CN108805442A - A kind of pool formula creative management system and method based on energy monitor - Google Patents

A kind of pool formula creative management system and method based on energy monitor Download PDF

Info

Publication number
CN108805442A
CN108805442A CN201810576221.1A CN201810576221A CN108805442A CN 108805442 A CN108805442 A CN 108805442A CN 201810576221 A CN201810576221 A CN 201810576221A CN 108805442 A CN108805442 A CN 108805442A
Authority
CN
China
Prior art keywords
energy
innovation
platform
product
communication network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810576221.1A
Other languages
Chinese (zh)
Inventor
朱子钦
陈劲
范利武
冯飙
胡楠
邵雪峰
李梓瑞
涂敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201810576221.1A priority Critical patent/CN108805442A/en
Publication of CN108805442A publication Critical patent/CN108805442A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of pool formula creative management system and method based on energy monitor, including communication network, opinion poll system, innovation risk analyzes assessment system, overall planning and qualification authentication system, Innovation Main Body, science & research instrument, produce instruments equipment, product, program, energy source monitoring system, scientific and technical innovation regulation and central control system.The present invention is by the opinion poll system statistics people to the acceptance of university park and product;Assessment system analysis and assessment university park and product are analyzed to risk caused by environment, ethics, society and safety etc. by innovation risk;Scientific and technical innovation development plan is formulated by overall planning and qualification authentication system, and Innovation Main Body is authorized to carry out related work;The crucial defence line of science and technology event out of control is set up by energy source monitoring system;The highest that scientific and technical innovation field is exercised by central control system supervises permission;The overall situation of scientific and technical innovation cause is assumed overall responsibility for by above system assistance party.

Description

A kind of pool formula creative management system and method based on energy monitor
Technical field
The present invention relates to creative management field more particularly to a kind of pool formula creative management system based on energy monitor and Method.
Background technology
Innovation is to lead the first power of development.In recent years, nuclear technology, space technology, artificial intelligence technology, information skill The explosion type development in the fields such as art, gene technology, quantum techniques and nanotechnology is just quickly pushing the progress of human society, but same When also bring science and technology risk out of control.
At present for scientific and technical innovation risk assessment and supervision be concentrated mainly on technical risk, the market risk, financial risk, Production risk and managing risk etc., can increasingly focus on the input of government or enterprise in scientific and technical innovation obtain preferably The impact of income, the environment brought to technology itself, ethics, society and safety etc. still lacks the management for the property planned as a whole with risk Method.
Set about building and improving the pool formula management system and method for innovation activity at this stage with stronger urgent Property.First, the environment of the earth, resource and space bearing capacity are limited, and realization and the popularization sequence of different technologies may be people Class society brings completely different influence, for example, the technologies such as the energy, agricultural, space flight and interspace immigrant development speed just need with Mankind's quantity and life speed under the promotion of the technologies such as life, gene and medical treatment match, and are just avoided that large-scale ring Border, resource and space crisis, so university park is planned, guides and constrained with carrying out the property planned as a whole will become increasingly to weigh It wants.Secondly, as productivity is constantly liberated and developed, common people's education level fast lifting, man-computer cooperation and information technology are sent out The lasting speed-raising of exhibition, individual obtains and the ability of processing information enhances rapidly, and the policy dynamics encouraged innovations is gradually increased, Ren Leishe It can be likely to realize whole people's scientific research and innovation in future soon, and welcome the epoch that technology explosion and civilization are crossed over, at this point, If the stage sex differernce contradiction between value identity and development course are orientated between individual or group wrongly utilized and Intensify, it is likely that the scientific and technical innovation " pernicious contest " for the purpose of threatening and destroy can be caused, under this situation, scientific and technical innovation is not It simply fails to bring happiness for human society, the ethics for being difficult to estimate, society and security crisis can be brought instead.Again, due to people The environment of body adapts to not move back into counter with survival ability class over the past thousands of years, at present nanotechnology, quantum techniques, gene skill Energy sum of series space scale involved by any one cutting edge technology such as art, information technology and nuclear technology all far beyond The range that the body of mankind's fragility can be resisted and be born, and the flexible combination between these technologies and mutually promote will be rapidly Shorten they from theoretical blank develop to practical application between needed for flow and the time, or even beyond assessment and regulatory agency Adaptibility to response, at this time any type of science and technology event out of control be all likely to bring the calamitous shadow being caught unprepared to human society It rings.Finally, the skills such as frontier science and technology development, distributed energy and block chain are even led in private capital and Enterprises ' Deep participation Art increasingly emphasizes that today of concepts such as " decentralizations ", " intelligence " and " self-management ", the mankind are likely to unconsciously Ground steps into the passive dangerous situation in constantly fall university park supervision position.
Baseline thinking in a foreseeable future is established based on several main causes that front is summarized, using big data, is surpassed Grade, which calculates, and the technologies such as quantum calculation are realized will have very all standing of scientific and technical innovation risk, fining, poolization management and control Important meaning, so it is necessary to set about beginning one's study, establish and improving a set of pool formula wound centered on the people at this stage New management system and method can assume overall responsibility for the overall situation of scientific and technical innovation cause to ensure party always.
The pool formula creative management system and method should be conceived to several critical issues.First, fully to investigate and body The will of the existing people.Second is that realize that the university park carried out in any form in any phase to any Innovation Main Body carries out All standing is supervised.Third, to focus on science, by setting up scientific and technical innovation risk assessment and managing related discipline and cultivate correlation The talent of profession, proposes scientific and reasonable index, with the integrated approach of the subjects such as modern mathematics, statistics and the science of law, realizes On the development trend in different subject directions and combination and on influence and risk caused by environment, ethics, society and safety etc. Carry out Accurate Analysis, assessment and management.Four are ensured that control power, with baseline thinking analysis it can be found that the energy be both from The necessary condition of thing university park, and the necessary condition of most scientific and technical innovation products is driven, when any one section When trend out of control occur in skill innovation activity or product, it is also most thorough one of defence line that cut-out energy supply, which is last, so really Protecting there is the core for absolutely controlling ability to be to monitor the energy university park, establish complete production of energy and monitoring body System is the gate of vitality place for preventing science and technology out of control.
Invention content
It is an object of the invention to solve the above problems, a kind of pool formula creative management system based on energy monitor is proposed And method, it realizes to the development trend in different subject directions and combination and to caused by environment, ethics, society and safety etc. It influences to carry out Accurate Analysis, assessment and management with risk, prevents the generation of science and technology event out of control.
A kind of pool formula creative management system based on energy monitor, it is characterised in that the system comprises communication network, Opinion poll system, innovation risk assessment system, overall planning and qualification authentication system, Innovation Main Body, science & research instrument, life Produce instrument and equipment, product, program, energy source monitoring system, scientific and technical innovation regulation and central control system;
The communication network is for establishing human body end, opinion poll system, innovation risk analysis assessment system, planning as a whole rule Draw and qualification authentication system, Innovation Main Body, science & research instrument, the equipment that produces instruments, product, program, energy source monitoring system and Contact between central control system;The opinion poll system is for investigating, the statistics and analysis people creates science and technology The acceptance of New activity and product;On the one hand the innovation risk assessment system is believed according to the data that opinion poll system provides University park and production are analyzed and assessed to breath and society and natural science knowledge with modern mathematics and statistical method On the other hand product bear the limit, life to influence and risk caused by environment, ethics, society and safety etc. with natural resources State environment bears the limit, social forest bears the limit and human survival to bear the limit be index, assessing and listing should forbid University park and product, and both sides assessment result is sent to overall planning and qualification authentication system;The system It raises planning and on the one hand application commission innovation risk analysis assessment system that qualification authentication system is submitted according to Innovation Main Body is to section Skill innovation activity and product are assessed, and on the other hand formulate development plan according to assessment result, and Innovation Main Body is authorized to carry out University park and production activity;The energy source monitoring system includes energy budget platform, energy statistics platform, energy Source audit platform, energy producing unit, power supply device, sequential monitoring platform, energy supply switch and spare energy system, energy budget Platform examines the energy usage budget of all science & research instruments, the equipment that produces instruments and product, energy statistics platform and the energy Platform statistics of auditing and audit energy usage, and switched on-off according to whether auditing result is consistent with budget by controlling energy supply To control the start and stop of power supply device;Energy producing unit produces the energy and power supply device, and is all sections by power supply device Grind instrument and equipment, the equipment that produces instruments and product provide the energy;Sequential monitoring platform monitor and judge all science & research instruments, The development rule that the equipment that produces instruments and product call and whether the program of operation meets overall planning and qualification authentication system is formulated It draws and the scope of authority, and is switched on-off according to judgement result by controlling energy supply and control the start and stop of power supply device;Reserved energy Source system provides stand-by power source for the science & research instrument accidentally closed, the equipment that produces instruments or product;The scientific and technical innovation method Rule are for specification opinion poll system, innovation risk analysis assessment system, overall planning and qualification authentication system and energy monitor The limits of functions and powers of system, while judicial supervision is carried out to Innovation Main Body;The central control system is to planning as a whole formula creative management All links of system possess highest supervision permission, can directly assign instruction to all energy supplies switch across any link, and Direct management and control energy producing unit and spare energy system.
The communication network is divided into communication network I, communication network II, communication network III and communication network IV;Communication network Network I establishes the contact between human body end, opinion poll system and innovation risk analysis assessment system, and communication network II establishes innovation Risk analysis assessment system, overall planning and qualification authentication system, Innovation Main Body, science & research instrument, the equipment that produces instruments, production Contact between product, program and sequential monitoring platform, communication network III establishes energy source monitoring system and overall planning and qualification is recognized Between card system, science & research instrument, the equipment that produces instruments, product, program, sequential monitoring platform and central control system Contact, communication network IV establish central control system and opinion poll system, innovation risk analysis assessment system, overall planning and Direct contact between qualification authentication system, sequential monitoring platform and energy source monitoring system;The communication network I, communication Network II, communication network III and communication network IV are independent close network.
The opinion poll system includes information collecting platform, statistical analysis platform and stimulating platform;The information Acquisition platform is mounted in the application program on the networked mobile devices that human body end uses, by inquiry questionnaire, intelligent sound pair Acceptance of the forms such as the words inquiry human body end about university park and product, is known by keyboard input, voice input, pupil Not, the modes such as brain wave identification acquire the data information of human body end feedback, and data information is uploaded to system by communication network I Count analysis platform;By the data information summarized, it translates and weaves into as reference format the statistical analysis platform, and unites to it Meter analysis, is sent to stimulating platform by the statistic analysis result of human body end contribution degree by communication network I later, terminates human body The statistic analysis result spent is sent to innovation risk analysis assessment system;The stimulating platform is according to the contribution degree at human body end To human body end feedback excitation information, the reward mechanism includes bonus goods, improving treatmet, authorizes for data and reward mechanism Honor promotes permission.
The innovation risk assessment system includes environmental risk assessment platform, ethics risk assessment platform, social risk Evaluation Platform, security risk assessment platform and comprehensive assessment platform.
The innovation risk analysis assessment system does not receive any instruction in addition to from central control system;It is described Opinion poll system do not receive any instruction in addition to from central control system;The energy source monitoring system does not receive Any external command in addition to from central control system.
The Innovation Main Body is included in all individuals or tissue for carrying out any university park in any period;It is described Science & research instrument include that when the phase carries out all science & research instruments of any university park in office;Described The equipment that produces instruments includes that when the phase produces all equipment that produce instruments of any scientific and technical innovation product in office;The production Product are included in any type of scientific and technical innovation product of any period production.
The program is divided into program I, program II and program III;Program I is the journey that science & research instrument is called and run Sequence, program II are produce instruments equipment calls and the program of operation, and program III is the program that product is called and run.
Energy currency data is uploaded to energy statistics platform by the power supply device in real time;Energy supply switch is only received and is held The instruction that row communication network III and communication network IV transmit;Power supply device can only be had by energy producing unit assembly and disassembly Encipherment protection and self-destruction program, once occur and communication network III and communication network IV simultaneously lost contact, encounter violence dismounting or by To unknown sources instruction by force start and stop when, power supply device just starts self-destruction program.
The central control system is backed up in realtime all information and instruction in pool formula creative management system, in case with When examine.
Compared with prior art, the present invention having the advantages that:
(1) pool formula creative management system and method described in realizes pair on the basis of abundant investigation and the analysis will of the people Any Innovation Main Body is supervised in all standing for the university park that any phase carries out in any form;
(2) this system and method improve innovation supervision it is comprehensive with it is scientific, by setting up scientific and technical innovation wind Danger is assessed and is managed related discipline and cultivates the talent of relevant speciality, proposes scientific and reasonable index, with modern mathematics, statistics It learns and the integrated approach of the subjects such as the science of law, realizes development trend to different subject directions and combination and to environment, ethics, society It influences to carry out Accurate Analysis, assessment and management with risk caused by meeting and safety etc.;
(3) this system and method are by rationally establishing the communication network of relative closure, it is ensured that central control system is to institute There is the highest supervision permission of link;
(4) this system and method have fully used baseline thinking, by establishing strict energy monitor system construction section The most thorough defence line of skill event out of control;
(5) function of this system has certain opening and autgmentability, and thinking and platform that can be based on this system be opened Send out the supervisory systems of other field.
Description of the drawings
Fig. 1 is a kind of flow chart of the pool formula creative management system and method based on energy monitor.
Specific implementation mode
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is described in more detail.
As shown in Figure 1, a kind of energy supervision system for the artificial intelligence epoch, communication network, opinion poll system, wound New risk analysis assessment system, overall planning and qualification authentication system, Innovation Main Body, science & research instrument, produce instruments equipment, Product, program, energy source monitoring system, scientific and technical innovation regulation and central control system.Human body end in figure is opinion poll system The user of system, makes an appraisal to university park and product.
The communication network is for establishing human body end, opinion poll system, innovation risk analysis assessment system, planning as a whole rule Draw and qualification authentication system, Innovation Main Body, science & research instrument, the equipment that produces instruments, product, program, energy source monitoring system and Contact between central control system;
As shown in Figure 1, in one particular embodiment of the present invention, the communication network is divided into communication network I, communication Network II, communication network III and communication network IV;Communication network I establishes human body end, opinion poll system and innovation risk analysis Contact between assessment system, communication network II establish innovation risk analysis assessment system, overall planning and qualification authentication system, Contact between Innovation Main Body, science & research instrument, the equipment that produces instruments, product, program and sequential monitoring platform, communication network III establishes energy source monitoring system and overall planning and qualification authentication system, science & research instrument, the equipment that produces instruments, product, journey Contact between sequence, sequential monitoring platform and central control system, communication network IV establish central control system and will of the people tune Look into system, innovation risk analysis assessment system, overall planning and qualification authentication system, sequential monitoring platform and energy monitor system Direct contact between system;Communication network I, communication network II, communication network III and the communication network IV is independent Close network.
The opinion poll system is used to investigate, the statistics and analysis people connects university park and product It is spent;In one particular embodiment of the present invention, the opinion poll system includes that information collecting platform, statistical analysis are flat Platform and stimulating platform;The information collecting platform is mounted in the application program on the networked mobile devices that human body end uses, Acceptance of the forms such as questionnaire, Intelligent voice dialog inquiry human body end about university park and product by inquiry, passes through The modes such as keyboard input, voice input, pupil identification, brain wave identification acquire the data information of human body end feedback, and by logical Data information is uploaded to statistical analysis platform by communication network I;By the data information summarized, it translates volume to the statistical analysis platform As reference format, and for statistical analysis to its, later by communication network I by the statistic analysis result of human body end contribution degree It is sent to stimulating platform, the statistic analysis result of human body end acceptance is sent to innovation risk analysis assessment system;Described Stimulating platform is according to the contribution degrees of data at human body end and reward mechanism to human body end feedback excitation information, the reward mechanism Including bonus goods, improving treatmet, honors or promote permission.
On the one hand data information that the described innovation risk assessment system is provided according to opinion poll system and society and Natural science knowledge, with modern mathematics and statistical method, analysis and assessment university park and product are to environment, human relations Influence and risk caused by reason, society and safety etc., on the other hand bear the limit, ecological environment bears pole with natural resources Limit, social forest bear the limit and human survival bears the limit as index, assess and list the university park that should forbid And product, and both sides assessment result is sent to overall planning and qualification authentication system;The innovation risk assessment system System includes environmental risk assessment platform, ethics risk assessment platform, social risk Evaluation Platform, security risk assessment platform and comprehensive Close Evaluation Platform.
On the one hand the overall planning and qualification authentication system entrusts innovation risk according to the application that Innovation Main Body is submitted Analysis assessment system assesses university park and product, on the other hand formulates development plan according to assessment result, and Innovation Main Body is authorized to carry out university park and production activity;
The energy source monitoring system includes energy budget platform, energy statistics platform, energy auditing platform, production of energy Unit, power supply device, sequential monitoring platform, energy supply switch and spare energy system, wherein energy budget platform examines all sections Grind instrument and equipment, the energy usage budget of the equipment that produces instruments and product, energy statistics platform and energy auditing platform statistics and It audits energy usage, and power supply device is controlled according to whether auditing result is consistent with budget to switch on-off by controlling energy supply Start and stop;Energy producing unit produces the energy and power supply device, and is all science & research instruments, production by power supply device Instrument and equipment and product provide the energy;Sequential monitoring platform monitor and judge all science & research instruments, the equipment that produces instruments and The development plan and the scope of authority that product calls and whether the program of operation meets overall planning and qualification authentication system is formulated, and It is switched on-off by control energy supply to control the start and stop of power supply device according to judgement result;Spare energy system is accidentally closed Science & research instrument, the equipment that produces instruments or product provide stand-by power source;
The scientific and technical innovation regulation is used for specification opinion poll system, innovation risk analysis assessment system, overall planning And the limits of functions and powers of qualification authentication system and energy source monitoring system, while judicial supervision is carried out to Innovation Main Body;
The central control system possesses highest to all links for planning as a whole formula creative management system and supervises permission, can be with Instruction, and directly management and control energy producing unit and spare energy system are directly assigned to all energy supplies switch across any link.
The innovation risk analysis assessment system does not receive any instruction in addition to from central control system;It is described Opinion poll system do not receive any instruction in addition to from central control system;The energy source monitoring system does not receive Any external command in addition to from central control system.
The Innovation Main Body is included in all individuals or tissue for carrying out any university park in any period;It is described Science & research instrument include that when the phase carries out all science & research instruments of any university park in office;Described The equipment that produces instruments includes that when the phase produces all equipment that produce instruments of any scientific and technical innovation product in office;The production Product are included in any type of scientific and technical innovation product of any period production.
The program is divided into program I, program II and program III;Program I is the journey that science & research instrument is called and run Sequence, program II are produce instruments equipment calls and the program of operation, and program III is the program that product is called and run.
Energy currency data is uploaded to energy statistics platform by the power supply device in real time;Energy supply switch is only received and is held The instruction that row communication network III and communication network IV transmit;Power supply device can only be had by energy producing unit assembly and disassembly Encipherment protection and self-destruction program, once occur and communication network III and communication network IV simultaneously lost contact, encounter violence dismounting or by To unknown sources instruction by force start and stop when, power supply device just starts self-destruction program.
The system application of the present invention is as follows:Scientific and technical innovation regulation is formulated first, establishes central control system to scientific and technical innovation All links of cause possess highest supervision permission, specification opinion poll system, innovation risk analysis assessment system, overall planning And the limits of functions and powers of qualification authentication system and energy source monitoring system, while judicial supervision is carried out to Innovation Main Body;Innovation Main Body to Overall planning and qualification authentication system submit research or the production application of scientific and technical innovation project;Opinion poll system is being made overall planning And under the commission of qualification authentication system investigation, the statistics and analysis people to the acceptance of university park and product, and It effectively encourages at the human body end that participation is given by stimulating platform;Innovation risk analyzes assessment system on the one hand according to opinion poll The data information of system offer and society and natural science knowledge, with modern mathematics and statistical method, analysis and assessment University park and product are on influence and risk caused by environment, ethics, society and safety etc., on the other hand with nature Resource bears the limit, ecological environment bears the limit, social forest bears the limit and human survival bear the limit be index, assessment and The university park and product that should forbid are listed, and both sides assessment result is sent to overall planning and qualification authentication System;Overall planning and qualification authentication system formulate development plan according to assessment result, and Innovation Main Body is authorized to carry out science and technology wound New activity and production activity;In the operational process of creative management system, function in terms of energy source monitoring system is responsible for four, one It is the energy usage budget for examining all science & research instruments, the equipment that produces instruments and product by energy budget platform, passes through Energy statistics platform and energy auditing platform statistics and audit energy usage, and pass through according to whether auditing result is consistent with budget Control energy supply switches on-off to control the start and stop of power supply device, is filled second is that producing the energy by energy producing unit and energizing Set, and by power supply device be all science & research instruments, the equipment that produces instruments and product provide the energy, while by energy stream Logical data are uploaded to energy statistics platform in real time, third, monitored and judged by sequential monitoring platform all science & research instruments, The development rule that the equipment that produces instruments and product call and whether the program of operation meets overall planning and qualification authentication system is formulated It draws and the scope of authority, and is switched on-off according to judgement result by controlling energy supply and control the start and stop of power supply device, fourth, logical It crosses spare energy system and provides stand-by power source for the science & research instrument accidentally closed, the equipment that produces instruments or product;Center control System possesses highest to all links for planning as a whole formula creative management system and supervises permission, can be across any link to all energy supplies Switch directly assigns instruction, and directly management and control energy producing unit and spare energy system;Any trial is gone beyond one's commission, and development is scientific and technological to be created Recent studies on, production and the behavior of the use unauthorized energy will all be sanctioned by most tough laws.
It will be appreciated by those skilled in the art that attached drawing is the schematic diagram of a preferred embodiment, above-described embodiment serial number is only It is only used for describing, can not represent the quality of embodiment.Above-described embodiment is only presently preferred embodiments of the present invention, but the implementation of the present invention Mode is simultaneously not restricted to the described embodiments, other are any within the spirit and principles in the present invention, made by modification, substitute, Combination, simplified, improvement etc., are included within the scope of the present invention.

Claims (10)

1. a kind of pool formula creative management system based on energy monitor, it is characterised in that the system comprises communication network, the people Meaning investigating system, innovation risk assessment system, overall planning and qualification authentication system, Innovation Main Body, science & research instrument, production Instrument and equipment, product, program, energy source monitoring system, scientific and technical innovation regulation and central control system;
The communication network for establish human body end, opinion poll system, innovation risk analysis assessment system, overall planning and Qualification authentication system, Innovation Main Body, science & research instrument, the equipment that produces instruments, product, program, energy source monitoring system and center Contact between control system;
The opinion poll system for investigate, receiving of the statistics and analysis people to university park and product Degree;
The innovation risk assessment system is on the one hand according to the data information of opinion poll system offer and society and nature Scientific knowledge, with modern mathematics and statistical method, analysis and assessment university park and product are to environment, ethics, society Influence and risk, on the other hand bear the limit, ecological environment bears the limit, society with natural resources caused by meeting and safety etc. Meeting ethics bears the limit and human survival bears the limit as index, assesses and list the university park that should forbid and production Product, and both sides assessment result is sent to overall planning and qualification authentication system;
On the one hand application commission innovation risk analysis that the overall planning and qualification authentication system is submitted according to Innovation Main Body Assessment system assesses university park and product, on the other hand formulates development plan according to assessment result, and authorize Innovation Main Body carries out university park and production activity;
The energy source monitoring system includes energy budget platform, energy statistics platform, energy auditing platform, production of energy list Position, power supply device, sequential monitoring platform, energy supply switch and spare energy system, energy budget platform examine all scientific research apparatus The energy usage budget of equipment, the equipment that produces instruments and product, energy statistics platform and energy auditing platform statistics and audit energy Source dosage, and control opening for power supply device according to whether auditing result is consistent with budget to switch on-off by controlling energy supply Stop;Energy producing unit produces the energy and power supply device, and by power supply device is all science & research instruments, produces instruments Equipment and product provide the energy;Sequential monitoring platform monitors and judges all science & research instruments, the equipment that produces instruments and product The development plan and the scope of authority that whether the program called and run meets overall planning and qualification authentication system is formulated, and according to Judgement result switches on-off to control the start and stop of power supply device by control energy supply;Spare energy system is the scientific research accidentally closed Instrument and equipment, the equipment that produces instruments or product provide stand-by power source;
The scientific and technical innovation regulation is used for specification opinion poll system, innovation risk analysis assessment system, overall planning and money The limits of functions and powers of lattice Verification System and energy source monitoring system, while judicial supervision is carried out to Innovation Main Body;
The central control system possesses highest to all links for planning as a whole formula creative management system and supervises permission, can be across Any link directly assigns instruction, and directly management and control energy producing unit and spare energy system to all energy supplies switch.
2. system according to claim 1, it is characterised in that the communication network is divided into communication network I, communication network II, communication network III and communication network IV;Communication network I establishes human body end, opinion poll system and innovation risk analysis assessment Contact between system, communication network II establish innovation risk analysis assessment system, overall planning and qualification authentication system, innovation Contact between main body, science & research instrument, the equipment that produces instruments, product, program and sequential monitoring platform, communication network III are built Vertical energy source monitoring system and overall planning and qualification authentication system, science & research instrument, the equipment that produces instruments, product, program, journey Contact between sequence monitoring platform and central control system, communication network IV establish central control system and opinion poll system System, innovation risk analysis assessment system, overall planning and qualification authentication system, sequential monitoring platform and energy source monitoring system it Between direct contact;Communication network I, communication network II, communication network III and the communication network IV is independent closing Network.
3. system according to claim 1, it is characterised in that the opinion poll system includes information collecting platform, system Count analysis platform and stimulating platform;The information collecting platform is mounted in answering on the networked mobile devices that human body end uses With program, by inquiry receiving of the forms such as questionnaire, Intelligent voice dialog inquiry human body end about university park and product Degree acquires the data information of human body end feedback by modes such as keyboard input, voice input, pupil identification, brain wave identifications, and Data information is uploaded to statistical analysis platform by communication network I;The data information that the statistical analysis platform will summarize It, which is translated, weaves into as reference format, and for statistical analysis to its, later by communication network I by the statistical of human body end contribution degree Analysis result is sent to stimulating platform, the statistic analysis result of human body end acceptance is sent to innovation risk analysis assessment system; The stimulating platform is according to the contribution degrees of data at human body end and reward mechanism to human body end feedback excitation information, the prize The mechanism of encouraging includes bonus goods, improving treatmet, honor or promotes permission.
4. system according to claim 1, it is characterised in that the innovation risk assessment system includes that environmental risk is commented Estimate platform, ethics risk assessment platform, social risk Evaluation Platform, security risk assessment platform and comprehensive assessment platform.
5. system according to claim 1, it is characterised in that the innovation risk analysis assessment system does not receive except next Any instruction from other than central control system;The opinion poll system does not receive in addition to from central control system Any instruction;The energy source monitoring system does not receive any external command in addition to from central control system.
6. system according to claim 1, it is characterised in that it is any that the Innovation Main Body is included in any period development All individuals or tissue of university park;The science & research instrument includes that when the phase carries out any science and technology in office All science & research instruments of innovation activity;The described equipment that produces instruments include for it is in office when any science and technology wound of phase production All equipment that produce instruments of new product;The product is included in any type of scientific and technical innovation production of any period production Product.
7. system according to claim 1, it is characterised in that the program is divided into program I, program II and program III;Journey Sequence I is the program that science & research instrument is called and run, and program II is produce instruments equipment calls and the program of operation, program III It is the program that product is called and run.
8. system according to claim 1, it is characterised in that the power supply device uploads energy currency data in real time Give energy statistics platform;Energy supply switch only receives and executes the instruction that communication network III and communication network IV transmit;Power supply device Can only have encipherment protection and self-destruction program by energy producing unit assembly and disassembly, once occur and communication network III and logical Communication network IV simultaneously lost contact, encounter violence dismounting or by unknown sources instruction by force start and stop when, power supply device just starts oneself Ruin program.
9. system according to claim 1, it is characterised in that the central control system back up in realtime pool formula innovation All information in management system and instruction, in case examining at any time.
10. a kind of pool formula creative management method based on energy monitor of system described in claim 1, it is characterised in that:
Scientific and technical innovation regulation is formulated first, establishes central control system and highest supervision is possessed to all links of scientific and technical innovation cause Permission, specification opinion poll system, innovation risk analysis assessment system, overall planning and qualification authentication system and energy monitor system The limits of functions and powers of system, while judicial supervision is carried out to Innovation Main Body;Innovation Main Body is submitted to overall planning and qualification authentication system The research or production application of scientific and technical innovation project;Opinion poll system is lowered in overall planning and the commission of qualification authentication system Look into, the statistics and analysis people is to the acceptance of university park and product, and the people of participation is given by stimulating platform Body end effectively encourages;On the one hand innovation risk analyzes assessment system according to the data information of opinion poll system offer and society Meeting and natural science knowledge, with modern mathematics and statistical method, analysis and assessment university park and product to environment, Caused by ethics, society and safety influence and risk, the limit is on the other hand born with natural resources, ecological environment bears the limit, Social forest bears the limit and human survival bears the limit as index, assesses and list the university park that should forbid and production Product, and both sides assessment result is sent to overall planning and qualification authentication system;Overall planning and qualification authentication system root Development plan is formulated according to assessment result, and Innovation Main Body is authorized to carry out university park and production activity;It is managed in innovation In the operational process of reason system, energy source monitoring system is responsible for four aspect functions, first, examining all sections by energy budget platform It grinds instrument and equipment, the energy usage budget of the equipment that produces instruments and product, is united by energy statistics platform and energy auditing platform Meter and audit energy usage, and energized by controlling to energize to switch on-off to control according to whether auditing result is consistent with budget The start and stop of device second is that producing the energy and power supply device by energy producing unit, and are all scientific researches by power supply device Instrument and equipment, the equipment that produces instruments and product provide the energy, while energy currency data is uploaded to energy statistics platform in real time, Third, monitoring and judging what all science & research instruments, the equipment that produces instruments and product were called and run by sequential monitoring platform The development plan and the scope of authority that whether program meets overall planning and qualification authentication system is formulated, and passed through according to judgement result Control energy supply switches on-off to control the start and stop of power supply device, fourth, being the scientific research apparatus accidentally closed by spare energy system Equipment, the equipment that produces instruments or product provide stand-by power source;All rings of the central control system to pool formula creative management system Section possesses highest supervision permission, can directly assign instruction, and the directly management and control energy to all energy supplies switch across any link Production unit and spare energy system.
CN201810576221.1A 2018-06-06 2018-06-06 A kind of pool formula creative management system and method based on energy monitor Pending CN108805442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810576221.1A CN108805442A (en) 2018-06-06 2018-06-06 A kind of pool formula creative management system and method based on energy monitor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810576221.1A CN108805442A (en) 2018-06-06 2018-06-06 A kind of pool formula creative management system and method based on energy monitor

Publications (1)

Publication Number Publication Date
CN108805442A true CN108805442A (en) 2018-11-13

Family

ID=64087317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810576221.1A Pending CN108805442A (en) 2018-06-06 2018-06-06 A kind of pool formula creative management system and method based on energy monitor

Country Status (1)

Country Link
CN (1) CN108805442A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109934488A (en) * 2019-03-11 2019-06-25 清华大学 A kind of pool formula sci-tech innovation resources management system and method
CN110083115A (en) * 2019-05-10 2019-08-02 清华大学 A kind of modular power supply device and energy supply method
CN110555588A (en) * 2019-07-29 2019-12-10 浙江大学 Modularized storage and transportation system for scientific and technological innovation resources

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008140683A2 (en) * 2007-04-30 2008-11-20 Sheltonix, Inc. A method and system for assessing, managing, and monitoring information technology risk
CN102446325A (en) * 2010-10-14 2012-05-09 周江红 Automatic distributed questionnaire survey system
CN107085820A (en) * 2017-04-20 2017-08-22 浙江大学 The popular wisdom data information management platform and method of a kind of promotion scientific and technical innovation
CN107133743A (en) * 2017-05-19 2017-09-05 重庆文理学院 A kind of appraisal procedure of small micro- enterprise operation project
CN107492041A (en) * 2017-07-24 2017-12-19 浙江大学 A kind of energy supervision system and method for the artificial intelligence epoch
CN108108869A (en) * 2017-11-03 2018-06-01 苏州海创天地信息科技有限公司 A kind of appraisal procedure that Enterprise Project is entered towards many wound spaces

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008140683A2 (en) * 2007-04-30 2008-11-20 Sheltonix, Inc. A method and system for assessing, managing, and monitoring information technology risk
CN102446325A (en) * 2010-10-14 2012-05-09 周江红 Automatic distributed questionnaire survey system
CN107085820A (en) * 2017-04-20 2017-08-22 浙江大学 The popular wisdom data information management platform and method of a kind of promotion scientific and technical innovation
CN107133743A (en) * 2017-05-19 2017-09-05 重庆文理学院 A kind of appraisal procedure of small micro- enterprise operation project
CN107492041A (en) * 2017-07-24 2017-12-19 浙江大学 A kind of energy supervision system and method for the artificial intelligence epoch
CN108108869A (en) * 2017-11-03 2018-06-01 苏州海创天地信息科技有限公司 A kind of appraisal procedure that Enterprise Project is entered towards many wound spaces

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
成鹏飞: "合作技术创新项目评价与风险管理研究", 《中国博士学位论文全文数据库 经济与管理科学辑》 *
梅亮等: "民众的科技满意度受何影响?——责任式创新的人本动因解析", 《科学学与科学技术管理》 *
梅亮等: "责任式创新范式下的新兴技术创新治理解析——以人工智能为例", 《技术经济》 *
蔡文飞: "煤矿企业技术创新的风险评价及对策研究", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109934488A (en) * 2019-03-11 2019-06-25 清华大学 A kind of pool formula sci-tech innovation resources management system and method
CN109934488B (en) * 2019-03-11 2021-06-29 清华大学 Overall planning type scientific and technological innovation resource management system and method
CN110083115A (en) * 2019-05-10 2019-08-02 清华大学 A kind of modular power supply device and energy supply method
CN110555588A (en) * 2019-07-29 2019-12-10 浙江大学 Modularized storage and transportation system for scientific and technological innovation resources

Similar Documents

Publication Publication Date Title
Renn Three decades of risk research: accomplishments and new challenges
Milne et al. Investigative interviewing
CN108805442A (en) A kind of pool formula creative management system and method based on energy monitor
Muriithi et al. The relationship between strategic thinking and leadership effectiveness in Kenyan indigenous banks
Mendelski Where does the European Union make a Difference?: Rule of Law Development in the Western Balkans and Beyond
Jackson et al. A flawed compass: A human rights analysis of the roadmap to strengthening public safety
KR20100060555A (en) Virtual university using rfid technology and artificial intelligence
Muegge et al. A design science approach to constructing critical infrastructure and communicating cybersecurity risks
De et al. A refinement approach for the reuse of privacy risk analysis results
Moran ‘Blue walls,’‘grey areas’ and ‘cleanups’: Issues in the control of police corruption in England and Wales
Hilder et al. Multi‐agency approaches to effective risk management in the community in England and Wales
Brunetto et al. The role of informal and formal networks: how professionals can be innovative in a constrained fiscal environment
Lowe All Eyes on US: Regulating the Use & Development of Facial Recognition Technology
Kelly Evidence on social inclusion programming in Nigeria
Shapiro Accountability and indeterminacy in predictive policing
Moedjiono et al. Decision Support Model For User Submission Approval Energy Partners Candidate Using Profile Matching Method and Analytical Hierarchy Process
Acasamoso et al. SEAMS: A Smart and Efficient Attendance Management System with Attendance Prediction and Forecasting
Ravid et al. Body-worn camera technologies can promote positive policing
CN108076024A (en) Data safe processing systems, devices and methods
Kunikowski et al. Methodology for the preparation of rescue plans–a Polish case study
Rezaee et al. Decentralized Legislative Oversight of Bureaucratic Policy Making
Саргин et al. EVALUATION OF THE LEVEL OF LOYALTY AND MOTIVATION OF THE STAFF WORKING WITH CONFIDENTIAL INFORMATION
Wang et al. The Researches on Security Risk Management Process
Nosova Foreign Direct Investment’s Impact on the Activity of Transnational Corporations
Sharma et al. Artificial Intelligence Applications in Robotics and Control: In Context of Healthcare Industry

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181113