration unit (13) is electrical Connect the input of file distributing unit (14);
Transmit to central processing unit (2), lead to by economic data collecting unit (1) collection of economic data and by economic data Cross the system login unit (3) and carry out system login, the data storage cell (6) is used to store economic data information, and Economic data information is stored to the historical data base (7), passes through economic data of the cost analysis unit (4) to collection Information carries out cost analysis, then passes through the budget of the cost budgeting unit (5) progress cost, the data acquisition unit (8) For capturing Economic History data from historical data base (7), by the way that data analysis comparison unit (9) is by history economics data and adopts The economic data of collection is contrasted and analyzed, and the result after comparative analysis is received simultaneously by the analysis expert decision package (10) Expert decision-making is made, the risk assessment unit (11) makes risk assessment by expert decision-making, and passes through the data transfer Unit (12) sends data to central processing unit (2), data is integrated by Data Integration unit (13), and pass through institute State the distribution that file distributing unit (14) carries out data.
2. a kind of enterprises economic management cost control system according to claim 1, it is characterised in that:The system Login unit (3) includes account number cipher login module and fingerprint recognition login module, and the account number cipher login module is used to lead to The form for crossing account and password is logged in, and the fingerprint recognition login module is used to carry out system by the form of fingerprint recognition Login.
3. a kind of enterprises economic management cost control system according to claim 1, it is characterised in that:The data Memory cell (6) includes data memory module, data backup module and data safety protection module, and the data memory module is used In storage economic data information, the data backup module is used for the backup to the economic data of storage, and the data safety is prevented Protecting module is used for the security protection of economic data.
4. a kind of enterprises economic management cost control system according to claim 1, it is characterised in that:The cost Analytic unit (4) includes manufacturing cost analysis module (41), quality cost analysis module (42) and human cost analysis module (43), the manufacturing cost analysis module (41), the manufacturing cost analysis module (41) is used for analysis product in manufacturing process In material cost, cost of labor, selling cost and management cost, the quality cost analysis module (42) be used for analysis product Prevention cost, appraisal cost and failure cost, the human cost analysis module (43) be used for analyze development of manpower cost, people Power use cost and manpower ensure cost.
5. a kind of enterprises economic management cost control system according to claim 1, it is characterised in that:The cost Budget unit (51) includes objective cost control module (51), objective cost and adjusts module (52) and objective cost formulation module (52), the objective cost control module (51) is used to control the plan of cost to pay, and the objective cost adjusts module (52) For adjusting planned costs, the objective cost, which formulates module (53), to be used to make planned costs by oneself.
6. a kind of enterprises economic management cost control system according to claim 1, it is characterised in that:The risk Evaluation unit (11) includes risk evaluation module and Risk-warning module, and the risk evaluation module is used to comment economic data Valency is with assessing, and the Risk-warning module is used to occur making early warning during fiscal risk.
7. a kind of enterprises economic management cost control system according to claim 1, it is characterised in that:The data Dispatching Unit (14) supports the data transfer of image, sound and video multiple format, and is provided between each transmission unit Ciphering unit.
CN201710026723.2A 2017-01-14 2017-01-14 A kind of enterprises economic management cost control system Pending CN107067147A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710026723.2A CN107067147A (en) 2017-01-14 2017-01-14 A kind of enterprises economic management cost control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710026723.2A CN107067147A (en) 2017-01-14 2017-01-14 A kind of enterprises economic management cost control system

Publications (1)

Publication Number Publication Date
CN107067147A true CN107067147A (en) 2017-08-18

Family

ID=59598567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710026723.2A Pending CN107067147A (en) 2017-01-14 2017-01-14 A kind of enterprises economic management cost control system

Country Status (1)

Country Link
CN (1) CN107067147A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107480903A (en) * 2017-08-23 2017-12-15 淄博职业学院 A kind of enterprises economic management control system
CN109299917A (en) * 2018-09-26 2019-02-01 李德柱 A kind of business economic management cost control system
CN109359883A (en) * 2018-10-19 2019-02-19 周萍 A kind of economic management cost control system
CN109409593A (en) * 2018-10-17 2019-03-01 郑州大学 For assisting the flow management method and system of hospital financial budget allocation decision
CN109598113A (en) * 2018-12-17 2019-04-09 日照职业技术学院 A kind of economic management cost control system
CN110363589A (en) * 2019-07-08 2019-10-22 石河子大学 A kind of construction cost control system based on BIM
CN111709594A (en) * 2019-08-15 2020-09-25 河南工业贸易职业学院(河南省粮食干部学校) Economic management data analysis system
CN111915147A (en) * 2020-07-08 2020-11-10 郑州轻工业大学 Intelligent-oriented multi-source heterogeneous data analysis platform
CN112990532A (en) * 2020-12-26 2021-06-18 广东电网有限责任公司 Power distribution network construction cost accounting system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104881753A (en) * 2015-06-04 2015-09-02 中共安阳市委党校 Control system of internal economic management cost of enterprise
CN105335820A (en) * 2015-10-16 2016-02-17 新乡学院 Economic management system
CN105701598A (en) * 2015-12-25 2016-06-22 中国石油大学(华东) Economic management cost control system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104881753A (en) * 2015-06-04 2015-09-02 中共安阳市委党校 Control system of internal economic management cost of enterprise
CN105335820A (en) * 2015-10-16 2016-02-17 新乡学院 Economic management system
CN105701598A (en) * 2015-12-25 2016-06-22 中国石油大学(华东) Economic management cost control system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘慧哲: "建设工程项目造价管理研究", 《价值工程》 *
彭翰林: "浅议施工企业成本控制管理", 《时代金融》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107480903A (en) * 2017-08-23 2017-12-15 淄博职业学院 A kind of enterprises economic management control system
CN109299917A (en) * 2018-09-26 2019-02-01 李德柱 A kind of business economic management cost control system
CN109409593A (en) * 2018-10-17 2019-03-01 郑州大学 For assisting the flow management method and system of hospital financial budget allocation decision
CN109409593B (en) * 2018-10-17 2021-07-16 郑州大学 Flow management method and system for assisting hospital financial budget allocation decision
CN109359883A (en) * 2018-10-19 2019-02-19 周萍 A kind of economic management cost control system
CN109598113A (en) * 2018-12-17 2019-04-09 日照职业技术学院 A kind of economic management cost control system
CN110363589A (en) * 2019-07-08 2019-10-22 石河子大学 A kind of construction cost control system based on BIM
CN111709594A (en) * 2019-08-15 2020-09-25 河南工业贸易职业学院(河南省粮食干部学校) Economic management data analysis system
CN111915147A (en) * 2020-07-08 2020-11-10 郑州轻工业大学 Intelligent-oriented multi-source heterogeneous data analysis platform
CN112990532A (en) * 2020-12-26 2021-06-18 广东电网有限责任公司 Power distribution network construction cost accounting system and method

Similar Documents

Publication Publication Date Title
CN107067147A (en) A kind of enterprises economic management cost control system
CN206193897U (en) Constructor management and wage management system
CN107330258A (en) A kind of Medical service regulation platform
CN107863134A (en) A kind of Intelligent medical management system based on cloud computing
CN105035902B (en) A kind of elevator safety condition evaluation method
CN106875030A (en) Commercial health insurance directly pays for intelligent recommendation system and method online
CN107256338A (en) A kind of hospital self-service method of charging out and system
CN110009516A (en) Medical insurance intelligent checks method and system
CN106709665A (en) Enterprise internal economic management and control system
CN109509093A (en) A kind of transaction security control method and system based on main body portrait
CN107085772A (en) A kind of major network work of electric power system ticket anticipation management system and method
CN104156801B (en) Teams and groups of company of city are to mark data handling system and data processing method
WO2022057108A1 (en) Federated-learning-based personal qualification evaluation method, apparatus and system, and storage medium
CN109242273A (en) A kind of distribution network failure recovery scheme population evaluation method
CN107181824A (en) A kind of intelligent body-building shop management system and its management method based on Internet of Things
CN107945025A (en) One kind investment and financing platform risk evaluation system
CN109345394A (en) A kind of medical supervision and examination system of people's wound Claims Resolution
CN202795547U (en) Comprehensive note processing system
CN106934728A (en) A kind of power grid security risk management and control intelligent evaluation method
CN108805442A (en) A kind of pool formula creative management system and method based on energy monitor
CN115222295B (en) Sports event risk prevention and control method and system based on risk level model
CN112232843A (en) Drug supervision system and method based on big data technology
CN104156802B (en) Company of city Team Construction data handling system and data processing method
CN107862611A (en) One kind investment and financing platform fund management system
CN107665277A (en) VR experiencing systems based on BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818

RJ01 Rejection of invention patent application after publication