CN107055451A - Link-type train jar opening sealer - Google Patents

Link-type train jar opening sealer Download PDF

Info

Publication number
CN107055451A
CN107055451A CN201710408903.7A CN201710408903A CN107055451A CN 107055451 A CN107055451 A CN 107055451A CN 201710408903 A CN201710408903 A CN 201710408903A CN 107055451 A CN107055451 A CN 107055451A
Authority
CN
China
Prior art keywords
fixed
journal stirrup
push rod
link
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710408903.7A
Other languages
Chinese (zh)
Other versions
CN107055451B (en
Inventor
陈普宽
卢西林
钱进
尚庆付
赵华苏
邱跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIANYUNGANG TIANBANG SCIENCE AND TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
LIANYUNGANG TIANBANG SCIENCE AND TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANYUNGANG TIANBANG SCIENCE AND TECHNOLOGY DEVELOPMENT Co Ltd filed Critical LIANYUNGANG TIANBANG SCIENCE AND TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201710408903.7A priority Critical patent/CN107055451B/en
Publication of CN107055451A publication Critical patent/CN107055451A/en
Application granted granted Critical
Publication of CN107055451B publication Critical patent/CN107055451B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67DDISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
    • B67D7/00Apparatus or devices for transferring liquids from bulk storage containers or reservoirs into vehicles or into portable containers, e.g. for retail sale purposes
    • B67D7/06Details or accessories
    • B67D7/42Filling nozzles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67DDISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
    • B67D7/00Apparatus or devices for transferring liquids from bulk storage containers or reservoirs into vehicles or into portable containers, e.g. for retail sale purposes
    • B67D7/06Details or accessories

Abstract

The present invention relates to fluid media (medium) field of sealing technology, the sealing device that can be connected with oil filling riser is particularly, specifically a kind of link-type train jar opening sealer.The sealing device includes closure, sealing gasket, drive rod, fixed cover, sliding sleeve, single connecting rod journal stirrup, double link journal stirrup, extension spring, cross bar, the first push rod, the second push rod, control stick and power set;One end of first push rod is fixed on cross bar, and one end of the second push rod is fixed on the bottom of double link journal stirrup, and one end of control stick is fixed on single connecting rod journal stirrup, and the other end of the other end of the first push rod, the other end of the second push rod and control stick links together.The present invention can be applied to the closed loading of the various media of train, and it, without precise alignment, can connect without increase miscellaneous part with train tank mouth, realize rapid and handy connection;Can also be harmless to oil filling riser from primary lock;And good sealing effect, can lift entrucking filling efficiency.

Description

Link-type train jar opening sealer
Technical field:
The present invention relates to fluid media (medium) field of sealing technology, the sealing device that can be particularly connected with oil filling riser, specifically one Plant link-type train jar opening sealer.
Background technology:
, can be special by means of transportation such as pipeline, train and automobiles in the transport of the fluid media (medium)s such as oil, natural gas Be not that train means of transportation has punctual, safety, freight volume is big, speed is fast, reliability is high, distance, freight charges are low, pollution is light and The advantages of climate influence is small.But, it is necessary to which fluid entrucking is filled before the fluid using train transporting petroleum chemical industry Into train tank, and the filling of entrucking at present mostly uses open type, i.e., oil fuel tube is inserted directly into train tank mouth, in entrucking plus During note, the gas that fluid media (medium) volatilization is produced in the residual gas and filling process in train tank is all directly discharged to greatly In gas, environmental pollution is not only caused, and very big influence is caused to safety in production and personal safety, or even can also when serious Fire and explosion accident are caused, while also result in the waste of fluid media (medium).
In order to seal train tank mouth, a variety of sealing devices on the nanubrium of oil filling riser, example are disclosed in the prior art Clamp automobile as patent CN201610475977.8 discloses a kind of leading screw-connecting rod, tinning mouth sealing device on train, it includes Leading screw driving source, pump supporting plate, support bar, leading screw, screw, slide plate, liquid-phase tube adpting flange, connecting rod, liquid-phase tube, sealing Cylinder, gas phase pipe adpting flange, sliding sleeve, sealing ring, automobile tank mouth, parallelogram linkage, auxiliary connecting rod, hinge support bar And copper wheel, the upper end of leading screw is connected through pump supporting plate with leading screw driving source, and lower end and the screw of leading screw are connected through a screw thread, institute The quantity of parallelogram linkage is stated for 3,3 parallelogram linkages along the sealing drum inner periphery uniformly to divide Cloth, each parallelogram linkage includes four connecting rods, and copper wheel is in sealing drum groove;Although the sealing device has one Fixed sealing effectiveness, but use lead screw transmission so that complicated integral structure, it is not easy to rapid and handy connection, influence fluid dress The efficiency of car filling.
The content of the invention:
The technical problems to be solved by the invention are there is overall structure when sealing train tank mouth for prior art to answer It is miscellaneous, be not easy to rapid and handy connection and may influence fluid entrucking fill efficiency the shortcomings of there is provided a kind of link-type train Jar opening sealer.
The technical scheme adopted by the invention to solve the technical problem is that:Link-type train jar opening sealer, is arranged on On the nanubrium of oil filling riser, it is characterised in that:Including closure, sealing gasket, drive rod, fixed cover, sliding sleeve, single connecting rod journal stirrup, doubly-linked Bar journal stirrup, extension spring, cross bar, the first push rod, the second push rod, control stick and power set;Closure is fixed on the outer surface of nanubrium On, sealing gasket is fixedly installed on the lower surface of closure, and fixed cover is set in the outer surface of nanubrium and its top and is fixed on sealing The lower surface of lid, the external diameter of fixed cover is less than the internal diameter of train tank mouth, and the internal diameter of fixed cover is more than the external diameter of nanubrium;Sliding sleeve can be slided The outer surface of fixed cover is set in dynamicly, and the bottom of drive rod is fixed on the top of sliding sleeve, and the top of drive rod passes through closure It is connected with power set, power set can drive drive rod to move up and down;Single connecting rod journal stirrup is fixed on the bottom of sliding sleeve, doubly-linked The freely slidable air-ground outer surface for being enclosed on sliding sleeve of bar journal stirrup and the top for being located at single connecting rod journal stirrup, extension spring are fixed on single connecting rod branch Between ear and double link journal stirrup;One end of cross bar is fixed on the top of double link journal stirrup, and the other end of cross bar is in water in cross bar Distance during level state apart from train tank mouth axis is more than the internal diameter of train tank mouth;One end of first push rod is fixed on cross bar, One end of second push rod is fixed on the bottom of double link journal stirrup, and one end of control stick is fixed on single connecting rod journal stirrup, the first push rod The other end, the other end of the second push rod and the other end of control stick link together.
Wherein, the peripheral dimension of closure is more than the external diameter of train tank mouth.
Wherein, the peripheral dimension of sealing gasket is less than the interior of train tank mouth more than the external diameter and its inner circumferential size of train tank mouth Footpath.
Wherein, the sealing gasket selects rubber gasket.
Wherein, power set are fixed on sealing cap upper surface.
Wherein, the link-type train jar opening sealer also includes feather key, and the feather key is fixed on double link branch The top of ear, guide groove is milled with the outer surface of fixed cover, and feather key is slidably mounted in the guide groove.
Wherein, fixing point one end of the first push rod being fixed on cross bar is defined as A points, by the another of the first push rod The tie point that the other end at end, the other end of the second push rod and control stick links together is defined as B points, by the one of the second push rod The fixing point for the bottom for being fixed on double link journal stirrup is held to be defined as C points, when cross bar is in horizontality, A points, B points and C points position In on straight line.
The present invention is due to taking above-mentioned technical proposal, and it has the advantages that:
Link-type train jar opening sealer of the present invention, can be applied to the closed loading of the various media of train, It, without precise alignment, can connect without increase miscellaneous part with train tank mouth, realize rapid and handy connection;Can also It is harmless to oil filling riser from primary lock;And good sealing effect, can lift entrucking filling efficiency.
Brief description of the drawings:
Fig. 1 is the structural representation for the link-type train jar opening sealer that connecting rod of the present invention is in collapsed state Figure;
Fig. 2 is the structural representation for the link-type train jar opening sealer that connecting rod of the present invention is in open mode Figure;
Embodiment:
Present disclosure is described further below in conjunction with accompanying drawing.
As depicted in figs. 1 and 2, link-type train jar opening sealer of the present invention, installed in the nanubrium 100 of oil filling riser On, it can seal train tank mouth 101 after oil filling riser insertion train tank mouth 101, it is characterised in that:Including closure 1, sealing gasket 2, Drive rod 3, fixed cover 4, sliding sleeve 5, single connecting rod journal stirrup 6, double link journal stirrup 7, extension spring 9, cross bar 10, the first push rod 11, second top Bar 12 and control stick 13;Closure 1 is fixed on the outer surface of nanubrium 100, and nanubrium 100 is inserted into train tank mouth 101, close The peripheral dimension of capping 1 is more than the external diameter of train tank mouth 101, so ensures that the link-type train jar opening sealer exists Closure 1 covers all train tank mouth 101 during sealing, it is ensured that sealing effectiveness;Sealing gasket 2 is fixedly installed on closure 1 Lower surface, the peripheral dimension of sealing gasket 2 is less than the interior of train tank mouth 101 more than the external diameter and its inner circumferential size of train tank mouth 101 Footpath, thus enables sealing gasket 2 cover all train tank mouth 101, further ensures sealing effectiveness;The sealing gasket 2 Rubber gasket can be selected;Fixed cover 4 is set in the outer surface of nanubrium 100 and its top and is fixed on the lower surface of closure 1, The external diameter of fixed cover 4 is less than the internal diameter of train tank mouth 101, and the internal diameter of fixed cover 4 is more than the external diameter of nanubrium 100;Sliding sleeve 5 is slidably Ground is set in the outer surface of fixed cover 4, and the bottom of drive rod 3 is fixed on the top of sliding sleeve 5, and the top of drive rod 3 passes through sealing Lid 1 is connected with power set (not shown), and power set are fixed on the upper surface of closure 1, and power set can drive drive rod 3 Move up and down to drive sliding sleeve 5 to slide up and down in the outer surface of fixed cover 4;Single connecting rod journal stirrup 6 is fixed on the bottom of sliding sleeve 5, It can be moved up and down together with sliding sleeve 5;The freely slidable air-ground outer surface for being enclosed on sliding sleeve 5 of double link journal stirrup 7 and positioned at Dan Lian The top of bar journal stirrup 6, extension spring 9 is fixed between single connecting rod journal stirrup 6 and double link journal stirrup 7, so as to control single connecting rod journal stirrup 6 and double Connecting rod journal stirrup 7 has close trend;One end of cross bar 10 is fixed on the top of double link journal stirrup 7, and the other end of cross bar 10 is in cross bar 10 be in horizontality when apart from the axis of train tank mouth 101 distance be more than train tank mouth 101 internal diameter so that connecting rod is in In the case of open mode, cross bar 10 can arrive to the bottom wall of train tank mouth 101;One end of first push rod 11 is fixed on cross bar 10 On, one end of the second push rod 12 is fixed on the bottom of double link journal stirrup 7, and one end of control stick 13 is fixed on single connecting rod journal stirrup 6, The other end of the other end of first push rod 11, the other end of the second push rod 12 and control stick 13 links together.
Wherein, the link-type train jar opening sealer also includes feather key 8, and the feather key 8 is fixed on double link The top of journal stirrup 7, guide groove (not shown) is milled with the outer surface of fixed cover 4, and feather key 8 is slidably mounted in the guiding In groove, slip of the feather key 8 in the guide groove is so as to limit the space slided up and down of double link journal stirrup 7.
Wherein, fixing point one end of the first push rod 11 being fixed on cross bar 10 is defined as A points, by the first push rod 11 The tie point that the other end of the other end, the other end of the second push rod 12 and control stick 13 links together is defined as B points, by second The fixing point that one end of push rod 12 is fixed on the bottom of double link journal stirrup 7 is defined as C points, when cross bar 10 is in horizontality, A Point, B points and C points are located on straight line;So as to realize self-locking;This can be by setting single connecting rod journal stirrup 6 and double link journal stirrup 7 Between minimum range realize final A points, B points and C points be located at straight line on.
Link-type train jar opening sealer of the present invention is being put into train tank mouth 101 or lift-off train tank mouth 101 When, connecting rod is packed up;In pinch seal train tank mouth 101, connecting rod is opened.
Connecting rod packs up action:The link-type train jar opening sealer is being put into train tank mouth 101 or lift-off train During tank mouth 101, Fig. 2 is set as original state, now cross bar 10 is in horizontality, drive rod 3 is moved downward, the band of drive rod 3 The dynamic slide downward of sliding sleeve 5, sliding sleeve 5 drives single connecting rod journal stirrup 6 to move downward, and double link journal stirrup 7 follows list in the presence of extension spring 9 Connecting rod journal stirrup 6 is moved downwardly together;When feather key 8 touches the lower notch of the guide groove of fixed cover 4, double link journal stirrup 7 is not Move still further below, single connecting rod journal stirrup 6 continues to move downward, single connecting rod journal stirrup 6 drives control stick 13 to move downward, the band of control stick 13 Dynamic second push rod 12 is rotated counterclockwise using C points as the center of circle, and the first push rod 11 links simultaneously, so as to drive cross bar 10 to turn to Fig. 1 Shown position, i.e., in vertically downward state, now drive rod 3 stops moving downward, and completes connecting rod and packs up action;
Connecting rod opening action:When making the link-type train jar opening sealer pinch seal train tank mouth 101, setting Fig. 1 is original state, and now cross bar 10 is in vertically downward state, and drive rod 3 is moved upwards, and drive rod 3 drives sliding sleeve 5 upward Slide, sliding sleeve 5 drives the motion upwards of single connecting rod journal stirrup 6, double link journal stirrup 7 and feather key 8 in the presence of extension spring 9 still with it is solid Surely the lower notch contact of the guide groove of set 4, double link journal stirrup 7 is not moved;Single connecting rod journal stirrup 6 drives control stick 13 to transport upwards Dynamic, control stick 13 drives the second push rod 12 to be rotated clockwise using C points as the center of circle, and the first push rod 11 links simultaneously, when A points, B points and When C points are in a straight line, cross bar 10 turns to position shown in Fig. 2, i.e., in horizontality, completes connecting rod opening action;
Pinch seal:When connecting rod is in open mode, now cross bar 10 is in horizontality, and drive rod 3 is continued up Motion, feather key 8 departs from the lower notch of the guide groove of fixed cover 4, and cross bar 10 keeps horizontality to follow sliding sleeve 5 to transport upwards together It is dynamic, when cross bar 10 arrives to the bottom wall of train tank mouth 101, due to A points, B points and C points point-blank, connecting rod self-locking;Due to The power set (not shown) of drive rod 3 is fixed on closure 1, and sealing gasket 2 is pushed down train tank mouth 101 by closure 1, is realized The sealing of train tank mouth.

Claims (7)

1. link-type train jar opening sealer, on the nanubrium of oil filling riser, it is characterised in that:Including closure, sealing gasket, Drive rod, fixed cover, sliding sleeve, single connecting rod journal stirrup, double link journal stirrup, extension spring, cross bar, the first push rod, the second push rod, control stick and Power set;Closure is fixed on the outer surface of nanubrium, and sealing gasket is fixedly installed on the lower surface of closure, and fixed cover is arranged The lower surface of closure is fixed on the outer surface of nanubrium and its top, the external diameter of fixed cover is less than the internal diameter of train tank mouth, Gu Surely the internal diameter covered is more than the external diameter of nanubrium;Sliding sleeve is slideably set in the outer surface of fixed cover, and the bottom of drive rod is fixed on The top of sliding sleeve, the top of drive rod is connected through closure with power set, and power set can drive and be transported above and below drive rod It is dynamic;Single connecting rod journal stirrup is fixed on the bottom of sliding sleeve, the freely slidable air-ground outer surface for being enclosed on sliding sleeve of double link journal stirrup and is located at The top of single connecting rod journal stirrup, extension spring is fixed between single connecting rod journal stirrup and double link journal stirrup;One end of cross bar is fixed on double link The top of journal stirrup, the other end of cross bar is more than train tank mouth when cross bar is in horizontality apart from the distance of train tank mouth axis Internal diameter;One end of first push rod is fixed on cross bar, and one end of the second push rod is fixed on the bottom of double link journal stirrup, control stick One end be fixed on single connecting rod journal stirrup, the other end of the other end of the first push rod, the other end of the second push rod and control stick connects It is connected together.
2. link-type train jar opening sealer according to claim 1, it is characterised in that:The peripheral dimension of closure is big In the external diameter of train tank mouth.
3. link-type train jar opening sealer according to claim 1, it is characterised in that:The peripheral dimension of sealing gasket is big It is less than the internal diameter of train tank mouth in the external diameter and its inner circumferential size of train tank mouth.
4. link-type train jar opening sealer according to claim 1, it is characterised in that:The sealing gasket selects rubber Sealing gasket.
5. link-type train jar opening sealer according to claim 1, it is characterised in that:Power set are fixed on sealing Cap upper surface.
6. link-type train jar opening sealer according to claim 1, it is characterised in that:The link-type train tank mouth Sealing device also includes feather key, and the feather key is fixed on the top of double link journal stirrup, is milled with and leads in the outer surface of fixed cover To groove, feather key is slidably mounted in the guide groove.
7. link-type train jar opening sealer according to claim 1, it is characterised in that:One end of first push rod is consolidated The fixing point being scheduled on cross bar is defined as A points, by the another of the other end of the first push rod, the other end of the second push rod and control stick Hold the tie point linked together to be defined as B points, one end of the second push rod is fixed on to the fixing point of the bottom of double link journal stirrup C points are defined as, when cross bar is in horizontality, A points, B points and C points are located on straight line.
CN201710408903.7A 2017-06-02 2017-06-02 Link-type train jar opening sealer Active CN107055451B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710408903.7A CN107055451B (en) 2017-06-02 2017-06-02 Link-type train jar opening sealer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710408903.7A CN107055451B (en) 2017-06-02 2017-06-02 Link-type train jar opening sealer

Publications (2)

Publication Number Publication Date
CN107055451A true CN107055451A (en) 2017-08-18
CN107055451B CN107055451B (en) 2018-04-24

Family

ID=59615727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710408903.7A Active CN107055451B (en) 2017-06-02 2017-06-02 Link-type train jar opening sealer

Country Status (1)

Country Link
CN (1) CN107055451B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107697497A (en) * 2017-09-27 2018-02-16 洛阳欣谱石化设备有限公司 A kind of operating method for oil truck internal fastening type sealing device
CN110775933A (en) * 2019-11-07 2020-02-11 安徽安凯汽车股份有限公司 Oil can device for clutch oiling
CN114455532A (en) * 2022-02-10 2022-05-10 西安索睿科技有限公司 Multifunctional filling vertical pipe for butt joint of fluid tank truck

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19543034A1 (en) * 1995-11-07 1997-05-15 Peter Dr Ing Loeffler Device for automatic filling of vehicle fuel tank at filling station
CN202369380U (en) * 2011-12-19 2012-08-08 信众 Swing arm type telescopic loading crane pipe sealing cover
CN103950882A (en) * 2014-05-15 2014-07-30 连云港天邦科技开发有限公司 Pneumatic locking type sealing device
CN105947963A (en) * 2016-06-27 2016-09-21 连云港天邦科技开发有限公司 Lead screw-connecting rod clamping vehicle and train tank opening sealing device
CN206799155U (en) * 2017-06-02 2017-12-26 连云港天邦科技开发有限公司 Link-type train jar opening sealer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19543034A1 (en) * 1995-11-07 1997-05-15 Peter Dr Ing Loeffler Device for automatic filling of vehicle fuel tank at filling station
CN202369380U (en) * 2011-12-19 2012-08-08 信众 Swing arm type telescopic loading crane pipe sealing cover
CN103950882A (en) * 2014-05-15 2014-07-30 连云港天邦科技开发有限公司 Pneumatic locking type sealing device
CN105947963A (en) * 2016-06-27 2016-09-21 连云港天邦科技开发有限公司 Lead screw-connecting rod clamping vehicle and train tank opening sealing device
CN206799155U (en) * 2017-06-02 2017-12-26 连云港天邦科技开发有限公司 Link-type train jar opening sealer

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107697497A (en) * 2017-09-27 2018-02-16 洛阳欣谱石化设备有限公司 A kind of operating method for oil truck internal fastening type sealing device
CN107697497B (en) * 2017-09-27 2023-06-02 洛阳源和科技有限公司 Operation method for inner buckle type sealing device of tank truck
CN110775933A (en) * 2019-11-07 2020-02-11 安徽安凯汽车股份有限公司 Oil can device for clutch oiling
CN114455532A (en) * 2022-02-10 2022-05-10 西安索睿科技有限公司 Multifunctional filling vertical pipe for butt joint of fluid tank truck
CN114455532B (en) * 2022-02-10 2023-08-29 西安索睿科技有限公司 Multifunctional filling vertical pipe for butt joint of fluid tank truck

Also Published As

Publication number Publication date
CN107055451B (en) 2018-04-24

Similar Documents

Publication Publication Date Title
CN107055451B (en) Link-type train jar opening sealer
CN101289135B (en) Respiration valve
CN206799155U (en) Link-type train jar opening sealer
US3348419A (en) Solids sampling apparatus
CN102923632B (en) Seal device and seal method for hermetically entrucking loading arm
CN103950882B (en) Pneumatic locking type sealing device
US4141394A (en) Apparatus for preventing an uncontrolled emission of gaseous hydrocarbons during the filling of containers
CN204280364U (en) The railway freight oil tank of train that a kind of tank internal pressure is adjustable
CN206050598U (en) For the jack catchs type sealing device of tank car closed loading
GB838918A (en) Improvements in or relating to back-pressure bottling apparatus
US3368948A (en) Apparatus for charging coke ovens
CN206496927U (en) A kind of oil exploitation sampling equipment
CN210286731U (en) Forced telescopic vertical pipe for submerged loading
US2843161A (en) Tank filling nozzle
US1432111A (en) Relief-valve structure
CN103130172A (en) Telescopic vertical tube for loading crane tube
CN207030940U (en) Unloading oil filling riser sealing device
US3251386A (en) Filler valve assembly
CN204113773U (en) A kind of oil gas transport power train in vehicle application steering oil tank
CN203614070U (en) Oil-bailing well mouth controller
CN203653223U (en) T-shaped lock bolt bottom clamping device with crane tube sealing mechanism
CN209602075U (en) A kind of free Follow-up type seal cap
CN206375662U (en) A kind of closed filling apparatus of oil truck
US2176635A (en) Liquid transferring apparatus
CN207645085U (en) A kind of glyceride stock transhipment cone convenient for adjusting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Chen Pukuan

Inventor after: Liu Lin

Inventor after: Lu Xilin

Inventor after: Qian Jin

Inventor after: Shang Qingfu

Inventor after: Ma Xuerong

Inventor after: Zhao Huasu

Inventor after: Qiu Yue

Inventor before: Chen Pukuan

Inventor before: Lu Xilin

Inventor before: Qian Jin

Inventor before: Shang Qingfu

Inventor before: Zhao Huasu

Inventor before: Qiu Yue