CN107059844A - A kind of quick pile splicing structure, prefabricated pile and method - Google Patents

A kind of quick pile splicing structure, prefabricated pile and method Download PDF

Info

Publication number
CN107059844A
CN107059844A CN201710178426.XA CN201710178426A CN107059844A CN 107059844 A CN107059844 A CN 107059844A CN 201710178426 A CN201710178426 A CN 201710178426A CN 107059844 A CN107059844 A CN 107059844A
Authority
CN
China
Prior art keywords
stake
pile
dowel
lower section
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710178426.XA
Other languages
Chinese (zh)
Inventor
王国富
王丹
路林海
刘浩
曹正龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201710178426.XA priority Critical patent/CN107059844A/en
Publication of CN107059844A publication Critical patent/CN107059844A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of quick pile splicing structure, prefabricated pile and method, the attachment structure for overcoming contiguous prefabricated stake in the prior art is complicated, the problem of there is stress concentration, the quick pile splicing structure proposed simply, is conveniently operated, effectively increase the various aspects of performance of the prefabricated pile of multistage connection, the quick pile splicing structure of one of which, including connector, connector is fastenedly connected respectively between upper section stake, the stake of lower section, and with upper section stake, the stake of lower section;Dowel, dowel is set through connector, and the two ends of dowel are each attached respectively with upper section stake, the stake of lower section;Fastener, fastener is located on dowel to lock connector and dowel.

Description

A kind of quick pile splicing structure, prefabricated pile and method
Technical field
The invention belongs to building foundation engineering and base pit engineering, more particularly to a kind of quick pile splicing structure, prefabricated pile and Method.
Background technology
In foundation ditch process of construction, generally using cast-in-situ bored pile as interim building enclosure, foundation ditch inside subject structure is complete After, interim fender post does waste treatment, causes material largely to waste, and geological environment is polluted;Drill simultaneously Bored concrete pile cast in situs, pile-forming speed and pile quality are influenceed by geological environment, plant equipment.Prefabricated pile is used in foundation ditch, Prefabricated pile is implanted directly into stratum by drawing hole measure, pile-forming speed is fast, and prefabricated pile can be protected effectively with factorial praluction Demonstrate,prove pile quality.But traffic condition, site condition and lifting factor are limited to, more than more than 20 meters of prefabricated pile can not whole life Production, need to meet engine request by pile extension at the scene.As foundation pit enclosure stake, pile body is passed during foundation ditch is ended by the soil body The lateral pressure come, produces shearing and moment of flexure, on the higher stratum of water level also by the pulling capacity on stratum, therefore, pile body in pile body Attachment means should meet multiple requirements such as bending resistance, shearing resistance, tension simultaneously.
At this stage, method is welded and mechanically connected more than pile extension mode using end plate.For Type of Welding, prefabricated tubular pile should With more, stake is saved up and down and is welded at seam crossing two and half steel loops of parcel, steel loop lower edges with stake end steel loop, the connection Form is preferable for transmission vertical pressure, but is limited to steel loop material, thickness and weldquality, and the form is in resist torque, drawing Poor in terms of pull out force and shearing force, quality is difficult to ensure that;Mechanical connection method is to be entered using pin by the bolt hole of upper and lower section stake Row anchoring, this form is influenceed greatly by quantity, the quality of bolt, and the form is sheerly in mechanical connection, it is impossible to form whole with pile body Body, causes joint shearing resistance, anti-bending strength to meet requirement;It is fast that application number 201610112378.X have submitted a kind of prefabricated pile Sub-buckle, box are attached by fast mechanical connecting device and construction method, this form using pin, but the joint form stress Transmission is complex, and stress concentration occurs easily at bolt hole position, material local yielding is caused, and the joint construction costs compared with Height, in addition, the problem of can not being also balanced in the presence of prefabricated pile verticality and connection speed in the prior art, i.e., in order to protect The perpendicularity of prefabricated pile is demonstrate,proved, connection speed is just restricted, conversely, then perpendicularity can not be guaranteed.
Accordingly, it would be desirable to for connecting two structures for saving prefabricated pile, carrying out new research and design.
The content of the invention
In order to overcome the deficiencies in the prior art, the invention provides a kind of quick pile splicing structure, the structure setting is simple, system Cause low, an achievable quick connection to prefabricated pile two adjacent sections.
A kind of concrete scheme of quick pile splicing structure is as follows:
A kind of quick pile splicing structure, including:
Connector, connector is fastenedly connected respectively between upper section stake, the stake of lower section, and with upper section stake, the stake of lower section;
Dowel, dowel is set through connector, and the two ends of dowel are each carried out respectively with upper section stake, the stake of lower section Connection;
Fastener, fastener is located on dowel to lock connector and dowel.
Above-mentioned quick pile splicing structure is laid between upper section stake, the stake of lower section by connector, improves pile body globality And bending strength, first layer connection is played, then the second layer connection function to upper section stake, the stake of lower section is realized by dowel, have Effect avoids stress concentration, improves the anti-drawing strength of pile body, the setting of fastener be effectively ensured dowel and connector it Between locking, improve the stability of strutting system of whole quick pile splicing structure.
The fastener is nut, and nut is respectively provided with the both sides up and down of flange, by nut further to flange and company Connect muscle to be fastenedly connected, set on dowel and connector setting is then passed through after a nut, spiral shell is set in the lower section of connector Female passing through in order to dowel, the dowel of one nut of band can be set in advance to be transported to scene again, is saved field worker and is applied Between man-hour.
The connector is flange, and flange includes two ring flanges, and a ring flange and the cage bar of upper section stake are fixed, another Individual ring flange and the cage bar of lower section stake are welded and fixed, and realize that flange and upper section stake, lower section are connected with this.
The dowel is provided with many, and dowel is arranged to a circle, per between adjacent two dowels interval setting away from From setting, the structure so constituted avoids stress concentration between two sections of prefabricated piles, if prefabricated pile cross section is square, dowel Cube structure is evenly arranged into, if prefabricated pile cross section is cylinder, dowel is evenly arranged into cylindrical shape.
In order to overcome the deficiencies in the prior art, prefabricated pile is connected present invention also offers a kind of merogenesis, the prefabricated pile is per phase Two adjacent section prefabricated piles are attached by above-mentioned pile splicing structure, and connection speed is fast, passes through the setting of many dowels, stress More uniform, stability is high.
A kind of merogenesis connection prefabricated pile includes:
Connected between at least two section prefabricated piles, two adjacent section prefabricated piles by a kind of described quick pile splicing structure Connect, the prefabricated pile is connected by multilayer, on the premise of connection speed is ensured, be effectively ensured vertical after prefabricated pile connection Degree.
For the two section prefabricated piles for needing to connect, pile crown is provided with the top of lower section stake, the bottom of upper section stake is again provided with Pile crown, pile crown protrudes from prefabricated pile setting, and the size of pile crown is less than the size of prefabricated pile, and pile crown is located at the center of prefabricated pile, The surface of pile crown carries out dabbing processing, so that pile crown surface is more smooth, so as to be further ensured that the perpendicularity of prefabricated pile, pile crown Shape and the shape of prefabricated pile be consistent.
For the ease of passing through for dowel, the size of the connector is more than the size of the pile crown, to ensure dowel Enclose and set around pile crown one;
Further, integument is set with lower section stake junction in upper section stake, integument is iron sheet, and iron sheet is provided with a slip casting Hole, Grouting Pipe, to two section prefabricated pile junction filling concrete slurries, is supported with giving the stable of third layer, improved by injected hole The shearing strength of joint location, and ensure that service life of the pile body in the underground space.
Preformed hole is provided with the week side of boss of the upper surface pile crown of lower section stake, preformed hole is worn for the dowel, in upper section The week side of boss of the lower surface pile crown of stake is equally provided with the preformed hole worn for dowel, and preformed hole is screwed hole, dowel and spiral shell Pit coordinates to ensure dowel and the connection validity of upper section stake, the stake of lower section.
In order to avoid causing damage to be provided with irony protective layer, irony in the upper surface of lower section stake in work progress to prefabricated pile Protective layer is embedded in the end of lower section stake stake top;
Further, irony protective layer is again provided with the lower surface of upper section stake, irony protective layer is embedded in section stake stake The end at bottom.
The effect of irony protective layer also has two:One is that protection pile body avoids colliding with causing pile body to produce in transportation Mass defect, second is when welding integument in the later stage, to be easy to integument to be welded to connect with irony protective layer, to realize integument Set.
In order to overcome the shortcomings of that connection speed is slow in the prior art, present invention also offers a kind of two sections of prefabricated piles of connection Method, passes through the setting of this method so that two sections of prefabricated pile connection speeds are fast, and ensure the perpendicularity of prefabricated pile connection.
A kind of method for connecting two sections of prefabricated piles, is comprised the following steps that:
1) by lower section stake implantation ground, the pile crown of lower section stake is exposed, pile crown is fixed with ring flange, by the stake of upper section stake bottom Head is fixed with another ring flange;
2) dowel is set through pile crown of the ring flange end in lower section stake around lower section stake, the bottom of dowel is with Section stake top portion is connected;
3) upper section stake is lifted by lifting machinery, upper section stake is alignd with lower section stake, and will insert upper section at the top of dowel The bottom of stake;
4) junction around upper section stake, the stake of lower section sets integument;
5) cement grout is injected to inside integument.
Compared with prior art, the beneficial effects of the invention are as follows:
1) upper and lower section stake is connected by the cage bar of upper and lower section stake by connector flange and structure, improves pile body overall Property and bending strength.
2) by the setting of nut, dowel, upper and lower section stake is connected to become entirety, the anti-pulling for improving pile body is strong Degree.
3) by injecting cement mortar in the junction of upper and lower section stake, dowel is poured and builds up reinforced concrete structure, is carried The high shearing strength of joint location, further increases the performance of prefabricated pile pile body.
4) by injecting cement mortar, the corrosion resistance of pile joint is effectively increased, it is ensured that pile body is in the underground space Service life.
5) connection by whole operation step to upper and lower section stake, simple to operate, is easy to execute-in-place to construct, feasibility It is high.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its illustrate be used for explain the application, do not constitute the improper restriction to the application.
Fig. 1 is upper section stake, lower section stake connection diagram;
Fig. 2 assigns schematic diagram for lower section stake with dowel;
Fig. 3 is lower section stake and pile body preformed hole schematic diagram;
Fig. 4 is dowel and nut schematic diagram;
Schematic diagram after the completion of Fig. 5 connects for upper section stake, the stake of lower section.
In figure:1st, upper section stake, 2, lower section stake, 3, flange, 4, preformed hole, 5, screw hole, 6, irony protective layer, 7, screw-thread steel Muscle, 8, nut, 9, injected hole, 10, pile crown, 11. iron sheets.
Embodiment
It is noted that described further below is all exemplary, it is intended to provide further instruction to the application.Unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
As background technology is introduced, attachment structure is complicated in the prior art, and stress concentration is easily produced in junction Deficiency, in order to solve technical problem as above, present applicant proposes a kind of quick pile splicing structure, prefabricated pile and method.
In a kind of typical embodiment of the application, as depicted in figs. 1 and 2, a kind of quick pile splicing structure, including connection Part, connector is fastenedly connected respectively between upper section stake 1, lower section stake 2, and with upper section stake 1, lower section stake 2;Dowel, Dowel is set through connector, and the two ends of dowel are each attached respectively with upper section stake 1, lower section stake 2;Fastener, Fastener is located on dowel to lock connector and dowel.
Above-mentioned quick pile splicing structure is laid between upper section stake, the stake of lower section by connector, improves pile body globality And bending strength, play first layer connection, then by dowel be spiral 7 realize to it is upper section stake 1, it is lower section stake 2 second Layer connection function, effectively prevent stress concentration, improves the anti-drawing strength of pile body, connection is effectively ensured in the setting of fastener Locking between muscle and connector, improves the stability of strutting system of whole quick pile splicing structure.
Connector is flange 3, and flange 3 and the cage bar of upper section stake, the stake of lower section are welded and fixed, and flange and upper section are realized with this Stake, lower section stake are connected.Fastener is nut 8, and nut 8 is respectively provided with the both sides up and down of flange 3, and one is entered by nut 8 Step is fastenedly connected to flange 3 and dowel, is set on dowel and connector setting is then passed through after a nut 8, in connection The lower section of part sets the passing through in order to dowel of nut 8, and the dowel of one nut 8 of band can be set in advance transports existing again , save the field worker engineering time.
Dowel is provided with many, and dowel is arranged to a circle, and the distance that setting is spaced between every adjacent two dowels is set Put, the structure so constituted avoids stress concentration between two sections of prefabricated piles, if prefabricated pile cross section is square, dowel is uniform Cube structure is arranged to, if prefabricated pile cross section is cylinder, dowel is evenly arranged into cylindrical shape.
In order to overcome the deficiencies in the prior art, present invention also offers second embodiment:A kind of merogenesis connects prefabricated pile, should Prefabricated pile is attached per two adjacent section prefabricated piles by above-mentioned pile splicing structure, and connection speed is fast, passes through many dowels Setting, stress is more uniform, and stability is high.
A kind of merogenesis connection prefabricated pile includes:
Connected between at least two section prefabricated piles, two adjacent section prefabricated piles by a kind of described quick pile splicing structure Connect, the prefabricated pile is connected by multilayer, on the premise of connection speed is ensured, be effectively ensured vertical after prefabricated pile connection Degree.
For the two section prefabricated piles for needing to connect, pile crown is provided with the top of lower section stake, the bottom of upper section stake is again provided with Pile crown, pile crown protrudes from prefabricated pile setting, and the size of pile crown is less than the size of prefabricated pile, and pile crown is located at the center of prefabricated pile, The surface of pile crown carries out dabbing processing, so that pile crown surface is more smooth, so as to be further ensured that the perpendicularity of prefabricated pile, pile crown Shape and the shape of prefabricated pile be consistent.
For the ease of passing through for dowel, the size of connector is more than the size of the pile crown, to ensure that dowel is surrounded The circle of pile crown one is set;
Integument is set in upper section stake 1 and lower section stake 2 junction, and integument is iron sheet 11, iron sheet 11 be a monoblock or Four pieces of compositions, silk block iron sheet is separately positioned on every one side of junction, and the upper and lower ends of iron sheet 11 are connected with prefabricated pile respectively Connect, be equally tightly connected between adjacent prefabricated pile, iron sheet is provided with an injected hole 9, Grouting Pipe is prefabricated to two sections by injected hole 9 Stake junction filling concrete slurries, are supported with giving the stable of third layer, improve the shearing strength of joint location, and ensure Service life of the pile body in the underground space.
Preformed hole 4 is provided with the week side of boss of the upper surface pile crown of lower section stake 2, the size of preformed hole 4 is more than the size of dowel, As shown in figure 3, preformed hole 4 is worn for the dowel, equally it is provided with the week side of boss of the lower surface pile crown of upper section stake 1 for connecting The preformed hole that muscle is worn is connect, preformed hole is screwed hole, and dowel coordinates to ensure dowel and upper section stake 1, lower section with screwed hole The connection validity of stake 2, the passing through in order to spiral 7 of screw hole 5 is provided with the side of flange 3.
In order to avoid causing damage to be provided with irony protective layer 6, iron in the upper surface of lower section stake 2 in work progress to prefabricated pile Quality guarantee sheath 6 is embedded in the end of the lower section stake top of stake 2;Irony protective layer 6 is again provided with the lower surface of upper section stake 1, irony is protected Sheath 6 is embedded in the end at 1 bottom of section stake.
In order to overcome the shortcomings of that connection speed is slow in the prior art, present invention also offers 3rd embodiment:One kind connection The method of two sections of prefabricated piles, passes through the setting of this method so that two sections of prefabricated pile connection speeds are fast, and ensures prefabricated pile connection Perpendicularity.
The concrete operation step of this method is as follows:
Step 1:Upper section stake 1, lower section stake 2 make processing.
Upper section stake 1, lower section stake 2 are square reinforced concrete pile, in order to avoid causing to damage in work progress to prefabricated pile Hinder and irony protective layer is provided with the upper surface of lower section stake, irony protective layer is embedded in the end of lower section stake stake top;In upper section stake Lower surface is again provided with irony protective layer, and irony protective layer is embedded in the end at section stake stake bottom;
Upper section stake 1 bottom is provided projectingly pile crown, the top of lower section stake 2 and is provided projectingly pile crown 10, and pile crown size is less than prefabricated pile Size;
Ring flange is set at the lower top of section stake 2, and ring flange and the cage bar of lower section stake 2 are welded to connect, and upper section stake 1 bottom is set Another ring flange being connected with upper section stake 1, this ring flange coordinates with foregoing ring flange constitutes flange 3.
Step 2:The implantation and fixation of lower section stake 2.
Lower section stake 2 implantation is to draw hole on ground, coordinates pile extension platform to draw lower section stake 2 implantation in hole using lifting machinery, And be held in pile extension platform, the pile crown 10 of lower section stake 2 is exposed.
Step 3:Upper section stake 1 lifting and the lower section centering of stake 2.
Before upper section stake 1 is alignd with lower section stake 2, nut is set in flange base, nut 8 is installed on spiral 7, As shown in figure 4, upper end and dowel i.e. spiral 7 to lock flange 3;
Spiral 7 is put into the screw hole 5 and pile body preformed hole 4 that flange 3 is reserved;
Anchoring adhesive is filled in the preformed hole 4 of upper section stake 1;
After upper section stake 1 is lifted, upper section stake 1 is sling using lifting machinery, alignd with lower section stake 2, and keep section stake 1 to erect Directly;
Anchoring adhesive is poured into the lower section pile body preformed hole 4 of stake 2.
In addition, the nut located at flange bottom can first be fixed by glue with flange, to facilitate subsequent operation to construct, save On-site construction time.
Step 4:The upper and lower nut 8 of spiral 7 is tightened.
Step 5:One layer of iron sheet 11 is welded with lower section stake 2 appearance in upper section stake 1, as shown in figure 5, joint location is closed into One cavity;
Iron sheet 11 is welded with pile joint irony protective layer 6, and iron sheet 11 wherein has one piece to be reserved with injected hole 10, injected hole 10 Size is fixed according to slip casting pipe size, and diameter is slightly larger than slip casting pipe diameter.
Step 6:By injected hole 10, the water filling cement mortar into cavity, cement mortar, grout coordinate ratio meets mobility and strong Degree is required;
After the completion of slip casting, injected hole 10 is blocked using stopple.
The preferred embodiment of the application is the foregoing is only, the application is not limited to, for the skill of this area For art personnel, the application can have various modifications and variations.It is all within spirit herein and principle, made any repair Change, equivalent substitution, improvement etc., should be included within the protection domain of the application.

Claims (10)

1. a kind of quick pile splicing structure, it is characterised in that including:
Connector, connector is fastenedly connected respectively between upper section stake, the stake of lower section, and with upper section stake, the stake of lower section;
Dowel, dowel is set through connector, and the two ends of dowel are each connected respectively with upper section stake, the stake of lower section Connect;
Fastener, fastener is located on dowel to lock connector and dowel.
2. a kind of quick pile splicing structure according to claim 1, it is characterised in that the fastener is nut.
3. a kind of quick pile splicing structure according to claim 1 or 2, it is characterised in that the connector is flange, flange It is welded and fixed with the cage bar of upper section stake, the stake of lower section.
4. a kind of quick pile splicing structure according to claim 1, it is characterised in that the dowel is provided with many, connection Muscle is arranged to a circle, and the distance that setting is spaced between every adjacent two dowels is set.
5. a kind of merogenesis connects prefabricated pile, it is characterised in that including:
It is fast by one kind as any one of claim 1-4 between at least two section prefabricated piles, two adjacent section prefabricated piles Fast pile splicing structure is attached.
6. a kind of merogenesis connection prefabricated pile according to claim 5, it is characterised in that saved for need to connect two prefabricated Stake, pile crown is provided with the top of lower section stake, and the bottom of upper section stake is again provided with pile crown, and pile crown protrudes from prefabricated pile setting, pile crown Size be less than prefabricated pile size.
7. a kind of merogenesis connection prefabricated pile according to claim 6, it is characterised in that the size of the connector is more than institute State the size of pile crown;
Further, integument is set with lower section stake junction in upper section stake.
8. a kind of merogenesis connection prefabricated pile according to claim 6, it is characterised in that in the lower upper surface pile crown for saving stake The week side of boss is provided with preformed hole, and preformed hole is worn for the dowel, and use is equally provided with the week side of boss of the lower surface pile crown of upper section stake The preformed hole worn in dowel.
9. a kind of merogenesis connection prefabricated pile according to claim 6, it is characterised in that be provided with iron in the upper surface of lower section stake Quality guarantee sheath;
Further, it is again provided with irony protective layer in the lower surface of upper section stake.
10. a kind of method for connecting two sections of prefabricated piles, it is characterised in that comprise the following steps that:
1) by lower section stake implantation ground, expose the pile crown of lower section stake, pile crown fixes with ring flange, by the pile crown of upper section stake bottom and Another ring flange is fixed;
2) dowel, the bottom of dowel and lower section stake are set through pile crown of the ring flange end in lower section stake around lower section stake Top is connected;
3) upper section stake is lifted by lifting machinery, upper section stake is alignd with lower section stake, and upper section stake will be inserted at the top of dowel Bottom;
4) junction around upper section stake, the stake of lower section sets integument;
5) cement grout is injected to inside integument.
CN201710178426.XA 2017-03-23 2017-03-23 A kind of quick pile splicing structure, prefabricated pile and method Pending CN107059844A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710178426.XA CN107059844A (en) 2017-03-23 2017-03-23 A kind of quick pile splicing structure, prefabricated pile and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710178426.XA CN107059844A (en) 2017-03-23 2017-03-23 A kind of quick pile splicing structure, prefabricated pile and method

Publications (1)

Publication Number Publication Date
CN107059844A true CN107059844A (en) 2017-08-18

Family

ID=59617959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710178426.XA Pending CN107059844A (en) 2017-03-23 2017-03-23 A kind of quick pile splicing structure, prefabricated pile and method

Country Status (1)

Country Link
CN (1) CN107059844A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930268A (en) * 2018-07-25 2018-12-04 暨南大学 Rotate nested type pile for prestressed pipe mechanical connection head and its construction method
CN112343051A (en) * 2020-11-14 2021-02-09 中冶成都勘察研究总院有限公司 Method for rotary digging implantation pile sinking in high backfill region
CN113653044A (en) * 2021-08-10 2021-11-16 大成科创基础建设股份有限公司 Construction method of deep soft soil pipe pile

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT357947B (en) * 1978-11-30 1980-08-11 Naegele & Co Bau CONNECTING ARRANGEMENT BETWEEN INDIVIDUAL PARTS OF A RAMP
CN1425831A (en) * 2003-01-10 2003-06-25 颜肖鸿 Butt device for prefabricated concrete pile and its producing method
CN1480593A (en) * 2002-09-06 2004-03-10 西胁醇 Connection structure of pile
CN201221081Y (en) * 2008-06-02 2009-04-15 华升建设集团有限公司 Connecting structure of prestressed concrete pipe pile
CN101451357A (en) * 2008-12-31 2009-06-10 童常荣 Anti-corrosive method of prestressing concrete pipe pile joint and concrete pipe pile prepared thereby
CN201276702Y (en) * 2008-09-08 2009-07-22 马纯杰 Pile splicing structure of precast prestressed concrete pipe pile
CN203782694U (en) * 2014-01-10 2014-08-20 浙江垠桥能源科技发展有限公司 Easy-positioning blind plate for connecting building static drill pile foundation rooting piles
CN104099926A (en) * 2013-04-10 2014-10-15 斯马泰克工程技术株式会社 Connecting Device Of High Strength Hollow Concrete Piles And Connecting Construction Utilizing Same
CN104540999A (en) * 2013-08-21 2015-04-22 王志财 End plate applied to concrete pile

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT357947B (en) * 1978-11-30 1980-08-11 Naegele & Co Bau CONNECTING ARRANGEMENT BETWEEN INDIVIDUAL PARTS OF A RAMP
CN1480593A (en) * 2002-09-06 2004-03-10 西胁醇 Connection structure of pile
CN1425831A (en) * 2003-01-10 2003-06-25 颜肖鸿 Butt device for prefabricated concrete pile and its producing method
CN201221081Y (en) * 2008-06-02 2009-04-15 华升建设集团有限公司 Connecting structure of prestressed concrete pipe pile
CN201276702Y (en) * 2008-09-08 2009-07-22 马纯杰 Pile splicing structure of precast prestressed concrete pipe pile
CN101451357A (en) * 2008-12-31 2009-06-10 童常荣 Anti-corrosive method of prestressing concrete pipe pile joint and concrete pipe pile prepared thereby
CN104099926A (en) * 2013-04-10 2014-10-15 斯马泰克工程技术株式会社 Connecting Device Of High Strength Hollow Concrete Piles And Connecting Construction Utilizing Same
CN104540999A (en) * 2013-08-21 2015-04-22 王志财 End plate applied to concrete pile
CN203782694U (en) * 2014-01-10 2014-08-20 浙江垠桥能源科技发展有限公司 Easy-positioning blind plate for connecting building static drill pile foundation rooting piles

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930268A (en) * 2018-07-25 2018-12-04 暨南大学 Rotate nested type pile for prestressed pipe mechanical connection head and its construction method
CN112343051A (en) * 2020-11-14 2021-02-09 中冶成都勘察研究总院有限公司 Method for rotary digging implantation pile sinking in high backfill region
CN112343051B (en) * 2020-11-14 2022-04-01 中冶成都勘察研究总院有限公司 Method for rotary digging implantation pile sinking in high backfill region
CN113653044A (en) * 2021-08-10 2021-11-16 大成科创基础建设股份有限公司 Construction method of deep soft soil pipe pile

Similar Documents

Publication Publication Date Title
CN105781125B (en) A kind of installation method of assembled architecture
CN206971232U (en) A kind of oblique inner support foundation pit enclosure structure of shaped steel cement earth pile
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN102828518A (en) Prestressed anchor cable anchoring structure of manual hole digging support pile and construction method thereof
CN103046557A (en) Foundation pit water-sealing supporting method by using long spiral cement soil mixing structural steel pile
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN110241828A (en) The outer sealing construction method for supporting of anchor in a kind of row's grating tubular pole grouting behind shaft or drift lining
CN207512752U (en) A kind of tall earth fill supporting construction
JP2015183364A (en) Method for preventing soil structure from sliding at slope surface layer with geocell fixing operation auxiliary means
CN109113749A (en) Four line large section railway tunnel construction method of weak surrounding rock
CN107059844A (en) A kind of quick pile splicing structure, prefabricated pile and method
CN109972630A (en) A kind of foundation pit enclosure structure and its construction method of the assembly of PC component
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN111593757A (en) Circuit pole tower and tower loop-shaped pile anchor composite foundation suitable for karst region and construction method thereof
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN206635768U (en) Composite soil nailing wall and pile-anchor retaining composite supporting construction
CN219416160U (en) Fixed monitoring pile for high-diving mining area
CN210263075U (en) Arrange bars formula tubular pile post back slip casting internal anchor outer stagnant water support system
CN102220764A (en) Deep foundation pit bracing system and construction method thereof
CN116242310A (en) Pile distribution method for fixed monitoring piles for high-water-level mining areas
CN207160041U (en) Anchor rod type artificial digging pile
CN107542086B (en) Anchor cable construction method for filling slope
JPS58178706A (en) Caisson and its setting
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818