CN206431219U - Impact load is to the long-range monitoring main frame of electric energy metering error - Google Patents

Impact load is to the long-range monitoring main frame of electric energy metering error Download PDF

Info

Publication number
CN206431219U
CN206431219U CN201720123299.9U CN201720123299U CN206431219U CN 206431219 U CN206431219 U CN 206431219U CN 201720123299 U CN201720123299 U CN 201720123299U CN 206431219 U CN206431219 U CN 206431219U
Authority
CN
China
Prior art keywords
circuit
signal
main frame
electric energy
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720123299.9U
Other languages
Chinese (zh)
Inventor
郑则诚
朱欣
张军达
沈萍
朱欢
陈宇渊
郭朱颖
许宏峰
丁浩城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Net Huangyan District Taizhou City Of Zhejiang Province Electric Co Of State
State Grid Corp of China SGCC
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Net Huangyan District Taizhou City Of Zhejiang Province Electric Co Of State
State Grid Corp of China SGCC
Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Net Huangyan District Taizhou City Of Zhejiang Province Electric Co Of State, State Grid Corp of China SGCC, Taizhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Net Huangyan District Taizhou City Of Zhejiang Province Electric Co Of State
Priority to CN201720123299.9U priority Critical patent/CN206431219U/en
Application granted granted Critical
Publication of CN206431219U publication Critical patent/CN206431219U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model proposes impact load to the long-range monitoring main frame of electric energy metering error, including housing, and the observation circuit being arranged in housing, observation circuit includes sample circuit, and the preferred circuit being connected with sample circuit.Sample circuit includes the sampling resistor for being used to receive electric signal, and sampling resistor is connected with simulating the input of discharge circuit, and on the one hand the output end for simulating discharge circuit is connected with the relay being arranged on multiple Measurement channels;Sampled result is calculated by simulating discharge circuit, when result of calculation is more than default range, the switching for realizing range is controlled to relay, guarantee accurately to obtain the parameter value that power supply to be detected exports electric signal, relative to the real-time that prior art can obtain electric energy meter and loop state detection device in real time, the detectability of measuring apparatus is improved.

Description

Impact load is to the long-range monitoring main frame of electric energy metering error
Technical field
The utility model belongs to field of electrical equipment, and more particularly to impact load is to the long-range monitoring master of electric energy metering error Machine.
Background technology
High-speed railway with its energy-saving and environmental protection, it is efficient, safe, comfortable, quick, punctual the features such as world's railway New trend.Recently as developing rapidly for China's high ferro technology, while people's trip is convenient, the construction at high ferro station is also electricity The problem of power metering introduces new.
Electric railway electric locomotive is high-power single-phase rectification load, is come for the power system power supply of three-phase symmetrical Say, the features such as electrization railway draught load has non-linear, asymmetric and impact, the harmonic wave electricity of three-phase imbalance will be produced Stream and fundamental negative sequence current injected system, cause the harmonic current, harmonic voltage, imbalance of three-phase voltage of points of common connection bus The multinomial power quality indexs such as degree are exceeded, had a strong impact on the safety of power system security, economy, stable operation and power consumer Electricity consumption, causes generator tripping, and protective relaying maloperation is made, and generator amature is burnt out, motor of power capacitor and user etc. The damage of electrical equipment.However, lacking real-time, Yi Jigao for some traditional electric energy meters and loop state detection device The load at iron station has discontinuity, constrains the detectability of conventional measurement devices, makes gage work personnel can not scene completion Test job, it is impossible to manage the metering accuracy of user.
Utility model content
In order to solve shortcoming and defect present in prior art, the utility model, which is provided, to be used to improve detectability Impact load is to the long-range monitoring main frame of electric energy metering error.
In order to reach above-mentioned technical purpose, the utility model provides impact load to the long-range monitoring master of electric energy metering error Machine, the remote detection main frame includes housing, and the observation circuit being arranged in housing, and the observation circuit includes sampling electricity Road, and the preferred circuit being connected with sample circuit;
The sample circuit includes the sampling resistor for being used to receive electric signal, the input of sampling resistor and simulation discharge circuit On the one hand end connection, the output end for simulating discharge circuit is connected with the relay being arranged on multiple Measurement channels, simulates amplifier On the other hand the output end of circuit is also connected with the input of preferred circuit;
The preferred circuit includes the modulus isolation circuit for being used to receive the electric signal from simulation discharge circuit output, in mould The output end of number isolation circuit is connected with data acquisition circuit, data processing circuit is connected with after data acquisition circuit, in number Serial communication circuit is connected with according to the output end of process circuit.
Optionally, the electric signal includes voltage signal, current signal and pulse signal.
Optionally, when the electric signal is voltage signal, being provided with the preferred circuit is used to receive simulation amplifier First analog to digital conversion circuit of circuit output voltage signal, the first benchmark electricity is connected with the input of the first analog to digital conversion circuit Press generation circuit.
Optionally, when the electric signal is current signal, being provided with the preferred circuit is used to receive simulation amplifier Second analog to digital conversion circuit of circuit output current signal, the second benchmark electricity is connected with the input of the second analog to digital conversion circuit Press generation circuit.
Optionally, the signal drive circuit being connected with the modulus isolation circuit, the input of signal drive circuit are additionally provided with End is connected with switching switch.
Optionally, the modulus isolation circuit is directly connected to data processing circuit.
Optionally, the current transformer for being used for receiving current signal is provided with sample circuit, the current transformer is External straight-through current transformer with electronic compensation function.
The beneficial effect brought of technical scheme that the utility model is provided is:
Sampled result is calculated by simulating discharge circuit, when result of calculation is more than default range, to relay It is controlled the switching for realizing range, it is ensured that can accurately obtain the parameter value that power supply to be detected exports electric signal, relative to Prior art can obtain the real-time of electric energy meter and loop state detection device in real time, improve the detection of measuring apparatus Ability.
Brief description of the drawings
In order to illustrate more clearly of the technical solution of the utility model, used required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present utility model, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 is the concrete structure diagram of the sample circuit that the utility model is provided and preferred circuit.
Embodiment
To make structure of the present utility model and advantage clearer, structure of the present utility model is made below in conjunction with accompanying drawing It is further described through.
Embodiment one
Concrete structure of the long-range monitoring main frame proposed in the utility model embodiment based on long-range monitoring main frame be:
Remote detection main frame includes housing, and the observation circuit being arranged in housing, and the observation circuit includes sampling Circuit, and the preferred circuit being connected with sample circuit.
Sample circuit and the concrete structure of preferred circuit are as shown in Figure 1.
The sample circuit includes the sampling resistor for being used to receive electric signal, the input of sampling resistor and simulation discharge circuit On the one hand end connection, the output end for simulating discharge circuit is connected with the relay being arranged on multiple Measurement channels, simulates amplifier On the other hand the output end of circuit is also connected with the input of preferred circuit;
The preferred circuit includes the modulus isolation circuit for being used to receive the electric signal from simulation discharge circuit output, in mould The output end of number isolation circuit is connected with data acquisition circuit, data processing circuit is connected with after data acquisition circuit, in number Serial communication circuit is connected with according to the output end of process circuit.
Wherein, the electric signal that sample circuit is used to receive specifically includes voltage signal, current signal and pulse signal.
When the electric signal is voltage signal, being provided with the preferred circuit is used to receive simulation discharge circuit output First analog to digital conversion circuit of voltage signal, is connected with the first reference voltage in the input of the first analog to digital conversion circuit and produces electricity Road.
When the electric signal is current signal, being provided with the preferred circuit is used to receive simulation discharge circuit output Second analog to digital conversion circuit of current signal, is connected with the second reference voltage in the input of the second analog to digital conversion circuit and produces electricity Road.
Optionally, the signal drive circuit being connected with the modulus isolation circuit is additionally provided with preferred circuit, signal drives The input of dynamic circuit is connected with switching switch.Signal drive circuit is used to receive the switching signal that switching switch is sent, so that The range switching based on manual intervention can be carried out after remotely monitoring main frame range can not be switched over.
Based on the signal drive circuit proposed above, the modulus isolation circuit being connected with signal drive circuit and data processing Circuit is directly connected to.I.e. modulus isolation circuit rear end is directly connected without data acquisition circuit with data processing circuit, and this is Because the time value that the signal that switching switch is produced need not be produced with crystal oscillator is matched, data processing circuit is transmitted directly to Handled.
Optionally, the current transformer for being used for receiving current signal is provided with sample circuit, the current transformer is External straight-through current transformer with electronic compensation function.
The utility model proposes impact load to the long-range monitoring main frame of electric energy metering error, including housing, and set Observation circuit in housing, observation circuit includes sample circuit, and the preferred circuit being connected with sample circuit.Sample circuit Including the sampling resistor for receiving electric signal, sampling resistor is connected with simulating the input of discharge circuit, simulates discharge circuit Output end on the one hand be connected with the relay being arranged on multiple Measurement channels.Sampled result is entered by simulating discharge circuit Row is calculated, and when result of calculation is more than default range, the switching for realizing range is controlled to relay, it is ensured that can be accurate The parameter value that power supply to be detected exports electric signal is obtained, electric energy meter and loop shape can be obtained in real time relative to prior art The real-time of state detection device, improves the detectability of measuring apparatus.
Each sequence number in above-described embodiment is for illustration only, and the elder generation during the assembling or use of each part is not represented Afterwards sequentially.
Embodiment of the present utility model is the foregoing is only, it is all in the utility model not to limit the utility model Spirit and principle within, any modification, equivalent substitution and improvements made etc. should be included in protection model of the present utility model Within enclosing.

Claims (7)

1. impact load is to the long-range monitoring main frame of electric energy metering error, it is characterised in that the remote detection main frame includes housing, And the observation circuit in housing is arranged on, the observation circuit includes sample circuit, and the standard being connected with sample circuit Circuit;
The sample circuit includes the sampling resistor for being used to receive electric signal, and the input of sampling resistor and simulation discharge circuit connects Connect, on the one hand the output end for simulating discharge circuit is connected with the relay being arranged on multiple Measurement channels, simulates discharge circuit Output end on the other hand be also connected with the input of preferred circuit;
The preferred circuit include be used for receive from simulation discharge circuit output electric signal modulus isolation circuit, modulus every Output end from circuit is connected with data acquisition circuit, and data processing circuit is connected with after data acquisition circuit, at data The output end of reason circuit is connected with serial communication circuit.
2. impact load according to claim 1 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that the electricity Signal includes voltage signal, current signal and pulse signal.
3. impact load according to claim 2 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that when described When electric signal is voltage signal, being provided with the preferred circuit is used to receive the first of simulation discharge circuit output voltage signal Analog to digital conversion circuit, the first reference voltage generating circuit is connected with the input of the first analog to digital conversion circuit.
4. impact load according to claim 2 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that when described When electric signal is current signal, being provided with the preferred circuit is used to receive the second of simulation discharge circuit output current signal Analog to digital conversion circuit, the second reference voltage generating circuit is connected with the input of the second analog to digital conversion circuit.
5. impact load according to claim 1 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that be additionally provided with The signal drive circuit being connected with the modulus isolation circuit, the input of signal drive circuit is connected with switching switch.
6. impact load according to claim 1 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that the mould Number isolation circuit is directly connected to data processing circuit.
7. impact load according to claim 2 is to the long-range monitoring main frame of electric energy metering error, it is characterised in that in sampling The current transformer for being used for receiving current signal is provided with circuit, the current transformer is with the external of electronic compensation function Formula straight-through current transformer.
CN201720123299.9U 2017-02-10 2017-02-10 Impact load is to the long-range monitoring main frame of electric energy metering error Active CN206431219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720123299.9U CN206431219U (en) 2017-02-10 2017-02-10 Impact load is to the long-range monitoring main frame of electric energy metering error

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720123299.9U CN206431219U (en) 2017-02-10 2017-02-10 Impact load is to the long-range monitoring main frame of electric energy metering error

Publications (1)

Publication Number Publication Date
CN206431219U true CN206431219U (en) 2017-08-22

Family

ID=59591179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720123299.9U Active CN206431219U (en) 2017-02-10 2017-02-10 Impact load is to the long-range monitoring main frame of electric energy metering error

Country Status (1)

Country Link
CN (1) CN206431219U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107064669A (en) * 2017-02-10 2017-08-18 国网浙江台州市黄岩区供电公司 Impact load is to the long-range monitoring main frame of electric energy metering error

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107064669A (en) * 2017-02-10 2017-08-18 国网浙江台州市黄岩区供电公司 Impact load is to the long-range monitoring main frame of electric energy metering error

Similar Documents

Publication Publication Date Title
CN102305922B (en) On-load detection method and device for intelligent optical fiber electric energy meter in substation
CN202230150U (en) On-line monitoring intelligent terminal for electric power lightning arrester with fiber for power supply
CN104569902A (en) Digital type electric energy meter power consumption measuring device and method
CN102298099A (en) Power distribution and consumption monitoring and measuring apparatus possessing time calibration function
CN103941079A (en) On-line monitoring and fault diagnosis system for power distribution network PT
CN109470914A (en) A kind of VFTO signal measurement apparatus
CN207114664U (en) A kind of electric energy quality monitoring system
CN106990382A (en) Impact load is to electric energy metering error remote monitoring method
CN202230195U (en) On-load detection device for intelligent optical-fiber electric energy meter in transformer station
CN206431219U (en) Impact load is to the long-range monitoring main frame of electric energy metering error
CN105372620A (en) Power metering detector
CN108896852B (en) Online measurement method and system for short circuit capacity of public access point
CN204556719U (en) A kind of intelligent electric power parameter monitor device
CN107064669A (en) Impact load is to the long-range monitoring main frame of electric energy metering error
CN206773113U (en) A kind of microcomputer comprehensive monitoring protector
CN203551615U (en) Hand-held photoelectric transformer simulator
CN216411535U (en) Distributed deployed portable current transformer polarity detection equipment
CN105223446A (en) Lightning arrester remote online monitoring device
CN212965347U (en) Intelligent distribution line on-line state monitoring terminal
CN103389431A (en) Intelligent on-load comprehensive test device for transformer substation
CN205091421U (en) Synchronous generator winding short circuit alarm device based on negative current
CN204302385U (en) A kind of measurement mechanism of apparatus insulated performance
CN201548607U (en) Resonance overvoltage analyzing system of transformer substation
CN108345243A (en) The digitized measurement tests FT3 to IEC61850-9-2 protocol conversion apparatus
CN208350908U (en) A kind of device measuring Zinc-Oxide Arrester electric property

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant