CN104156802A - Construction data processing system and data processing method for municipal company teams - Google Patents

Construction data processing system and data processing method for municipal company teams Download PDF

Info

Publication number
CN104156802A
CN104156802A CN201410341501.6A CN201410341501A CN104156802A CN 104156802 A CN104156802 A CN 104156802A CN 201410341501 A CN201410341501 A CN 201410341501A CN 104156802 A CN104156802 A CN 104156802A
Authority
CN
China
Prior art keywords
data
teams
groups
report
team construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410341501.6A
Other languages
Chinese (zh)
Other versions
CN104156802B (en
Inventor
杜军
李建鹏
张学俊
宋士锋
李红梅
于长城
田兵
闫斌
史国宏
董绍峰
李新白
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electric Power Co Ltd filed Critical State Grid Shandong Electric Power Co Ltd
Priority to CN201410341501.6A priority Critical patent/CN104156802B/en
Publication of CN104156802A publication Critical patent/CN104156802A/en
Application granted granted Critical
Publication of CN104156802B publication Critical patent/CN104156802B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a construction data processing system and a data processing method for municipal company teams. The data processing system comprises a system basic data maintenance module, an indicator system and evaluation rule establishment module, a report setting, evaluation authority set and data input module, a data collection, data statistics, data analysis, data analysis result display and statement output module and a benchmarking team and advanced team matching module, wherein the report setting, evaluation authority set and data input module is used for setting the report authority and the evaluation authority, and inputting report data; the data collection, data statistics, data analysis, data analysis result display and statement output module is used for summary statistics of the input completion values of the team indicators and the evaluation scores of the teams, calculation of the corresponding team construction indicators according to the set statistics template, concrete analysis of the team construction indicators, display of the analysis results and output of the statements; the benchmarking team and advanced team matching module is used for screening and displaying benchmarking teams and advanced teams. As for the management data and duty segregation of the teams, the data processing system and the data processing method process and analyze the team data from multiple perspectives.

Description

City company Team Construction data handling system and data processing method
Technical field
The present invention relates to a kind of city company Team Construction data handling system and data processing method.
Background technology
In prior art, exist teams and groups to evaluate and checking system, to the teams and groups of this system evaluate and examination data processing procedure in still exist that confidentiality is poor, data are easily tampered and the problem such as the large inefficiency of data volume.
The teams and groups of city company evaluate and examination data disposal system in still exist the technical matters that some do not have solution, such as:
1 in teams and groups' evaluation with to marking in the processing procedure of large data, and prior art is all manually to operate, and cannot avoid occurring omission and the mistake in large data processing;
The authenticity of 2 evaluating datas for teams and groups, the method for operating of prior art does not consider that increasing authority processes, to estimator's personal information protection is not very well;
The data of 3 existing teams and groups evaluation management systems, in transmission and mutual process, are not taked encryption measures, easily leave the leak of distorting;
In 4 prior aries, in teams and groups' evaluation and checking system, can there is repetition and the redundancy of data, delete and arrange redundant data and need to waste staff's time.
Summary of the invention
Object of the present invention is exactly in order to address the above problem, provide a kind of city company Team Construction data handling system and data processing method, according to mark and two latitudes of evaluation are carried out starting to carry out teams and groups, workshop, the analysis of company's multi-layer multi-angle, evaluation from teams and groups self.
To achieve these goals, the present invention adopts following technical scheme:
A city company Team Construction data handling system, comprising:
Index system and evaluation rule are set up module, are used in reference to the foundation of mark system and evaluation rule; And the additions and deletions of Team Construction index system and Team Construction evaluation detailed rules and regulations are changed to the work of looking into;
Make a report on setting, evaluate authority setting and data typing module, for the setting and the typing that utilize Fingerprint Identification Unit to make a report on the setting of authority, utilize Fingerprint Identification Unit to evaluate authority, make a report on data; Team Construction index and Team Construction are evaluated to detailed rules and regulations and distribute to sales department, fortune inspection portion and power regulation center and be in charge of department, described in be in charge of department and just evaluate detailed rules and regulations according to the index of distributing to, by mobile phone or computer client, carry out the typing of data;
Data gather, data statistics, data analysis, data results are shown and form is derived module, for teams and groups' index of typing being completed to Zhi He teams and groups evaluation score, carry out tabulate statistics, according to the statistical mask arranging, calculate corresponding Team Construction index, the derivation of the concrete analysis of Team Construction index, the displaying of analysis result and form;
Mark post teams and groups and advanced teams and groups matching module, for to the screening of mark post teams and groups and advanced teams and groups and displaying, and reporting mark post teams and groups and advanced teams and groups.
Described setting, evaluation authority setting and the data typing module of making a report on, comprising:
Index system or evaluation detailed rules and regulations setting unit, for to index system with evaluate the setting of detailed rules and regulations, comprise arrange Team Construction index system weight, making a report on authority, Team Construction is set evaluates detailed rules and regulations displaying order, Team Construction is set evaluates detailed rules and regulations standard and divide and Team Construction is set and evaluate detailed rules and regulations subitem minute of Team Construction index system is set;
User can typing index or scoring item allocation units, for the use department of Team Construction index system and the use department that Team Construction is evaluated detailed rules and regulations are set, Team Construction index and Team Construction are evaluated to detailed rules and regulations simultaneously and are assigned to department; Each workshop, department, city company and city company carry out typing teams and groups evaluating data according to Team Construction index and Team Construction evaluation detailed rules and regulations;
The legitimacy unit of checking typing content, for all departments being made a report on to the checking that data are made a report on standard, comprises the verification operation of decimal place, data length and data type information;
Unit is preserved, examined and report to data, for to making a report on the encryption of data, after encryption, preserves, to making a report on the audit of data and reporting.
Described data gather, data statistics, data analysis, data results are shown and form is derived module, comprising:
Data tabulate statistics and analysis preparatory unit, for the data of having made a report on being carried out to tabulate statistics and analyzing preparation, judge whether to meet analysis condition by computational data typing completion rate;
Tabulate statistics data typing unit, for to the checking of tabulate statistics data typing situation, shows image data and the not yet detail of image data;
Adopt Algorithm Analysis data cell, according to Principle of Statistics, achievement data is carried out to descriptive statistics, according to the characteristic distributions of data, adopt respectively the method for normal distribution and five minutes positions, specified data quantile.
Generate the comprehensive reporting unit of analyzing, for to analysis result and the comprehensive analysis report of report generation.
Described mark post teams and groups and advanced teams and groups matching module, comprising:
Mark post teams and groups or advanced teams and groups Data Matching preparatory unit, for the data of mark post teams and groups and advanced teams and groups are prepared and are verified, checking according to the various restrictive conditions that are systemic presupposition, while verifying, system Auto-matching restrictive condition, filters out qualified teams and groups;
Mark post teams and groups or advanced teams and groups matching condition setting unit, for index system, form phase, workshop type and the teams and groups' type of selecting to screen;
Calculate mark post teams and groups or advanced teams and groups' integrate score unit, for carrying out integrate score calculating to meeting the teams and groups of matching condition;
The unit that carries out matched data processing to participating in teams and groups according to the matching condition arranging and integrate score, for judging the matching treatment of carrying out data according to integrate score to the teams and groups of matching condition;
Generate mark post teams and groups or advanced teams and groups reporting unit, for the generation of mark post teams and groups and advanced teams and groups with report.
A city company Team Construction data processing method, comprises the steps:
Index system and evaluation rule are set up: the foundation of index system and evaluation rule; And the additions and deletions of Team Construction index system and Team Construction evaluation detailed rules and regulations are changed to the work of looking into;
Make a report on setting, evaluate authority setting and data typing: be provided with fingerprint recognition make a report on authority, be provided with fingerprint recognition evaluation authority and typing make a report on data; Team Construction index and Team Construction are evaluated to detailed rules and regulations and distribute to sales department, fortune inspection portion and power regulation center and be in charge of department, described in be in charge of department and just evaluate detailed rules and regulations according to the index of distributing to, by mobile phone or computer client, carry out the typing of data;
Data gather, data statistics, data analysis, data results are shown and form is derived: teams and groups' index of typing is completed to Zhi He teams and groups and evaluate score and carry out tabulate statistics, according to the statistical mask arranging, calculate corresponding Team Construction index, the derivation of the concrete analysis of Team Construction index, the displaying of analysis result and form;
Mark post teams and groups and advanced teams and groups coupling: to the screening of mark post teams and groups and advanced teams and groups and displaying, and reporting mark post teams and groups and advanced teams and groups.
Describedly make a report on setting, evaluate authority setting and data typing, comprise the steps:
Index system or evaluate detailed rules and regulations setting: to index system with evaluate the setting of detailed rules and regulations, comprise arrange Team Construction index system weight, making a report on authority, Team Construction is set evaluates detailed rules and regulations displaying order, Team Construction is set evaluates detailed rules and regulations standard and divide and Team Construction is set and evaluate detailed rules and regulations subitem minute of Team Construction index system is set;
User can typing index or scoring item distribute: the use department of Team Construction index system and the use department that Team Construction is evaluated detailed rules and regulations are set, Team Construction index and Team Construction are evaluated to detailed rules and regulations simultaneously and be assigned to department; Each workshop, department, city company and city company carry out typing teams and groups evaluating data according to Team Construction index and Team Construction evaluation detailed rules and regulations;
During typing teams and groups evaluating datas, minute multilayer, repeatedly carry out, wherein: workshop is monthly evaluated once subordinate teams and groups, per season of department is evaluated once workshop, per season of city company, to Sectoral assessment once city company evaluated once teams and groups every year, and city company every year to city's company evaluation once.
The legitimacy of checking typing content: the checking that data are made a report on standard is made a report on to by all departments, comprise the verification operation of decimal place, data length and data type information;
Data are preserved, are examined and report: to making a report on the preservation of data, to making a report on the audit of data and reporting.
Described data gather, data statistics, data analysis, data results are shown and form is derived, and comprise the steps:
Data tabulate statistics and analysis are prepared: the data of having made a report on are carried out tabulate statistics and analyzed preparation, by computational data typing completion rate, judge whether to meet analysis condition;
Tabulate statistics data typing: to checking of tabulate statistics data typing situation, show image data and the not yet detail of image data;
Adopt Algorithm Analysis data: according to Principle of Statistics, achievement data is carried out to descriptive statistics, according to the characteristic distributions of data, adopt respectively the method for normal distribution and five minutes positions, specified data quantile.
Generate comprehensive analysis report: to analysis result and the comprehensive analysis report of report generation.
Described mark post teams and groups and advanced teams and groups coupling, comprise the steps:
Mark post teams and groups or advanced teams and groups Data Matching are prepared: the data of mark post teams and groups and advanced teams and groups are prepared and verified, checking according to the various restrictive conditions that are systemic presupposition, while verifying, system Auto-matching restrictive condition, filters out qualified teams and groups;
Mark post teams and groups or advanced teams and groups matching condition arrange: the index system that selection need to screen, form phase, workshop type and teams and groups' type;
Calculate mark post teams and groups or advanced teams and groups integrate score: to meeting the teams and groups of matching condition, carry out integrate score calculating;
According to the matching condition arranging and integrate score, to participating in teams and groups, carry out matched data processing: the teams and groups of matching condition are judged to the matching treatment of carrying out data according to integrate score;
Generate mark post teams and groups or the report of advanced teams and groups: the generation of mark post teams and groups and advanced teams and groups and reporting.
The method of described normal distribution is as follows:
Check meets the achievement data of normal distribution, take respectively 1 σ (standard deviation that σ is achievement data), 0.33 σ ,-0.33 σ and-1 σ is quantile, data are divided into A, B, C, D, five sections of E by the outstanding order to falling behind, and the score of each section is respectively 4,3,2,1,0 minutes.
The method of described five period in arithmetrics is as follows:
Check does not meet the data of normal distribution, with five period in arithmetrics, achievement data is divided into five sections, embodies respectively from falling behind to outstanding change and compares and good and bad degree.Choosing of its quantile is consistent with normal distribution method, adopts respectively 16%, 37%, 63% and 84% probability setting, and achievement data is divided into A, B, C, D, five sections of E, and the score of each section is respectively 4,3,2,1,0 minutes.
For logging data being analyzed according to the normal distribution and the five minutes position algorithms that have arranged;
Analysis result is shown and form lead-out unit, for the derivation operation to the displaying of analysis result and report data;
While carrying out mark to analyze, minute multilayer is carried out, from the bottom up successively:
A, by index, calculate the score of each teams and groups, the teams and groups of same type carry out mark
B, by teams and groups, calculate the score in each workshop, carry out mark in the workshop of same type
C, by workshop, calculate the score of each city company, between each city company, carry out mark.
To meeting the teams and groups of matching condition, to carry out the algorithm of integrate score calculating as follows:
Department of Team Construction examination score=our department of enterprise checks and rates score * 30%+ teams and groups and checks that examination score * 30%+ teams and groups divide * 40% to mark evaluation
Department of examination score=∑ our department of department of described our department specialty evaluation score;
Described teams and groups check that the advanced teams and groups of examination score=100-verify the ratio deduction of points of deduction of points-selective examination deduction of points-teams and groups not up to standard of teams and groups up to standard;
Described advanced teams and groups verify defective advanced teams and groups number * 1 of deducting points=verify
Advanced teams and groups are verified comprehensively, verify underproof, each teams and groups button 1 minute
Described teams and groups up to standard spot-check teams and groups up to standard number of non-compliances/(certainly reporting teams and groups up to standard number * 10%) * 100 * 0.5 of deducting points=spot-check
By 10% selective examination of certainly reporting teams and groups up to standard, calculate teams and groups up to standard of unit disqualification rate, each percentage point button 0.5 minute.
Teams and groups of number/our unit of report teams and groups not up to standard sum * 100 * 0.5 of described teams and groups not up to standard ratios deduction of points=certainly
From report teams and groups not up to standard ratio, each percentage point button 0.5 minute
Described teams and groups are to marking average mark=teams and groups to mark total points/participation Dui Biao teams and groups number.
Beneficial effect of the present invention:
1 has solved the safety issue in Team Construction data handling procedure, can effectively prevent distorting of teams and groups' data, promotes the work efficiency of data processing.
2, in the analysis of Dui teams and groups index value of completing, adopt the data distribution algorithms normal distribution in statistics, five minutes positions, guaranteed science, rationality, the correctness of analysis result.
Teams and groups' index analysis be take the elementary cell that the value of completing of single index be to be analyzed, the corresponding a plurality of values of completing of common index meeting, first to these values of completing, adopt normal distribution algorithm to carry out segmentation calculating, while finding that there is abnormal data in computation process, rejecting abnormalities data, then continue to calculate, if also have abnormal data, continue to reject, until there is no abnormal data; If abnormal data cannot all be rejected, explanation is not suitable for using normal distribution algorithm, just need to use five minutes position algorithms to carry out segmentation calculating.
3, adopt segmentation score 4,3,2,1,0 corresponding A that normal distribution, five minutes position algorithms calculate, B, C, D, E section and not directly the value of being used to complete carry out index Ordination, can increase the achievement of each teams and groups in each index and reach probability advanced or that fall behind, the improvement result of oneself can be seen by the teams and groups that can effectively guarantee to make great efforts improvement.
4, during typing teams and groups evaluating data, minute multilayer, repeatedly carry out, wherein: workshop is monthly evaluated once subordinate teams and groups, per season of department is evaluated once workshop, per season of city company, to Sectoral assessment once city company evaluated once teams and groups every year, and city company every year to city's company evaluation once, for management data and the segregation of duties of teams and groups, from a plurality of angles, the data of teams and groups are processed and analyzed.
Accompanying drawing explanation
Fig. 1 is the block diagram of Team Construction management system of the present invention;
Fig. 2 is the flow chart of steps that Team Construction management system of the present invention is made a report on the embodiment of setting, the setting of evaluation authority, data typing module;
Fig. 3 is that Team Construction Management System Data of the present invention gathers, the flow chart of steps of data statistics, data analysis, data results is shown, form is derived embodiment;
Fig. 4 is the flow chart of steps of the embodiment of Team Construction management system mark post of the present invention teams and groups, advanced teams and groups matching module.
Embodiment
Below in conjunction with accompanying drawing and embodiment, the invention will be further described.
As shown in Figure 1, a kind of city company Team Construction data handling system, comprising:
Index system and evaluation rule are set up module, are used in reference to the foundation of mark system and evaluation rule; And the additions and deletions of Team Construction index system and Team Construction evaluation detailed rules and regulations are changed to the work of looking into;
Make a report on setting, evaluate authority setting and data typing module, for the setting and the typing that utilize Fingerprint Identification Unit to make a report on the setting of authority, utilize Fingerprint Identification Unit to evaluate authority, make a report on data; Team Construction index and Team Construction are evaluated to detailed rules and regulations and distribute to sales department, fortune inspection portion and power regulation center and be in charge of department, described in be in charge of department and just evaluate detailed rules and regulations according to the index of distributing to, by mobile phone or computer client, carry out the typing of data;
Data gather, data statistics, data analysis, data results are shown and form is derived module, for teams and groups' index of typing being completed to Zhi He teams and groups evaluation score, carry out tabulate statistics, according to the statistical mask arranging, calculate corresponding Team Construction index, the derivation of the concrete analysis of Team Construction index, the displaying of analysis result and form;
Mark post teams and groups and advanced teams and groups matching module, for to the screening of mark post teams and groups and advanced teams and groups and displaying, and reporting mark post teams and groups and advanced teams and groups.
As shown in Figure 2, described in make a report on setting, evaluate authority setting and data typing, comprising:
Index system or evaluate detailed rules and regulations setting: to index system with evaluate the setting of detailed rules and regulations, comprise arrange Team Construction index system weight, making a report on authority, Team Construction is set evaluates detailed rules and regulations displaying order, Team Construction is set evaluates detailed rules and regulations standard and divide and Team Construction is set and evaluate detailed rules and regulations subitem minute of Team Construction index system is set;
User can typing index or scoring item distribute: the use department of Team Construction index system and the use department that Team Construction is evaluated detailed rules and regulations are set, Team Construction index and Team Construction are evaluated to detailed rules and regulations simultaneously and be assigned to department; Each workshop, department, city company and city company carry out typing teams and groups evaluating data according to Team Construction index and Team Construction evaluation detailed rules and regulations;
The legitimacy of checking typing content: the checking that data are made a report on standard is made a report on to by all departments, comprise the verification operation of decimal place, data length and data type information;
Data are preserved, are examined and report: to making a report on the preservation of data, to making a report on the audit of data and reporting.
As shown in Figure 3, described data gather, data statistics, data analysis, data results are shown and form is derived module, comprising:
Data tabulate statistics and analysis preparatory unit, for the data of having made a report on being carried out to tabulate statistics and analyzing preparation, judge whether to meet analysis condition by computational data typing completion rate;
Tabulate statistics data typing unit, for to the checking of tabulate statistics data typing situation, shows image data and the not yet detail of image data;
Adopt Algorithm Analysis data cell, according to Principle of Statistics, achievement data is carried out to descriptive statistics, according to the characteristic distributions of data, adopt respectively the method for normal distribution and five minutes positions, specified data quantile.
Generate the comprehensive reporting unit of analyzing, for to analysis result and the comprehensive analysis report of report generation.
As shown in Figure 4, described mark post teams and groups and advanced teams and groups matching module, comprising:
Mark post teams and groups or advanced teams and groups Data Matching preparatory unit, for the data of mark post teams and groups and advanced teams and groups are prepared and are verified, checking according to the various restrictive conditions that are systemic presupposition, while verifying, system Auto-matching restrictive condition, filters out qualified teams and groups;
Mark post teams and groups or advanced teams and groups matching condition setting unit, for index system, form phase, workshop type and the teams and groups' type of selecting to screen;
Calculate mark post teams and groups or advanced teams and groups' integrate score unit, for carrying out integrate score calculating to meeting the teams and groups of matching condition;
The unit that carries out matched data processing to participating in teams and groups according to the matching condition arranging and integrate score, for judging the matching treatment of carrying out data according to integrate score to the teams and groups of matching condition;
Generate mark post teams and groups or advanced teams and groups reporting unit, for the generation of mark post teams and groups and advanced teams and groups with report.
A city company Team Construction data processing method, comprises the steps:
Index system and evaluation rule are set up: the foundation of index system and evaluation rule; And the additions and deletions of Team Construction index system and Team Construction evaluation detailed rules and regulations are changed to the work of looking into;
Make a report on setting, evaluate authority setting and data typing: utilize Fingerprint Identification Unit make a report on the setting of authority, utilize Fingerprint Identification Unit evaluate authority setting and typing make a report on data; Team Construction index and Team Construction are evaluated to detailed rules and regulations and distribute to sales department, fortune inspection portion and power regulation center and be in charge of department, described in be in charge of department and just evaluate detailed rules and regulations according to the index of distributing to, by mobile phone or computer client, carry out the typing of data;
Data gather, data statistics, data analysis, data results are shown and form is derived: teams and groups' index of typing is completed to Zhi He teams and groups and evaluate score and carry out tabulate statistics, according to the statistical mask arranging, calculate corresponding Team Construction index, the derivation of the concrete analysis of Team Construction index, the displaying of analysis result and form;
Mark post teams and groups and advanced teams and groups coupling: to the screening of mark post teams and groups and advanced teams and groups and displaying, and reporting mark post teams and groups and advanced teams and groups.
Describedly make a report on setting, evaluate authority setting and data typing, comprise the steps:
Data typing initialization: initialization teams and groups achievement data is made a report on, teams and groups evaluate the needed indication information of marking, scoring item information;
Index system or evaluate detailed rules and regulations setting: to index system with evaluate the setting of detailed rules and regulations, comprise arrange Team Construction index system weight, making a report on authority, Team Construction is set evaluates detailed rules and regulations displaying order, Team Construction is set evaluates detailed rules and regulations standard and divide and Team Construction is set and evaluate detailed rules and regulations subitem minute of Team Construction index system is set;
User can typing index or scoring item distribute: the use department of Team Construction index system and the use department that Team Construction is evaluated detailed rules and regulations are set, Team Construction index and Team Construction are evaluated to detailed rules and regulations simultaneously and be assigned to department; Each workshop, department, city company and city company carry out typing teams and groups evaluating data according to Team Construction index and Team Construction evaluation detailed rules and regulations;
During typing teams and groups evaluating datas, minute multilayer, repeatedly carry out, wherein: workshop is monthly evaluated once subordinate teams and groups, per season of department is evaluated once workshop, per season of city company, to Sectoral assessment once city company evaluated once teams and groups every year, and city company every year to city's company evaluation once.
The legitimacy of checking typing content: the checking that data are made a report on standard is made a report on to by all departments, comprise the verification operation of decimal place, data length and data type information;
Data are preserved, are examined and report: to making a report on the preservation of data, to making a report on the audit of data and reporting.
Described data gather, data statistics, data analysis, data results are shown and form is derived, and comprise the steps:
Data tabulate statistics and analysis are prepared: the data of having made a report on are carried out tabulate statistics and analyzed preparation, by computational data typing completion rate, judge whether to meet analysis condition;
Tabulate statistics data typing: to checking of tabulate statistics data typing situation, show image data and the not yet detail of image data;
Adopt Algorithm Analysis data: according to Principle of Statistics, achievement data is carried out to descriptive statistics, according to the characteristic distributions of data, adopt respectively the method for normal distribution and five minutes positions, specified data quantile.
Generate comprehensive analysis report: to analysis result and the comprehensive analysis report of report generation.
Described mark post teams and groups and advanced teams and groups coupling, comprise the steps:
Mark post teams and groups or advanced teams and groups Data Matching are prepared: the data of mark post teams and groups and advanced teams and groups are prepared and verified, checking according to the various restrictive conditions that are systemic presupposition, while verifying, system Auto-matching restrictive condition, filters out qualified teams and groups;
Mark post teams and groups or advanced teams and groups matching condition arrange: the index system that selection need to screen, form phase, workshop type and teams and groups' type;
Calculate mark post teams and groups or advanced teams and groups integrate score: to meeting the teams and groups of matching condition, carry out integrate score calculating;
According to the matching condition arranging and integrate score, to participating in teams and groups, carry out matched data processing: the teams and groups of matching condition are judged to the matching treatment of carrying out data according to integrate score;
Generate mark post teams and groups or the report of advanced teams and groups: the generation of mark post teams and groups and advanced teams and groups and reporting.
Described detailed rules and regulations comprise the evaluation detailed rules and regulations of management layer and the evaluation detailed rules and regulations of heterogeneity teams and groups;
The evaluation detailed rules and regulations of described management layer comprise:
(1) the Team Construction responsibility formulation that, production management evaluation detailed rules and regulations are born mainly for the departments that are in charge of manging enterprises that transmission of electricity fortune is examined, distribution is transported the teams and groups such as inspection, substation equipment maintenance and repair, state evaluation, information communication, robotization O&M, power transformation O&M, distribution repairing, power scheduling, power utility check, electric energy metrical.
(2), integrated management is evaluated the Team Construction responsibility that detailed rules and regulations bear mainly for the departments that are in charge of manging enterprises of the teams and groups such as business accounting, market development, Electric Design, material supply, integrated service and is formulated
The evaluation detailed rules and regulations of described heterogeneity teams and groups comprise:
(3), production maintenance teams and groups evaluate detailed rules and regulations and are applicable to the inspection of transmission of electricity fortune, the inspection of distribution fortune, substation equipment maintenance and repair, state evaluation, information communication, robotization O&M Lei Deng teams and groups;
(4), produce O&M teams and groups evaluation detailed rules and regulations and be applicable to power transformation O&M, distribution repairing, power scheduling Lei Deng teams and groups;
(5), market on-the-spot teams and groups evaluate detailed rules and regulations and are applicable to power utility check, electric energy metrical Lei Deng teams and groups;
(6), marketing service teams and groups evaluate detailed rules and regulations and are applicable to business accounting, market development Lei Deng teams and groups;
(7), business support teams and groups evaluate detailed rules and regulations and are applicable to Electric Design, material supply, integrated service Lei Deng teams and groups.
Although above-mentioned, by reference to the accompanying drawings the specific embodiment of the present invention is described; but be not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various modifications that creative work can make or distortion still in protection scope of the present invention.

Claims (8)

1.Yi Zhong city company Team Construction data handling system, is characterized in that, comprising:
Index system and evaluation rule are set up module, are used in reference to the foundation of mark system and evaluation rule; And the additions and deletions of Team Construction index system and Team Construction evaluation detailed rules and regulations are changed to the work of looking into;
Make a report on setting, evaluate authority setting and data typing module, for the setting and the typing that utilize Fingerprint Identification Unit to make a report on the setting of authority, utilize Fingerprint Identification Unit to evaluate authority, make a report on data; Team Construction index and Team Construction are evaluated to detailed rules and regulations and distribute to sales department, fortune inspection portion and power regulation center and be in charge of department, described in be in charge of department and just evaluate detailed rules and regulations according to the index of distributing to, carry out the typing of data;
Data gather, data statistics, data analysis, data results are shown and form is derived module, for teams and groups' index of typing being completed to Zhi He teams and groups evaluation score, carry out tabulate statistics, according to the statistical mask arranging, calculate corresponding Team Construction index, the derivation of the concrete analysis of Team Construction index, the displaying of analysis result and form;
Mark post teams and groups and advanced teams and groups matching module, for to the screening of mark post teams and groups and advanced teams and groups and displaying, and reporting mark post teams and groups and advanced teams and groups.
2. a kind of city as claimed in claim 1 company Team Construction data handling system, is characterized in that, described in make a report on setting, evaluate authority setting and data typing module, comprising:
Index system or evaluation detailed rules and regulations setting unit, for to index system with evaluate the setting of detailed rules and regulations, comprise arrange Team Construction index system weight, making a report on authority, Team Construction is set evaluates detailed rules and regulations displaying order, Team Construction is set evaluates detailed rules and regulations standard and divide and Team Construction is set and evaluate detailed rules and regulations subitem minute of Team Construction index system is set;
User can typing index or scoring item allocation units, for the use department of Team Construction index system and the use department that Team Construction is evaluated detailed rules and regulations are set, Team Construction index and Team Construction are evaluated to detailed rules and regulations simultaneously and are assigned to department; Each workshop, department, city company and city company carry out typing teams and groups evaluating data according to Team Construction index and Team Construction evaluation detailed rules and regulations;
During typing teams and groups evaluating datas, minute multilayer, repeatedly carry out, wherein: workshop is monthly evaluated once subordinate teams and groups, per season of department is evaluated once workshop, per season of city company, to Sectoral assessment once city company evaluated once teams and groups every year, and city company every year to city's company evaluation once;
The legitimacy unit of checking typing content, for all departments being made a report on to the checking that data are made a report on standard, comprises the verification operation of decimal place, data length and data type information;
Unit is preserved, examined and report to data, for to making a report on the encryption of data, after encryption, preserves, to making a report on the audit of data and reporting.
3. a kind of city as claimed in claim 1 company Team Construction data handling system, is characterized in that,
Described data gather, data statistics, data analysis, data results are shown and form is derived module, comprising:
Data tabulate statistics and analysis preparatory unit, for the data of having made a report on being carried out to tabulate statistics and analyzing preparation, judge whether to meet analysis condition by computational data typing completion rate;
Tabulate statistics data typing unit, for to the checking of tabulate statistics data typing situation, shows image data and the not yet detail of image data;
Adopt Algorithm Analysis data cell, according to Principle of Statistics, achievement data is carried out to descriptive statistics, according to the characteristic distributions of data, adopt respectively the method for normal distribution and five minutes positions, specified data quantile;
Generate the comprehensive reporting unit of analyzing, for to analysis result and the comprehensive analysis report of report generation.
4. a kind of city as claimed in claim 1 company Team Construction data handling system, is characterized in that, described mark post teams and groups and advanced teams and groups matching module, comprising:
Mark post teams and groups or advanced teams and groups Data Matching preparatory unit, for the data of mark post teams and groups and advanced teams and groups are prepared and are verified, checking according to the various restrictive conditions that are systemic presupposition, while verifying, system Auto-matching restrictive condition, filters out qualified teams and groups;
Mark post teams and groups or advanced teams and groups matching condition setting unit, for index system, form phase, workshop type and the teams and groups' type of selecting to screen;
Calculate mark post teams and groups or advanced teams and groups' integrate score unit, for carrying out integrate score calculating to meeting the teams and groups of matching condition;
The unit that carries out matched data processing to participating in teams and groups according to the matching condition arranging and integrate score, for judging the matching treatment of carrying out data according to integrate score to the teams and groups of matching condition;
Generate mark post teams and groups or advanced teams and groups reporting unit, for the generation of mark post teams and groups and advanced teams and groups with report.
5. the applied method of a kind of city company Team Construction data handling system as described in above-mentioned arbitrary claim, is characterized in that, comprises the steps:
Index system and evaluation rule are set up: the foundation of index system and evaluation rule; And the additions and deletions of Team Construction index system and Team Construction evaluation detailed rules and regulations are changed to the work of looking into;
Make a report on setting, evaluate authority setting and data typing: data are made a report in the setting and the typing that utilize Fingerprint Identification Unit to make a report on the setting of authority, to utilize Fingerprint Identification Unit to evaluate authority; Team Construction index and Team Construction are evaluated to detailed rules and regulations and distribute to sales department, fortune inspection portion and power regulation center and be in charge of department, described in be in charge of department and just evaluate detailed rules and regulations according to the index of distributing to, by mobile phone or computer client, carry out the typing of data;
Data gather, data statistics, data analysis, data results are shown and form is derived: teams and groups' index of typing is completed to Zhi He teams and groups and evaluate score and carry out tabulate statistics, according to the statistical mask arranging, calculate corresponding Team Construction index, the derivation of the concrete analysis of Team Construction index, the displaying of analysis result and form;
Mark post teams and groups and advanced teams and groups coupling: to the screening of mark post teams and groups and advanced teams and groups and displaying, and reporting mark post teams and groups and advanced teams and groups.
6. method as claimed in claim 5, is characterized in that, described in make a report on setting, evaluate authority setting and data typing module, comprising:
Index system or evaluation detailed rules and regulations setting unit, for to index system with evaluate the setting of detailed rules and regulations, comprise arrange Team Construction index system weight, making a report on authority, Team Construction is set evaluates detailed rules and regulations displaying order, Team Construction is set evaluates detailed rules and regulations standard and divide and Team Construction is set and evaluate detailed rules and regulations subitem minute of Team Construction index system is set;
User can typing index or scoring item allocation units, for the use department of Team Construction index system and the use department that Team Construction is evaluated detailed rules and regulations are set, Team Construction index and Team Construction are evaluated to detailed rules and regulations simultaneously and are assigned to department; Each workshop, department, city company and city company carry out typing teams and groups evaluating data according to Team Construction index and Team Construction evaluation detailed rules and regulations;
During typing teams and groups evaluating datas, minute multilayer, repeatedly carry out, wherein: workshop is monthly evaluated once subordinate teams and groups, per season of department is evaluated once workshop, per season of city company, to Sectoral assessment once city company evaluated once teams and groups every year, and city company every year to city's company evaluation once;
The legitimacy unit of checking typing content, for all departments being made a report on to the checking that data are made a report on standard, comprises the verification operation of decimal place, data length and data type information;
Unit is preserved, examined and report to data, for to making a report on the encryption of data, after encryption, preserves, to making a report on the audit of data and reporting.
7. method as claimed in claim 5, is characterized in that, described data gather, data statistics, data analysis, data results are shown and form is derived, and comprise the steps:
Data tabulate statistics and analysis are prepared: the data of having made a report on are carried out tabulate statistics and analyzed preparation, by computational data typing completion rate, judge whether to meet analysis condition;
Tabulate statistics data typing: to checking of tabulate statistics data typing situation, show image data and the not yet detail of image data;
Adopt Algorithm Analysis data: according to Principle of Statistics, achievement data is carried out to descriptive statistics, according to the characteristic distributions of data, adopt respectively the method for normal distribution and five minutes positions, specified data quantile;
Generate comprehensive analysis report: to analysis result and the comprehensive analysis report of report generation.
8. method as claimed in claim 5, is characterized in that, described mark post teams and groups and advanced teams and groups coupling, comprise the steps:
Mark post teams and groups or advanced teams and groups Data Matching are prepared: the data of mark post teams and groups and advanced teams and groups are prepared and verified, checking according to the various restrictive conditions that are systemic presupposition, while verifying, system Auto-matching restrictive condition, filters out qualified teams and groups;
Mark post teams and groups or advanced teams and groups matching condition arrange: the index system that selection need to screen, form phase, workshop type and teams and groups' type;
Calculate mark post teams and groups or advanced teams and groups integrate score: to meeting the teams and groups of matching condition, carry out integrate score calculating;
According to the matching condition arranging and integrate score, to participating in teams and groups, carry out matched data processing: the teams and groups of matching condition are judged to the matching treatment of carrying out data according to integrate score;
Generate mark post teams and groups or the report of advanced teams and groups: the generation of mark post teams and groups and advanced teams and groups and reporting.
CN201410341501.6A 2014-07-17 2014-07-17 Company of city Team Construction data handling system and data processing method Expired - Fee Related CN104156802B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410341501.6A CN104156802B (en) 2014-07-17 2014-07-17 Company of city Team Construction data handling system and data processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410341501.6A CN104156802B (en) 2014-07-17 2014-07-17 Company of city Team Construction data handling system and data processing method

Publications (2)

Publication Number Publication Date
CN104156802A true CN104156802A (en) 2014-11-19
CN104156802B CN104156802B (en) 2017-11-28

Family

ID=51882297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410341501.6A Expired - Fee Related CN104156802B (en) 2014-07-17 2014-07-17 Company of city Team Construction data handling system and data processing method

Country Status (1)

Country Link
CN (1) CN104156802B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108595405A (en) * 2018-05-16 2018-09-28 上海众深科技股份有限公司 A kind of equipment Monitoring detailed rules and regulations or outline management method
CN110738427A (en) * 2019-10-21 2020-01-31 广东电网有限责任公司 electric power part work quality scoring system
CN115859930A (en) * 2023-02-21 2023-03-28 翌飞锐特电子商务(北京)有限公司 System and method for quickly generating electronic report

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴佳怡: "《基于标杆管理的电力企业同业对标》", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108595405A (en) * 2018-05-16 2018-09-28 上海众深科技股份有限公司 A kind of equipment Monitoring detailed rules and regulations or outline management method
CN110738427A (en) * 2019-10-21 2020-01-31 广东电网有限责任公司 electric power part work quality scoring system
CN115859930A (en) * 2023-02-21 2023-03-28 翌飞锐特电子商务(北京)有限公司 System and method for quickly generating electronic report

Also Published As

Publication number Publication date
CN104156802B (en) 2017-11-28

Similar Documents

Publication Publication Date Title
CN104156804A (en) Benchmarking data processing system and data processing method for provincial company teams
WO2021232588A1 (en) Food safety risk assessment method, apparatus, device, and storage medium
CN103337043B (en) The method for early warning of electric power communication device running status and system
CN105635112B (en) The appraisal procedure of information system security energy
CN104156801A (en) Benchmarking data processing system and data processing method for municipal company teams
CN107067324A (en) A kind of utilization network packet capturing data realize the method and system of transaction risk control
CN107240014A (en) A kind of credit rating method based on enterprise's reference business
CN108898311A (en) A kind of data quality checking method towards intelligent distribution network repairing dispatching platform
CN104156803B (en) Provincial company Team Construction data handling system and data processing method
CN104299116A (en) Quantitative evaluation method for security risk of operation of power network
CN104156802A (en) Construction data processing system and data processing method for municipal company teams
CN103018063A (en) Bridge random fatigue life prediction method based on Mittag-Leffler distribution
CN106408140A (en) Grading and classifying model method based on power grid enterprise data
CN110659976A (en) Enterprise technology service credit investigation system based on block chain and management method thereof
CN104156399A (en) System and method for processing evaluation data of teams of provincial companies
CN103985018B (en) Method for analyzing networked transaction data collection and transaction completion degree
CN107818422A (en) A kind of market administration and monitoring system
CN103970651A (en) Software architecture safety assessment method based on module safety attributes
CN102013081A (en) User-defined credit analysis model method based on credit rating system
CN109271314A (en) A kind of software test personnel performance assessment system and its application method
CN111127186A (en) Application method of customer credit rating evaluation system based on big data technology
CN104598713A (en) Power grid theoretical line loss computation demand data synthesizing method
CN104156800A (en) Evaluation data processing system and data processing method for municipal company teams
CN114742412A (en) Software technology service system and method
CN103714440A (en) Safety production integrated information management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128

Termination date: 20180717