CN104156802B - Company of city Team Construction data handling system and data processing method - Google Patents
Company of city Team Construction data handling system and data processing method Download PDFInfo
- Publication number
- CN104156802B CN104156802B CN201410341501.6A CN201410341501A CN104156802B CN 104156802 B CN104156802 B CN 104156802B CN 201410341501 A CN201410341501 A CN 201410341501A CN 104156802 B CN104156802 B CN 104156802B
- Authority
- CN
- China
- Prior art keywords
- groups
- teams
- data
- regulations
- evaluation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses company of city Team Construction data handling system and data processing method;The system includes:System-based data maintenance module;Index system and evaluation rule establish module;Make a report on setting, evaluation priority assignation and data recording module, for set make a report on authority, evaluation authority is set and typing make a report on data;Data summarization, data statistics, data analysis, data results displaying and form export module, for carrying out collect statistics to teams and groups' index completion value of typing and teams and groups' evaluation score, the Team Construction index according to corresponding to calculating the statistical mask of setting, the concrete analysis of Team Construction index, the displaying of analysis result and the export of form;Mark post teams and groups and advanced teams and groups' matching module, for the screening and displaying to mark post teams and groups and advanced teams and groups;The data of teams and groups are handled and analyzed from multiple angles by management data and segregation of duties of the present invention for teams and groups.
Description
Technical field
The present invention relates to a kind of company of city Team Construction data handling system and data processing method.
Background technology
Teams and groups' evaluation and checking system in the prior art be present, to teams and groups' evaluation of the system and examination data processing procedure
In still there are problems that confidentiality is poor, data be easily tampered it is low with the big operating efficiency of data volume etc..
Still asked in teams and groups' evaluation of company of city and examination data processing system there is some without the technology solved
Topic, such as:
1 evaluated in teams and groups and the processing procedure to marking big data in, prior art is all manually to operate, and can not be avoided out
Omission and mistake in existing big data processing;
2 are directed to the authenticity of the evaluating data of teams and groups, and the operating method of prior art does not account for increase authority processing,
Personal information protection to estimator is not very well;
The data of 3 existing teams and groups' evaluation management systems do not take encryption measures during transmission and interaction, hold
Easily leave the leak distorted;
4 in the prior art, can there is repetition and the redundancy of data in teams and groups' evaluation and checking system, deletes and arrange redundancy
Data need to waste the time of staff.
The content of the invention
The purpose of the present invention is exactly to solve the above problems, there is provided a kind of company of city Team Construction data handling system and
Data processing method, according to mark and evaluate two latitudes carry out proceeding by teams and groups, workshop, company from teams and groups itself it is multi-level
Analysis, the evaluation of multi-angle.
To achieve these goals, the present invention adopts the following technical scheme that:
A kind of company of city Team Construction data handling system, including:
Index system and evaluation rule establish module, the foundation for index system and evaluation rule;And teams and groups are built
If the additions and deletions of index system and Team Construction evaluation detailed rules and regulations, which change, looks into work;
Setting, evaluation priority assignation and data recording module are made a report on, for carrying out making a report on authority using Fingerprint Identification Unit
Set, using Fingerprint Identification Unit carry out evaluate authority setting and typing make a report on data;Team Construction index and teams and groups are built
If evaluation detailed rules and regulations distribute to sales department, transport inspection department and power regulation center and are in charge of department, the department that is in charge of is according to distributing to
Index just evaluates detailed rules and regulations, and the typing of data is carried out by mobile phone or computer client;
Data summarization, data statistics, data analysis, data results displaying and form export module, for typing
Teams and groups' index completion value and teams and groups evaluation score carry out collect statistics, according to the statistical mask of setting calculate corresponding to teams and groups build
If index, the concrete analysis of Team Construction index, the displaying of analysis result and the export of form;
Mark post teams and groups and advanced teams and groups' matching module, for the screening and displaying to mark post teams and groups and advanced teams and groups, and
Mark post teams and groups and advanced teams and groups are reported.
It is described to make a report on setting, evaluate priority assignation and data recording module, including:
Index system or evaluation detailed rules and regulations setting unit, for the setting to index system and evaluation detailed rules and regulations, including set class
Set up and set the weight of index system, making a report on authority, setting Team Construction to evaluate detailed rules and regulations displaying for Team Construction index system is set
Sequentially, set Team Construction to evaluate detailed rules and regulations standard scores and set Team Construction to evaluate detailed rules and regulations subitem point;
User can typing index or scoring item allocation unit, for set Team Construction index system using department and
Team Construction evaluation detailed rules and regulations use department, while Team Construction index and Team Construction evaluation detailed rules and regulations are assigned into department;Respectively
Individual workshop, department, company of city and company of city evaluate detailed rules and regulations according to Team Construction index and Team Construction and evaluate number come typing teams and groups
According to;
Verify the legitimacy unit of typing content, the checking for making a report on specification for all departments to be made a report on data, including decimal
The verification operation of position, data length and data type information;
Data preservation, examination & verification and reporting unit, for the encryption to making a report on data, preserved after encryption, to filling out
The examination & verification of count off evidence and report.
The data summarization, data statistics, data analysis, data results displaying and form export module, including:
Data summarization statistics and analysis preparatory unit, for carrying out collect statistics to the data made a report on and carrying out analysis standard
It is standby, judge whether to meet analysis condition by calculating data inputting completion rate;
Collect statistics data entry element, for being checked to collect statistics data inputting situation, show acquired
The detail of data and not yet gathered data;
Using Algorithm Analysis data cell, according to Principle of Statistics, statistics description is carried out to achievement data, according to data
Characteristic distributions, the method that normal distribution and five points of positions is respectively adopted, determine data quantile.
Comprehensive analysis reporting unit is generated, for analysis result and the report of report generation comprehensive analysis.
The mark post teams and groups and advanced teams and groups' matching module, including:
Mark post teams and groups or advanced teams and groups' Data Matching preparatory unit, for being carried out to the data of mark post teams and groups and advanced teams and groups
Preparing and verify, the foundation of checking is the various restrictive conditions of systemic presupposition, when being verified, system Auto-matching limitation bar
Part, filter out qualified teams and groups;
Mark post teams and groups or advanced teams and groups' matching condition setting unit, for selecting to need index system, the report screened
Table phase, workshop type and teams and groups' type;
Mark post teams and groups or advanced teams and groups' comprehensive score unit are calculated, for the teams and groups for meeting matching condition integrate
Divide and calculate;
According to setting matching condition and comprehensive score to participate in teams and groups carry out matched data processing unit, for
Teams and groups with condition judge to carry out the matching treatment of data according to comprehensive score;
Generate mark post teams and groups or advanced teams and groups' reporting unit, for mark post teams and groups and advanced teams and groups generation and report.
A kind of company of city Team Construction data processing method, comprises the following steps:
Index system and evaluation rule are established:The foundation of index system and evaluation rule;And to Team Construction index body
The additions and deletions of system and Team Construction evaluation detailed rules and regulations, which change, looks into work;
Make a report on setting, evaluation priority assignation and data inputting:It is provided with making a report on authority, being provided with finger for fingerprint recognition
Data are made a report in the evaluation authority and typing of line identification;Team Construction index and Team Construction evaluation detailed rules and regulations are distributed into marketing
Department is in charge of at portion, transport inspection department and power regulation center, and the department that is in charge of just evaluates detailed rules and regulations according to the index distributed to, passes through hand
Machine or computer client carry out the typing of data;
Data summarization, data statistics, data analysis, data results displaying and form export:The teams and groups of typing are referred to
Mark completion value and teams and groups' evaluation score carry out collect statistics, the Team Construction index according to corresponding to calculating the statistical mask of setting,
The concrete analysis of Team Construction index, the displaying of analysis result and the export of form;
Mark post teams and groups and the matching of advanced teams and groups:Screening and displaying to mark post teams and groups and advanced teams and groups, and to mark post class
Group reports with advanced teams and groups.
It is described to make a report on setting, evaluation priority assignation and data inputting, comprise the following steps:
Index system or evaluation detailed rules and regulations are set:Setting to index system and evaluation detailed rules and regulations, including set Team Construction to refer to
The weight of mark system, making a report on authority, setting Team Construction to evaluate detailed rules and regulations displaying order, set for Team Construction index system is set
Team Construction evaluates detailed rules and regulations standard scores and sets Team Construction to evaluate detailed rules and regulations subitem point;
User can typing index or scoring item distribution:Set Team Construction index system uses department and Team Construction
The department that uses of detailed rules and regulations is evaluated, while Team Construction index and Team Construction evaluation detailed rules and regulations are assigned to department;Each workshop, portion
Door, company of city and company of city evaluate detailed rules and regulations come typing teams and groups evaluating data according to Team Construction index and Team Construction;
During typing teams and groups evaluating data, divide multilayer, repeatedly carry out, wherein:Workshop is monthly evaluated once subordinate teams and groups, portion
Door quarterly to workshop evaluation once, company of city quarterly to Sectoral assessment once, company of city every year to teams and groups evaluation once, city
Company every year to city's company evaluation once.
Verify the legitimacy of typing content:All departments are made a report on the checking that data make a report on specification, including decimal place, data length
The verification operation of degree and data type information;
Data preserve, audit and report:To making a report on the preservation of data, the examination & verification to making a report on data and reporting.
The data summarization, data statistics, data analysis, data results displaying and form export, including following step
Suddenly:
Data summarization statistics and analysis prepares:Collect statistics are carried out to the data made a report on and carry out analysis preparation, are passed through
Data inputting completion rate is calculated to judge whether to meet analysis condition;
Collect statistics data inputting:Collect statistics data inputting situation is checked, shows gathered data Buddhist monk
The detail of non-gathered data;
Using Algorithm Analysis data:According to Principle of Statistics, statistics description is carried out to achievement data, the distribution according to data
Feature, the method that normal distribution and five points of positions is respectively adopted, determines data quantile.
Generate comprehensive analysis report:Analysis result and report generation comprehensive analysis are reported.
The mark post teams and groups and the matching of advanced teams and groups, comprise the following steps:
Mark post teams and groups or advanced teams and groups' Data Matching prepare:The data of mark post teams and groups and advanced teams and groups are prepared and tested
Card, the foundation of checking is the various restrictive conditions of systemic presupposition, when being verified, system Auto-matching restrictive condition, is filtered out
Qualified teams and groups;
Mark post teams and groups or advanced teams and groups' matching condition are set:Selection need screen index system, the form phase, workshop
Type and teams and groups' type;
Calculate mark post teams and groups or advanced teams and groups' comprehensive score:Comprehensive score calculating is carried out to the teams and groups for meeting matching condition;
According to the matching condition and comprehensive score of setting matched data processing is carried out to participating in teams and groups:To the class of matching condition
Group judges to carry out the matching treatment of data according to comprehensive score;
Generate mark post teams and groups or the report of advanced teams and groups:The generation of mark post teams and groups and advanced teams and groups and report.
The method of the normal distribution is as follows:
The achievement data for meeting normal distribution is examined, respectively using 1 σ (standard deviations of the σ as achievement data), 0.33 σ, -0.33 σ
It is quantile with -1 σ, data is divided into five sections of A, B, C, D, E, the score difference of each section by the outstanding order to backwardness
For 4,3,2,1,0 points.
The method of five period in arithmetric is as follows:
Examine and do not meet the data of normal distribution, achievement data is divided into five sections with five period in arithmetrics, embody respectively from
Backwardness compares and good and bad degree to outstanding variation.The selection of its quantile is consistent with normal distribution method, be respectively adopted 16%,
37%th, 63% and 84% probability is set, and achievement data is divided into five sections of A, B, C, D, E, the score of each section is respectively 4,
3rd, 2,1,0 points.
For being analyzed according to the normal distribution and five points of position algorithms that have set logging data;
Analysis result is shown and form lead-out unit, is operated for the displaying to analysis result and the export of report data;
When mark is analyzed, point multilayer is carried out, and is successively from the bottom up:
A, the score of each teams and groups is calculated by index, the teams and groups of same type are carried out to mark
B, the score in each workshop is calculated by teams and groups, the workshop of same type is carried out to mark
C, the score of each company of city is calculated by workshop, is carried out between each company of city to mark.
The algorithm that the teams and groups for meeting matching condition are carried out with comprehensive score calculating is as follows:
Enterprise's Team Construction examination score=department of our department examination score × 30%+ teams and groups check examination score × 30%+
Teams and groups are to mark evaluation point × 40%
The department of our department checks and rates score=department of ∑ our department specialty evaluation score;
The teams and groups check that the advanced teams and groups of examination score=100- verify deduction of points-teams and groups up to standard selective examination deduction of points-class not up to standard
Group ratio deduction of points;
The advanced teams and groups verify unqualified advanced teams and groups number × 1 of deduction of points=verification
Advanced teams and groups are verified comprehensively, verify underproof, each 1 point of teams and groups' button
Teams and groups' selective examination deduction of points=selective examination up to standard teams and groups' number of non-compliances up to standard/(from teams and groups' number × 10% up to standard is reported) ×
100×0.5
By from 10% selective examination for reporting teams and groups up to standard, unit teams and groups' disqualification rate up to standard, each percentage point of button 0.5 are calculated
Point.
Teams and groups' ratio deduction of points not up to standard=report teams and groups' number not up to standard/teams and groups of our unit sum × 100 × 0.5 certainly
From teams and groups' ratio not up to standard is reported, each percentage point is detained 0.5 point
The teams and groups are to mark average mark=teams and groups to mark total score/participation to mark teams and groups number.
Beneficial effects of the present invention:
1 solves the safety issue in Team Construction data handling procedure, can effectively prevent distorting for teams and groups' data,
Lift the operating efficiency of data processing.
2nd, in the analysis to teams and groups' index completion value, data distribution algorithms normal distribution in statistics, five are employed
Divide position, ensure that the science, reasonability, correctness of analysis result.
Elementary cell of teams and groups' index analysis using the completion value of single index as analysis, a usual index can be correspondingly multiple
Completion value, segmentation calculating first is carried out using normal distribution algorithm to these completion values, when discovery has abnormal data in calculating process
When, then rejecting abnormalities data, then proceed to calculate, and continue to reject if also abnormal data, until no abnormal data is
Only;If abnormal data can not be rejected all, illustrate to be not suitable for using normal distribution algorithm, it is necessary to use five points of position algorithms
Carry out segmentation calculating.
3rd, the corresponding A of segmentation score 4,3,2,1,0 calculated using normal distribution, five points of position algorithms, B, C, D, E section
Without being directly worth using completion into row index Ordination, by increasing capacitance it is possible to increase achievement of each teams and groups in each index reaches
Probability that is advanced or falling behind, can be effectively ensured the teams and groups for making great efforts improvement it can be seen that the improvement result of oneself.
4th, during typing teams and groups evaluating data, divide multilayer, repeatedly carry out, wherein:Workshop is monthly evaluated once subordinate teams and groups,
Department quarterly to workshop evaluation once, company of city quarterly to Sectoral assessment once, company of city every year to teams and groups evaluation once,
Company of city every year to city's company evaluation once, for the management data of teams and groups and segregation of duties, the number from multiple angles to teams and groups
According to being handled and analyzed.
Brief description of the drawings
Fig. 1 is the block diagram of Team Construction management system of the present invention;
Fig. 2 is that Team Construction management system of the present invention makes a report on setting, evaluation priority assignation, the embodiment of data inputting module
Step flow chart;
Fig. 3 be Team Construction Management System Data of the present invention collect, data statistics, data analysis, data results exhibition
Show, the step flow chart of embodiment derived from form;
Fig. 4 be Team Construction management system mark post teams and groups of the present invention, advanced teams and groups' matching module embodiment the step of flow
Cheng Tu.
Embodiment
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of company of city Team Construction data handling system, including:
Index system and evaluation rule establish module, the foundation for index system and evaluation rule;And teams and groups are built
If the additions and deletions of index system and Team Construction evaluation detailed rules and regulations, which change, looks into work;
Setting, evaluation priority assignation and data recording module are made a report on, for carrying out making a report on authority using Fingerprint Identification Unit
Set, using Fingerprint Identification Unit carry out evaluate authority setting and typing make a report on data;Team Construction index and teams and groups are built
If evaluation detailed rules and regulations distribute to sales department, transport inspection department and power regulation center and are in charge of department, the department that is in charge of is according to distributing to
Index just evaluates detailed rules and regulations, and the typing of data is carried out by mobile phone or computer client;
Data summarization, data statistics, data analysis, data results displaying and form export module, for typing
Teams and groups' index completion value and teams and groups evaluation score carry out collect statistics, according to the statistical mask of setting calculate corresponding to teams and groups build
If index, the concrete analysis of Team Construction index, the displaying of analysis result and the export of form;
Mark post teams and groups and advanced teams and groups' matching module, for the screening and displaying to mark post teams and groups and advanced teams and groups, and
Mark post teams and groups and advanced teams and groups are reported.
As shown in Fig. 2 described make a report on setting, evaluate priority assignation and data inputting, including:
Index system or evaluation detailed rules and regulations are set:Setting to index system and evaluation detailed rules and regulations, including set Team Construction to refer to
The weight of mark system, making a report on authority, setting Team Construction to evaluate detailed rules and regulations displaying order, set for Team Construction index system is set
Team Construction evaluates detailed rules and regulations standard scores and sets Team Construction to evaluate detailed rules and regulations subitem point;
User can typing index or scoring item distribution:Set Team Construction index system uses department and Team Construction
The department that uses of detailed rules and regulations is evaluated, while Team Construction index and Team Construction evaluation detailed rules and regulations are assigned to department;Each workshop, portion
Door, company of city and company of city evaluate detailed rules and regulations come typing teams and groups evaluating data according to Team Construction index and Team Construction;
Verify the legitimacy of typing content:All departments are made a report on the checking that data make a report on specification, including decimal place, data length
The verification operation of degree and data type information;
Data preserve, audit and report:To making a report on the preservation of data, the examination & verification to making a report on data and reporting.
As shown in figure 3, the data summarization, data statistics, data analysis, data results displaying and form export mould
Block, including:
Data summarization statistics and analysis preparatory unit, for carrying out collect statistics to the data made a report on and carrying out analysis standard
It is standby, judge whether to meet analysis condition by calculating data inputting completion rate;
Collect statistics data entry element, for being checked to collect statistics data inputting situation, show acquired
The detail of data and not yet gathered data;
Using Algorithm Analysis data cell, according to Principle of Statistics, statistics description is carried out to achievement data, according to data
Characteristic distributions, the method that normal distribution and five points of positions is respectively adopted, determine data quantile.
Comprehensive analysis reporting unit is generated, for analysis result and the report of report generation comprehensive analysis.
As shown in figure 4, the mark post teams and groups and advanced teams and groups' matching module, including:
Mark post teams and groups or advanced teams and groups' Data Matching preparatory unit, for being carried out to the data of mark post teams and groups and advanced teams and groups
Preparing and verify, the foundation of checking is the various restrictive conditions of systemic presupposition, when being verified, system Auto-matching limitation bar
Part, filter out qualified teams and groups;
Mark post teams and groups or advanced teams and groups' matching condition setting unit, for selecting to need index system, the report screened
Table phase, workshop type and teams and groups' type;
Mark post teams and groups or advanced teams and groups' comprehensive score unit are calculated, for the teams and groups for meeting matching condition integrate
Divide and calculate;
According to setting matching condition and comprehensive score to participate in teams and groups carry out matched data processing unit, for
Teams and groups with condition judge to carry out the matching treatment of data according to comprehensive score;
Generate mark post teams and groups or advanced teams and groups' reporting unit, for mark post teams and groups and advanced teams and groups generation and report.
A kind of company of city Team Construction data processing method, comprises the following steps:
Index system and evaluation rule are established:The foundation of index system and evaluation rule;And to Team Construction index body
The additions and deletions of system and Team Construction evaluation detailed rules and regulations, which change, looks into work;
Make a report on setting, evaluation priority assignation and data inputting:Carry out making a report on the setting of authority using Fingerprint Identification Unit, utilize
Data are made a report in the setting and typing that Fingerprint Identification Unit evaluate authority;Team Construction index and Team Construction evaluation is thin
Then distribute to sales department, transport inspection department and power regulation center and be in charge of department, the department that is in charge of just is commented according to the index distributed to
Valency detailed rules and regulations, the typing of data is carried out by mobile phone or computer client;
Data summarization, data statistics, data analysis, data results displaying and form export:The teams and groups of typing are referred to
Mark completion value and teams and groups' evaluation score carry out collect statistics, the Team Construction index according to corresponding to calculating the statistical mask of setting,
The concrete analysis of Team Construction index, the displaying of analysis result and the export of form;
Mark post teams and groups and the matching of advanced teams and groups:Screening and displaying to mark post teams and groups and advanced teams and groups, and to mark post class
Group reports with advanced teams and groups.
It is described to make a report on setting, evaluation priority assignation and data inputting, comprise the following steps:
Data inputting initializes:Initialization teams and groups achievement data is made a report on, teams and groups evaluate the required indication information of marking, comments
Valency item information;
Index system or evaluation detailed rules and regulations are set:Setting to index system and evaluation detailed rules and regulations, including set Team Construction to refer to
The weight of mark system, making a report on authority, setting Team Construction to evaluate detailed rules and regulations displaying order, set for Team Construction index system is set
Team Construction evaluates detailed rules and regulations standard scores and sets Team Construction to evaluate detailed rules and regulations subitem point;
User can typing index or scoring item distribution:Set Team Construction index system uses department and Team Construction
The department that uses of detailed rules and regulations is evaluated, while Team Construction index and Team Construction evaluation detailed rules and regulations are assigned to department;Each workshop, portion
Door, company of city and company of city evaluate detailed rules and regulations come typing teams and groups evaluating data according to Team Construction index and Team Construction;
During typing teams and groups evaluating data, divide multilayer, repeatedly carry out, wherein:Workshop is monthly evaluated once subordinate teams and groups, portion
Door quarterly to workshop evaluation once, company of city quarterly to Sectoral assessment once, company of city every year to teams and groups evaluation once, city
Company every year to city's company evaluation once.
Verify the legitimacy of typing content:All departments are made a report on the checking that data make a report on specification, including decimal place, data length
The verification operation of degree and data type information;
Data preserve, audit and report:To making a report on the preservation of data, the examination & verification to making a report on data and reporting.
The data summarization, data statistics, data analysis, data results displaying and form export, including following step
Suddenly:
Data summarization statistics and analysis prepares:Collect statistics are carried out to the data made a report on and carry out analysis preparation, are passed through
Data inputting completion rate is calculated to judge whether to meet analysis condition;
Collect statistics data inputting:Collect statistics data inputting situation is checked, shows gathered data Buddhist monk
The detail of non-gathered data;
Using Algorithm Analysis data:According to Principle of Statistics, statistics description is carried out to achievement data, the distribution according to data
Feature, the method that normal distribution and five points of positions is respectively adopted, determines data quantile.
Generate comprehensive analysis report:Analysis result and report generation comprehensive analysis are reported.
The mark post teams and groups and the matching of advanced teams and groups, comprise the following steps:
Mark post teams and groups or advanced teams and groups' Data Matching prepare:The data of mark post teams and groups and advanced teams and groups are prepared and tested
Card, the foundation of checking is the various restrictive conditions of systemic presupposition, when being verified, system Auto-matching restrictive condition, is filtered out
Qualified teams and groups;
Mark post teams and groups or advanced teams and groups' matching condition are set:Selection need screen index system, the form phase, workshop
Type and teams and groups' type;
Calculate mark post teams and groups or advanced teams and groups' comprehensive score:Comprehensive score calculating is carried out to the teams and groups for meeting matching condition;
According to the matching condition and comprehensive score of setting matched data processing is carried out to participating in teams and groups:To the class of matching condition
Group judges to carry out the matching treatment of data according to comprehensive score;
Generate mark post teams and groups or the report of advanced teams and groups:The generation of mark post teams and groups and advanced teams and groups and report.
The detailed rules and regulations include the evaluation detailed rules and regulations of management layer and the evaluation detailed rules and regulations of heterogeneity teams and groups;
The evaluation detailed rules and regulations of the management layer include:
(1), production management evaluation detailed rules and regulations transport inspection, substation equipment maintenance and repair, state evaluation, information mainly for the inspection of transmission of electricity fortune, distribution
The specialized management of the teams and groups such as communication, automation O&M, power transformation O&M, distribution repairing, power scheduling, power utility check, electric energy metrical
The Team Construction responsibility that department is undertaken is formulated.
(2), integrated management evaluation detailed rules and regulations are mainly for business accounting, market development, Electric Design, material supply, synthesis
The Team Construction responsibility that the departments that are in charge of manging enterprises of the teams and groups such as service are undertaken is formulated
The evaluation detailed rules and regulations of the heterogeneity teams and groups include:
(3), production maintenance teams and groups evaluation detailed rules and regulations are applied to the inspection of transmission of electricity fortune, the inspection of distribution fortune, substation equipment maintenance and repair, state evaluation, letter
Message communication, automation O&M Lei Deng teams and groups;
(4) O&M teams and groups evaluation detailed rules and regulations, are produced and are applied to power transformation O&M, distribution repairing, power scheduling Lei Deng teams and groups;
(5) live teams and groups' evaluation detailed rules and regulations of, marketing are applied to power utility check, electric energy metrical Lei Deng teams and groups;
(6), marketing service teams and groups evaluation detailed rules and regulations are applied to business accounting, market development Lei Deng teams and groups;
(7), business support teams and groups evaluation detailed rules and regulations are applied to Electric Design, material supply, integrated service Lei Deng teams and groups.
Although above-mentioned the embodiment of the present invention is described with reference to accompanying drawing, model not is protected to the present invention
The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not
Need to pay various modifications or deformation that creative work can make still within protection scope of the present invention.
Claims (2)
1. a kind of company of city Team Construction data handling system, it is characterized in that, including:
Index system and evaluation rule establish module, the foundation for index system and evaluation rule;And Team Construction is referred to
The additions and deletions of mark system and Team Construction evaluation detailed rules and regulations, which change, looks into work;
Make a report on setting, evaluation priority assignation and data recording module, for using Fingerprint Identification Unit make a report on the setting of authority,
Evaluate the setting of authority using Fingerprint Identification Unit and data are made a report in typing;Team Construction index and Team Construction are evaluated
Detailed rules and regulations distribute to sales department, transport inspection department and power regulation center and are in charge of department, described to be in charge of department according to the index distributed to just
Detailed rules and regulations are evaluated, carry out the typing of data;
It is described to make a report on setting, evaluate priority assignation and data recording module, including:
Index system or evaluation detailed rules and regulations setting unit, for the setting to index system and evaluation detailed rules and regulations, including set teams and groups to build
If the weight of index system, set Team Construction index system make a report on authority, set Team Construction evaluate detailed rules and regulations displayings order,
Set Team Construction to evaluate detailed rules and regulations standard scores and set Team Construction to evaluate detailed rules and regulations subitem point;
User can typing index or scoring item allocation unit, for set Team Construction index system use department and teams and groups
The department that uses of evaluation detailed rules and regulations is built, while Team Construction index and Team Construction evaluation detailed rules and regulations are assigned to department;Each car
Between, department and company of city detailed rules and regulations are evaluated come typing teams and groups evaluating data according to Team Construction index and Team Construction;
During typing teams and groups evaluating data, divide multilayer, repeatedly carry out, wherein:Workshop is monthly evaluated once subordinate teams and groups, and department is every
Season to workshop evaluate once, company of city quarterly to Sectoral assessment once, company of city every year to teams and groups evaluation once, company of city
Every year to city's company evaluation once;
Verify the legitimacy unit of typing content, the checking for making a report on specification for all departments to be made a report on data, including decimal place, number
According to the verification operation of length and data type information;
Data preservation, examination & verification and reporting unit, for the encryption to making a report on data, preserved after encryption, to making a report on number
According to examination & verification and report;
Data summarization, data statistics, data analysis, data results displaying and form export module, for the class to typing
Group index completion value and teams and groups' evaluation score carry out collect statistics, and the Team Construction according to corresponding to calculating the statistical mask of setting refers to
Mark, the concrete analysis of Team Construction index, the displaying of analysis result and the export of form;
The data summarization, data statistics, data analysis, data results displaying and form export module, including:
Data summarization statistics and analysis preparatory unit, for carrying out collect statistics to the data made a report on and carrying out analysis preparation,
Judge whether to meet analysis condition by calculating data inputting completion rate;
Collect statistics data entry element, for being checked to collect statistics data inputting situation, show gathered data
The not yet detail of gathered data;
Using Algorithm Analysis data cell, according to Principle of Statistics, statistics description is carried out to achievement data, the distribution according to data
Feature, the method that normal distribution and five points of positions is respectively adopted, determines data quantile;
Comprehensive analysis reporting unit is generated, for analysis result and the report of report generation comprehensive analysis;
Mark post teams and groups and advanced teams and groups' matching module, for the screening and displaying to mark post teams and groups and advanced teams and groups, and to mark
Bar teams and groups and advanced teams and groups report;
The mark post teams and groups and advanced teams and groups' matching module, including:
Mark post teams and groups or advanced teams and groups' Data Matching preparatory unit, for being prepared to the data of mark post teams and groups and advanced teams and groups
And checking, the foundation of checking is the various restrictive conditions of systemic presupposition, when being verified, system Auto-matching restrictive condition, and sieve
Select qualified teams and groups;
Mark post teams and groups or advanced teams and groups' matching condition setting unit, for select need screen index system, the form phase,
Workshop type and teams and groups' type;
Mark post teams and groups or advanced teams and groups' comprehensive score unit are calculated, based on carrying out comprehensive score to the teams and groups for meeting matching condition
Calculate;
The unit of matched data processing is carried out to participating in teams and groups according to the matching condition and comprehensive score of setting, for matching bar
The teams and groups of part judge to carry out the matching treatment of data according to comprehensive score;
Generate mark post teams and groups or advanced teams and groups' reporting unit, for mark post teams and groups and advanced teams and groups generation and report;
When mark is analyzed, point multilayer is carried out, and is successively from the bottom up:
A, the score of each teams and groups is calculated by index, the teams and groups of same type are carried out to mark
B, the score in each workshop is calculated by teams and groups, the workshop of same type is carried out to mark
C, the score of each company of city is calculated by workshop, is carried out between each company of city to mark;
The algorithm that the teams and groups for meeting matching condition are carried out with comprehensive score calculating is as follows:
Enterprise's Team Construction examination score=department of our department examination score × 30%+ teams and groups check examination score × 30%+ teams and groups
To mark evaluation point × 40%
The department of our department checks and rates score=department of ∑ our department specialty evaluation score;
The teams and groups check that the advanced teams and groups of examination score=100- verify deduction of points-teams and groups up to standard selective examination deduction of points-teams and groups' ratio not up to standard
Rate is deducted points;
The advanced teams and groups verify unqualified advanced teams and groups number × 1 of deduction of points=verification
Advanced teams and groups are verified comprehensively, verify underproof, each 1 point of teams and groups' button
Teams and groups' selective examination deduction of points=selective examination up to standard teams and groups' number of non-compliances up to standard/(from teams and groups' number × 10% up to standard is reported) × 100 ×
0.5
By from 10% selective examination for reporting teams and groups up to standard, unit teams and groups' disqualification rate up to standard is calculated, each percentage point is detained 0.5 point;
Teams and groups' ratio deduction of points not up to standard=report teams and groups' number not up to standard/teams and groups of our unit sum × 100 × 0.5 certainly
From teams and groups' ratio not up to standard is reported, each percentage point is detained 0.5 point
The teams and groups are to mark average mark=teams and groups to mark total score/participation to mark teams and groups number;
The evaluation detailed rules and regulations include the evaluation detailed rules and regulations of management layer and the evaluation detailed rules and regulations of heterogeneity teams and groups;
The evaluation detailed rules and regulations of the management layer include:
(1), production management evaluation detailed rules and regulations for transmission of electricity fortune inspection, distribution fortune inspection, substation equipment maintenance and repair, state evaluation, information communication, automatically
Change O&M, power transformation O&M, distribution repairing, power scheduling, power utility check, the departments that are in charge of manging enterprises of electric energy metrical teams and groups are undertaken
Team Construction responsibility is formulated;
(2), integrated management evaluation detailed rules and regulations are for business accounting, market development, Electric Design, material supply, integrated service teams and groups
The Team Construction responsibility that is undertaken of departments that are in charge of manging enterprises formulate;
The evaluation detailed rules and regulations of the heterogeneity teams and groups include:
(3), production maintenance teams and groups evaluation detailed rules and regulations are led to suitable for the inspection of transmission of electricity fortune, the inspection of distribution fortune, substation equipment maintenance and repair, state evaluation, information
Letter, automation O&M class teams and groups;
(4) O&M teams and groups evaluation detailed rules and regulations, are produced and are applied to power transformation O&M, distribution repairing, power scheduling class teams and groups;
(5) live teams and groups' evaluation detailed rules and regulations of, marketing are applied to power utility check, electric energy metrical class teams and groups;
(6), marketing service teams and groups evaluation detailed rules and regulations are applied to business accounting, market development class teams and groups;
(7), business support teams and groups evaluation detailed rules and regulations are applied to Electric Design, material supply, integrated service class teams and groups.
2. the method that a kind of company of city Team Construction data handling system as claimed in claim 1 is applied, it is characterized in that, bag
Include following steps:
Index system and evaluation rule are established:The foundation of index system and evaluation rule;And to Team Construction index system and
The additions and deletions of Team Construction evaluation detailed rules and regulations, which change, looks into work;
Make a report on setting, evaluation priority assignation and data inputting:Carry out making a report on the setting of authority using Fingerprint Identification Unit, utilize fingerprint
Identifier evaluate the setting of authority and data are made a report in typing;By Team Construction index and Team Construction evaluation detailed rules and regulations distribution
It is in charge of department to sales department, transport inspection department and power regulation center, the department that is in charge of just evaluates detailed rules and regulations according to the index distributed to,
The typing of data is carried out by mobile phone or computer client;
It is described to make a report on setting, evaluate priority assignation and data recording module, including:
Index system or evaluation detailed rules and regulations setting unit, for the setting to index system and evaluation detailed rules and regulations, including set teams and groups to build
If the weight of index system, set Team Construction index system make a report on authority, set Team Construction evaluate detailed rules and regulations displayings order,
Set Team Construction to evaluate detailed rules and regulations standard scores and set Team Construction to evaluate detailed rules and regulations subitem point;
User can typing index or scoring item allocation unit, for set Team Construction index system use department and teams and groups
The department that uses of evaluation detailed rules and regulations is built, while Team Construction index and Team Construction evaluation detailed rules and regulations are assigned to department;Each car
Between, department and company of city detailed rules and regulations are evaluated come typing teams and groups evaluating data according to Team Construction index and Team Construction;
During typing teams and groups evaluating data, divide multilayer, repeatedly carry out, wherein:Workshop is monthly evaluated once subordinate teams and groups, and department is every
Season to workshop evaluate once, company of city quarterly to Sectoral assessment once, company of city every year to teams and groups evaluation once, company of city
Every year to city's company evaluation once;
Verify the legitimacy unit of typing content, the checking for making a report on specification for all departments to be made a report on data, including decimal place, number
According to the verification operation of length and data type information;
Data preservation, examination & verification and reporting unit, for the encryption to making a report on data, preserved after encryption, to making a report on number
According to examination & verification and report;
Data summarization, data statistics, data analysis, data results displaying and form export:It is complete to teams and groups' index of typing
Collect statistics are carried out into value and teams and groups' evaluation score, the Team Construction index according to corresponding to calculating the statistical mask of setting, teams and groups
The concrete analysis of construction quotas, the displaying of analysis result and the export of form;
The data summarization, data statistics, data analysis, data results displaying and form export, comprise the following steps:
Data summarization statistics and analysis prepares:Collect statistics are carried out to the data made a report on and carry out analysis preparation, pass through calculating
Data inputting completion rate judges whether to meet analysis condition;
Collect statistics data inputting:Collect statistics data inputting situation is checked, gathered data is shown and not yet adopts
Collect the detail of data;
Using Algorithm Analysis data:According to Principle of Statistics, statistics description is carried out to achievement data, the distribution according to data is special
Point, the method that normal distribution and five points of positions is respectively adopted, determines data quantile;
Generate comprehensive analysis report:Analysis result and report generation comprehensive analysis are reported;
Mark post teams and groups and the matching of advanced teams and groups:Screening and displaying to mark post teams and groups and advanced teams and groups, and to mark post teams and groups and
Advanced teams and groups report;
The mark post teams and groups and the matching of advanced teams and groups, comprise the following steps:
Mark post teams and groups or advanced teams and groups' Data Matching prepare:The data of mark post teams and groups and advanced teams and groups are prepared and verified,
The foundation of checking is the various restrictive conditions of systemic presupposition, when being verified, system Auto-matching restrictive condition, filters out and meets
The teams and groups of condition;
Mark post teams and groups or advanced teams and groups' matching condition are set:Selection needs index system, form phase, the workshop type screened
With teams and groups' type;
Calculate mark post teams and groups or advanced teams and groups' comprehensive score:Comprehensive score calculating is carried out to the teams and groups for meeting matching condition;
According to the matching condition and comprehensive score of setting matched data processing is carried out to participating in teams and groups:To teams and groups' root of matching condition
Judge to carry out the matching treatment of data according to comprehensive score;
Generate mark post teams and groups or the report of advanced teams and groups:The generation of mark post teams and groups and advanced teams and groups and report;
When mark is analyzed, point multilayer is carried out, and is successively from the bottom up:
A, the score of each teams and groups is calculated by index, the teams and groups of same type are carried out to mark
B, the score in each workshop is calculated by teams and groups, the workshop of same type is carried out to mark
C, the score of each company of city is calculated by workshop, is carried out between each company of city to mark;
The algorithm that the teams and groups for meeting matching condition are carried out with comprehensive score calculating is as follows:
Enterprise's Team Construction examination score=department of our department examination score × 30%+ teams and groups check examination score × 30%+ teams and groups
To mark evaluation point × 40%
The department of our department checks and rates score=department of ∑ our department specialty evaluation score;
The teams and groups check that the advanced teams and groups of examination score=100- verify deduction of points-teams and groups up to standard selective examination deduction of points-teams and groups' ratio not up to standard
Rate is deducted points;
The advanced teams and groups verify unqualified advanced teams and groups number × 1 of deduction of points=verification
Advanced teams and groups are verified comprehensively, verify underproof, each 1 point of teams and groups' button
Teams and groups' selective examination deduction of points=selective examination up to standard teams and groups' number of non-compliances up to standard/(from teams and groups' number × 10% up to standard is reported) × 100 ×
0.5
By from 10% selective examination for reporting teams and groups up to standard, unit teams and groups' disqualification rate up to standard is calculated, each percentage point is detained 0.5 point;
Teams and groups' ratio deduction of points not up to standard=report teams and groups' number not up to standard/teams and groups of our unit sum × 100 × 0.5 certainly
From teams and groups' ratio not up to standard is reported, each percentage point is detained 0.5 point
The teams and groups are to mark average mark=teams and groups to mark total score/participation to mark teams and groups number;
The evaluation detailed rules and regulations include the evaluation detailed rules and regulations of management layer and the evaluation detailed rules and regulations of heterogeneity teams and groups;
The evaluation detailed rules and regulations of the management layer include:
(1), production management evaluation detailed rules and regulations for transmission of electricity fortune inspection, distribution fortune inspection, substation equipment maintenance and repair, state evaluation, information communication, automatically
Change O&M, power transformation O&M, distribution repairing, power scheduling, power utility check, the departments that are in charge of manging enterprises of electric energy metrical teams and groups are undertaken
Team Construction responsibility is formulated;
(2), integrated management evaluation detailed rules and regulations are for business accounting, market development, Electric Design, material supply, integrated service teams and groups
The Team Construction responsibility that is undertaken of departments that are in charge of manging enterprises formulate;
The evaluation detailed rules and regulations of the heterogeneity teams and groups include:
(3), production maintenance teams and groups evaluation detailed rules and regulations are led to suitable for the inspection of transmission of electricity fortune, the inspection of distribution fortune, substation equipment maintenance and repair, state evaluation, information
Letter, automation O&M class teams and groups;
(4) O&M teams and groups evaluation detailed rules and regulations, are produced and are applied to power transformation O&M, distribution repairing, power scheduling class teams and groups;
(5) live teams and groups' evaluation detailed rules and regulations of, marketing are applied to power utility check, electric energy metrical class teams and groups;
(6), marketing service teams and groups evaluation detailed rules and regulations are applied to business accounting, market development class teams and groups;
(7), business support teams and groups evaluation detailed rules and regulations are applied to Electric Design, material supply, integrated service class teams and groups.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410341501.6A CN104156802B (en) | 2014-07-17 | 2014-07-17 | Company of city Team Construction data handling system and data processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410341501.6A CN104156802B (en) | 2014-07-17 | 2014-07-17 | Company of city Team Construction data handling system and data processing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104156802A CN104156802A (en) | 2014-11-19 |
CN104156802B true CN104156802B (en) | 2017-11-28 |
Family
ID=51882297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410341501.6A Expired - Fee Related CN104156802B (en) | 2014-07-17 | 2014-07-17 | Company of city Team Construction data handling system and data processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104156802B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108595405A (en) * | 2018-05-16 | 2018-09-28 | 上海众深科技股份有限公司 | A kind of equipment Monitoring detailed rules and regulations or outline management method |
CN110738427A (en) * | 2019-10-21 | 2020-01-31 | 广东电网有限责任公司 | electric power part work quality scoring system |
CN115859930A (en) * | 2023-02-21 | 2023-03-28 | 翌飞锐特电子商务(北京)有限公司 | System and method for quickly generating electronic report |
-
2014
- 2014-07-17 CN CN201410341501.6A patent/CN104156802B/en not_active Expired - Fee Related
Non-Patent Citations (1)
Title |
---|
《基于标杆管理的电力企业同业对标》;吴佳怡;《中国优秀硕士学位论文全文数据库 经济与管理科学辑》;20080430;正文第J150-165页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104156802A (en) | 2014-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104156804B (en) | Provincial company teams and groups are to mark data handling system and data processing method | |
CN103337043B (en) | The method for early warning of electric power communication device running status and system | |
CN104156801B (en) | Teams and groups of company of city are to mark data handling system and data processing method | |
CN107862450A (en) | Performance appraisal system and method | |
CN108830510B (en) | Power data preprocessing method based on mathematical statistics | |
CN104156803B (en) | Provincial company Team Construction data handling system and data processing method | |
CN108596443A (en) | A kind of Electricity customers method for evaluating credit rating based on multi-dimensional data | |
CN107248985A (en) | A kind of network security test and appraisal and project quality assessment system | |
CN102800018A (en) | Credit management system and credit processing method thereof | |
CN104156802B (en) | Company of city Team Construction data handling system and data processing method | |
CN110138597A (en) | Based on the block chain DPOS of credit score and node clustering common recognition mechanism improved method | |
CN110046812A (en) | The integrated evaluating method of city safety development level | |
CN108038615A (en) | A kind of colliery sector Post Value appraisal procedure | |
CN112686405A (en) | Power distribution network fault area division method based on fault tree | |
CN106652621A (en) | Automotive soldier driving subject checking and judging system | |
CN107358338A (en) | A kind of multi-service and the D5000 system healths degree layering evaluation of priorities method of hardware fusion | |
CN108470243A (en) | A kind of method and system of performance appraisal | |
CN104156399B (en) | Provincial company teams and groups evaluating data processing system and data processing method | |
CN107609775A (en) | A kind of active safety production risk apparatus for evaluating and method | |
CN103985018B (en) | Method for analyzing networked transaction data collection and transaction completion degree | |
CN107818422A (en) | A kind of market administration and monitoring system | |
CN112633639B (en) | Food and drug safety supervision targeting risk early warning platform and method | |
CN102013080A (en) | Credit analysis and grading method based on credit rating work system | |
CN104156800B (en) | Teams and groups of company of city evaluating data processing system and data processing method | |
CN111127186A (en) | Application method of customer credit rating evaluation system based on big data technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171128 Termination date: 20180717 |
|
CF01 | Termination of patent right due to non-payment of annual fee |