CN109541352A - A kind of non-on-board charger detection device bus parallel connection formula load dispatching method and its device - Google Patents

A kind of non-on-board charger detection device bus parallel connection formula load dispatching method and its device Download PDF

Info

Publication number
CN109541352A
CN109541352A CN201811449390.5A CN201811449390A CN109541352A CN 109541352 A CN109541352 A CN 109541352A CN 201811449390 A CN201811449390 A CN 201811449390A CN 109541352 A CN109541352 A CN 109541352A
Authority
CN
China
Prior art keywords
load
detection
circulation
unit
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811449390.5A
Other languages
Chinese (zh)
Other versions
CN109541352B (en
Inventor
谢三军
黄洋界
裴茂林
陈燕东
周平炉
赵伟
杨爱超
李敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang Ke Chen Electric Power Test Research Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
Nanchang Ke Chen Electric Power Test Research Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Ke Chen Electric Power Test Research Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical Nanchang Ke Chen Electric Power Test Research Co Ltd
Priority to CN201811449390.5A priority Critical patent/CN109541352B/en
Publication of CN109541352A publication Critical patent/CN109541352A/en
Application granted granted Critical
Publication of CN109541352B publication Critical patent/CN109541352B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The present invention provides a kind of non-on-board charger detection device bus parallel connection formula load dispatching method and its devices, plate is held including circulation load unit, ohmic load unit, detection control centre's unit and human-computer interaction, detection control centre's unit includes high current channel plate, BMS simulator, power management module, front end-plate, sampling plate, Insulation monitoring unit and inspection center's industrial personal computer, the circulation load unit and ohmic load unit are formed by by standardized bus type support structures;The present invention can effectively adapt to the load parallel running of the circulation more than three or more to the dispatching method of charging detection circulation load;Second, the present invention can make to detect the severe situation under work effectively adapts to field electric energy quality to a certain degree;Third, it is possible to prevente effectively from partial test work (such as ripple) is interfered by circulation type load-strap;Therefore the present invention will make load have bigger flexibility ratio, preferably answer the demand in right scene or laboratory.

Description

A kind of non-on-board charger detection device bus parallel connection formula load dispatching method and its Device
Technical field
The present invention relates to charger detection technique field, specially a kind of non-on-board charger detection device bus parallel connection formula Load dispatching method and its device.
Background technique
In the case where policy encourages background, quantity rapidly increases charging pile.
With the propulsion of China's economic sustained and rapid development and Development of China's Urbanization, resident persistently increases trip ability need Add, longer one period, automobile trip requirements amount will keep growth from now on.And China's oil resource largely relies on the world Oil market.Thus bring energy shortage problem and problem of environmental pollution will be protruded more.To mitigate environmental pollution and reduction To the degree of dependence on inport of the international petroleum energy, China accelerates the popularization and application of new-energy automobile in recent years.And for servicing new energy Source automobile accessories electrically-charging equipment, country is it is also proposed that charging equipment quantity advanced instruction more appropriate than electric car quantity.? Under the policy support of country and local government, there is swift and violent growth momentum in charging equipment.
Due to being in the initial stage of industry development, the everyway of charging equipment industry is perfect not to the utmost, leads to charging equipment matter It measures very different.And the quality of charging equipment is directly related to electric car continuous capability, user's personal safety as well as the property safety, electricity Fair deal etc..Charging operator must assure that the safety of charging equipment, accuracy, versatility as substantial responsibility side.
Work is detected after carrying out the cycle detection of charging pile scene and arrival, is to ensure that charging pile safety, versatility and electricity The key link of energy metering accuracy.It is this directly facing scene and to the detection work of charging pile before scene, can rationally keep away Exempt from current generally existing in type experiment, in fact it could happen that inspection charging equipment be actually better than the same model at the scene of being sent to and fill Electric equipment phenomenon.It can also effectively check that, because of long-term working environment influence, caused charging pile performance degradation failure is asked Topic.It is final to guarantee that fast charge station maintain good use state.
Therefore, the relevant technologies that research is applied to the cycle detection of charging pile scene are highly desirable, are developed specifically for filling The efficient dedicated on-site detecting device of the performances such as electric stake metering, carries out charging pile scene cycle detection work.This is to raising Safety, versatility and the charging clearing that charging pile scene is run are fair and just, reduce charging pile on-site test job costs, mention High charge service quality is of great significance.
DC charging bring measurement problem first is that DC charging capacity is larger, if direct-current charging post electrical energy measurement verifies Load in device is using pure resistance or electronic load form and circulation detection mode.Direct-current charging post regularly period every year Verification will bring the biggish energy to dissipate, and second, when on-site test, the distribution network electric energy quality environment faced is possible to excessively dislike It is bad, finally bring challenges to on-site test work;Third, in project testings such as thin performances, circulation type load may detected Interference is brought when certain performances.It is therefore desirable to study module type detection load dispatching method to keep various types load preferably suitable For use demand.
Summary of the invention
The object of the present invention is to which problem when being directed to non-on-board charger on-site test or laboratory testing, provides a kind of non- Vehicle-mounted charge machine detecting device bus parallel connection formula load dispatching method and its device, enable various types of loads preferably to fit Answer the demand of scene or laboratory testing.
To achieve the above object, the one side of embodiment of the present invention provides a kind of non-on-board charger detection device bus Parallel load dispatcher, including circulation load unit, ohmic load unit, detection control centre's unit and human-computer interaction hand Maintain an equal level plate, and detection control centre's unit includes high current channel plate, and BMS simulator, power management module, front end-plate adopts Template, Insulation monitoring unit and inspection center's industrial personal computer, the circulation load unit and ohmic load unit are by by standard The bus type support structures of change form;
The Insulation monitoring unit carries out insulating properties detection to charging pile pipette tips under the order of heart industrial personal computer in the detection, if Between meter insulation detecting circuit connection DC+ and PE, DC- and PE, after starting Insulation monitoring, call high pressure that module occurs, to charging High pressure is loaded between the bus and PE that rifle introduces respectively, and it is obtained by the electric current between detection DC+ and PE, DC- and PE Insulation resistance value;
The human-computer interaction holds plate, using the connection transmitting message and control of wireless WIFI and detection control centre's unit System order;
The circulation load unit is mainly used for realizing that high-power power when detection feeds back to power grid by this unit, mainly It is made of multiple groups Three-Phase PWM Rectifier module, power information holds flat-plate emergency by inspection center's industrial personal computer and human-computer interaction Control;
The bus type support structures select the scheme of communication protocol layering to carry out bus communication protocol design, to classics Seven layer protocol of OSI reference model optimizes, and is layered as physical layer, data link layer and application layer.
Preferably, the human-computer interaction, which holds plate, can also scan two dimensional code made of charging pile name plate information, directly Name plate information is automatically entered into inspection center's industrial personal computer, saves the cumbersome work for being manually entered name plate information before detection prepares.
Preferably, the ohmic load unit can adjust resistance sizes by continuous-stable according to demand.
Preferably, in the physical layer, the strong feature of the anti-live interference performance of CAN bus based difference has been borrowed and has been filled The CAN bus of electric national standard interface.
Preferably, in the data link layer, avoidance machine is sent using with priority setting ability CAN2.0B message System, to guarantee timely responding to for the important high-priority message of core.
To achieve the above object, the another aspect of embodiment of the present invention also provides a kind of non-on-board charger detection device Bus parallel connection formula load dispatching method, comprising the following steps:
Step 1: wiring: maximum power range according to demand, access can complete that detection can only be completed by ohmic load The load of purpose minimum resistance, other load shares are formed by having the load of the circulation type of bus interface ability, use inspection center Industrial personal computer opens WIFI hot spot, plate connection WIFI hot spot is held using human-computer interaction, into hot stand-by duty;
Step 2: starting to test;
Step 3: flat-bed scanning nameplate two-dimensional barcode information is used, by plate automatic input data to inspection center's industrial personal computer;
Step 4: being judged using detection device institute An Wendu, humidity, barometric pressure sensor calibrating environmental condition, judge ring When border condition meets sets requirement, work is continued to test;
Step 5: detector plugs in rifle and carries out insulating properties detection to charging pile pipette tips to switch sections;
Step 6: loading condition needed for current detection instrument is judged:
It is preferential to start circulation load if needing to detect detecting large volume at this time but being less than circulation load capacity, most If start-up resistor loads afterwards;It is transferred to step 7;
It is preferential to start circulation load if needing to detect detecting large volume but being higher than circulation load capacity at this time, Last start-up resistor load;It is transferred to step 22;
If the distribution environment of charging pile detection at this time is poor, idle and harmonic wave situation is had;It is transferred to step 23;
If needing to carry out the detection work that ripple can only be carried out by ohmic load at this time;It is transferred to step 26;
Step 7: it swipes the card and starts charging pile, start circulation load unit, after circulation load unit enters stable state, inspection Target operating condition or customized power operating condition are set as this suboptimization input quantity by observing and controlling center cell, it is assumed that this operating condition power It is required that being P;
Step 8: if the circulation load unit of this circulation detection is to use, increase and decrease or replace situation for the first time, entering step 9, if it is not, we enter step 14;
Step 9: the power for the circulation load unit that test is used for the first time, increases and decreases or replaced is corresponding with unit efficiencies bent Line, and test data array is inputted into detection control centre;
Step 10: detection control centre carries out the power that fitting of a polynomial obtains each new unit to i-th of test data Efficiency curve, such as y=fi (pi);
Step 11: overall losses formula can be obtained using power efficiency curve are as follows:
Step 12: the equality constraint of this circulating device can be abstracted as follows:
Or it is written as follow matrix form:
Definition above formula left side square matrix is Aeq, column vector P;
Above formula can be write a Chinese character in simplified form are as follows:
AeqP=Po
Inequality constraints is as follows:
For following formats can be standardized into convenient for subsequent statement:
It is lost, is expressed as follows to find the minimum met under equality constraint:
Minimize:Ploss
Subject to:AeqP=Po
Step 13: in order to find globally optimal solution, being solved with genetic algorithm in above-mentioned equality constraint and inequality The vector P for making Ploss obtain minimum value is found under constraint condition;
Step 14: the function that the power assignment value of the multiple units obtained by genetic algorithm will obtain whole circulating device Rate loss is minimum;
Genetic algorithmic steps are since step 15:
Step 15: multiple individuals are generated as initial population by random function;
Step 16: calculating the fitness function of current locationAs the mark for judging quality It is quasi-;
Step 17: selection operator being acted on into group, the purpose of selection is that the individual of optimization is genetic directly to the next generation Or intersect the individual generated newly by pairing and be genetic to the next generation again, the fitness that selection operation is built upon individual in population is commented On the basis of estimating;
Step 18: crossover operator being acted on into group, what is played the role of a nucleus in genetic algorithm is exactly crossover operator;
Step 19: mutation operator being acted on into group, is the gene on certain locus to the individual string in group Value changes;
Step 20: if having reached termination condition judgement, there is maximum adaptation degree individual with obtained in evolutionary process It is exported as optimal solution, terminates and calculate;
Step 21: each value that algorithm is obtained distributes to each circulation load unit output power instruction value, realizes most Excellent operation;
Step 22: surmounting the maximum capacity part of circulation load unit, setting resistance value is U2/(P-PCirculation);
Step 23: the control of detection control centre obtains the related idle situation of distribution and humorous using moment idle theoretical detection Wavy state;
Step 24: the idle and harmonic wave task that detection control centre compensates demand distributes to each circulation load unit, Form adds to the output order part of each circulation load unit with additive;
Step 25: after distribution network electric energy quality state is restricted, carrying out non-on-board charger on-site test;
Step 26: if detection process carries out the test influenced to ripple test vulnerable to power device switch, shutting down circulation Load unit;
Step 27: enabling ohmic load to the load gear of required test, tested;
Step 28: test terminates.
Compared with prior art, the beneficial effects of the present invention are:
The present invention can effectively adapt to the load of the circulation more than three or more to the dispatching method of charging detection circulation load Parallel running.Also more there is the ability for finding global optimum compared with particle swarm algorithm simultaneously;Second, when on-site test, the distribution that faces Power quality environment is possible to excessively severe, finally brings challenges to on-site test work;The present invention can be such that detection work has Imitate the severe situation under adapting to field electric energy quality to a certain degree;Third, (such as ripple it is possible to prevente effectively from partial test works Deng) interfered by circulation type load-strap.Therefore the present invention uses the combined schedule of several different loads, has load bigger Flexibility ratio, preferably answer it is right scene or laboratory demand.
Detailed description of the invention
Fig. 1 is apparatus of the present invention schematic illustration;
Fig. 2 is genetic algorithm flow chart of the present invention.
Specific embodiment
The present invention is further described with reference to the accompanying drawings and detailed description.
Referring to Fig. 1, the one side of embodiment of the present invention provides a kind of non-on-board charger detection device bus parallel connection Formula load dispatcher, including circulation load unit, ohmic load unit, detection control centre's unit and human-computer interaction are hand-held flat Plate, detection control centre's unit include high current channel plate, BMS simulator, power management module, front end-plate, sampling plate, Insulation monitoring unit and inspection center's industrial personal computer, the circulation load unit and ohmic load unit are by by standardized total Wire type support structures composition;
The Insulation monitoring unit carries out insulating properties detection to charging pile pipette tips under the order of heart industrial personal computer in the detection, if Between meter insulation detecting circuit connection DC+ and PE, DC- and PE, after starting Insulation monitoring, call high pressure that module occurs, to charging High pressure is loaded between the bus and PE that rifle introduces respectively, and it is obtained by the electric current between detection DC+ and PE, DC- and PE Insulation resistance value;
The human-computer interaction holds plate, when being execute-in-place, avoids the hard work of operator's solarization or operation of squatting down, Using the connection transmitting message and control command of wireless WIFI and detection control centre's unit;
The circulation load unit is mainly used for realizing that high-power power when detection feeds back to power grid by this unit, mainly It is made of multiple groups Three-Phase PWM Rectifier module, power information holds flat-plate emergency by inspection center's industrial personal computer and human-computer interaction Control;
The bus type support structures select the scheme of communication protocol layering to carry out bus communication protocol design, real to meet When property and low cost require, and optimize to classical seven layer protocol of OSI Reference Model, only remaining physical layer, data link layer And application layer.
Preferably, the human-computer interaction, which holds plate, can also scan two dimensional code made of charging pile name plate information, directly Name plate information is automatically entered into inspection center's industrial personal computer, saves the cumbersome work for being manually entered name plate information before detection prepares.
Preferably, the ohmic load unit can adjust resistance sizes by continuous-stable according to demand.
Preferably, in the physical layer, the strong feature of the anti-live interference performance of CAN bus based difference, a bite is dual-purpose The simple simplicity that engineering uses is brought, the interface specification of national standard is also to promote this standard to reduce very big difficulty, has borrowed and has filled The CAN bus of electric national standard interface.
Preferably, in the data link layer, since in on-site test, the high-voltage great-current that load is related to secure context is asked Topic, the real-time of bus are sent to key message and its important, therefore selection has ability CAN2.0B message is arranged with priority Escape mechanism is sent, to guarantee timely responding to for the important high-priority message of core.
The another aspect of embodiment of the present invention also provides a kind of non-on-board charger detection device bus parallel connection formula load Dispatching method, comprising the following steps:
Step 1: wiring: maximum power range according to demand, access can complete that detection can only be completed by ohmic load The load of purpose minimum resistance, other load shares are formed by having the load of the circulation type of bus interface ability, use inspection center Industrial personal computer opens WIFI hot spot, plate connection WIFI hot spot is held using human-computer interaction, into hot stand-by duty;
Step 2: starting to test;
Step 3: flat-bed scanning nameplate two-dimensional barcode information is used, by plate automatic input data to inspection center's industrial personal computer;
Step 4: being judged using detection device institute An Wendu, humidity, barometric pressure sensor calibrating environmental condition, judge ring When border condition meets sets requirement, work is continued to test;
Step 5: detector plugs in rifle and carries out insulating properties detection to charging pile pipette tips to switch sections;
Step 6: loading condition needed for current detection instrument is judged:
It is preferential to start circulation load if needing to detect detecting large volume at this time but being less than circulation load capacity, most If start-up resistor loads afterwards;It is transferred to step 7;
It is preferential to start circulation load if needing to detect detecting large volume but being higher than circulation load capacity at this time, Last start-up resistor load;It is transferred to step 22;
If the distribution environment of charging pile detection at this time is poor, idle and harmonic wave situation is had;It is transferred to step 23;
If needing to carry out the detection work that ripple can only be carried out by ohmic load at this time;It is transferred to step 26;
Step 7: it swipes the card and starts charging pile, start circulation load unit, after circulation load unit enters stable state, inspection Target operating condition or customized power operating condition are set as this suboptimization input quantity by observing and controlling center cell, it is assumed that this operating condition power It is required that being P;
Step 8: if the circulation load unit of this circulation detection is to use, increase and decrease or replace situation for the first time, entering step 9, if it is not, we enter step 14;
Step 9: the power for the circulation load unit that test is used for the first time, increases and decreases or replaced is corresponding with unit efficiencies bent Line, and test data array is inputted into detection control centre;
Step 10: detection control centre carries out the power that fitting of a polynomial obtains each new unit to i-th of test data Efficiency curve, such as y=fi (pi);
Step 11: overall losses formula can be obtained using power efficiency curve are as follows:
Step 12: the equality constraint of this circulating device can be abstracted as follows:
Or it is written as follow matrix form:
Definition above formula left side square matrix is Aeq, column vector P;
Above formula can be write a Chinese character in simplified form are as follows:
AeqP=Po
Inequality constraints is as follows:
For following formats can be standardized into convenient for subsequent statement:
It is lost, is expressed as follows to find the minimum met under equality constraint:
Minimize:Ploss
Subject to:AeqP=Po
Step 13: in order to find globally optimal solution, being solved with genetic algorithm in above-mentioned equality constraint and inequality The vector P for making Ploss obtain minimum value is found under constraint condition;As shown in Figure 2;
Step 14: the function that the power assignment value of the multiple units obtained by genetic algorithm will obtain whole circulating device Rate loss is minimum;
Genetic algorithmic steps are since step 15:
Step 15: multiple individuals are generated as initial population by random function;
Step 16: calculating the fitness function of current locationAs the mark for judging quality It is quasi-;
Step 17: selection operator being acted on into group, the purpose of selection is that the individual of optimization is genetic directly to the next generation Or intersect the individual generated newly by pairing and be genetic to the next generation again, the fitness that selection operation is built upon individual in population is commented On the basis of estimating;
Step 18: crossover operator being acted on into group, what is played the role of a nucleus in genetic algorithm is exactly crossover operator;
Step 19: mutation operator being acted on into group, is the gene on certain locus to the individual string in group Value changes;
Step 20: if having reached termination condition judgement, there is maximum adaptation degree individual with obtained in evolutionary process It is exported as optimal solution, terminates and calculate;
Step 21: each value that algorithm is obtained distributes to each circulation load unit output power instruction value, realizes most Excellent operation;
Step 22: surmounting the maximum capacity part of circulation load unit, setting resistance value is U2/(P-PCirculation);
Step 23: the control of detection control centre obtains the related idle situation of distribution and humorous using moment idle theoretical detection Wavy state;
Step 24: the idle and harmonic wave task that detection control centre compensates demand distributes to each circulation load unit, Form adds to the output order part of each circulation load unit with additive;
Step 25: after distribution network electric energy quality state is restricted, carrying out non-on-board charger on-site test;
Step 26: if detection process carries out the test influenced to ripple test vulnerable to power device switch, shutting down circulation Load unit;
Step 27: enabling ohmic load to the load gear of required test, tested;
Step 28: test terminates.
The above only expresses the preferred embodiment of the present invention, and the description thereof is more specific and detailed, but can not be because This and be interpreted as limitations on the scope of the patent of the present invention.It should be pointed out that for those of ordinary skill in the art, Under the premise of not departing from present inventive concept, several deformations can also be made, improves and substitutes, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (6)

1. a kind of non-on-board charger detection device bus parallel connection formula load dispatcher, which is characterized in that loaded including circulation Unit, ohmic load unit, detection control centre's unit and human-computer interaction hold plate, and detection control centre unit includes High current channel plate, BMS simulator, power management module, front end-plate, sampling plate, Insulation monitoring unit and inspection center's industry control Machine, the circulation load unit and ohmic load unit are formed by by standardized bus type support structures;
The Insulation monitoring unit carries out insulating properties detection to charging pile pipette tips under the order of heart industrial personal computer in the detection, and design is exhausted Between the connection of edge detection circuit DC+ and PE, DC- and PE, after starting Insulation monitoring, calls high pressure that module occurs, charging gun is drawn High pressure is loaded between the bus and PE entered respectively, and its insulation is obtained by the electric current between detection DC+ and PE, DC- and PE Resistance value;
The human-computer interaction holds plate, is ordered using the connection transmitting message and control of wireless WIFI and detection control centre's unit It enables;
The circulation load unit is mainly used for realizing that high-power power when detection feeds back to power grid by this unit, mainly by more Group Three-Phase PWM Rectifier module composition, power information hold flat-plate emergency by inspection center's industrial personal computer and human-computer interaction and control;
The bus type support structures select the scheme of communication protocol layering to carry out bus communication protocol design, to classical OSI Seven layer protocol of reference model optimizes, and is layered as physical layer, data link layer and application layer.
2. a kind of non-on-board charger detection device bus parallel connection formula load dispatcher according to claim 1, special Sign is: the human-computer interaction, which holds plate, can also scan two dimensional code made of charging pile name plate information, directly believe nameplate Breath automatically enters inspection center's industrial personal computer, saves the cumbersome work that name plate information is manually entered before detection prepares.
3. a kind of non-on-board charger detection device bus parallel connection formula load dispatcher according to claim 1, special Sign is: the ohmic load unit, can adjust resistance sizes by continuous-stable according to demand.
4. a kind of non-on-board charger detection device bus parallel connection formula load dispatcher according to claim 1, special Sign is: in the physical layer, the strong feature of the anti-live interference performance of CAN bus based difference has borrowed charging state tag splice The CAN bus of mouth.
5. a kind of non-on-board charger detection device bus parallel connection formula load dispatcher according to claim 1, special Sign is: in the data link layer, escape mechanism is sent using with priority setting ability CAN2.0B message, to guarantee The important high-priority message of core timely responds to.
6. a kind of non-on-board charger detection device bus parallel connection formula load dispatching method, which comprises the following steps:
Step 1: wiring: maximum power range according to demand, access can complete that detection project can only be completed by ohmic load Minimum resistance load, other load shares are formed by having the load of the circulation type of bus interface ability, use inspection center's industry control Machine opens WIFI hot spot, plate connection WIFI hot spot is held using human-computer interaction, into hot stand-by duty;
Step 2: starting to test;
Step 3: flat-bed scanning nameplate two-dimensional barcode information is used, by plate automatic input data to inspection center's industrial personal computer;
Step 4: being judged using detection device institute An Wendu, humidity, barometric pressure sensor calibrating environmental condition, judge environment item When part meets sets requirement, work is continued to test;
Step 5: detector plugs in rifle and carries out insulating properties detection to charging pile pipette tips to switch sections;
Step 6: loading condition needed for current detection instrument is judged:
It is preferential to start circulation load if needing to detect detecting large volume at this time but being less than circulation load capacity, if last Start-up resistor load;It is transferred to step 7;
It is preferential to start circulation load if needing to detect detecting large volume but being higher than circulation load capacity at this time, finally Start-up resistor load;It is transferred to step 22;
If the distribution environment of charging pile detection at this time is poor, idle and harmonic wave situation is had;It is transferred to step 23;
If needing to carry out the detection work that ripple can only be carried out by ohmic load at this time;It is transferred to step 26;
Step 7: it swipes the card and starts charging pile, start circulation load unit, after circulation load unit enters stable state, detection control Target operating condition or customized power operating condition are set as this suboptimization input quantity by center cell processed, it is assumed that this operating condition power requirement For P;
Step 8: if the circulation load unit of this circulation detection is to use, increase and decrease or replace situation for the first time, 9 are entered step, if No, we enter step 14;
Step 9: the power for the circulation load unit that test is used for the first time, increases and decreases or replaced and the homologous thread of unit efficiencies, and Test data array is inputted into detection control centre;
Step 10: detection control centre carries out the power efficiency that fitting of a polynomial obtains each new unit to i-th of test data Curve, such as y=fi (pi);
Step 11: overall losses formula can be obtained using power efficiency curve are as follows:
Step 12: the equality constraint of this circulating device can be abstracted as follows:
Or it is written as follow matrix form:
Definition above formula left side square matrix is Aeq, column vector P;
Above formula can be write a Chinese character in simplified form are as follows:
AeqP=Po
Inequality constraints is as follows:
For following formats can be standardized into convenient for subsequent statement:
It is lost, is expressed as follows to find the minimum met under equality constraint:
Minimize:Ploss
Subject to:AeqP=Po
Step 13: in order to find globally optimal solution, being solved with genetic algorithm in above-mentioned equality constraint and inequality constraints Under the conditions of find make Ploss obtain minimum value vector P;
Step 14: the power assignment value of the multiple units obtained by genetic algorithm damages the power for obtaining whole circulating device Consumption is minimum;
Genetic algorithmic steps are since step 15:
Step 15: multiple individuals are generated as initial population by random function;
Step 16: calculating the fitness function of current locationAs the standard for judging quality;
Step 17: selection operator being acted on into group, the purpose of selection is the individual of optimization to be genetic directly to the next generation or logical It crosses the individual that pairing intersection generates newly and is genetic to the next generation again, selection operation is built upon the Fitness analysis base of individual in population On plinth;
Step 18: crossover operator being acted on into group, what is played the role of a nucleus in genetic algorithm is exactly crossover operator;
Step 19: mutation operator being acted on into group, is the genic value work on certain locus to the individual string in group It changes;
Step 20: if having reached termination condition judgement, using in evolutionary process it is obtained have maximum adaptation degree individual as Optimal solution output, terminates and calculates;
Step 21: each value that algorithm is obtained distributes to each circulation load unit output power instruction value, realizes optimal fortune Row;
Step 22: surmounting the maximum capacity part of circulation load unit, setting resistance value is U2/(P-PCirculation);
Step 23: the control of detection control centre obtains the related idle situation of distribution and harmonic wave shape using moment idle theoretical detection State;
Step 24: the idle and harmonic wave task that detection control centre compensates demand distributes to each circulation load unit, to add Method form adds to the output order part of each circulation load unit;
Step 25: after distribution network electric energy quality state is restricted, carrying out non-on-board charger on-site test;
Step 26: if detection process carries out the test influenced to ripple test vulnerable to power device switch, shutting down circulation load Unit;
Step 27: enabling ohmic load to the load gear of required test, tested;
Step 28: test terminates.
CN201811449390.5A 2018-11-29 2018-11-29 Bus parallel load scheduling method and device for off-vehicle charger detection device Active CN109541352B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811449390.5A CN109541352B (en) 2018-11-29 2018-11-29 Bus parallel load scheduling method and device for off-vehicle charger detection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811449390.5A CN109541352B (en) 2018-11-29 2018-11-29 Bus parallel load scheduling method and device for off-vehicle charger detection device

Publications (2)

Publication Number Publication Date
CN109541352A true CN109541352A (en) 2019-03-29
CN109541352B CN109541352B (en) 2023-12-05

Family

ID=65851305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811449390.5A Active CN109541352B (en) 2018-11-29 2018-11-29 Bus parallel load scheduling method and device for off-vehicle charger detection device

Country Status (1)

Country Link
CN (1) CN109541352B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013131392A1 (en) * 2012-03-07 2013-09-12 甘肃省电力公司电力科学研究院 Dc power supply dynamic simulation system and dc power supply test system
CN203275553U (en) * 2013-06-03 2013-11-06 国家电网公司 Feedback type charger detection platform
CN103412206A (en) * 2013-07-10 2013-11-27 华北电力大学(保定) Multiple-working-condition automatic testing experiment system of electric vehicle charging equipment
CN103840521A (en) * 2014-02-27 2014-06-04 武汉大学 Large-scale electric vehicle optimized charging and discharging system and method based on the optimal power flow
CN104198856A (en) * 2014-09-02 2014-12-10 国家电网公司 Off-board charger test method and device
CN204832381U (en) * 2015-07-23 2015-12-02 邵羽达 Energy repayment formula is charged intellectual detection system and is overhauld a system
CN107064701A (en) * 2017-06-12 2017-08-18 青岛特来电新能源有限公司 Charging pile experimental provision and system
CN206725673U (en) * 2017-04-26 2017-12-08 安徽聚捷汽车电子有限公司 A kind of off-board direct-current charging post detection means of electric automobile
CN107677905A (en) * 2017-09-23 2018-02-09 国网江西省电力公司电力科学研究院 A kind of off-board charging machine detecting device of electric automobile
CN108427092A (en) * 2018-03-05 2018-08-21 江苏大学 A kind of off-board DC charging motor direct current energy meter in-line calibration System and method for of electric vehicle
EP3402035A1 (en) * 2017-05-10 2018-11-14 Vector Informatik GmbH Method for charging a battery and stationary loading installation

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013131392A1 (en) * 2012-03-07 2013-09-12 甘肃省电力公司电力科学研究院 Dc power supply dynamic simulation system and dc power supply test system
CN203275553U (en) * 2013-06-03 2013-11-06 国家电网公司 Feedback type charger detection platform
CN103412206A (en) * 2013-07-10 2013-11-27 华北电力大学(保定) Multiple-working-condition automatic testing experiment system of electric vehicle charging equipment
CN103840521A (en) * 2014-02-27 2014-06-04 武汉大学 Large-scale electric vehicle optimized charging and discharging system and method based on the optimal power flow
CN104198856A (en) * 2014-09-02 2014-12-10 国家电网公司 Off-board charger test method and device
CN204832381U (en) * 2015-07-23 2015-12-02 邵羽达 Energy repayment formula is charged intellectual detection system and is overhauld a system
CN206725673U (en) * 2017-04-26 2017-12-08 安徽聚捷汽车电子有限公司 A kind of off-board direct-current charging post detection means of electric automobile
EP3402035A1 (en) * 2017-05-10 2018-11-14 Vector Informatik GmbH Method for charging a battery and stationary loading installation
CN107064701A (en) * 2017-06-12 2017-08-18 青岛特来电新能源有限公司 Charging pile experimental provision and system
CN107677905A (en) * 2017-09-23 2018-02-09 国网江西省电力公司电力科学研究院 A kind of off-board charging machine detecting device of electric automobile
CN108427092A (en) * 2018-03-05 2018-08-21 江苏大学 A kind of off-board DC charging motor direct current energy meter in-line calibration System and method for of electric vehicle

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘亚丽;李国栋;滕文;胡波;车延博;: "充电机检测平台及其集成设计", 电气传动, no. 01, pages 73 - 76 *
钟劲松;刘卫新;李宁;潘霞;曹威;: "电动汽车直流充电桩检定系统研制", 电测与仪表, no. 1, pages 99 - 102 *

Also Published As

Publication number Publication date
CN109541352B (en) 2023-12-05

Similar Documents

Publication Publication Date Title
CN108761341A (en) A kind of lithium ion battery battery chemical modeling parameter acquisition methods
CN101963640B (en) Detection system and detection method of direct-current charging post
EP2590290A1 (en) Power control method, program, and power control device
CN105069919B (en) The method of intelligent charge management
CN111366854B (en) Testing method and device for fuel cell power system testing platform
CN103576025A (en) Detection test system for energy storage power station grid connection
CN209070040U (en) One kind being used for electric car direct-current charging post detection system
CN110749825B (en) Method and device for establishing acceleration working condition of fuel cell durability test
CN107154626A (en) Distributed photovoltaic intelligent energy manages SaaS systems with energy storage
CN116799844B (en) Portable distributed energy storage system
CN105046593A (en) Intelligent power distribution and utilization evaluation method conforming to low-carbon energy policy
CN104269895A (en) Integrated intelligent charging parking garage for electric passenger car
CN109470956A (en) One kind being used for electric car direct-current charging post detection system and method
CN109541352A (en) A kind of non-on-board charger detection device bus parallel connection formula load dispatching method and its device
CN111746352B (en) Method and device for determining battery of power hybrid electric vehicle and upper computer
CN117060473A (en) Intelligent power distribution network energy storage optimal configuration method
CN201532447U (en) Automatic monitoring system of electrical property of solar electric source
CN115549247A (en) Mixed power management method and system
CN107632267B (en) A kind of battery exception monomer localization method and system
CN109188339A (en) A kind of non-on-board charger detection device circulation module control method and device
CN104362725A (en) Photoelectric complementary intelligent charging system for electric automobile
CN114977503A (en) Full-chain monitoring system and method for running state of integrated system
CN114221000A (en) Aluminum-air battery detection system and control method thereof
CN110824271A (en) Electric automobile fills electric pile simulation test platform
CN101071956A (en) Method and and device for regulating secondary cell array for solar photovalatic system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant