CN107060808A CN201710302239.8A CN201710302239A CN107060808A CN 107060808 A CN107060808 A CN 107060808A CN 201710302239 A CN201710302239 A CN 201710302239A CN 107060808 A CN107060808 A CN 107060808A
Authority
CN
China
Prior art keywords
anchor
net
canopy
shaped
country rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710302239.8A
Other languages
Chinese (zh)
Inventor
唐致峰
王杰
尹正良
冷光海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Panjiang Refined Coal Co Ltd
Original Assignee
Guizhou Panjiang Refined Coal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Panjiang Refined Coal Co Ltd filed Critical Guizhou Panjiang Refined Coal Co Ltd
Priority to CN201710302239.8A priority Critical patent/CN107060808A/en
Publication of CN107060808A publication Critical patent/CN107060808A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses a kind of New Coal Mine underworkings combined retaining structure and its construction method, it includes internal layer anchor net and anchor cable, there is one layer of outer layer anchor net outside internal layer anchor net, it is one layer of mining thin bamboo strips used for weaving seat outside outer layer anchor net, outer layer anchor net and mining thin bamboo strips used for weaving seat are supported with U-shaped canopy and use steel wire lashing, U-shaped canopy is fixed with U-shaped card, and U-shaped card is fixed on firm country rock body B with anchor cable, and concrete has been poured between internal layer anchor net and outer layer anchor net.It uses the tunnel combined retaining structure of anchor rete cord+U-shaped canopy+concrete+anchor cable, effectively the demand of roadway support can not be met with the increase of mining depth by solving the common bolt-mesh-anchor support used at present or U-shaped canopy and other steel lining structures, there is bolting with wire mesh structure blanket net, anchor pole fails, there is folding beam broken leg in U-shaped canopy supporting construction or bar of stopping breaks the problem of empty top of the empty side of appearance of dropping loses support capacity influence mine safety production, obtains good practical function.

Description

A kind of New Coal Mine underworkings combined retaining structure and its construction method
Technical field
The present invention relates to a kind of New Coal Mine underworkings combined retaining structure and its construction method, belong to underground coal mine lane Road support technology field.
Background technology
According in the existing roadway support of current underground coal mine, wooden support structure has been eliminated, and what is now used is common Bolt-mesh-anchor support or U-shaped canopy and other steel lining structures also can not meet tunnel branch therewith with being continuously increased for mining depth Supporting, anchor net can not be effectively carried out in the soft-rock tunnel of the demand of shield, particularly stress concentration and the tunnel of rock crusher Occurs anchor string bag net in the tunnel of rope supporting, anchor pole, which is broken, folding beam broken leg occurs in supporting failure, the tunnel of U-shaped canopy supporting, stop Bar breaks the serious support issues such as the empty top of the empty side of appearance of dropping, and has badly influenced the safety in production of mine.
The content of the invention
The technical problem to be solved in the present invention is:A kind of New Coal Mine underworkings combined retaining structure and its construction are provided Method, using the tunnel combined retaining structure of anchor rete cord+U-shaped canopy+concrete+anchor cable, effectively solves the common anchor used at present Rete cord supporting or U-shaped canopy and other steel lining structures can not meet the demand of roadway support with the increase of mining depth, go out Existing bolting with wire mesh structure blanket net, anchor pole failure, U-shaped canopy supporting construction appearance folding beam broken leg or bar of stopping break the empty side sky of appearance of dropping The problem of top loses support capacity influence mine safety production.
The technical scheme is that:A kind of New Coal Mine underworkings combined retaining structure, it includes internal layer anchor net And anchor cable, there is one layer of outer layer anchor net outside internal layer anchor net, be one layer of mining thin bamboo strips used for weaving seat outside outer layer anchor net, outer layer anchor net and mining Thin bamboo strips used for weaving seat is supported with U-shaped canopy and uses steel wire lashing, and U-shaped canopy is fixed with U-shaped card, and U-shaped card is fixed on firm country rock body B with anchor cable On, pour concrete between internal layer anchor net and outer layer anchor net.
Internal layer anchor net and outer layer the anchor net reticulates supporting thing using reinforcement welding, and its mesh is square, the length of side For 80~120mm.
The anchor cable is arranged in anchor hole, and is fixed on Anchor Agent on firm country rock body B, anchor cable it is a diameter of 21.6mm, its tensile strength is not less than 1770Mpa, and the anchoring strength of Anchor Agent is more than 25Mpa.
Anchorage length of the anchor cable in firm country rock body B is not less than 2m.
The U-shaped canopy is the U-shaped canopy of arch of the basket handle arch using the processing of 29#U shaped steel, and canopy is away from for 350~450mm.
The aperture of the anchor hole is that array pitch is 700~900mm between φ 25mm, anchor hole.
The intensity of the concrete is not less than 40Mpa.
A kind of New Coal Mine underworkings combined retaining structure, its construction method and step are:
(One)First reach that the tunnel of design is broken through expanding span length and height after side caunches on soft or broken country rock body A Face, in advance from perforate on soft or broken country rock body A, construction bores anchor hole to complete country rock body B;
(Two)Anchor Agent is encased in B sections of the complete country rock body of anchor hole bottom section by section using anchor cable, by anchor pole machine equipment by anchor Rope, which is installed to rotation anchor cable in anchor hole and punctures Anchor Agent and stir, solidifies Anchor Agent, by the end of anchor cable and complete country rock Body B anchor connections are together;
(Three)Hang up internal layer anchor net and fasten anchor cable and carry out the broken country rock body A of supporting;
(Four)Install U-shaped canopy in the anchor rete cord drift section inner sleeve canopy of supporting, make the U-shaped canopy external periphery outline face that installs with At least 500mm space between the anchor rete cord tunnel contoured surface of supporting;
(Five)Lay outer layer anchor net and mining thin bamboo strips used for weaving seat on the outer peripheral contoured surface of U-shaped canopy, and with iron wire by outer layer anchor net It is fixed on the binding of mining thin bamboo strips used for weaving seat on U-shaped canopy;
(Six)Formed between U-shaped canopy external periphery outline face and the anchor rete cord tunnel contoured surface of supporting in the space of a closing Pour concrete;
(Seven)Apart from the respectively construction 2 of 300~500mm of roadway floor position and capplce middle on the canopy leg for the U-shaped canopy being arranged The anchor cable of same specification, and U-shaped canopy is fixed on firm country rock body B by U-shaped card, and capplce leg strengthening supporting is formed into one kind The integer support form of combined supporting.
The beneficial effects of the invention are as follows:Compared with prior art, the present invention uses the connection of anchor rete cord+U-shaped canopy+concrete+anchor cable Supporting construction is closed, in the case of directly carrying out supporting to soft rock or breaking surrounding rock body by anchor rete cord, U-shaped canopy is arranged and U-shaped Lay in the closing space formed between bar-mat reinforcement and mining thin bamboo strips used for weaving seat and bolt-mesh-anchor support contoured surface and pour on the outward flange of canopy Concrete, while constructed respectively on the capplce leg of U-shaped canopy anchor cable and carries out secondary supporting to soft rock or breaking surrounding rock body, simultaneously Anchor cable generates certain pretightning force to U-shaped canopy, can reduce the deflection of U-shaped canopy;This combined supporting form make use of U-shaped canopy and Concrete support is strengthened the advantage of soft rock or breaking surrounding rock tunnel energy at initial stage effective support using bolt-mesh-anchor support and anchor cable again The active support relation formed between supporting and complete rock stratum, the complementary passive protecting situation of U-shaped canopy and concrete support, has There is blanket net in the anchor net supporting roadway that solves of effect, and anchor pole failure and U-shaped canopy supported laneway folding beam broken leg, bar of stopping occur and dropped There is the problem of empty top of empty side loses support capacity influence mine safety production.Technology construction is relatively simple, and underground is easily grasped Make, supporting effect substantially, the length of service in tunnel is extended on the basis of original roadway support, is provided for the safety in production of mine Sound assurance, obtains good practical function.
Brief description of the drawings
A kind of structural representations of New Coal Mine underworkings combined retaining structure of Fig. 1;
A kind of New Coal Mine underworkings combined retaining structure A-A sectional views of Fig. 2;
A kind of New Coal Mine underworkings combined retaining structure B-B sectional views of Fig. 3;
It is designated in figure:1st, internal layer anchor net, 2, anchor cable, 3, Anchor Agent, 4, country rock body B, 5, anchor hole, 6, country rock body A, 7, U-shaped canopy, 8th, mining thin bamboo strips used for weaving seat, 9, concrete, 10, outer layer anchor net, 11, U-shaped card.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below with reference to this specification accompanying drawing to this hair It is bright to be described in further detail.
Embodiment 1:A kind of New Coal Mine underworkings combined retaining structure, it includes internal layer anchor net 1 and anchor cable 2, It is one layer of mining thin bamboo strips used for weaving seat 8 that internal layer anchor net 1 is outer, which to be also had outside one layer of outer layer anchor net 10, outer layer anchor net 10, outer layer anchor net 10 and mining Thin bamboo strips used for weaving seat 8 is supported with U-shaped canopy 7 and uses steel wire lashing, and U-shaped canopy 7 is fixed with U-shaped card 11, and U-shaped card 11 is fixed on firmly with anchor cable 2 Country rock body B6 on, poured concrete 9 between internal layer anchor net 1 and outer layer anchor net 10.
The internal layer anchor net 1 and outer layer anchor net 10 reticulate supporting thing using reinforcement welding, and its mesh is square, side A length of 80~120mm.In the present embodiment, internal layer anchor net 1 and outer layer anchor net 10 use φ 6.5mm reinforcement welding established practice Lattice are length × wide=1790 × 890mm net support thing, and its mesh specification is length × wide=100 × 100mm.
The anchor cable 2 is arranged in anchor hole 5, and is fixed on Anchor Agent 3 on firm country rock body B6, the diameter of anchor cable 2 For 21.6mm, its tensile strength is 1900Mpa, and the anchoring strength of Anchor Agent 3 is 30Mpa.
Anchorage length of the anchor cable 2 in firm country rock body B6 is 2.2m.
The U-shaped canopy 7 is the U-shaped canopy of arch of the basket handle arch using the processing of 29#U shaped steel, and canopy is away from for 350mm.
The aperture of the anchor hole 5 is that array pitch is 700mm between φ 25mm, anchor hole 5.
The intensity of the concrete 9 is 45Mpa.
A kind of New Coal Mine underworkings combined retaining structure, its construction method and step are:
(One)First reach that the tunnel of design is broken through expanding span length and height after side caunches on soft or broken country rock body A4 Face, in advance from perforate on soft or broken country rock body A4, construction bores anchor hole 5 to complete country rock body B6;
(Two)Anchor Agent 3 is encased in B6 sections of the complete country rock body of the bottom of anchor hole 5 section by section using anchor cable 2, passes through anchor pole machine equipment Being installed to rotation anchor cable 2 in anchor hole 5 and puncture Anchor Agent 3 and stir anchor cable 2 solidifies Anchor Agent 3, by the end of anchor cable 2 Together with complete country rock body B6 anchor connections;
(Three)Hang up internal layer anchor net 1 and fasten anchor cable 2 and carry out the broken country rock body A4 of supporting;
(Four)Install U-shaped canopy 7 in the anchor rete cord drift section inner sleeve canopy of supporting, make the external periphery outline face of U-shaped canopy 7 that installs with At least 500mm space between the anchor rete cord tunnel contoured surface of supporting;
(Five)Lay outer layer anchor net 10 and mining thin bamboo strips used for weaving seat 8 on the outer peripheral contoured surface of U-shaped canopy 7, and with iron wire by outer layer Anchor net 10 and the binding of mining thin bamboo strips used for weaving seat 8 are fixed on U-shaped canopy 7;
(Six)The space of a closing is formed between the U-shaped external periphery outline face of canopy 7 and the anchor rete cord tunnel contoured surface of supporting Interior pouring concrete 9;
(Seven)Apart from roadway floor 300mm position and capplce middle, respectively construction 2 is same on the canopy leg for the U-shaped canopy 7 being arranged The anchor cable 2 of control gauge lattice, and U-shaped canopy 7 is fixed on firm country rock body B6 by U-shaped card 11, by capplce leg strengthening supporting formation one Plant the integer support form of combined supporting.
Embodiment 2:A kind of New Coal Mine underworkings combined retaining structure, it includes internal layer anchor net 1 and anchor cable 2, It is one layer of mining thin bamboo strips used for weaving seat 8 that internal layer anchor net 1 is outer, which to be also had outside one layer of outer layer anchor net 10, outer layer anchor net 10, outer layer anchor net 10 and mining Thin bamboo strips used for weaving seat 8 is supported with U-shaped canopy 7 and uses steel wire lashing, and U-shaped canopy 7 is fixed with U-shaped card 11, and U-shaped card 11 is fixed on firmly with anchor cable 2 Country rock body B6 on, poured concrete 9 between internal layer anchor net 1 and outer layer anchor net 10.
The internal layer anchor net 1 and outer layer anchor net 10 reticulate supporting thing using reinforcement welding, and its mesh is square, side A length of 80~120mm.In the present embodiment, internal layer anchor net 1 and outer layer anchor net 10 use φ 6.5mm reinforcement welding established practice Lattice are length × wide=1790 × 890mm net support thing, and its mesh specification is length × wide=120 × 120mm.
The anchor cable 2 is arranged in anchor hole 5, and is fixed on Anchor Agent 3 on firm country rock body B6, the diameter of anchor cable 2 For 21.6mm, its tensile strength is 1800Mpa, and the anchoring strength of Anchor Agent 3 is 30Mpa.
Anchorage length of the anchor cable 2 in firm country rock body B6 is 3m.
The U-shaped canopy 7 is the U-shaped canopy of arch of the basket handle arch using the processing of 29#U shaped steel, and canopy is away from for 450mm.
The aperture of the anchor hole 5 is that array pitch is 900mm between φ 25mm, anchor hole 5.
The intensity of the concrete 9 is 50Mpa.
A kind of New Coal Mine underworkings combined retaining structure, its construction method and step are:
(One)First reach that the tunnel of design is broken through expanding span length and height after side caunches on soft or broken country rock body A4 Face, in advance from perforate on soft or broken country rock body A4, construction bores anchor hole 5 to complete country rock body B6;
(Two)Anchor Agent 3 is encased in B6 sections of the complete country rock body of the bottom of anchor hole 5 section by section using anchor cable 2, passes through anchor pole machine equipment Being installed to rotation anchor cable 2 in anchor hole 5 and puncture Anchor Agent 3 and stir anchor cable 2 solidifies Anchor Agent 3, by the end of anchor cable 2 Together with complete country rock body B6 anchor connections;
(Three)Hang up internal layer anchor net 1 and fasten anchor cable 2 and carry out the broken country rock body A4 of supporting;
(Four)Install U-shaped canopy 7 in the anchor rete cord drift section inner sleeve canopy of supporting, make the external periphery outline face of U-shaped canopy 7 that installs with At least 500mm space between the anchor rete cord tunnel contoured surface of supporting;
(Five)Lay outer layer anchor net 10 and mining thin bamboo strips used for weaving seat 8 on the outer peripheral contoured surface of U-shaped canopy 7, and with iron wire by outer layer Anchor net 10 and the binding of mining thin bamboo strips used for weaving seat 8 are fixed on U-shaped canopy 7;
(Six)The space of a closing is formed between the U-shaped external periphery outline face of canopy 7 and the anchor rete cord tunnel contoured surface of supporting Interior pouring concrete 9;
(Seven)Apart from roadway floor 500mm position and capplce middle, respectively construction 2 is same on the canopy leg for the U-shaped canopy 7 being arranged The anchor cable 2 of control gauge lattice, and U-shaped canopy 7 is fixed on firm country rock body B6 by U-shaped card 11, by capplce leg strengthening supporting formation one Plant the integer support form of combined supporting.

Claims (8)

1. a kind of New Coal Mine underworkings combined retaining structure, it includes internal layer anchor net(1)And anchor cable(2), its feature exists In:In internal layer anchor net(1)There is one layer of outer layer anchor net outside(10), outer layer anchor net(10)It is one layer of mining thin bamboo strips used for weaving seat outside(8), outer layer Anchor net(10)With mining thin bamboo strips used for weaving seat(8)Use U-shaped canopy(7)Support and use steel wire lashing, U-shaped canopy(7)Use U-shaped card(11)It is fixed, it is U-shaped Card(11)Use anchor cable(2)It is fixed on firm country rock body B(6)On, in internal layer anchor net(1)With outer layer anchor net(10)Between poured concrete (9).
2. a kind of New Coal Mine underworkings combined retaining structure according to claim 1, it is characterised in that:The internal layer Anchor net(1)With outer layer anchor net(10)Supporting thing being reticulated using reinforcement welding, its mesh is square, the length of side is 80~ 120mm。
3. a kind of New Coal Mine underworkings combined retaining structure according to claim 1, it is characterised in that:The anchor cable (2)Installed in anchor hole(5)It is interior, and use Anchor Agent(3)It is fixed on country rock body(6)On, anchor cable(2)A diameter of 21.6mm, its resist Tensile strength is not less than 1770Mpa, Anchor Agent(3)Anchoring strength be more than 25Mpa.
4. a kind of New Coal Mine underworkings combined retaining structure according to claim 1 or 3, it is characterised in that:It is described Anchor cable(2)In country rock body(6)In anchorage length be not less than 2m.
5. a kind of New Coal Mine underworkings combined retaining structure according to claim 1, it is characterised in that:It is described U-shaped Canopy(7)For the U-shaped canopy of arch for the basket handle arch processed using 29#U shaped steel, canopy is away from for 350~450mm.
6. a kind of New Coal Mine underworkings combined retaining structure according to claim 3, it is characterised in that:The anchor hole (5)Aperture be φ 25mm, anchor hole(5)Between array pitch be 700~900mm.
7. a kind of New Coal Mine underworkings combined retaining structure according to claim 1, it is characterised in that:The concrete (9)Intensity be not less than 40Mpa.
8. any one New Coal Mine underworkings combined retaining structure, its feature according to claims 1 to 3,5~7 It is:Its construction method and step are:
(One)First in soft or broken country rock body A(4)On reach the tunnel of design through expanding span length and height after side caunches Section, in advance from soft or broken country rock body A(4)Anchor hole is bored in upper perforate, construction(5)To complete country rock body B(6)On;
(Two)Utilize anchor cable(2)By Anchor Agent(3)Anchor hole is encased in section by section(5)The complete country rock body B of bottom(6)Section, passes through anchor Bar machine equipment is by anchor cable(2)It is installed to anchor hole(5)Interior rotation anchor cable(2)Puncture Anchor Agent(3)And stir and make Anchor Agent(3) Solidification, by anchor cable(2)End and complete country rock body(6)Anchor connection is together;
(Three)Hang up internal layer anchor net(1)And fasten anchor cable(2)Carry out the broken country rock body A of supporting(4);
(Four)U-shaped canopy is installed in the anchor rete cord drift section inner sleeve canopy of supporting(7), make the U-shaped canopy installed(7)External periphery outline At least 500mm space between the anchor rete cord tunnel contoured surface of face and supporting;
(Five)In U-shaped canopy(7)Outer peripheral contoured surface on lay outer layer anchor net(10)With mining thin bamboo strips used for weaving seat(8), and use iron wire By outer layer anchor net(10)With mining thin bamboo strips used for weaving seat(8)Binding is fixed on U-shaped canopy(7)On;
(Six)In U-shaped canopy(7)The sky of a closing is formed between the anchor rete cord tunnel contoured surface of external periphery outline face and supporting It is interior to pour concrete(9);
(Seven)In the U-shaped canopy being arranged(7)Canopy leg on respectively applied apart from 300~500mm of roadway floor position and capplce middle The anchor cable of the same specification of work 2(2), and U-shaped card(11)By U-shaped canopy(7)It is fixed on firm country rock body B(6)On, by capplce leg Strengthening supporting forms a kind of integer support form of combined supporting.
CN201710302239.8A 2017-05-02 2017-05-02 A kind of New Coal Mine underworkings combined retaining structure and its construction method Pending CN107060808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710302239.8A CN107060808A (en) 2017-05-02 2017-05-02 A kind of New Coal Mine underworkings combined retaining structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710302239.8A CN107060808A (en) 2017-05-02 2017-05-02 A kind of New Coal Mine underworkings combined retaining structure and its construction method

Publications (1)

Publication Number Publication Date
CN107060808A true CN107060808A (en) 2017-08-18

Family

ID=59595933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710302239.8A Pending CN107060808A (en) 2017-05-02 2017-05-02 A kind of New Coal Mine underworkings combined retaining structure and its construction method

Country Status (1)

Country Link
CN (1) CN107060808A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472807A (en) * 2020-04-08 2020-07-31 北京科技大学 Tunnel or tunnel surrounding rock shielding and protecting structure and method
CN113494305A (en) * 2020-04-06 2021-10-12 永城煤电控股集团有限公司 Construction method of shotcrete anchor net for roadway surrounding rock support

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201254996Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 Tunnel composite supporting construction
CN201254995Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 U-shaped composite supporting construction for tunnel
CN103174435A (en) * 2013-02-26 2013-06-26 中国矿业大学(北京) Roadway support method adopting U-shaped canopy frame support structure body
CN103615259A (en) * 2013-12-06 2014-03-05 中国矿业大学(北京) Structure and method for anchor net cable-shape steel support coupling supporting
CN204572023U (en) * 2015-04-30 2015-08-19 贵州盘江精煤股份有限公司 A kind of colliery tunnel support structure
CN105041353A (en) * 2015-08-17 2015-11-11 河南理工大学 Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN105569699A (en) * 2015-12-22 2016-05-11 大同煤矿集团有限责任公司 Inclined shaft development support technology for isolated coal pillar
CN106089271A (en) * 2016-08-17 2016-11-09 国投新集能源股份有限公司 A kind of tunnel filling formula composite support and construction method thereof
CN205858371U (en) * 2016-07-01 2017-01-04 河南理工大学 A kind of colliery big cross section digging laneway combined support structure
CN106593467A (en) * 2016-11-09 2017-04-26 大唐陇东能源有限公司 Supporting method for underground soft rock roadway of coal mine
CN206801575U (en) * 2017-05-02 2017-12-26 贵州盘江精煤股份有限公司 A kind of New Coal Mine underworkings combined retaining structure
CN111271077A (en) * 2019-05-03 2020-06-12 石家庄国盛矿业科技有限公司 High-ground-stress three-soft-roadway surrounding rock bolting-grouting combined reinforcement method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201254996Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 Tunnel composite supporting construction
CN201254995Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 U-shaped composite supporting construction for tunnel
CN103174435A (en) * 2013-02-26 2013-06-26 中国矿业大学(北京) Roadway support method adopting U-shaped canopy frame support structure body
CN103615259A (en) * 2013-12-06 2014-03-05 中国矿业大学(北京) Structure and method for anchor net cable-shape steel support coupling supporting
CN204572023U (en) * 2015-04-30 2015-08-19 贵州盘江精煤股份有限公司 A kind of colliery tunnel support structure
CN105041353A (en) * 2015-08-17 2015-11-11 河南理工大学 Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN105569699A (en) * 2015-12-22 2016-05-11 大同煤矿集团有限责任公司 Inclined shaft development support technology for isolated coal pillar
CN205858371U (en) * 2016-07-01 2017-01-04 河南理工大学 A kind of colliery big cross section digging laneway combined support structure
CN106089271A (en) * 2016-08-17 2016-11-09 国投新集能源股份有限公司 A kind of tunnel filling formula composite support and construction method thereof
CN106593467A (en) * 2016-11-09 2017-04-26 大唐陇东能源有限公司 Supporting method for underground soft rock roadway of coal mine
CN206801575U (en) * 2017-05-02 2017-12-26 贵州盘江精煤股份有限公司 A kind of New Coal Mine underworkings combined retaining structure
CN111271077A (en) * 2019-05-03 2020-06-12 石家庄国盛矿业科技有限公司 High-ground-stress three-soft-roadway surrounding rock bolting-grouting combined reinforcement method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
丁家贵;: "巷道"锚网索喷"+钢管混凝土支架支护技术" *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113494305A (en) * 2020-04-06 2021-10-12 永城煤电控股集团有限公司 Construction method of shotcrete anchor net for roadway surrounding rock support
CN111472807A (en) * 2020-04-08 2020-07-31 北京科技大学 Tunnel or tunnel surrounding rock shielding and protecting structure and method
CN111472807B (en) * 2020-04-08 2020-12-22 北京科技大学 Tunnel or tunnel surrounding rock shielding and protecting structure and method

Similar Documents

Publication Publication Date Title
CN106320346B (en) Campshed adds anchor cable grouting behind shaft or drift lining deep foundation pit supporting construction method
CN106593497B (en) A kind of coal working face crosses crossheading caving place supporting processing method
CN205663447U (en) Novel anchor net spouts compound supporting construction
CN105201514B (en) A kind of water-bearing stratum shaft wall structure and construction method
CN104895072B (en) A kind of prestress anchorage cable and prestress anchorage cable one-pass molding construction method
CN205778903U (en) A kind of soft-rock tunnel pucking preventing and treating device
CN107747493A (en) Roadway floor prestress anchorage cable group coordinates ruggedized construction and construction method with slip casting
CN102635377A (en) Tensile reinforcement concrete spray body supporting method for deep soft roadway
CN104389628A (en) Landslide section tunnel reinforcing device and reinforcing construction method
CN108330965A (en) The anchor of civil construction
CN102797478A (en) Method for preventing bottom squeeze of soft rock roadway by using distributed shear-resistant slip-resistant reinforced concrete pile
CN106996299A (en) Control the steel floral tube pile retaining structure and its construction method of tunnel biased deformation
CN107060808A (en) A kind of New Coal Mine underworkings combined retaining structure and its construction method
CN104533483A (en) Roadway total-space prestress truss, anchor cable and anchor rod coordinated supporting method
CN103806451B (en) A kind of anchorage type foundation ditch strengthening structure and construction method thereof
CN110847195A (en) Construction method for stable treatment of side and upward slope of large-block-diameter loose rock pile body opening
CN203614107U (en) Composite retaining structure for horsehead
CN107795322B (en) Assembled concrete arc plate and chessboard type prestressed anchor cable composite supporting structure and construction method thereof
CN207673349U (en) A kind of assembled supporting construction of chessboard distribution anchor cable and concrete slab
CN206801575U (en) A kind of New Coal Mine underworkings combined retaining structure
CN106194213B (en) A kind of shed hole structure and construction method across debris flow gully
CN106894826A (en) The supporting construction and method for protecting support of section of being caved in a kind of hole
CN107542086B (en) Anchor cable construction method for filling slope
CN109958454A (en) Stope drift active workings pucking control system and its control method
CN210948737U (en) Efficient and rapid tunneling roadway support facility for inclined small-section half-coal-rock roadway with thin coal seam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818