Charging pile experimental provision and system
Technical field
The present invention relates to charging pile technical field of measurement and test, more particularly, to a kind of charging pile experimental provision and system.
Background technology
In recent years, continuing to develop with electric vehicle engineering, the New Energy Industry based on electric automobile is also sent out at a high speed
Exhibition.In order to comply with the trend of new energy production development, charging pile industry is also in the growth of explosion type, and the quantity of charging pile is significantly
Increase, to meet the market demand.
But, when charging pile is tested in laboratory, it may appear that bearing power not enough leads to not carry out high-power charging
The situation of the fully loaded performance test of stake, or, even if the conditions permit of bearing power, also due to load excessive so that entering
Row charging pile produces very big electric power energy when being fully loaded with performance test and wasted.
Fully loaded performance test is carried out for charging pile and produces the problem of larger electric power energy is wasted, and is not yet proposed at present effective
Solution.
The content of the invention
In view of this, it is an object of the invention to provide a kind of charging pile experimental provision and system, to alleviate existing skill
The technical problem that larger electric power energy is wasted is produced in art when carrying out fully loaded performance test to charging pile.
In a first aspect, the embodiments of the invention provide a kind of charging pile experimental provision, for the fully loaded performance to charging pile
Tested, the device includes:Direct-flow input end, inversion module and the ac output end being sequentially connected;Direct-flow input end passes through
The DC output end connection of cable and charging pile, receives the direct current of charging pile output, and by DC power transmission to inversion module;
Inversion module includes multiple sub- inversion modules in parallel, and the input of many sub- inversion modules is connected with direct-flow input end respectively,
The output end of many sub- inversion modules is connected with ac output end respectively;Many sub- inversion modules are used to be converted in direct current
Alternating current, and alternating current is transmitted to the ac input end of charging pile by ac output end, to carry out fully loaded property to charging pile
Can test.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the first of first aspect, wherein, on
Stating device also includes dc circuit breaker, and the dc circuit breaker is arranged on the path that direct-flow input end is connected with inversion module, uses
To control the break-make of direct-flow input end.
With reference to the first possible embodiment of first aspect, the embodiments of the invention provide second of first aspect
Possible embodiment, wherein, said apparatus also include AC circuit breaker, the AC circuit breaker be arranged on ac output end with it is inverse
On the path for becoming module connection, the break-make to control ac output end.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the third of first aspect, wherein, on
Stating device also includes DC fuse, and the DC fuse is arranged on the path that direct-flow input end is connected with inversion module, with
Overcurrent protection is carried out to inversion module.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 4th of first aspect kind, wherein, on
The quantity for stating sub- inversion module is 4.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 5th of first aspect kind, wherein, on
Ac output end is stated for three-phase four-wire system.
With reference to second of possible embodiment of first aspect, the embodiments of the invention provide the 6th of first aspect kind
Possible embodiment, wherein, above-mentioned inversion module is encapsulated in a cabinet;The device also includes what is be connected with inversion module
Ammeter, the parameter to measure inversion module;Wherein, above-mentioned ammeter includes alternating-current watt-hour meter and direct current energy meter;Exchange electric degree
Table is connected by current transformer with ac output end, wherein, current transformer is arranged on ac output end and connected with inversion module
On the path connect;Direct current energy meter is connected by current divider or Hall sensor with direct-flow input end, wherein, current divider or
Hall sensor is arranged on the path that direct-flow input end is connected with inversion module;The reading plotter of the ammeter is arranged on cabinet
Outside, for display parameters, wherein, the parameter includes the one or more in following parameter:Voltage parameter, current parameters, work(
The switch being connected with dc circuit breaker and AC circuit breaker is additionally provided with outside rate parameter and electrical energy parameter, the cabinet, to control
The break-make of direct-flow input end and ac output end processed.
With reference to the 6th kind of possible embodiment of first aspect, the embodiments of the invention provide the 7th of first aspect kind
Possible embodiment, wherein, be additionally provided with multiple sub- cabinets being arranged in order inside above-mentioned cabinet, the quantity of the sub- cabinet with
The quantity Matching of sub- inversion module;Every sub- inversion module is separately positioned in every sub- cabinet;With every sub- cabinet outside cabinet
The corresponding position of body is additionally provided with air vent.
Second aspect, the embodiment of the present invention also provides a kind of charging pile experimental system, and the system includes above-mentioned first aspect
Described charging pile experimental provision, in addition to charging pile;The direct-flow input end of the charging pile experimental provision and the direct current of charging pile
Output end is connected;The ac output end of charging pile experimental provision and the ac input end of charging pile are connected;Above-mentioned charging pile is used for
Upon actuation, the alternating current that ac input end is inputted is converted into direct current, and is delivered to charging pile experimental provision;Charging pile is real
Direct current is converted to alternating current by experiment device again, and is transmitted back to charging pile, wherein, after charging pile starts, charging pile and charging pile
The power of experimental provision is continuously increased, until power increases to performance number set in advance;Charging pile experimental provision is used to monitor
Whether the power of charging pile increases to performance number set in advance, and charging pile operation duration whether reach it is set in advance
Duration, when being satisfied by, sends prompt message, to point out staff to terminate experiment.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of the first of second aspect, wherein, on
Stating system also includes AC power distribution cabinet/AC distribution panel, the ac input end connection of the AC power distribution cabinet/AC distribution panel and charging pile, for starting above-mentioned charging
Stake, and make up energy loss when said system is run.
The embodiment of the present invention brings following beneficial effect:
A kind of charging pile experimental provision and system that the present invention is provided, when the fully loaded performance to charging pile is tested,
The direct-flow input end of charging pile experimental provision is connected by the DC output end of cable and charging pile, to receive charging pile output
Direct current, and by DC power transmission to inversion module, inversion module is converted to direct current defeated by exchanging after alternating current
Go out end to transmit again to the ac input end of charging pile, to carry out fully loaded performance test to charging pile, realize to a certain extent
The output electric energy of charging pile is recycled, effectively alleviates when charging pile is fully loaded with performance test and produces very big electric power energy
Waste.
Other features and advantages of the present invention will be illustrated in the following description, also, partly be become from specification
Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages are in specification, claims
And specifically noted structure is realized and obtained in accompanying drawing.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate
Appended accompanying drawing, is described in detail below.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art
The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below
Accompanying drawing is some embodiments of the present invention, for those skilled in the art, on the premise of not paying creative work,
Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation of charging pile experimental provision provided in an embodiment of the present invention;
Fig. 2 is a kind of internal wiring connection diagram of charging pile experimental provision provided in an embodiment of the present invention;
Fig. 3 is a kind of contour structures schematic diagram of charging pile experimental provision provided in an embodiment of the present invention;
Fig. 4 is a kind of structural representation of charging pile experimental system provided in an embodiment of the present invention;
Fig. 5 is the ability exchange schematic diagram that a kind of charging pile provided in an embodiment of the present invention is fully loaded with performance test;
Icon:101- direct-flow input ends;102- inversion modules;The sub- inversion modules of 102a~102d-;103- exchange outputs
End;104- dc circuit breakers;105- AC circuit breakers;106- DC fuses;107- alternating-current watt-hour meters;108- Current Mutual Inductances
Device;109- direct current energy meters;110- current dividers;301- cabinets;302- reading plotters;303a, 303b- are switched;The sub- cabinets of 304-;
305- air vents;306- handles.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention
Technical scheme be clearly and completely described, it is clear that described embodiment is a part of embodiment of the invention, rather than
Whole embodiments.Based on the embodiment in the present invention, those skilled in the art institute under the premise of creative work is not made
The every other embodiment obtained, belongs to the scope of protection of the invention.
At present, charging pile can all carry out fully loaded performance test before use of dispatching from the factory, to judge whether to reach requirement of dispatching from the factory,
Larger load is usually required because the power of charging pile is larger, therefore in experiment, charging pile is may result in and is being fully loaded with
Very big electric power energy is produced during performance test to waste.Based on this, the embodiments of the invention provide a kind of charging pile experimental provision
And system, to alleviate the technical problem of electric power energy waste.
For ease of understanding the present embodiment, first to a kind of charging pile experimental provision disclosed in the embodiment of the present invention
Describe in detail.
Embodiment one:
Charging pile experimental provision provided in an embodiment of the present invention, is tested, Fig. 1 is for the fully loaded performance to charging pile
A kind of structural representation of charging pile experimental provision provided in an embodiment of the present invention, the device includes:The direct current being sequentially connected is defeated
Enter end 101, inversion module 102 and ac output end 103;
When implementing, above-mentioned direct-flow input end 101 is connected by the DC output end of cable and charging pile, receives charging
The direct current of stake output, and by DC power transmission to inversion module 102;Inversion module 102 includes multiple sub- inversion moulds in parallel
Block, sub- inversion module 102a~102d as shown in Figure 1, the inputs of many sub- inversion modules respectively with direct-flow input end 101
Connection, the output end of many sub- inversion modules is connected with ac output end 103 respectively.
Many sub- inversion modules are used to direct current being converted to alternating current, and alternating current is passed through into ac output end 103
Transmit to the ac input end of charging pile, to carry out fully loaded performance test to charging pile.
It should be appreciated that Fig. 1 is only a kind of schematic diagram of charging pile experimental provision provided in an embodiment of the present invention, in order to just
Four sub- inversion modules being connected in parallel, in other embodiments, the quantity of its sub- inversion module are shown in explanation, Fig. 1
There can also be other quantity, inversion module is constituted after being connected in parallel, particular number can be by experimenter according to actual conditions
It is configured, the embodiment of the present invention is not limited to this.
Charging pile experimental provision provided in an embodiment of the present invention, when the fully loaded performance to charging pile is tested, will fill
The direct-flow input end of electric stake experimental provision is connected by the DC output end of cable and charging pile, to receive the straight of charging pile output
Stream electricity, and by DC power transmission to inversion module, inversion module is converted to direct current after alternating current by ac output end
Transmit to the ac input end of charging pile, to carry out fully loaded performance test to charging pile, realize to a certain extent to filling again
The output electric energy of electric stake is recycled, and effectively alleviates and very big electric power energy wave is produced when charging pile is fully loaded with performance test
Take.
Embodiment two:
For the ease of understanding charging pile experimental provision provided in an embodiment of the present invention, in the base of above-described embodiment one
On plinth, as shown in Fig. 2 the embodiment of the present invention additionally provides a kind of internal wiring connection diagram of charging pile experimental provision, Fig. 2
Include direct-flow input end 101, sub- inversion module 102a~102d and ac output end 103.
Preferably, as shown in Fig. 2 said apparatus also includes dc circuit breaker 104, the dc circuit breaker 104 is arranged on directly
On the path that stream input 101 is connected with inversion module, the break-make to control direct-flow input end.Further, said apparatus is also
Including AC circuit breaker 105, the AC circuit breaker 105 is arranged on the path that ac output end 103 is connected with inversion module, is used
To control the break-make of ac output end.
Preferably, said apparatus also include DC fuse 106, the DC fuse 106 be arranged on direct-flow input end with
On the path of inversion module connection, to carry out overcurrent protection to inversion module.
In actual use, the quantity of the sub- inversion module of charging pile experimental provision provided in an embodiment of the present invention is 4,
Further, in the present embodiment, above-mentioned ac output end is three-phase four-wire system.
Bearing power during in view of charging pile to charging electric vehicle is larger, therefore, and the present invention is real with above-mentioned charging pile
Experiment device carries out illustrating exemplified by fully loaded performance test to power for 300kw direct-current charging post.
Corresponding to 300kw direct-current charging post, the peak power of the inversion module in the present embodiment is also 300kw, with full
The fully loaded performance of sufficient direct-current charging post.Specifically, four sub- inversion module 102a~102d in Fig. 2 are preferably 60kw AC/
DC power models (sub- inversion module), dc circuit breaker 104 is arranged on the "+" end of incoming cables and "-" end of incoming cables of direct-flow input end, directly
Flow fuse 106 is arranged on the "+" end of incoming cables of direct-flow input end.In experimentation, aforementioned four 60kW inversion module
Direct current can be changed into alternating current, AC circuit breaker and dc circuit breaker realize the disjunction of electric current, DC fuse is used for pair
Inversion module carries out overcurrent protection, prevents DC current excessive, and inversion module is caused to damage.
Because the ac output end in the present embodiment is three-phase four-wire system, A, B, C and N as shown in Figure 2 are therefore, above-mentioned
AC circuit breaker 105 is arranged on the circuit of the A phases of ac output end, B phases and C phases, meanwhile, sub- inversion module 102a~102d
Output end be also three-phase four-wire system, the phase line of each output end and corresponding ac output end is connected, wherein, often height is inverse
Become the N lines ground connection of module.This many sub- inversion modules mode in parallel, when being tested, every sub- inversion module is used
In direct current is converted into alternating current, and alternating current is transmitted to the ac input end of charging pile, when it by ac output end
In a sub- inversion module break down when can not run, other several sub- inversion modules in parallel are unaffected, and are made whole
Individual device can continue to operation, ensure the stability of plant running.
When implementing, the ac input end of above-mentioned 300kW direct-current charging posts also needs to connect AC power distribution cabinet/AC distribution panel, by handing over
Power distribution cabinet is flowed to start direct-current charging post, wherein, the power of the AC power distribution cabinet/AC distribution panel is preferably 30kw.
When carrying out fully loaded performance test to above-mentioned direct-current charging post, after direct-current charging post starts, the energy of output is to filling
Direct current is changed into alternating current by electric stake experimental provision, charging pile experimental provision, as the input of direct-current charging post, wherein, direct current
After charging pile starts, its power is continuously increased, until power increases to performance number set in advance, such as 300kw, charging pile experiment
The operation power of device also correspondingly increases to 300kw, so that the input power of direct-current charging post also reaches 300kW, in experiment
During, charging pile experimental provision has also served as the negative of direct-current charging post while exchange output is provided for direct-current charging post
Carry, because the peak power of direct-current charging post and charging pile experimental provision is 300kw, therefore, in test process, direct current fills
Electric stake can realize the fully loaded performance test of high-power charging pile to a certain extent with full-load run.
In actual use, above-mentioned inversion module can be encapsulated in a cabinet, direct-flow input end and ac output end
Can be to be arranged in the form of binding post on cabinet, in order to install cable.Meanwhile, for the ease of the sight to experimentation
Survey, above-mentioned charging pile experimental provision is also including the ammeter being connected with inversion module, the parameter to measure inversion module, wherein,
The ammeter includes alternating-current watt-hour meter and direct current energy meter.
Specifically, as shown in Fig. 2 alternating-current watt-hour meter 107 is connected by current transformer 108 with ac output end, wherein,
Current transformer 108 is arranged on the path that ac output end is connected with inversion module;Direct current energy meter 109 by current divider or
Person's Hall sensor is connected with direct-flow input end, wherein, preferably current divider, point as shown in Figure 2 in embodiments of the present invention
Device 110 is flowed, current divider 110 is arranged on the path that direct-flow input end is connected with inversion module;It is defeated due to exchanging when implementing
It is three-phase four-wire system to go out end, and therefore, above-mentioned current transformer 108 is arranged in the A phases of ac output end, B phases and C phases, enters one
Step, above-mentioned current divider 110 is arranged on the "-" end of incoming cables of direct-flow input end.
Preferably, the reading plotter of above-mentioned ammeter is arranged on the outside of cabinet, for display parameters, wherein, above-mentioned parameter
Including the one or more in following parameter:Voltage parameter, current parameters, power parameter and electrical energy parameter, corresponding reading dress
It can be dial plate or digital display panel to put, to facilitate operating personnel to carry out the parameters in experimentation
Observation.
Fig. 3 shows a kind of contour structures schematic diagram of charging pile experimental provision, including cabinet 301 and reading plotter 302,
Further, the switch being connected with dc circuit breaker and AC circuit breaker is also provided with the outside of above-mentioned cabinet 301, is such as schemed
Switch 303a and 303b shown in 3, switch 303a and 303b are connected with dc circuit breaker and AC circuit breaker respectively, above-mentioned to open
It can be toggle switch to close 303a and 303b, the break-make to control direct-flow input end and ac output end.
Preferably, multiple sub- cabinets being arranged in order are additionally provided with inside above-mentioned cabinet 301, sub- cabinet as shown in Figure 3
304, the quantity of sub- cabinet 304 and the quantity Matching of sub- inversion module;Every sub- inversion module is separately positioned on every sub- cabinet
It is interior;Further, the above-mentioned outside of cabinet 301 is additionally provided with air vent 305, convenient radiating with every corresponding position of sub- cabinet 304.
When implementing, above-mentioned sub- cabinet can be designed to the form of drawer, can be pulled out out of cabinet, facilitate operating personnel's antithetical phrase inverse
Become module to be safeguarded and overhauled.Specifically, handle 306 can be set in every the outside of sub- cabinet, facilitates operating personnel to grasp
Make.
It should be appreciated that Fig. 3 is only a kind of preferred contour structures schematic diagram provided in an embodiment of the present invention, rather than only
One structure chart, for convenience of description, it illustrates four sub- cabinets and corresponding air vent, in actual use, its sub- cabinet
The number quantity and form of body and air vent can also have other forms, meanwhile, switch 303a and 303b and reading plotter 302
Position can also have other forms, can be specifically configured according to actual use situation, the embodiment of the present invention is not entered to this
Row limitation.
Although not shown, above-mentioned charging pile experimental provision can also include cabinet door, indicator lamp and cooling fan etc., herein
Repeat no more.
Embodiment three:
On the basis of above-described embodiment, the embodiment of the present invention additionally provides a kind of charging pile experimental system, and Fig. 4 is shown
A kind of structural representation of charging pile experimental system, as shown in figure 4, the system is included described in above-described embodiment one and embodiment two
Charging pile experimental provision, in addition to charging pile.The direct-flow input end of charging pile experimental provision and the DC output end of charging pile
Connection;The ac output end of charging pile experimental provision and the ac input end of charging pile are connected.
Further, said system also includes AC power distribution cabinet/AC distribution panel, and the ac input end of the AC power distribution cabinet/AC distribution panel and charging pile is connected,
For starting charging pile, and energy loss when making up the system operation.
Based on said system, the embodiment of the present invention additionally provides a kind of charging pile and is fully loaded with performance test methods, and this method is led to
Cross above-mentioned charging pile experimental system to realize, by charging pile experimental provision, charging pile and AC power distribution cabinet/AC distribution panel according to the structure shown in Fig. 4
Block diagram is connected, wherein, between charging pile and charging pile experimental provision, it can pass through cable between charging pile and AC power distribution cabinet/AC distribution panel
Connection, can also use copper bar to connect, comprise the following steps:
(1) charging pile fills for upon actuation, the alternating current that ac input end is inputted being converted into direct current, and being delivered to
Electric stake experimental provision;
(2) direct current is converted to alternating current by charging pile experimental provision again, and is transmitted back to charging pile, wherein, charging pile is opened
After dynamic, the power of charging pile and charging pile experimental provision is continuously increased, until power increases to performance number set in advance;
(3) whether charging pile experimental provision is used to monitoring the power of charging pile increases to performance number set in advance, and
Whether the operation duration of charging pile reaches duration set in advance, when being satisfied by, and sends prompt message, to point out staff to tie
Beam is tested.
Understand for the ease of being fully loaded with performance test methods to above-mentioned charging pile, below to test 300kw DC chargings
Illustrated exemplified by stake.Wherein, the peak power of charging pile experimental provision is 300kw, and the power output of AC power distribution cabinet/AC distribution panel is
30kw。
300kw direct-current charging posts ac input end connection 30kw AC power distribution cabinet/AC distribution panels exchange output with charging pile experimental provision
End, the DC output end of 300kw direct-current charging posts connects the direct-flow input end of charging pile experimental provision.
After AC power distribution cabinet/AC distribution panel is connected, the 30kw energy of input is used to open direct-current charging post, and direct-current charging post is started working
When, power gradually increases, and also can accordingly increase along with the power of charging pile experimental provision, until direct-current charging post power reaches
300kW.In the direct-current charging post course of work, alternating current is converted into direct current, the direct current of output to charging pile experimental provision is defeated
Enter end.Direct current is converted to exchange electricity output to the ac input end of direct-current charging post by charging pile experimental provision again, as filling
The input of electric stake, makes the input power of charging pile reach 300kW with this.
Fig. 5 shows that a kind of charging pile is fully loaded with the ability exchange schematic diagram of performance test, as shown in figure 5, passing through above-mentioned system
During system carries out the fully loaded performance test of charging pile, it is desirable to have enough abilities are exchanged to ensure the normal operation of system,
During exchange energy, the 30kW energy that direct-current charging post is given by AC power distribution cabinet/AC distribution panel makes up the damage of energy in interchange process
Consumption.Because charging pile is typically equipped with the heat abstractors such as blower fan, therefore, the capacity loss in test process, in addition to wind
The capacity loss of the operating of the equipment such as machine, these capacity loss, the 30kW energy that can be given by AC power distribution cabinet/AC distribution panel is carried out more
Mend, to ensure the normal operation of whole test system.Therefore, above-mentioned charging pile be fully loaded with performance test when energy flow can be general
Include for:
The energy loss of the energy loss of 300kW direct-current charging posts+charging pile experimental provision=30kW AC power distribution cabinet/AC distribution panels
Enter heat input;
Energy loss+the 30kW of the energy consumed during 300kW direct-current charging post full-load runs≤charging pile experimental provision is handed over
That flows power distribution cabinet enters heat input.
Therefore, when carrying out fully loaded experiment to charging pile by said system, it is thus only necessary to which 30kw ability input just can be with
Complete, greatly save electric power energy.
Charging pile experimental system provided in an embodiment of the present invention, when the fully loaded performance to charging pile is tested, will fill
The direct-flow input end of electric stake experimental provision is connected by the DC output end of cable and charging pile, to receive the straight of charging pile output
Stream electricity, and by DC power transmission to inversion module, inversion module is converted to direct current after alternating current by ac output end
Transmit to the ac input end of charging pile, to carry out fully loaded performance test to charging pile, realize to a certain extent to filling again
The output electric energy of electric stake is recycled, and effectively alleviates and very big electric power energy wave is produced when charging pile is fully loaded with performance test
Take.
Charging pile experimental system provided in an embodiment of the present invention, the charging pile experimental provision provided with above-described embodiment has
Identical technical characteristic, so can also solve identical technical problem, reaches identical technique effect.
It is apparent to those skilled in the art that, for convenience and simplicity of description, the system of foregoing description
Specific work process, may be referred to the corresponding process in previous embodiment, will not be repeated here.
In addition, in the description of the embodiment of the present invention, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi
The connection of two element internals.To those skilled in the art, above-mentioned term can be understood in the present invention with concrete condition
Concrete meaning.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ",
The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to
Be easy to the description present invention and simplify description, rather than indicate or imply signified device or element must have specific orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ",
" the 3rd " is only used for describing purpose, and it is not intended that indicating or implying relative importance.
Finally it should be noted that:Above example, is only the embodiment of the present invention, the skill to illustrate the present invention
Art scheme, rather than its limitations, protection scope of the present invention is not limited thereto, although entering with reference to the foregoing embodiments to the present invention
Go detailed description, it should be understood by those skilled in the art that:Any one skilled in the art takes off in the present invention
In the technical scope of dew, it can still modify to the technical scheme described in previous embodiment or can readily occur in change
Change, or equivalent substitution is carried out to which part technical characteristic;And these modifications, change or replacement, do not make relevant art
Scheme essence depart from technical scheme of the embodiment of the present invention spirit and scope, should all cover protection scope of the present invention it
It is interior.Therefore, protection scope of the present invention should be defined by scope of the claims.