CN107064998A - A kind of tunnel geological forecast focus connection protection device and method - Google Patents

A kind of tunnel geological forecast focus connection protection device and method Download PDF

Info

Publication number
CN107064998A
CN107064998A CN201611267994.9A CN201611267994A CN107064998A CN 107064998 A CN107064998 A CN 107064998A CN 201611267994 A CN201611267994 A CN 201611267994A CN 107064998 A CN107064998 A CN 107064998A
Authority
CN
China
Prior art keywords
explosive
protective housing
detonator
focus
protection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611267994.9A
Other languages
Chinese (zh)
Other versions
CN107064998B (en
Inventor
李术才
夏腾
薛翊国
苏茂鑫
李志强
王丹
陶宇帆
张开
张学亮
周炳桦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201611267994.9A priority Critical patent/CN107064998B/en
Publication of CN107064998A publication Critical patent/CN107064998A/en
Application granted granted Critical
Publication of CN107064998B publication Critical patent/CN107064998B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/02Generating seismic energy
    • G01V1/104Generating seismic energy using explosive charges
    • G01V1/13Arrangements or disposition of charges to produce a desired pattern in space or time

Landscapes

  • Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Acoustics & Sound (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of tunnel geological forecast focus connection protection device and method; device includes explosive protective housing; its one end is provided with opening and hollow setting is with the connecting line of its internal explosive and explosive; the other end hinders piece provided with multiple detonators; detonator hinders piece one end and explosive protective housing and is connected, detonator resistance piece it is overall relative to explosive protective housing end slope into explosive protective housing or outer incline is set;Enclosing cover, enclosing cover is detachably connected with explosive protective housing openend, and to during TSP blast hole projectile fillings, because detonator hinders the stop of piece, instant electric detonator will not depart from emulsion, it is ensured that the smooth generation of TSP Geological Advanced Prediction focus;The joint connection in site of emulsion and instant electric detonator is more convenient, saves the time of whole TSP Geological Advanced Predictions, improves operating efficiency;Focus quality is not influenceed;TSP explosive detonator connection protection device makes simple, and cost is small, easily operates, and has very big practicality.

Description

A kind of tunnel geological forecast focus connection protection device and method
Technical field
Protected the present invention relates to tunnel geological forecast field, more particularly to a kind of connection of tunnel geological forecast focus Protection unit and method.
Background technology
During constructing tunnel, to ensure the security of whole work progress, it is necessary to pre- in advance to tunnel progress geology Report, TSP method for forecasting advanced geology is the common method of progress Geological Advanced Prediction during current constructing tunnel.TSP is advanced Geologic prediction is connect using Observation principle is reflected, it is necessary to be used as focus by instant electric detonator ignition emulsion by wave detector The seismic signal that receiving portions are reflected, finally carries out corresponding data analysis and draws a conclusion.TSP advance geologic prediction processes In, the joint connection in site and placement of explosive and detonator, smooth generation for focus and the security entirely forecast all are very heavy Want.To during TSP blast hole projectile fillings, because emulsion is softer, TSP blastholes relatively deep, TSP blastholes have certain inclination angle and It is rough inside blasthole, detonator is frequently can lead to by detonator insertion explosive and during loading blasthole de- inside explosive From, do not simply fail to ignite progress generation focus, and explosive is difficult to take out in the presence of very big potential danger.
There is the detonator protection device for the demolition blasting blasting charge in the prior art, device is only applicable to shallower and level Blasthole, the main purpose of the device is to carry out ensuring that explosive is normally connected so as to successful detonation with detonator during explosion, and TSP is advanced Geologic prediction requires then entirely different for the ignition of focus.TSP advance geologic predictions need emulsion as vibroseis acquisition Data, but country rock can not be damaged, therefore the successful detonation and focus quality requirement for focus are very strict.And due to TSP big guns Hole is the complicated condition in tunnel surrounding, some blast hole depths close to 2 meters, be straight blasthole and all have it is certain be angled downward, If using the device when the explosive for inserting detonator is pushed into blasthole by the first step, there may be inside tunnel TSP blastholes rubble or Person's mud, hole wall injustice is easily damaged explosive, and if the device can extremely be easily caused explosive and detonator in TSP blastholes Depart from, can not ensure that explosive can keep during blasthole is filled in being connected with detonator at all, cause the disengaging of explosive and detonator, And TSP advance geologic predictions need into blasthole abundant water filling to ensure focus quality after focus is installed, in the prior art Detonator protection device for the demolition blasting blasting charge needs to fill in plugging material, and the process for pushing plugging material tamping is very unrestrained It is time-consuming, it is clear that tunnel TSP advance geologic predictions field can not be applied at all.
At present, also the explosive in TSP advance geologic prediction powder charge process can be solved without effective device with detonator to hold Easily depart from this FAQs, it is necessary to be carried out using the wire of detonator to explosive attached when generally connection explosive is with detonator at the scene Plus bundle, this process needs to waste many times, has had a strong impact on efficiency, and easily binding does not cause thunder in powder charge process tightly Pipe comes off.
The content of the invention
An object of the present disclosure is to provide a kind of tunnel geological forecast focus connection protection device, and the device passes through thunder Pipe hinders the barrier effect of piece, is prevented effectively from the disengaging of detonator and emulsion, without explosive is repeatedly bundled to detonator, has Effect ensure that the smooth generation of TSP Geological Advanced Prediction focus.
The second object of the present invention is to provide a kind of tunnel geological forecast focus connection guard method, and this method is used Said apparatus realizes the joint connection in site of emulsion and instant electric detonator, connects more convenient, improves operating efficiency.
In order to reach above-mentioned purpose, first technical scheme that the present invention is provided:
A kind of tunnel geological forecast cap explosive connects protection device, including:
Explosive protective housing, its one end is provided with opening and hollow setting is with the connection of its internal explosive and explosive Line, the other end hinders piece provided with multiple detonators, and detonator resistance piece one end is connected with explosive protective housing, and detonator resistance piece is overall relative to fried Medicine protective housing end slope is set to explosive protective housing is tilted, and detonator resistance piece has the elasticity of setting, and detonator resistance piece exists Tilted under external force effect to explosive protective housing inwall, detonator resistance piece is returned to original position, and multiple detonators resistance piece after external force disappears Nearly conical curved surface is surrounded, detonator resistance piece can prevent instant electric detonator from departing from emulsion, the detonator resistance piece being obliquely installed can Detonator is facilitated to insert explosive and difficult for drop-off;
Enclosing cover, enclosing cover is detachably connected with explosive protective housing openend.
In above-mentioned connection protection device, by explosive protective housing explosive, because be when detonator is inserted into explosive by Outside is internally inserted, therefore detonator resistance inner inclination of the piece to explosive containment vessel, and detonator is put into explosive containment vessel more Easily.In powder charge process, the protective effect of explosive protective housing can eliminate what explosive was caused a departure from detonator because hole wall is coarse Influence, and detonator resistance piece has certain inward slant angle and toughness reguirements, pair can produce with the detonator that explosive is connected and hinder Keep off and there is certain inside holding power, even if making detonator by can still keep connection with explosive during outside pulling force effect not It is extracted, the joint connection in site high efficiency and time conservation of explosive and detonator can be made, and explosive will not come off with detonator generation in powder charge process, protect The smooth generation of TSP Geological Advanced Prediction focus is demonstrate,proved.
Because of the setting of whole device, it can be admitted in deeper blasthole, practicality is higher.
The end of detonator resistance piece towards the explosive protective housing axis direction is pointed;Or, detonator resistance piece is with frying Spring is set to ensure that detonator hinders the smooth return of piece between medicine protective housing, spring one end is connected with explosive protective housing inside, The other end hinders part of the piece inside explosive protective housing with detonator and is connected.
The shell is attached with explosive protective housing by inserting mode or thread connecting mode, can not only be prevented There are rock particles or mud to enter explosive protective housing in powder charge process and damage explosive, can also effectively solve in powder charge process In, because there is TSP blastholes certain inclination angle to cause explosive to depart from explosive protective housing because of Action of Gravity Field, so as to cause explosive and thunder The possibility of the disconnection of pipe.Dose of the explosive protective housing specification according to needed for different TSP blastholes, is respectively arranged with corresponding Specification.
The enclosure realizes explosive protective housing with being respectively provided with projection outside explosive protective housing by male cooperation With the connection of enclosing cover, mutually blocking for shell and explosive protective housing, progress plug-in connection are realized by raised settings.
The detonator resistance piece is 2 °~15 ° relative to explosive protective housing end slope angle, and detonator end can be enable to wear Detonator pack insertion explosive is crossed, and ensures the tunnel geological forecast focus for installing explosive and detonator connecting protection dress Detonator when filling in TSP blastholes is put to be not easily disconnected from.
The material of the shell, detonator resistance piece and explosive protective housing is respectively provided with the toughness of setting, accordingly even when blasthole is long Degree is longer, even if there is certain angle in blasthole, explosive protective housing has certain toughness, runs into knee explosive containment vessel Certain deformation occurs for body, then and can recover quickly, not interfere with explosive and be transported to specified location.
The material of the shell, detonator resistance piece and explosive protective housing uses PP plastic materials, is set using such Mode can be easy to detonator to be tucked into explosive protective housing, further, space is provided between adjacent detonator resistance piece, between being somebody's turn to do The width of gap is less than the size of detonator, is easy to that detonator is tucked into explosive protective housing using the toughness that detonator hinders piece, without Detonator can be come off out of explosive protective housing, the shells of PP plastic materials have with explosive protective housing be difficult tear it is damaged and The characteristics of cost is low.
The alternative plan that the present invention is provided is:
A kind of tunnel geological forecast focus connects guard method, is shaken using a kind of described tunnel geological forecast Source connects protection device.
The above method, comprises the following steps:
1) appropriate emulsion is put into suitable explosive protective housing, emulsion one end and explosive protective housing Ends contact, the other end and the detonator resistance piece ends contact after return;
2) instant electric detonator end is hindered at the explosive that the space between piece is inserted into explosive protective housing by detonator And the wire of detonator is stretched, detonator is in explosive protective housing, and explosive protective housing is produced to detonator to be stopped and with certain Inside holding power;
3) explosive protective housing and enclosing cover are connected;
4) after the installation site for determining explosive, tunnel geological forecast focus is connected into container lid in protection device One end be loaded into powder charge bar in TSP blastholes forward;
5) repeat step 1)-step 4), until completing the focus placement of all TSP blastholes.
The present invention has advantages below:
1) to during TSP blast hole projectile fillings, because detonator hinders resistance, the protection of explosive protective housing and the container of piece The stop of enclosing cover, not only can effectively protect explosive and detonator, and determine in powder charge process, and detonator will not be due to inertia Effect spins off inside explosive, disconnects the connection with explosive, it is ensured that the smooth generation of TSP Geological Advanced Prediction focus.
As long as 2) detonator is filled in explosive by the joint connection in site of emulsion and instant electric detonator by detonator resistance piece, save The time of whole TSP Geological Advanced Predictions has been saved, operating efficiency is improved.
3) device does not interfere with the quality of focus, and the data of collection can effectively and accurately react geological state, will not Result is impacted.
4) TSP focus connection protection device makes easy, and cost is small, easy to operate, there is very big practicality.
5) device connectivity is good, can be sent to the device in the complex blasthole of deeper internal environment, practicality It is higher.
Brief description of the drawings
Fig. 1 is overall structure diagram in one embodiment of the invention.
Fig. 2 is overall structure front schematic view in one embodiment of the invention.
Fig. 3 is the structural representation of explosive protective housing in one embodiment of the invention.
Fig. 4 is the structural representation of container lid in one embodiment of the invention.
Fig. 5 is the overall structure front schematic view after focus connection is completed in one embodiment of the invention.
Fig. 6 is profile when overall structure loads TSP blastholes in one embodiment of the invention
Wherein:1st, explosive protective housing, 2, container lid, 3, detonator resistance piece, 4, outer lug, 5, internal projection, 6, emulsification it is fried Medicine, 7, detonator end, 8, detonator lead, 9, tunnel surrounding.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Whole description.
A kind of tunnel geological forecast focus connection protection device includes explosive protective housing 1 and enclosing cover 2, such as Fig. 1 institutes Show.Wherein described explosive protective housing 1 and the described plug-in of enclosing cover 2 connection, the described outside of explosive protective housing 1 is with outside The inner side of lid 2 has outer lug 4 and internal projection 5 respectively, and the described top of explosive protective housing 1 has 6 detonator resistance pieces 3, can prevented Only instant electric detonator departs from emulsion.
In the present embodiment, as shown in Fig. 2 the described top of explosive protective housing 1 has 6 detonator resistance pieces 3, and each The angle that detonator resistance piece 3 can all be set to the inner inclination of explosive sleeve pipe 1, can facilitate detonator to insert explosive and difficult for drop-off;Or, Detonator, which hinders, sets spring to ensure that detonator hinders the smooth return of piece, spring one end and explosive containment vessel between piece and explosive protective housing Internal portion's connection, the other end hinders part of the piece inside explosive protective housing with detonator and is connected.
In the present embodiment, described explosive protective housing 1 has certain toughness, is difficult tear breakage and the low spy of cost Point, material uses PP plastic materials.
In the present embodiment, dose of the described specification of explosive protective housing 1 according to needed for different TSP blastholes, sets respectively It is equipped with corresponding different size specification.
In the present embodiment, as shown in Figure 3 and Figure 4, the described outer wall of explosive protective housing 1 have two it is symmetrical Outer lug 4, can mutually be blocked with the internal projection 5 of the inwall of enclosing cover 2, carry out plug-in connection, explosive protective housing 1 and enclosing cover 2 are equal For cylindrical shape.
In the present embodiment, described enclosing cover 2 has certain toughness, the characteristics of being difficult damaged tear and low cost, material Using PP plastic materials.
In the present embodiment, the described inwall of enclosing cover 2 has two symmetrical internal projections 5, can with outside blasting explosive container The outer lug 4 of wall is mutually blocked, and carries out plug-in connection.
A kind of tunnel geological forecast focus connects guard method, comprises the following steps:
1) appropriate emulsion is put into suitable explosive protective housing 1;
2) 7, the instant electric detonator end space hindered by detonator between piece 3 is inserted into the explosive in explosive protective housing 1 Place and the wire 8 for stretching detonator;
3) container lid 2 is covered;
4) after the installation site for determining explosive, tunnel geological forecast focus is connected into protection device will with powder charge bar It is encased in TSP blastholes;
5) repeat step 1)-step 4), until completing the focus placement of all TSP blastholes.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. a kind of tunnel geological forecast focus connects protection device, it is characterised in that including:
Explosive protective housing, its one end provided with opening and hollow setting with the connecting line of its internal explosive and explosive, separately One end hinders piece provided with multiple detonators, and detonator resistance piece one end is connected with explosive protective housing, and detonator resistance piece is overall to be protected relative to explosive Protective case body end face is tilted towards in explosive protective housing or outer incline is set, and detonator resistance piece has the elasticity of setting;
Enclosing cover, enclosing cover is detachably connected with explosive protective housing openend.
2. a kind of tunnel geological forecast focus connection protection device as claimed in claim 1, it is characterised in that the thunder The end of pipe resistance piece towards explosive protective housing axis direction is pointed.
3. a kind of tunnel geological forecast focus connection protection device as claimed in claim 1, it is characterised in that described outer Shell is attached with explosive protective housing by inserting mode or thread connecting mode.
4. a kind of tunnel geological forecast focus connection protection device as claimed in claim 1, it is characterised in that described outer With being respectively provided with projection outside explosive protective housing inside shell, the connection of explosive protective housing and enclosing cover is realized by male cooperation.
5. a kind of tunnel geological forecast focus connection protection device as claimed in claim 2, it is characterised in that the thunder It is 2 °~15 ° that pipe, which hinders piece relative to explosive protective housing end slope angle,.
6. a kind of tunnel geological forecast focus connection protection device as claimed in claim 1, it is characterised in that described outer The material of shell, detonator resistance piece and explosive protective housing is respectively provided with the toughness of setting.
7. a kind of tunnel geological forecast focus connection protection device as claimed in claim 6, it is characterised in that described outer The material of shell, detonator resistance piece and explosive protective housing uses PP plastic materials.
8. a kind of tunnel geological forecast focus connection protection device as claimed in claim 1, it is characterised in that adjacent Space is provided between detonator resistance piece.
9. a kind of tunnel geological forecast focus connects guard method, it is characterised in that using any in such as claim 1-8 A kind of tunnel geological forecast cap explosive connection protection device described in.
10. a kind of tunnel geological forecast focus connection guard method as claimed in claim 9, it is characterised in that including Following steps:
1) appropriate emulsion is put into suitable explosive protective housing;
2) instant electric detonator end is hindered at the explosive that the space between piece is inserted into explosive protective housing and drawn by detonator The wire of straight explosive;
3) explosive protective housing and enclosing cover are connected;
4) after the installation site for determining explosive, tunnel geological forecast focus is connected into outer casing end direction in protection device Blasthole is encased in TSP blastholes;
5) repeat step 1)-step 4), until completing the focus placement of all TSP blastholes.
CN201611267994.9A 2016-12-31 2016-12-31 A kind of tunnel geological forecast focus connection protective device and method Active CN107064998B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611267994.9A CN107064998B (en) 2016-12-31 2016-12-31 A kind of tunnel geological forecast focus connection protective device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611267994.9A CN107064998B (en) 2016-12-31 2016-12-31 A kind of tunnel geological forecast focus connection protective device and method

Publications (2)

Publication Number Publication Date
CN107064998A true CN107064998A (en) 2017-08-18
CN107064998B CN107064998B (en) 2019-07-16

Family

ID=59623591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611267994.9A Active CN107064998B (en) 2016-12-31 2016-12-31 A kind of tunnel geological forecast focus connection protective device and method

Country Status (1)

Country Link
CN (1) CN107064998B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4867266A (en) * 1987-01-27 1989-09-19 Martin Philip N Seismic energy source
CN2331001Y (en) * 1998-06-16 1999-07-28 孟祥国 Seismic exploration seismic source well explosive protective cap
CN2606745Y (en) * 2003-03-13 2004-03-17 韩秀山 Source detonator protective shell
CN2784866Y (en) * 2005-04-28 2006-05-31 丁永杰 Improved seismic explosive column casing
CN203224181U (en) * 2013-04-17 2013-10-02 贵州新联爆破工程集团有限公司 Detonator protective device for disassembling blasting charge
CN204268980U (en) * 2014-11-14 2015-04-15 辽宁庆阳民爆器材有限公司 Containing energy emulsion explosive-source explosive post

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4867266A (en) * 1987-01-27 1989-09-19 Martin Philip N Seismic energy source
CN2331001Y (en) * 1998-06-16 1999-07-28 孟祥国 Seismic exploration seismic source well explosive protective cap
CN2606745Y (en) * 2003-03-13 2004-03-17 韩秀山 Source detonator protective shell
CN2784866Y (en) * 2005-04-28 2006-05-31 丁永杰 Improved seismic explosive column casing
CN203224181U (en) * 2013-04-17 2013-10-02 贵州新联爆破工程集团有限公司 Detonator protective device for disassembling blasting charge
CN204268980U (en) * 2014-11-14 2015-04-15 辽宁庆阳民爆器材有限公司 Containing energy emulsion explosive-source explosive post

Also Published As

Publication number Publication date
CN107064998B (en) 2019-07-16

Similar Documents

Publication Publication Date Title
CN104613834B (en) Apparatus for placing and operational approach for TSP big gun hole emulsion
CN101713624A (en) Explosion and crushing method for underground concealed rock ground drilling
CN109373840A (en) Tunnel excavation hydraulic pressure demolition construction method
CN205102714U (en) Umbrella structure detonator big gun line fixing device
KR20110023968A (en) Controlled blasting method for protecting cut slope, cbps
CN104318847B (en) A kind of ammunition demolition simulation training device
CN107605491B (en) A kind of tunneling method
CN102967191A (en) Blasting method for treatment of gob
CN203837604U (en) Full-face hole bottom air-spaced loading mechanism for underground roadway tunneling
CN105547066B (en) A kind of apparatus for placing and operating method for TSP blasthole emulsions
CN107064998A (en) A kind of tunnel geological forecast focus connection protection device and method
CN215447614U (en) Top-cutting entry-retaining presplitting blasting back-dragging energy-gathered charging device
Sazid et al. Effective explosive energy utilization for engineering blasting–initial results of an inventive stemming plug, SPARSH
CN107367207B (en) Joint-cutting explosive package and axial uncoupled explosive-loading step deep hole smooth blasting device
KR101166776B1 (en) Induced method for control of blasting environment and back break
CN105043180B (en) A kind of explosion method fast blocking-up device
US11236974B2 (en) Anti-static, folding container for blasting operations, which can be partially compressed, and associated accessories
CN206709710U (en) A kind of blast working flat hole blanking plug
CN213021276U (en) Explosive loading funnel for blasting
CN107884815A (en) Suitable for the detonator anti-drop device and method of tunnel seismic wave method advance geologic prediction
CN210036468U (en) Explosive loading device for controlling loading depth
CN208444016U (en) Tunnel TGP advance geologic prediction excites the explosive in hole to deliver bar
CN213182051U (en) Tunnel advanced geological forecast blasting seismic source, and mounting tool and mounting structure thereof
CN115979085B (en) Liquid carbon dioxide blasting method suitable for open-air high steps
CN211178166U (en) Tuff blasting big gun hole structure of arranging

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant