CN107064669A - Impact load is to the long-range monitoring main frame of electric energy metering error - Google Patents
Impact load is to the long-range monitoring main frame of electric energy metering error Download PDFInfo
- Publication number
- CN107064669A CN107064669A CN201710073629.2A CN201710073629A CN107064669A CN 107064669 A CN107064669 A CN 107064669A CN 201710073629 A CN201710073629 A CN 201710073629A CN 107064669 A CN107064669 A CN 107064669A
- Authority
- CN
- China
- Prior art keywords
- circuit
- signal
- main frame
- electric energy
- long
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
Abstract
Impact load proposed by the present invention is to the long-range monitoring main frame of electric energy metering error, including housing, and the observation circuit being arranged in housing, and observation circuit includes sample circuit, and the preferred circuit being connected with sample circuit.Sample circuit includes the sampling resistor for being used to receive electric signal, and sampling resistor is connected with simulating the input of discharge circuit, and on the one hand the output end for simulating discharge circuit is connected with the relay being arranged on multiple Measurement channels;Sampled result is calculated by simulating discharge circuit, when result of calculation is more than default range, the switching for realizing range is controlled to relay, guarantee accurately to obtain the parameter value that power supply to be detected exports electric signal, relative to the real-time that prior art can obtain electric energy meter and loop state detection device in real time, the detectability of measuring apparatus is improved.
Description
Technical field
The invention belongs to field of electrical equipment, more particularly to impact load is to the long-range monitoring main frame of electric energy metering error.
Background technology
High-speed railway with its energy-saving and environmental protection, it is efficient, safe, comfortable, quick, punctual the features such as world's railway
New trend.Recently as developing rapidly for China's high ferro technology, while people's trip is convenient, the construction at high ferro station is also electricity
The problem of power metering introduces new.
Electric railway electric locomotive is high-power single-phase rectification load, is come for the power system power supply of three-phase symmetrical
Say, the features such as electrization railway draught load has non-linear, asymmetric and impact, the harmonic wave electricity of three-phase imbalance will be produced
Stream and fundamental negative sequence current injected system, cause the harmonic current, harmonic voltage, imbalance of three-phase voltage of points of common connection bus
The multinomial power quality indexs such as degree are exceeded, had a strong impact on the safety of power system security, economy, stable operation and power consumer
Electricity consumption, causes generator tripping, and protective relaying maloperation is made, and generator amature is burnt out, motor of power capacitor and user etc.
The damage of electrical equipment.However, lacking real-time, Yi Jigao for some traditional electric energy meters and loop state detection device
The load at iron station has discontinuity, constrains the detectability of conventional measurement devices, makes gage work personnel can not scene completion
Test job, it is impossible to manage the metering accuracy of user.
The content of the invention
In order to solve shortcoming and defect present in prior art, the invention provides the impact for improving detectability
Load is to the long-range monitoring main frame of electric energy metering error.
In order to reach above-mentioned technical purpose, the invention provides impact load to the long-range monitoring main frame of electric energy metering error,
The remote detection main frame includes housing, and the observation circuit being arranged in housing, and the observation circuit includes sample circuit,
And the preferred circuit being connected with sample circuit;
The sample circuit includes the sampling resistor for being used to receive electric signal, the input of sampling resistor and simulation discharge circuit
On the one hand end connection, the output end for simulating discharge circuit is connected with the relay being arranged on multiple Measurement channels, simulates amplifier
On the other hand the output end of circuit is also connected with the input of preferred circuit;
The preferred circuit includes the modulus isolation circuit for being used to receive the electric signal from simulation discharge circuit output, in mould
The output end of number isolation circuit is connected with data acquisition circuit, data processing circuit is connected with after data acquisition circuit, in number
Serial communication circuit is connected with according to the output end of process circuit.
Optionally, the electric signal includes voltage signal, current signal and pulse signal.
Optionally, when the electric signal is voltage signal, being provided with the preferred circuit is used to receive simulation amplifier
First analog to digital conversion circuit of circuit output voltage signal, the first benchmark electricity is connected with the input of the first analog to digital conversion circuit
Press generation circuit.
Optionally, when the electric signal is current signal, being provided with the preferred circuit is used to receive simulation amplifier
Second analog to digital conversion circuit of circuit output current signal, the second benchmark electricity is connected with the input of the second analog to digital conversion circuit
Press generation circuit.
Optionally, the signal drive circuit being connected with the modulus isolation circuit, the input of signal drive circuit are additionally provided with
End is connected with switching switch.
Optionally, the modulus isolation circuit is directly connected to data processing circuit.
Optionally, the current transformer for being used for receiving current signal is provided with sample circuit, the current transformer is
External straight-through current transformer with electronic compensation function.
The beneficial effect that the technical scheme that the present invention is provided is brought is:
Sampled result is calculated by simulating discharge circuit, when result of calculation is more than default range, to relay
It is controlled the switching for realizing range, it is ensured that can accurately obtain the parameter value that power supply to be detected exports electric signal, relative to
Prior art can obtain the real-time of electric energy meter and loop state detection device in real time, improve the detection of measuring apparatus
Ability.
Brief description of the drawings
In order to illustrate more clearly of technical scheme, the accompanying drawing used required in being described below to embodiment
It is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, general for this area
For logical technical staff, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the concrete structure diagram of the sample circuit that the present invention is provided and preferred circuit.
Embodiment
To make the structure and advantage of the present invention clearer, the structure of the present invention is made further below in conjunction with accompanying drawing
Description.
Embodiment one
Concrete structure of the long-range monitoring main frame proposed in the embodiment of the present invention based on long-range monitoring main frame be:
Remote detection main frame includes housing, and the observation circuit being arranged in housing, and the observation circuit includes sampling
Circuit, and the preferred circuit being connected with sample circuit.
Sample circuit and the concrete structure of preferred circuit are as shown in Figure 1.
The sample circuit includes the sampling resistor for being used to receive electric signal, the input of sampling resistor and simulation discharge circuit
On the one hand end connection, the output end for simulating discharge circuit is connected with the relay being arranged on multiple Measurement channels, simulates amplifier
On the other hand the output end of circuit is also connected with the input of preferred circuit;
The preferred circuit includes the modulus isolation circuit for being used to receive the electric signal from simulation discharge circuit output, in mould
The output end of number isolation circuit is connected with data acquisition circuit, data processing circuit is connected with after data acquisition circuit, in number
Serial communication circuit is connected with according to the output end of process circuit.
Wherein, the electric signal that sample circuit is used to receive specifically includes voltage signal, current signal and pulse signal.
When the electric signal is voltage signal, being provided with the preferred circuit is used to receive simulation discharge circuit output
First analog to digital conversion circuit of voltage signal, is connected with the first reference voltage in the input of the first analog to digital conversion circuit and produces electricity
Road.
When the electric signal is current signal, being provided with the preferred circuit is used to receive simulation discharge circuit output
Second analog to digital conversion circuit of current signal, is connected with the second reference voltage in the input of the second analog to digital conversion circuit and produces electricity
Road.
Optionally, the signal drive circuit being connected with the modulus isolation circuit is additionally provided with preferred circuit, signal drives
The input of dynamic circuit is connected with switching switch.Signal drive circuit is used to receive the switching signal that switching switch is sent, so that
The range switching based on manual intervention can be carried out after remotely monitoring main frame range can not be switched over.
Based on the signal drive circuit proposed above, the modulus isolation circuit being connected with signal drive circuit and data processing
Circuit is directly connected to.I.e. modulus isolation circuit rear end is directly connected without data acquisition circuit with data processing circuit, and this is
Because the time value that the signal that switching switch is produced need not be produced with crystal oscillator is matched, data processing circuit is transmitted directly to
Handled.
Optionally, the current transformer for being used for receiving current signal is provided with sample circuit, the current transformer is
External straight-through current transformer with electronic compensation function.
Impact load proposed by the present invention is to the long-range monitoring main frame of electric energy metering error, including housing, and is arranged on shell
Internal observation circuit, observation circuit includes sample circuit, and the preferred circuit being connected with sample circuit.Sample circuit includes
Sampling resistor for receiving electric signal, sampling resistor is connected with simulating the input of discharge circuit, simulates the defeated of discharge circuit
Go out end to be on the one hand connected with the relay being arranged on multiple Measurement channels.Sampled result is counted by simulating discharge circuit
Calculate, when result of calculation is more than default range, the switching for realizing range is controlled to relay, it is ensured that can accurately obtain
Power supply to be detected exports the parameter value of electric signal, and electric energy meter and loop state inspection can be obtained in real time relative to prior art
The real-time of measurement equipment, improves the detectability of measuring apparatus.
Each sequence number in above-described embodiment is for illustration only, and the elder generation during the assembling or use of each part is not represented
Afterwards sequentially.
Embodiments of the invention are the foregoing is only, are not intended to limit the invention, it is all in the spirit and principles in the present invention
Within, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.
Claims (7)
1. impact load is to the long-range monitoring main frame of electric energy metering error, it is characterised in that the remote detection main frame includes housing,
And the observation circuit in housing is arranged on, the observation circuit includes sample circuit, and the standard being connected with sample circuit
Circuit;
The sample circuit includes the sampling resistor for being used to receive electric signal, and the input of sampling resistor and simulation discharge circuit connects
Connect, on the one hand the output end for simulating discharge circuit is connected with the relay being arranged on multiple Measurement channels, simulates discharge circuit
Output end on the other hand be also connected with the input of preferred circuit;
The preferred circuit include be used for receive from simulation discharge circuit output electric signal modulus isolation circuit, modulus every
Output end from circuit is connected with data acquisition circuit, and data processing circuit is connected with after data acquisition circuit, at data
The output end of reason circuit is connected with serial communication circuit.
2. impact load according to claim 1 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that the electricity
Signal includes voltage signal, current signal and pulse signal.
3. impact load according to claim 2 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that when described
When electric signal is voltage signal, being provided with the preferred circuit is used to receive the first of simulation discharge circuit output voltage signal
Analog to digital conversion circuit, the first reference voltage generating circuit is connected with the input of the first analog to digital conversion circuit.
4. impact load according to claim 2 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that when described
When electric signal is current signal, being provided with the preferred circuit is used to receive the second of simulation discharge circuit output current signal
Analog to digital conversion circuit, the second reference voltage generating circuit is connected with the input of the second analog to digital conversion circuit.
5. impact load according to claim 1 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that be additionally provided with
The signal drive circuit being connected with the modulus isolation circuit, the input of signal drive circuit is connected with switching switch.
6. impact load according to claim 1 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that the mould
Number isolation circuit is directly connected to data processing circuit.
7. impact load according to claim 2 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that in sampling
The current transformer for being used for receiving current signal is provided with circuit, the current transformer is with the external of electronic compensation function
Formula straight-through current transformer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710073629.2A CN107064669A (en) | 2017-02-10 | 2017-02-10 | Impact load is to the long-range monitoring main frame of electric energy metering error |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710073629.2A CN107064669A (en) | 2017-02-10 | 2017-02-10 | Impact load is to the long-range monitoring main frame of electric energy metering error |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107064669A true CN107064669A (en) | 2017-08-18 |
Family
ID=59598478
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710073629.2A Pending CN107064669A (en) | 2017-02-10 | 2017-02-10 | Impact load is to the long-range monitoring main frame of electric energy metering error |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107064669A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111756552A (en) * | 2019-03-27 | 2020-10-09 | Wago管理有限责任公司 | Electric energy supply device |
CN111756552B (en) * | 2019-03-27 | 2024-05-07 | Wago管理有限责任公司 | Electric energy supply device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202351422U (en) * | 2011-11-18 | 2012-07-25 | 厦门红相电力设备股份有限公司 | Automatic detection device of electric energy metering device |
CN105116364A (en) * | 2015-07-06 | 2015-12-02 | 浙江涵普电力科技有限公司 | Standard measurement unit and method used for electric energy metering remote on-line monitoring system |
CN105675978A (en) * | 2016-01-04 | 2016-06-15 | 江阴长仪集团有限公司 | Electric energy meter with wide range and adaptive adjusting method of current channel thereof |
CN206431219U (en) * | 2017-02-10 | 2017-08-22 | 国网浙江台州市黄岩区供电公司 | Impact load is to the long-range monitoring main frame of electric energy metering error |
-
2017
- 2017-02-10 CN CN201710073629.2A patent/CN107064669A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202351422U (en) * | 2011-11-18 | 2012-07-25 | 厦门红相电力设备股份有限公司 | Automatic detection device of electric energy metering device |
CN105116364A (en) * | 2015-07-06 | 2015-12-02 | 浙江涵普电力科技有限公司 | Standard measurement unit and method used for electric energy metering remote on-line monitoring system |
CN105675978A (en) * | 2016-01-04 | 2016-06-15 | 江阴长仪集团有限公司 | Electric energy meter with wide range and adaptive adjusting method of current channel thereof |
CN206431219U (en) * | 2017-02-10 | 2017-08-22 | 国网浙江台州市黄岩区供电公司 | Impact load is to the long-range monitoring main frame of electric energy metering error |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111756552A (en) * | 2019-03-27 | 2020-10-09 | Wago管理有限责任公司 | Electric energy supply device |
US11822303B2 (en) | 2019-03-27 | 2023-11-21 | Wago Verwaltungsgesellschaft Mbh | Electronic device and communication unit |
CN111756552B (en) * | 2019-03-27 | 2024-05-07 | Wago管理有限责任公司 | Electric energy supply device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100549709C (en) | The computing method and the device of circulation in the Y/ △ transformer triangle winding | |
CN202230150U (en) | On-line monitoring intelligent terminal for electric power lightning arrester with fiber for power supply | |
CN201177662Y (en) | Remote on-line detection system for electric energy metering error | |
CN102175951A (en) | Distribution network fault detection system | |
CN204188757U (en) | Portable power equipment leakage point insulating pick-up unit | |
CN205377257U (en) | Intelligence electric leakage recloses protection switch | |
CN204575811U (en) | A kind of test macro of high-voltage switch contact | |
CN103063895B (en) | Pliers-shaped anti-interference current transformer and transformer iron core grounding current testing system | |
CN103941079A (en) | On-line monitoring and fault diagnosis system for power distribution network PT | |
CN106990382A (en) | Impact load is to electric energy metering error remote monitoring method | |
CN109470914A (en) | A kind of VFTO signal measurement apparatus | |
CN110828101A (en) | Power transformer demagnetization and remanence measurement device | |
CN207114664U (en) | A kind of electric energy quality monitoring system | |
CN108226645A (en) | A kind of vacuum circuit breaker divide-shut brake coil direct current resistance m easurem ent device | |
CN201207081Y (en) | Signal detection circuit for electric energy metering error remote on-line detection system | |
CN206431219U (en) | Impact load is to the long-range monitoring main frame of electric energy metering error | |
CN107064669A (en) | Impact load is to the long-range monitoring main frame of electric energy metering error | |
CN206945842U (en) | A kind of distribution reactive power compensator analogue test platform | |
CN203164360U (en) | Transformer device insulation online monitoring system | |
CN216411535U (en) | Distributed deployed portable current transformer polarity detection equipment | |
CN206788289U (en) | A kind of singlephase earth fault analysis system suitable for small current neutral grounding system | |
CN201548607U (en) | Resonance overvoltage analyzing system of transformer substation | |
CN205091421U (en) | Synchronous generator winding short circuit alarm device based on negative current | |
CN105223446A (en) | Lightning arrester remote online monitoring device | |
CN212965347U (en) | Intelligent distribution line on-line state monitoring terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |