CN107060140A - A kind of prefabricated assembled double steel pipe concrete shear force wall and its assembly method - Google Patents

A kind of prefabricated assembled double steel pipe concrete shear force wall and its assembly method Download PDF

Info

Publication number
CN107060140A
CN107060140A CN201710373977.1A CN201710373977A CN107060140A CN 107060140 A CN107060140 A CN 107060140A CN 201710373977 A CN201710373977 A CN 201710373977A CN 107060140 A CN107060140 A CN 107060140A
Authority
CN
China
Prior art keywords
steel pipe
concrete
concrete walls
shear force
force wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710373977.1A
Other languages
Chinese (zh)
Other versions
CN107060140B (en
Inventor
周靖
方小丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201710373977.1A priority Critical patent/CN107060140B/en
Publication of CN107060140A publication Critical patent/CN107060140A/en
Priority to AU2017415961A priority patent/AU2017415961B2/en
Priority to PCT/CN2017/115600 priority patent/WO2018214477A1/en
Application granted granted Critical
Publication of CN107060140B publication Critical patent/CN107060140B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/562Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with fillings between the load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a kind of prefabricated assembled double steel pipe concrete shear force wall and its assembly method;Including the outer steel pipe being embedded in concrete walls;It is embedded in the bar-mat reinforcement constituted that interweaved by steel tie, vertical distribution bar and horizontal distribution reinforcing bar in concrete walls;The upper and lower part of concrete walls is stretched out in the upper and lower side of the outer steel pipe, part;The internal sleeve of the outer steel pipe is provided with interior steel pipe;The interior steel duct is filled with high-strength concrete column;The outer steel pipe stretches out the part of concrete walls with interior steel pipe, extends radially through fixation by cross bolts, the relative motion for preventing axial and circumferential between the two.This double steel pipe concrete shear force wall have vertical connection it is quick it is reliable, construction technology is simple, level shear capacity is high, good integrity, lateral stability high, anti-seismic performance is good, the construction period is short, most of component can standardized production.

Description

A kind of prefabricated assembled double steel pipe concrete shear force wall and its assembly method
Technical field
The present invention relates to belonging to prefabricated assembled concrete technical field of structures in Structural Engineering, more particularly to it is a kind of prefabricated Assembled double steel pipe concrete shear force wall and its assembly method.
Background technology
Seam interconnection technique is the key technology for ensureing prefabricated assembled concrete structural integrity and anti-seismic performance.Tradition Prefabricated assembled shear wall or prefabricated assembled concrete-filled steel tube shear wall horizontal joint are mainly filled using the sleeve of vertical reinforcement Slurry or slurry anchor overlap joint connection, the more complicated, construction process requirement of Vertical bar connection construction is high, assembling Quality Control difficulty is big, Duration is longer, cost is high, it is impossible to give full play to the advantage of fabricated shear wall structure, building height is very limited;Also have Using design of the steel core concrete column as connection, but steel pipe is non-penetrating to be continuously rigidly connected, it is difficult to which volatilize steel tube concrete The bending resistance of the embedded post of soil, eccentric stability is not high outside strong, face for the globality of structure, so as to seriously reduce assembled steel tube The anti-seismic performance of concrete shear force wall.
The country has carried out phase to prefabricated assembled steel pipe concrete frame shear wall and its Vertical bar connection method at present Research is closed, but a kind of the technical side of prefabricated assembled globality and lateral stability can be fundamentally significantly changed without proposition Method, the anti-seismic performance of prefabricated assembled steel pipe concrete frame shear wall structure is limited by horizontal joint interconnection technique.High level knot Structure prefabrication and assembly construction rate is to weigh the important indicator of following China building industrialization development level, develops and proposes to adapt in high level Even the prefabricated assembled shear wall of super high rise structure turns into active demand.
The content of the invention
It is an object of the invention to the shortcoming and defect for overcoming above-mentioned prior art, there is provided a kind of prefabricated assembled double steel pipe Concrete shear force wall and its assembly method.With vertical connection it is quick it is reliable, construction technology is simple, level shear capacity is high, Good integrity, lateral stability are high, anti-seismic performance is good, the construction period is short, most of component can standardized production.
The present invention is achieved through the following technical solutions:
A kind of prefabricated assembled double steel pipe concrete shear force wall, including such as lower component:
It is embedded in the outer steel pipe 3 in concrete walls 4;
It is embedded in concrete walls 4 and interweaves what is constituted by steel tie 9, vertical distribution bar 7 and horizontal distribution reinforcing bar 8 Bar-mat reinforcement;
The upper and lower part of concrete walls 4 is stretched out in the upper and lower side of the outer steel pipe 3, part;
The internal sleeve of the outer steel pipe 3 is provided with interior steel pipe 1;The inside of interior steel pipe 1 is filled with high-strength concrete column 2;
The outer steel pipe 3 stretches out the part of concrete walls 4 with interior steel pipe 1, and fixation is extended radially through by cross bolts 11, uses In preventing the relative motion of axial and circumferential between the two.
The outer steel pipe 3 has some, in a row and spaced be embedded in concrete walls 4.
The outer wall of the outer steel pipe 3, has some anti-shear ring muscle 10 along the outer axial directional distribution of steel pipe 3.
The bottom interval of the concrete walls 4 is embedded with multiple vertical reinforcement sleeves 6, and top interval is embedded with multiple vertical Connect reinforcing bar 5.
The partial-length that the outer steel pipe 3 stretches out concrete walls 4 with interior steel pipe 1 is 80mm~120mm.
Spacing distance between each anti-shear ring muscle 10 is 500mm~1000mm.
Assembly method of the prefabricated assembled double steel pipe concrete shear force wall in construction is as follows:
The installation of the concrete walls 4 of first layer:
Concrete walls 4 are consolidated on the cast-in-place reinforced concrete foundation of ground;
Outside the bottom of concrete walls 4 in the exposed parts embedment reinforced concrete foundation of steel pipe 3;
The installation of the concrete walls 4 of the second layer:
The vertical reinforcement sleeve 6 of the bottom of concrete walls 4 of the second layer is connected with the vertical of the top of concrete walls 4 of first layer Connect reinforcing bar 5 to dock, i.e., vertical reinforcement sleeve 6 is inserted in vertical connection reinforcing bar 5, and now outer steel pipe 3 and interior steel pipe 1 are aligned, then Their joint is welded, and the part of concrete walls 4 is stretched out in outer steel pipe 3 and interior steel pipe 1, is passed through by the radial direction of cross bolts 11 It is fixed to fasten, and prevents the relative motion of axial and circumferential between the two;
The installation of floor:
Between the upper limb face of the concrete walls 4 of first layer, the i.e. concrete walls of first layer and the second layer, floor is installed 12 pre-erection, the precast reinforced and concrete walls 4 of the end of floor 12 are connected;In first layer and the concrete of the second layer Joining place between wall 4 and floor 12, concrete perfusion completes the construction of seat pulp layer, while the cast-in-place part of floor 12 is completed, The upper and lower concrete walls 4 adjacent with floor 12 are made to form entirety;Circulate successively, complete the prefabricated assembled double steel pipe of full wafer Concrete shear force wall.
After the assembling for often completing 2 to 3 floor plates, concrete perfusion in inside steel pipe 1, by that analogy.
The present invention has the following advantages and effect relative to prior art:
The assembled double steel pipe concrete shear force wall of " partial precast, part are cast-in-place ", the interior steel made with " part is cast-in-place " Pipe 1 and its interior high-strength concrete column 2 make prefabricated mixed as the part for connecting " partial precast " concrete shear force wall above and below adjacent Solidifying soil shear wall module formation one it is complete be sleeved on steel pipe high strength concrete column reinforcing it is overall, so as to significantly improve concrete Resistance to compression stability outside the globality of native shear wall structure, face;The continuous steel pipe high strength concrete column reinforcing of insertion have higher resistance to compression, Shearing resistance and bending resistance, can significantly improve the horizontal shear strength and bending resistance energy of precast concrete shear wall level connection joint seam crossing Power;Due to improving globality, resistance to compression stability, precast concrete shear wall has good energy consumption ability, redundancy bullet Plastic deformation ability, gives full play to concrete shear force wall advantage in high-level structure application, improves prefabricated assembled shear wall knot The construction height of structure;Using insertion steel pipe high strength concrete column reinforcing, reduce and even cancel vertical connection reinforcing bar, simplify construction technology, Ensure prefabricated assembled concrete shear wall construction quality.
Brief description of the drawings
Fig. 1 is the cross-sectional view of prefabricated assembled double steel pipe concrete shear force wall of the invention.
Fig. 2 is the schematic cross-section of outer steel pipe 3 and interior steel pipe 1.
Fig. 3 is Fig. 1 B-B cross-sectional views.
Fig. 4 is outer and inner tube connection close-up schematic view between the concrete walls 4 of the upper and lower;F represents weldering in figure Seam.
Fig. 5 is Fig. 4 C-C cross-sectional views.
Embodiment
The present invention is more specifically described in detail with reference to specific embodiment.
Embodiment
As shown in Fig. 1 to 5.The invention discloses a kind of prefabricated assembled double steel pipe concrete shear force wall, including it is embedded in Outer steel pipe 3 in concrete walls 4 (precast concrete shear wall);Be embedded in concrete walls 4 by steel tie 9, vertical point The bar-mat reinforcement that cloth reinforcing bar 7 and the intertexture of horizontal distribution reinforcing bar 8 are constituted;
The upper and lower part of concrete walls 4 is stretched out in the upper and lower side of the outer steel pipe 3, part;
The internal sleeve of the outer steel pipe 3 is provided with interior steel pipe 1;The inside of interior steel pipe 1 is filled with high-strength concrete column 2;
The outer steel pipe 3 stretches out the part of concrete walls 4 with interior steel pipe 1, and fixation is extended radially through by cross bolts 11, uses In preventing the relative motion of axial and circumferential between the two.
The outer steel pipe 3 has some, in a row and spaced be embedded in concrete walls 4.
The outer wall of the outer steel pipe 3, has some anti-shear ring muscle 10 along the outer axial directional distribution of steel pipe 3.
The bottom interval of the concrete walls 4 is embedded with multiple vertical reinforcement sleeves 6, and top interval is embedded with multiple vertical Connect reinforcing bar 5.
The partial-length that the outer steel pipe 3 stretches out concrete walls 4 with interior steel pipe 1 is 80mm~120mm.
Spacing distance between each anti-shear ring muscle 10 is 500mm~1000mm.
Concrete column in interior steel pipe 1 pours for job site.Outer steel pipe 3 is arranged with the spacing of its 2~6 times of diameters.
The concrete shear force wall of the outer steel pipe of the peripheral band is prefabricated in the factory, and transports scene splicing, configures vertical within the walls The two panels bar-mat reinforcement that distribution bar 7 and horizontal distribution reinforcing bar 8 are constituted, with the drawknot two panels bar-mat reinforcement of steel tie 9, concrete walls 4 The pre-buried a small amount of vertical connection reinforcing bar 5 in top, the reserved a small amount of vertical connection reinforced bar sleeve 6 in bottom, grout hole is reserved in wall bottom, embedding The outer steel pipe 3 for entering concrete walls 4 is welded outside anti-shear ring muscle 10, embedded wall every 500mm~1000mm spacing in circumference patch Steel pipe 3 is synchronous with concrete walls 4 prefabricated, and outer steel pipe 3 stretches out lower edge face 80mm~120mm on wall, and reserved cross bolts 11 Fastener hole, outer steel pipe 3 is easy to the concrete column of interior steel pipe to pass through and has enough sliding spaces.
Assembly method of the prefabricated assembled double steel pipe concrete shear force wall of the present invention in construction is as follows:
The installation of the concrete walls 4 of first layer:
Concrete walls 4 are consolidated on the cast-in-place reinforced concrete foundation of ground;
Outside the bottom of concrete walls 4 in the exposed parts embedment reinforced concrete foundation of steel pipe 3;
The installation of the concrete walls 4 of the second layer:
The vertical reinforcement sleeve 6 of the bottom of concrete walls 4 of the second layer is connected with the vertical of the top of concrete walls 4 of first layer Connect reinforcing bar 5 to dock, i.e., vertical reinforcement sleeve 6 is inserted in vertical connection reinforcing bar 5, and now outer steel pipe 3 and interior steel pipe 1 are aligned, then Their joint is welded, and the part of concrete walls 4 is stretched out in outer steel pipe 3 and interior steel pipe 1, is passed through by the radial direction of cross bolts 11 It is fixed to fasten, and prevents the relative motion of axial and circumferential between the two;
The installation of floor (Prefabricated stacking floor):
Between the upper limb face of the concrete walls 4 of first layer, the i.e. concrete walls of first layer and the second layer, floor is installed 12 pre-erection, the precast reinforced and concrete walls 4 of the end of floor 12 are connected;In first layer and the concrete of the second layer Joining place between wall 4 and floor 12, concrete perfusion completes the construction of seat pulp layer, while the cast-in-place part of floor 12 is completed, The upper and lower concrete walls 4 adjacent with floor 12 are made to form entirety;Circulate successively, complete the prefabricated assembled double steel pipe of full wafer Concrete shear force wall.
After the assembling for often completing 2 to 3 floor plates, concrete perfusion in inside steel pipe 1, by that analogy.
As described above, the present invention can be better realized.
Embodiments of the present invention are simultaneously not restricted to the described embodiments, other any Spirit Essences without departing from the present invention With the change made under principle, modification, replacement, combine, simplify, should be equivalent substitute mode, be included in the present invention Within protection domain.

Claims (8)

1. a kind of prefabricated assembled double steel pipe concrete shear force wall, it is characterised in that including such as lower component:
It is embedded in the outer steel pipe (3) in concrete walls (4);
Be embedded in concrete walls (4) by steel tie (9), vertical distribution bar (7) and horizontal distribution reinforcing bar (8) intertexture structure Into bar-mat reinforcement;
The upper and lower part of concrete walls (4) is stretched out in the upper and lower side of the outer steel pipe (3), part;
The internal sleeve of the outer steel pipe (3) is provided with interior steel pipe (1);High-strength concrete column is filled with inside the interior steel pipe (1) (2);
The outer steel pipe (3) stretches out the part of concrete walls (4) with interior steel pipe (1), is extended radially through by cross bolts (11) solid It is fixed, the relative motion for preventing axial and circumferential between the two.
2. prefabricated assembled double steel pipe concrete shear force wall according to claim 1, it is characterised in that:The outer steel pipe (3) There are some, it is in a row and spaced be embedded in concrete walls (4).
3. prefabricated assembled double steel pipe concrete shear force wall according to claim 2, it is characterised in that:The outer steel pipe (3) Outer wall, have some anti-shear ring muscle (10) along outer steel pipe (3) axial directional distribution.
4. prefabricated assembled double steel pipe concrete shear force wall according to claim 3, it is characterised in that:The concrete walls (4) bottom interval is embedded with multiple vertical reinforcement sleeves (6), and top interval is embedded with multiple vertical connection reinforcing bars (5).
5. prefabricated assembled double steel pipe concrete shear force wall according to claim 4, it is characterised in that:The outer steel pipe (3) The partial-length for stretching out concrete walls (4) with interior steel pipe (1) is 80mm~120mm.
6. prefabricated assembled double steel pipe concrete shear force wall according to claim 5, it is characterised in that:Each anti-shear ring muscle (10) Between spacing distance be 500mm~1000mm.
7. assembly method of the prefabricated assembled double steel pipe concrete shear force wall described in claim 6 in construction, it is characterised in that Comprise the following steps:
The installation of the concrete walls (4) of first layer:
Concrete walls (4) are consolidated and are arranged on the cast-in-place reinforced concrete foundation of ground;
Outside concrete walls (4) bottom in the exposed parts embedment reinforced concrete foundation of steel pipe (3);
The installation of the concrete walls (4) of the second layer:
By the vertical of the vertical reinforcement sleeve (6) of concrete walls (4) bottom of the second layer and concrete walls (4) top of first layer Connect in reinforcing bar (5) docking, the i.e. vertical connection reinforcing bar (5) of vertical reinforcement sleeve (6) insertion, now outer steel pipe (3) and interior steel pipe (1) align, then weld their joint, and the part of concrete walls (4) is stretched out in outer steel pipe (3) and interior steel pipe (1), lead to Cross cross bolts (11) and extend radially through fixation, prevent the relative motion of axial and circumferential between the two;
The installation of floor:
In the upper limb face of the concrete walls (4) of first layer, i.e., between the concrete walls of first layer and the second layer, floor is installed (12) pre-erection, the precast reinforced and concrete walls (4) of the end of floor (12) are connected;In first layer and the second layer Joining place between concrete walls (4) and floor (12), concrete perfusion completes the construction of seat pulp layer, while completing floor (12) Cast-in-place part, make adjacent with floor (12) the upper and lower concrete walls (4) formation overall;
Circulate successively, complete the assembling of each prefabricated assembled double steel pipe concrete shear force wall of layer full wafer.
8. according to claim 7 prefabricated assembled double steel pipe concrete shear force wall construction when assembly method, its feature After the assembling for being 2 to 3 floor plates of every completion, the interior concrete perfusion of inside steel pipe (1), by that analogy.
CN201710373977.1A 2017-05-24 2017-05-24 Prefabricated double-steel-tube concrete shear wall and assembling method thereof Active CN107060140B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201710373977.1A CN107060140B (en) 2017-05-24 2017-05-24 Prefabricated double-steel-tube concrete shear wall and assembling method thereof
AU2017415961A AU2017415961B2 (en) 2017-05-24 2017-12-12 Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor
PCT/CN2017/115600 WO2018214477A1 (en) 2017-05-24 2017-12-12 Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710373977.1A CN107060140B (en) 2017-05-24 2017-05-24 Prefabricated double-steel-tube concrete shear wall and assembling method thereof

Publications (2)

Publication Number Publication Date
CN107060140A true CN107060140A (en) 2017-08-18
CN107060140B CN107060140B (en) 2023-09-26

Family

ID=59610525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710373977.1A Active CN107060140B (en) 2017-05-24 2017-05-24 Prefabricated double-steel-tube concrete shear wall and assembling method thereof

Country Status (3)

Country Link
CN (1) CN107060140B (en)
AU (1) AU2017415961B2 (en)
WO (1) WO2018214477A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005309A (en) * 2017-12-06 2018-05-08 华南理工大学 A kind of prefabricated assembled embedded steel sleeve connection concrete column and its assembly method
CN108316514A (en) * 2018-03-12 2018-07-24 华南理工大学 A kind of Self-resetting prefabricated assembled concrete waves wall and its assembly method
WO2018214477A1 (en) * 2017-05-24 2018-11-29 华南理工大学 Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor
CN109898651A (en) * 2018-12-12 2019-06-18 中建四局第六建筑工程有限公司 The connection structure and construction method of antidetonation steel pipe in a kind of shear wall

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555112A (en) * 2018-12-04 2019-04-02 中国建筑股份有限公司 A kind of structure superposition formula diaphram wall and construction method
CN109577176B (en) * 2019-01-30 2024-04-23 深圳市市政设计研究院有限公司福建分公司 Composite connection type concrete filled steel tube pier and construction method thereof
CN110205921B (en) * 2019-07-17 2024-04-30 福州大学 Prefabricated assembled pier column structure connected through reinforcing steel bar inserted corrugated pipe and construction method
CN110439119A (en) * 2019-07-18 2019-11-12 南京长江都市建筑设计股份有限公司 A kind of outer filling wall construction with lateral connection node
CN110468966B (en) * 2019-08-29 2021-08-24 内蒙古科技大学 Steel plate concrete wall and steel beam joint based on assembled type crossed U-shaped connecting piece
CN111734010B (en) * 2020-06-02 2024-05-28 长春工程学院 Assembled double-limb shear wall with inner arch type connecting beam and assembling method
CN112302165A (en) * 2020-10-16 2021-02-02 上海市建筑科学研究院有限公司 Box-shaped sleeve type connecting structure of assembled concrete member, construction method and application
CN112681568B (en) * 2020-12-25 2022-04-05 重庆涛扬绿建科技有限公司 Full-prefabricated steel tube concrete shear wall and building structure system
CN112942639A (en) * 2021-04-07 2021-06-11 碧源建工有限公司 Construction method for embedding temporary water supply pipe and temporary power main cable shear wall
CN113958038A (en) * 2021-09-26 2022-01-21 中国三冶集团有限公司 L-shaped steel pipe concrete short-limb shear wall
CN113914350B (en) * 2021-10-26 2023-02-10 中交第四航务工程勘察设计院有限公司 Prefabricated concrete foundation structure and installation method thereof
CN115126120A (en) * 2022-07-20 2022-09-30 长沙理工大学 Assembled double-layer X-shaped steel plate supporting superposed shear wall
CN115419177B (en) * 2022-10-13 2024-03-19 吴承辉 Precast concrete shear wall building structure and construction method thereof
CN115434451B (en) * 2022-10-19 2023-08-18 华北理工大学 Assembled concrete connection structure and construction method
CN115492249A (en) * 2022-10-29 2022-12-20 安徽建工集团股份有限公司 Dry-type connection structure of prefabricated post of modularization box-type building and foundation slab

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07139057A (en) * 1993-11-15 1995-05-30 Tokyu Koken Kk Jointing method for precast concrete wall construction
CN202073208U (en) * 2011-04-28 2011-12-14 华南理工大学建筑设计研究院 Concrete-filled steel tube shear wall
CN102409782A (en) * 2011-11-28 2012-04-11 北京工业大学 Steel tube concrete frame inbuilt steel plate shear wall with soft steel sleeves at bottom and producing method of steel tube concrete frame inbuilt steel plate shear wall
CN102409783A (en) * 2011-11-28 2012-04-11 北京工业大学 Bottom double composite section steel shear wall with reinforced concrete frame and inside-hidden steel plate as well as manufacturing method
CN106639052A (en) * 2017-01-18 2017-05-10 陕西省建筑设计研究院有限责任公司 Fabricated structural system of steel plate reinforced concrete shear walls and construction method of fabricated structural system
CN206829416U (en) * 2017-05-24 2018-01-02 华南理工大学 A kind of prefabricated assembled double steel pipe concrete shear force wall

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2836005B2 (en) * 1994-02-17 1998-12-14 株式会社シェルター Building
JPH1025840A (en) * 1996-07-11 1998-01-27 Fujita Corp Constructing method for building frame with precast anti-seismic wall
KR20050009086A (en) * 2003-07-15 2005-01-24 유승룡 Constructing method of prefabricated bearing wall and wall member therefor
CN101881056B (en) * 2010-06-11 2011-12-07 北京工业大学 Internal division type laminated column frame-bilayer steel plate concrete combined shear wall and manufacturing method thereof
CN102127941B (en) * 2010-12-10 2012-11-14 清华大学 Steel tube concrete column-double-layer steel plate combined shear wall and construction method thereof
CN102561553B (en) * 2012-03-05 2013-12-25 河北联合大学 Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof
CN103790265B (en) * 2014-01-28 2016-02-17 江苏建筑职业技术学院 A kind of prefabricated assembled steel tube concrete core pillar is put more energy into the making assembly method of shear wall
CN204418422U (en) * 2015-01-06 2015-06-24 深圳大学 A kind of combined concrete shear wall
CN106284844A (en) * 2016-10-13 2017-01-04 沈阳建筑大学 A kind of concrete-filled double skin steel tube superposed column and preparation method thereof
CN106639040B (en) * 2016-10-13 2019-02-19 哈尔滨工业大学 Elongated hole precast shear wall and its construction method is perfused after vertical muscle boundling
CN107060140B (en) * 2017-05-24 2023-09-26 华南理工大学 Prefabricated double-steel-tube concrete shear wall and assembling method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07139057A (en) * 1993-11-15 1995-05-30 Tokyu Koken Kk Jointing method for precast concrete wall construction
CN202073208U (en) * 2011-04-28 2011-12-14 华南理工大学建筑设计研究院 Concrete-filled steel tube shear wall
CN102409782A (en) * 2011-11-28 2012-04-11 北京工业大学 Steel tube concrete frame inbuilt steel plate shear wall with soft steel sleeves at bottom and producing method of steel tube concrete frame inbuilt steel plate shear wall
CN102409783A (en) * 2011-11-28 2012-04-11 北京工业大学 Bottom double composite section steel shear wall with reinforced concrete frame and inside-hidden steel plate as well as manufacturing method
CN106639052A (en) * 2017-01-18 2017-05-10 陕西省建筑设计研究院有限责任公司 Fabricated structural system of steel plate reinforced concrete shear walls and construction method of fabricated structural system
CN206829416U (en) * 2017-05-24 2018-01-02 华南理工大学 A kind of prefabricated assembled double steel pipe concrete shear force wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018214477A1 (en) * 2017-05-24 2018-11-29 华南理工大学 Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor
CN108005309A (en) * 2017-12-06 2018-05-08 华南理工大学 A kind of prefabricated assembled embedded steel sleeve connection concrete column and its assembly method
CN108005309B (en) * 2017-12-06 2023-10-20 华南理工大学 Prefabricated assembled embedded steel sleeve connecting concrete column and assembling method thereof
CN108316514A (en) * 2018-03-12 2018-07-24 华南理工大学 A kind of Self-resetting prefabricated assembled concrete waves wall and its assembly method
CN109898651A (en) * 2018-12-12 2019-06-18 中建四局第六建筑工程有限公司 The connection structure and construction method of antidetonation steel pipe in a kind of shear wall

Also Published As

Publication number Publication date
AU2017415961B2 (en) 2020-09-03
CN107060140B (en) 2023-09-26
WO2018214477A1 (en) 2018-11-29
AU2017415961A1 (en) 2019-07-18

Similar Documents

Publication Publication Date Title
CN107060140A (en) A kind of prefabricated assembled double steel pipe concrete shear force wall and its assembly method
CN108301561A (en) A kind of connection structure of assembly concrete-filled steel tube shaft
CN105804255B (en) Precast concrete beam and composite steel tube concrete column assembling structure and its construction method
CN105544801A (en) Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN107299641A (en) A kind of assembled heel join node and its construction method
CN106869315A (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN106869316A (en) The beam column edge of a wing is the group frame system and construction method of concrete filled steel tube
CN108086693A (en) A kind of assembled steel reinforced concrete frame structure system method of construction of low multilayer
CN205653923U (en) Novel big board shear wall structure is secretly supported in prefabricated assembled area of connecting from top to bottom
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN106988551A (en) Attached frame reinforcing structure and method outside the full assembled of Bolted angle connection
CN104818801A (en) Pre-fabricated section steel reinforced concrete beam and pillar and manufacturing method
CN206368422U (en) A kind of assembled beam-column connecting node
CN108571070A (en) A kind of Prefabricated concrete-filled steel tube ring beam connection structure and construction method
CN109057004A (en) A kind of assembled steel-Combined concrete frame and its connection installation method
CN206829416U (en) A kind of prefabricated assembled double steel pipe concrete shear force wall
CN107060211A (en) A kind of reinforced concrete sandwich formula tubing string, superposed type core pipe post and its construction method
CN106968332A (en) A kind of prestressing force assembled high-performance concrete-filled circular steel tube column concrete girder connection and its construction method
CN103628571B (en) Beam-column joint for reverse construction method and construction method
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN207017484U (en) Reinforced precast reinforced concrete shear wall and structural system
CN108005267A (en) A kind of yi word pattern assembled stem steel plate shear force wall and its assembling constructing method
CN106088412A (en) L-type steel beam column
CN107246109A (en) Framework and its construction method that real compound concrete filled steel tube coupled column combination beam is constituted

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant