CN107059844A - A kind of quick pile splicing structure, prefabricated pile and method - Google Patents
A kind of quick pile splicing structure, prefabricated pile and method Download PDFInfo
- Publication number
- CN107059844A CN107059844A CN201710178426.XA CN201710178426A CN107059844A CN 107059844 A CN107059844 A CN 107059844A CN 201710178426 A CN201710178426 A CN 201710178426A CN 107059844 A CN107059844 A CN 107059844A
- Authority
- CN
- China
- Prior art keywords
- stake
- pile
- dowel
- lower section
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 26
- 239000011241 protective layer Substances 0.000 claims description 15
- 229910052742 iron Inorganic materials 0.000 claims description 13
- 238000002513 implantation Methods 0.000 claims description 5
- 210000003205 muscle Anatomy 0.000 claims description 5
- 239000011440 grout Substances 0.000 claims description 3
- 239000004568 cement Substances 0.000 claims description 2
- 239000010410 layer Substances 0.000 description 7
- 238000010008 shearing Methods 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 5
- 238000005452 bending Methods 0.000 description 5
- 239000004567 concrete Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 239000011083 cement mortar Substances 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 4
- 238000007569 slipcasting Methods 0.000 description 4
- 238000004873 anchoring Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 239000000853 adhesive Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011797 cavity material Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 238000005493 welding type Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of quick pile splicing structure, prefabricated pile and method, the attachment structure for overcoming contiguous prefabricated stake in the prior art is complicated, the problem of there is stress concentration, the quick pile splicing structure proposed simply, is conveniently operated, effectively increase the various aspects of performance of the prefabricated pile of multistage connection, the quick pile splicing structure of one of which, including connector, connector is fastenedly connected respectively between upper section stake, the stake of lower section, and with upper section stake, the stake of lower section;Dowel, dowel is set through connector, and the two ends of dowel are each attached respectively with upper section stake, the stake of lower section;Fastener, fastener is located on dowel to lock connector and dowel.
Description
Technical field
The invention belongs to building foundation engineering and base pit engineering, more particularly to a kind of quick pile splicing structure, prefabricated pile and
Method.
Background technology
In foundation ditch process of construction, generally using cast-in-situ bored pile as interim building enclosure, foundation ditch inside subject structure is complete
After, interim fender post does waste treatment, causes material largely to waste, and geological environment is polluted;Drill simultaneously
Bored concrete pile cast in situs, pile-forming speed and pile quality are influenceed by geological environment, plant equipment.Prefabricated pile is used in foundation ditch,
Prefabricated pile is implanted directly into stratum by drawing hole measure, pile-forming speed is fast, and prefabricated pile can be protected effectively with factorial praluction
Demonstrate,prove pile quality.But traffic condition, site condition and lifting factor are limited to, more than more than 20 meters of prefabricated pile can not whole life
Production, need to meet engine request by pile extension at the scene.As foundation pit enclosure stake, pile body is passed during foundation ditch is ended by the soil body
The lateral pressure come, produces shearing and moment of flexure, on the higher stratum of water level also by the pulling capacity on stratum, therefore, pile body in pile body
Attachment means should meet multiple requirements such as bending resistance, shearing resistance, tension simultaneously.
At this stage, method is welded and mechanically connected more than pile extension mode using end plate.For Type of Welding, prefabricated tubular pile should
With more, stake is saved up and down and is welded at seam crossing two and half steel loops of parcel, steel loop lower edges with stake end steel loop, the connection
Form is preferable for transmission vertical pressure, but is limited to steel loop material, thickness and weldquality, and the form is in resist torque, drawing
Poor in terms of pull out force and shearing force, quality is difficult to ensure that;Mechanical connection method is to be entered using pin by the bolt hole of upper and lower section stake
Row anchoring, this form is influenceed greatly by quantity, the quality of bolt, and the form is sheerly in mechanical connection, it is impossible to form whole with pile body
Body, causes joint shearing resistance, anti-bending strength to meet requirement;It is fast that application number 201610112378.X have submitted a kind of prefabricated pile
Sub-buckle, box are attached by fast mechanical connecting device and construction method, this form using pin, but the joint form stress
Transmission is complex, and stress concentration occurs easily at bolt hole position, material local yielding is caused, and the joint construction costs compared with
Height, in addition, the problem of can not being also balanced in the presence of prefabricated pile verticality and connection speed in the prior art, i.e., in order to protect
The perpendicularity of prefabricated pile is demonstrate,proved, connection speed is just restricted, conversely, then perpendicularity can not be guaranteed.
Accordingly, it would be desirable to for connecting two structures for saving prefabricated pile, carrying out new research and design.
The content of the invention
In order to overcome the deficiencies in the prior art, the invention provides a kind of quick pile splicing structure, the structure setting is simple, system
Cause low, an achievable quick connection to prefabricated pile two adjacent sections.
A kind of concrete scheme of quick pile splicing structure is as follows:
A kind of quick pile splicing structure, including:
Connector, connector is fastenedly connected respectively between upper section stake, the stake of lower section, and with upper section stake, the stake of lower section;
Dowel, dowel is set through connector, and the two ends of dowel are each carried out respectively with upper section stake, the stake of lower section
Connection;
Fastener, fastener is located on dowel to lock connector and dowel.
Above-mentioned quick pile splicing structure is laid between upper section stake, the stake of lower section by connector, improves pile body globality
And bending strength, first layer connection is played, then the second layer connection function to upper section stake, the stake of lower section is realized by dowel, have
Effect avoids stress concentration, improves the anti-drawing strength of pile body, the setting of fastener be effectively ensured dowel and connector it
Between locking, improve the stability of strutting system of whole quick pile splicing structure.
The fastener is nut, and nut is respectively provided with the both sides up and down of flange, by nut further to flange and company
Connect muscle to be fastenedly connected, set on dowel and connector setting is then passed through after a nut, spiral shell is set in the lower section of connector
Female passing through in order to dowel, the dowel of one nut of band can be set in advance to be transported to scene again, is saved field worker and is applied
Between man-hour.
The connector is flange, and flange includes two ring flanges, and a ring flange and the cage bar of upper section stake are fixed, another
Individual ring flange and the cage bar of lower section stake are welded and fixed, and realize that flange and upper section stake, lower section are connected with this.
The dowel is provided with many, and dowel is arranged to a circle, per between adjacent two dowels interval setting away from
From setting, the structure so constituted avoids stress concentration between two sections of prefabricated piles, if prefabricated pile cross section is square, dowel
Cube structure is evenly arranged into, if prefabricated pile cross section is cylinder, dowel is evenly arranged into cylindrical shape.
In order to overcome the deficiencies in the prior art, prefabricated pile is connected present invention also offers a kind of merogenesis, the prefabricated pile is per phase
Two adjacent section prefabricated piles are attached by above-mentioned pile splicing structure, and connection speed is fast, passes through the setting of many dowels, stress
More uniform, stability is high.
A kind of merogenesis connection prefabricated pile includes:
Connected between at least two section prefabricated piles, two adjacent section prefabricated piles by a kind of described quick pile splicing structure
Connect, the prefabricated pile is connected by multilayer, on the premise of connection speed is ensured, be effectively ensured vertical after prefabricated pile connection
Degree.
For the two section prefabricated piles for needing to connect, pile crown is provided with the top of lower section stake, the bottom of upper section stake is again provided with
Pile crown, pile crown protrudes from prefabricated pile setting, and the size of pile crown is less than the size of prefabricated pile, and pile crown is located at the center of prefabricated pile,
The surface of pile crown carries out dabbing processing, so that pile crown surface is more smooth, so as to be further ensured that the perpendicularity of prefabricated pile, pile crown
Shape and the shape of prefabricated pile be consistent.
For the ease of passing through for dowel, the size of the connector is more than the size of the pile crown, to ensure dowel
Enclose and set around pile crown one;
Further, integument is set with lower section stake junction in upper section stake, integument is iron sheet, and iron sheet is provided with a slip casting
Hole, Grouting Pipe, to two section prefabricated pile junction filling concrete slurries, is supported with giving the stable of third layer, improved by injected hole
The shearing strength of joint location, and ensure that service life of the pile body in the underground space.
Preformed hole is provided with the week side of boss of the upper surface pile crown of lower section stake, preformed hole is worn for the dowel, in upper section
The week side of boss of the lower surface pile crown of stake is equally provided with the preformed hole worn for dowel, and preformed hole is screwed hole, dowel and spiral shell
Pit coordinates to ensure dowel and the connection validity of upper section stake, the stake of lower section.
In order to avoid causing damage to be provided with irony protective layer, irony in the upper surface of lower section stake in work progress to prefabricated pile
Protective layer is embedded in the end of lower section stake stake top;
Further, irony protective layer is again provided with the lower surface of upper section stake, irony protective layer is embedded in section stake stake
The end at bottom.
The effect of irony protective layer also has two:One is that protection pile body avoids colliding with causing pile body to produce in transportation
Mass defect, second is when welding integument in the later stage, to be easy to integument to be welded to connect with irony protective layer, to realize integument
Set.
In order to overcome the shortcomings of that connection speed is slow in the prior art, present invention also offers a kind of two sections of prefabricated piles of connection
Method, passes through the setting of this method so that two sections of prefabricated pile connection speeds are fast, and ensure the perpendicularity of prefabricated pile connection.
A kind of method for connecting two sections of prefabricated piles, is comprised the following steps that:
1) by lower section stake implantation ground, the pile crown of lower section stake is exposed, pile crown is fixed with ring flange, by the stake of upper section stake bottom
Head is fixed with another ring flange;
2) dowel is set through pile crown of the ring flange end in lower section stake around lower section stake, the bottom of dowel is with
Section stake top portion is connected;
3) upper section stake is lifted by lifting machinery, upper section stake is alignd with lower section stake, and will insert upper section at the top of dowel
The bottom of stake;
4) junction around upper section stake, the stake of lower section sets integument;
5) cement grout is injected to inside integument.
Compared with prior art, the beneficial effects of the invention are as follows:
1) upper and lower section stake is connected by the cage bar of upper and lower section stake by connector flange and structure, improves pile body overall
Property and bending strength.
2) by the setting of nut, dowel, upper and lower section stake is connected to become entirety, the anti-pulling for improving pile body is strong
Degree.
3) by injecting cement mortar in the junction of upper and lower section stake, dowel is poured and builds up reinforced concrete structure, is carried
The high shearing strength of joint location, further increases the performance of prefabricated pile pile body.
4) by injecting cement mortar, the corrosion resistance of pile joint is effectively increased, it is ensured that pile body is in the underground space
Service life.
5) connection by whole operation step to upper and lower section stake, simple to operate, is easy to execute-in-place to construct, feasibility
It is high.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing further understanding of the present application, and the application's shows
Meaning property embodiment and its illustrate be used for explain the application, do not constitute the improper restriction to the application.
Fig. 1 is upper section stake, lower section stake connection diagram;
Fig. 2 assigns schematic diagram for lower section stake with dowel;
Fig. 3 is lower section stake and pile body preformed hole schematic diagram;
Fig. 4 is dowel and nut schematic diagram;
Schematic diagram after the completion of Fig. 5 connects for upper section stake, the stake of lower section.
In figure:1st, upper section stake, 2, lower section stake, 3, flange, 4, preformed hole, 5, screw hole, 6, irony protective layer, 7, screw-thread steel
Muscle, 8, nut, 9, injected hole, 10, pile crown, 11. iron sheets.
Embodiment
It is noted that described further below is all exemplary, it is intended to provide further instruction to the application.Unless another
Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field
The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root
According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative
It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag
Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
As background technology is introduced, attachment structure is complicated in the prior art, and stress concentration is easily produced in junction
Deficiency, in order to solve technical problem as above, present applicant proposes a kind of quick pile splicing structure, prefabricated pile and method.
In a kind of typical embodiment of the application, as depicted in figs. 1 and 2, a kind of quick pile splicing structure, including connection
Part, connector is fastenedly connected respectively between upper section stake 1, lower section stake 2, and with upper section stake 1, lower section stake 2;Dowel,
Dowel is set through connector, and the two ends of dowel are each attached respectively with upper section stake 1, lower section stake 2;Fastener,
Fastener is located on dowel to lock connector and dowel.
Above-mentioned quick pile splicing structure is laid between upper section stake, the stake of lower section by connector, improves pile body globality
And bending strength, play first layer connection, then by dowel be spiral 7 realize to it is upper section stake 1, it is lower section stake 2 second
Layer connection function, effectively prevent stress concentration, improves the anti-drawing strength of pile body, connection is effectively ensured in the setting of fastener
Locking between muscle and connector, improves the stability of strutting system of whole quick pile splicing structure.
Connector is flange 3, and flange 3 and the cage bar of upper section stake, the stake of lower section are welded and fixed, and flange and upper section are realized with this
Stake, lower section stake are connected.Fastener is nut 8, and nut 8 is respectively provided with the both sides up and down of flange 3, and one is entered by nut 8
Step is fastenedly connected to flange 3 and dowel, is set on dowel and connector setting is then passed through after a nut 8, in connection
The lower section of part sets the passing through in order to dowel of nut 8, and the dowel of one nut 8 of band can be set in advance transports existing again
, save the field worker engineering time.
Dowel is provided with many, and dowel is arranged to a circle, and the distance that setting is spaced between every adjacent two dowels is set
Put, the structure so constituted avoids stress concentration between two sections of prefabricated piles, if prefabricated pile cross section is square, dowel is uniform
Cube structure is arranged to, if prefabricated pile cross section is cylinder, dowel is evenly arranged into cylindrical shape.
In order to overcome the deficiencies in the prior art, present invention also offers second embodiment:A kind of merogenesis connects prefabricated pile, should
Prefabricated pile is attached per two adjacent section prefabricated piles by above-mentioned pile splicing structure, and connection speed is fast, passes through many dowels
Setting, stress is more uniform, and stability is high.
A kind of merogenesis connection prefabricated pile includes:
Connected between at least two section prefabricated piles, two adjacent section prefabricated piles by a kind of described quick pile splicing structure
Connect, the prefabricated pile is connected by multilayer, on the premise of connection speed is ensured, be effectively ensured vertical after prefabricated pile connection
Degree.
For the two section prefabricated piles for needing to connect, pile crown is provided with the top of lower section stake, the bottom of upper section stake is again provided with
Pile crown, pile crown protrudes from prefabricated pile setting, and the size of pile crown is less than the size of prefabricated pile, and pile crown is located at the center of prefabricated pile,
The surface of pile crown carries out dabbing processing, so that pile crown surface is more smooth, so as to be further ensured that the perpendicularity of prefabricated pile, pile crown
Shape and the shape of prefabricated pile be consistent.
For the ease of passing through for dowel, the size of connector is more than the size of the pile crown, to ensure that dowel is surrounded
The circle of pile crown one is set;
Integument is set in upper section stake 1 and lower section stake 2 junction, and integument is iron sheet 11, iron sheet 11 be a monoblock or
Four pieces of compositions, silk block iron sheet is separately positioned on every one side of junction, and the upper and lower ends of iron sheet 11 are connected with prefabricated pile respectively
Connect, be equally tightly connected between adjacent prefabricated pile, iron sheet is provided with an injected hole 9, Grouting Pipe is prefabricated to two sections by injected hole 9
Stake junction filling concrete slurries, are supported with giving the stable of third layer, improve the shearing strength of joint location, and ensure
Service life of the pile body in the underground space.
Preformed hole 4 is provided with the week side of boss of the upper surface pile crown of lower section stake 2, the size of preformed hole 4 is more than the size of dowel,
As shown in figure 3, preformed hole 4 is worn for the dowel, equally it is provided with the week side of boss of the lower surface pile crown of upper section stake 1 for connecting
The preformed hole that muscle is worn is connect, preformed hole is screwed hole, and dowel coordinates to ensure dowel and upper section stake 1, lower section with screwed hole
The connection validity of stake 2, the passing through in order to spiral 7 of screw hole 5 is provided with the side of flange 3.
In order to avoid causing damage to be provided with irony protective layer 6, iron in the upper surface of lower section stake 2 in work progress to prefabricated pile
Quality guarantee sheath 6 is embedded in the end of the lower section stake top of stake 2;Irony protective layer 6 is again provided with the lower surface of upper section stake 1, irony is protected
Sheath 6 is embedded in the end at 1 bottom of section stake.
In order to overcome the shortcomings of that connection speed is slow in the prior art, present invention also offers 3rd embodiment:One kind connection
The method of two sections of prefabricated piles, passes through the setting of this method so that two sections of prefabricated pile connection speeds are fast, and ensures prefabricated pile connection
Perpendicularity.
The concrete operation step of this method is as follows:
Step 1:Upper section stake 1, lower section stake 2 make processing.
Upper section stake 1, lower section stake 2 are square reinforced concrete pile, in order to avoid causing to damage in work progress to prefabricated pile
Hinder and irony protective layer is provided with the upper surface of lower section stake, irony protective layer is embedded in the end of lower section stake stake top;In upper section stake
Lower surface is again provided with irony protective layer, and irony protective layer is embedded in the end at section stake stake bottom;
Upper section stake 1 bottom is provided projectingly pile crown, the top of lower section stake 2 and is provided projectingly pile crown 10, and pile crown size is less than prefabricated pile
Size;
Ring flange is set at the lower top of section stake 2, and ring flange and the cage bar of lower section stake 2 are welded to connect, and upper section stake 1 bottom is set
Another ring flange being connected with upper section stake 1, this ring flange coordinates with foregoing ring flange constitutes flange 3.
Step 2:The implantation and fixation of lower section stake 2.
Lower section stake 2 implantation is to draw hole on ground, coordinates pile extension platform to draw lower section stake 2 implantation in hole using lifting machinery,
And be held in pile extension platform, the pile crown 10 of lower section stake 2 is exposed.
Step 3:Upper section stake 1 lifting and the lower section centering of stake 2.
Before upper section stake 1 is alignd with lower section stake 2, nut is set in flange base, nut 8 is installed on spiral 7,
As shown in figure 4, upper end and dowel i.e. spiral 7 to lock flange 3;
Spiral 7 is put into the screw hole 5 and pile body preformed hole 4 that flange 3 is reserved;
Anchoring adhesive is filled in the preformed hole 4 of upper section stake 1;
After upper section stake 1 is lifted, upper section stake 1 is sling using lifting machinery, alignd with lower section stake 2, and keep section stake 1 to erect
Directly;
Anchoring adhesive is poured into the lower section pile body preformed hole 4 of stake 2.
In addition, the nut located at flange bottom can first be fixed by glue with flange, to facilitate subsequent operation to construct, save
On-site construction time.
Step 4:The upper and lower nut 8 of spiral 7 is tightened.
Step 5:One layer of iron sheet 11 is welded with lower section stake 2 appearance in upper section stake 1, as shown in figure 5, joint location is closed into
One cavity;
Iron sheet 11 is welded with pile joint irony protective layer 6, and iron sheet 11 wherein has one piece to be reserved with injected hole 10, injected hole 10
Size is fixed according to slip casting pipe size, and diameter is slightly larger than slip casting pipe diameter.
Step 6:By injected hole 10, the water filling cement mortar into cavity, cement mortar, grout coordinate ratio meets mobility and strong
Degree is required;
After the completion of slip casting, injected hole 10 is blocked using stopple.
The preferred embodiment of the application is the foregoing is only, the application is not limited to, for the skill of this area
For art personnel, the application can have various modifications and variations.It is all within spirit herein and principle, made any repair
Change, equivalent substitution, improvement etc., should be included within the protection domain of the application.
Claims (10)
1. a kind of quick pile splicing structure, it is characterised in that including:
Connector, connector is fastenedly connected respectively between upper section stake, the stake of lower section, and with upper section stake, the stake of lower section;
Dowel, dowel is set through connector, and the two ends of dowel are each connected respectively with upper section stake, the stake of lower section
Connect;
Fastener, fastener is located on dowel to lock connector and dowel.
2. a kind of quick pile splicing structure according to claim 1, it is characterised in that the fastener is nut.
3. a kind of quick pile splicing structure according to claim 1 or 2, it is characterised in that the connector is flange, flange
It is welded and fixed with the cage bar of upper section stake, the stake of lower section.
4. a kind of quick pile splicing structure according to claim 1, it is characterised in that the dowel is provided with many, connection
Muscle is arranged to a circle, and the distance that setting is spaced between every adjacent two dowels is set.
5. a kind of merogenesis connects prefabricated pile, it is characterised in that including:
It is fast by one kind as any one of claim 1-4 between at least two section prefabricated piles, two adjacent section prefabricated piles
Fast pile splicing structure is attached.
6. a kind of merogenesis connection prefabricated pile according to claim 5, it is characterised in that saved for need to connect two prefabricated
Stake, pile crown is provided with the top of lower section stake, and the bottom of upper section stake is again provided with pile crown, and pile crown protrudes from prefabricated pile setting, pile crown
Size be less than prefabricated pile size.
7. a kind of merogenesis connection prefabricated pile according to claim 6, it is characterised in that the size of the connector is more than institute
State the size of pile crown;
Further, integument is set with lower section stake junction in upper section stake.
8. a kind of merogenesis connection prefabricated pile according to claim 6, it is characterised in that in the lower upper surface pile crown for saving stake
The week side of boss is provided with preformed hole, and preformed hole is worn for the dowel, and use is equally provided with the week side of boss of the lower surface pile crown of upper section stake
The preformed hole worn in dowel.
9. a kind of merogenesis connection prefabricated pile according to claim 6, it is characterised in that be provided with iron in the upper surface of lower section stake
Quality guarantee sheath;
Further, it is again provided with irony protective layer in the lower surface of upper section stake.
10. a kind of method for connecting two sections of prefabricated piles, it is characterised in that comprise the following steps that:
1) by lower section stake implantation ground, expose the pile crown of lower section stake, pile crown fixes with ring flange, by the pile crown of upper section stake bottom and
Another ring flange is fixed;
2) dowel, the bottom of dowel and lower section stake are set through pile crown of the ring flange end in lower section stake around lower section stake
Top is connected;
3) upper section stake is lifted by lifting machinery, upper section stake is alignd with lower section stake, and upper section stake will be inserted at the top of dowel
Bottom;
4) junction around upper section stake, the stake of lower section sets integument;
5) cement grout is injected to inside integument.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710178426.XA CN107059844A (en) | 2017-03-23 | 2017-03-23 | A kind of quick pile splicing structure, prefabricated pile and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710178426.XA CN107059844A (en) | 2017-03-23 | 2017-03-23 | A kind of quick pile splicing structure, prefabricated pile and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107059844A true CN107059844A (en) | 2017-08-18 |
Family
ID=59617959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710178426.XA Pending CN107059844A (en) | 2017-03-23 | 2017-03-23 | A kind of quick pile splicing structure, prefabricated pile and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107059844A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930268A (en) * | 2018-07-25 | 2018-12-04 | 暨南大学 | Rotate nested type pile for prestressed pipe mechanical connection head and its construction method |
CN112343051A (en) * | 2020-11-14 | 2021-02-09 | 中冶成都勘察研究总院有限公司 | Method for rotary digging implantation pile sinking in high backfill region |
CN113653044A (en) * | 2021-08-10 | 2021-11-16 | 大成科创基础建设股份有限公司 | Construction method of deep soft soil pipe pile |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT357947B (en) * | 1978-11-30 | 1980-08-11 | Naegele & Co Bau | CONNECTING ARRANGEMENT BETWEEN INDIVIDUAL PARTS OF A RAMP |
CN1425831A (en) * | 2003-01-10 | 2003-06-25 | 颜肖鸿 | Butt device for prefabricated concrete pile and its producing method |
CN1480593A (en) * | 2002-09-06 | 2004-03-10 | 西胁醇 | Connection structure of pile |
CN201221081Y (en) * | 2008-06-02 | 2009-04-15 | 华升建设集团有限公司 | Connecting structure of prestressed concrete pipe pile |
CN101451357A (en) * | 2008-12-31 | 2009-06-10 | 童常荣 | Anti-corrosive method of prestressing concrete pipe pile joint and concrete pipe pile prepared thereby |
CN201276702Y (en) * | 2008-09-08 | 2009-07-22 | 马纯杰 | Pile splicing structure of precast prestressed concrete pipe pile |
CN203782694U (en) * | 2014-01-10 | 2014-08-20 | 浙江垠桥能源科技发展有限公司 | Easy-positioning blind plate for connecting building static drill pile foundation rooting piles |
CN104099926A (en) * | 2013-04-10 | 2014-10-15 | 斯马泰克工程技术株式会社 | Connecting Device Of High Strength Hollow Concrete Piles And Connecting Construction Utilizing Same |
CN104540999A (en) * | 2013-08-21 | 2015-04-22 | 王志财 | End plate applied to concrete pile |
-
2017
- 2017-03-23 CN CN201710178426.XA patent/CN107059844A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT357947B (en) * | 1978-11-30 | 1980-08-11 | Naegele & Co Bau | CONNECTING ARRANGEMENT BETWEEN INDIVIDUAL PARTS OF A RAMP |
CN1480593A (en) * | 2002-09-06 | 2004-03-10 | 西胁醇 | Connection structure of pile |
CN1425831A (en) * | 2003-01-10 | 2003-06-25 | 颜肖鸿 | Butt device for prefabricated concrete pile and its producing method |
CN201221081Y (en) * | 2008-06-02 | 2009-04-15 | 华升建设集团有限公司 | Connecting structure of prestressed concrete pipe pile |
CN201276702Y (en) * | 2008-09-08 | 2009-07-22 | 马纯杰 | Pile splicing structure of precast prestressed concrete pipe pile |
CN101451357A (en) * | 2008-12-31 | 2009-06-10 | 童常荣 | Anti-corrosive method of prestressing concrete pipe pile joint and concrete pipe pile prepared thereby |
CN104099926A (en) * | 2013-04-10 | 2014-10-15 | 斯马泰克工程技术株式会社 | Connecting Device Of High Strength Hollow Concrete Piles And Connecting Construction Utilizing Same |
CN104540999A (en) * | 2013-08-21 | 2015-04-22 | 王志财 | End plate applied to concrete pile |
CN203782694U (en) * | 2014-01-10 | 2014-08-20 | 浙江垠桥能源科技发展有限公司 | Easy-positioning blind plate for connecting building static drill pile foundation rooting piles |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930268A (en) * | 2018-07-25 | 2018-12-04 | 暨南大学 | Rotate nested type pile for prestressed pipe mechanical connection head and its construction method |
CN112343051A (en) * | 2020-11-14 | 2021-02-09 | 中冶成都勘察研究总院有限公司 | Method for rotary digging implantation pile sinking in high backfill region |
CN112343051B (en) * | 2020-11-14 | 2022-04-01 | 中冶成都勘察研究总院有限公司 | Method for rotary digging implantation pile sinking in high backfill region |
CN113653044A (en) * | 2021-08-10 | 2021-11-16 | 大成科创基础建设股份有限公司 | Construction method of deep soft soil pipe pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105781125B (en) | A kind of installation method of assembled architecture | |
CN206971232U (en) | A kind of oblique inner support foundation pit enclosure structure of shaped steel cement earth pile | |
CN109024651B (en) | Steel pipe concrete mixed pile foundation and construction method | |
CN103510540B (en) | Mortar flag stone retaining wall reinforcement construction method and structure thereof | |
CN102828518A (en) | Prestressed anchor cable anchoring structure of manual hole digging support pile and construction method thereof | |
CN103046557A (en) | Foundation pit water-sealing supporting method by using long spiral cement soil mixing structural steel pile | |
CN106498950A (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body | |
CN110241828A (en) | The outer sealing construction method for supporting of anchor in a kind of row's grating tubular pole grouting behind shaft or drift lining | |
CN207512752U (en) | A kind of tall earth fill supporting construction | |
JP2015183364A (en) | Method for preventing soil structure from sliding at slope surface layer with geocell fixing operation auxiliary means | |
CN109113749A (en) | Four line large section railway tunnel construction method of weak surrounding rock | |
CN107059844A (en) | A kind of quick pile splicing structure, prefabricated pile and method | |
CN109972630A (en) | A kind of foundation pit enclosure structure and its construction method of the assembly of PC component | |
CN206408630U (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body | |
CN111593757A (en) | Circuit pole tower and tower loop-shaped pile anchor composite foundation suitable for karst region and construction method thereof | |
CN101793027B (en) | Core-grouted static pressure anchor rod pile | |
CN206635768U (en) | Composite soil nailing wall and pile-anchor retaining composite supporting construction | |
CN219416160U (en) | Fixed monitoring pile for high-diving mining area | |
CN210263075U (en) | Arrange bars formula tubular pile post back slip casting internal anchor outer stagnant water support system | |
CN102220764A (en) | Deep foundation pit bracing system and construction method thereof | |
CN116242310A (en) | Pile distribution method for fixed monitoring piles for high-water-level mining areas | |
CN207160041U (en) | Anchor rod type artificial digging pile | |
CN107542086B (en) | Anchor cable construction method for filling slope | |
JPS58178706A (en) | Caisson and its setting | |
CN105484270A (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |