CN107052742A - A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy - Google Patents
A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy Download PDFInfo
- Publication number
- CN107052742A CN107052742A CN201710109436.8A CN201710109436A CN107052742A CN 107052742 A CN107052742 A CN 107052742A CN 201710109436 A CN201710109436 A CN 201710109436A CN 107052742 A CN107052742 A CN 107052742A
- Authority
- CN
- China
- Prior art keywords
- rotating bar
- rotating shaft
- material box
- rotating
- economy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
- B23P19/001—Article feeders for assembling machines
Abstract
The invention discloses a kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy, it is characterized in that, including material box, rotating bar, back-moving spring and rotating shaft, the rotating bar is longitudinally disposed, and the material box is arranged on the upper end of the rotating bar;The back-moving spring is arranged on rear side of the lower end of rotating bar;The rotating bar is arranged in rotating shaft with rotating shaft to be turnably connected, and the rotating shaft is located between material box and back-moving spring, and the length of the rotating shaft to rotating bar lower end is less than rotating shaft to the length of rotating bar upper end.Described rotating bar is set for fore-and-aft tilt, and the material box is arranged on the front side of the rotating bar.Including pedal, the pedal is arranged on the front side of the rotating bar bottom.This installation cost is low, can effectively solve the problem of inefficiency and person works' amount are big, labor intensity is big.
Description
Technical field
The present invention relates to material delivery system, especially a kind of foot-operated thing of large-scale workpiece for meeting action Principles of Economy
Expect feedway.
Background technology
In the case that main body is larger in assembly work to be processed, material box can not be placed on people place within reach, put
It can stop the sight of operating personnel again above workpiece, therefore the material stretched out one's hand in crawl material box works to turn into and causes work to imitate
Rate is low and person works measure the reason for big, labor intensity is big.
The content of the invention
The purpose of the present invention is that there is provided a kind of large-scale workpiece for meeting action Principles of Economy is foot-operated for above-mentioned situation
Material delivery system, this installation cost is low, can effectively solve inefficiency and person works' amount is big, labor intensity asking greatly
Topic.
Realizing the technical scheme of the object of the invention is:
A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy, including
Material box;
Rotating bar, the rotating bar is longitudinally disposed, and the material box is arranged on the upper end of the rotating bar;
Back-moving spring, the back-moving spring is arranged on rear side of the lower end of rotating bar;
Rotating shaft, the rotating bar is arranged in rotating shaft with rotating shaft to be turnably connected, and the rotating shaft is located at material box with resetting
Between spring, the length of the rotating shaft to rotating bar lower end is less than rotating shaft to the length of rotating bar upper end.
On front side of the rotating bar lower end during stress, rotating bar rotates around the shaft, on front side of rotating bar lower end during non-stress, rotates
The position that bar is returned in the presence of back-moving spring before rotating.
Described rotating bar is set for fore-and-aft tilt, and the material box is arranged on the front side of the rotating bar.
Including pedal, the pedal is arranged on the front side of the rotating bar bottom.
The height of the front side of the material box is more than the height of rear side.
The described foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy is 2-4, operator's
Left foot, right crus of diaphragm respectively operate 1-2.
In use, when operator rides stress on front side of the lower end of rotating bar, rotating bar lower end, rotating bar rotates around the shaft,
So that material box from the distal end apart from operator is moved to near-end with the rotation of rotating bar upper end, operator is set to take material box
In part, then operator pin is removed from rotating bar lower end, on front side of rotating bar lower end during non-stress, rotating bar is resetting bullet
The position returned in the presence of spring before rotating, material box is moved with the rotation of rotating bar upper end from the near-end apart from operator
To distal end, material box is set not stop the sight of operator, operator can be with a hand while installation operation is carried out, another
Hand captures part under the assistance that homonymy is ridden, and the hand of operation element is carried out without sight is removed, it is achieved thereby that
Both hands operation.
People, which stretches out one's hand crawl part in tote-box remotely, will employ large arm action, even shoulder and action of standing up.Root
According to the motion analysis standard of international project association, this will bring many times of time consumption, cause that action is uneconomical, and the present apparatus is because of thing
Magazine is moved to from hand more nearby, substantially reduces the crawl time, and enhancing action economy, therefore, this installation cost are low, can have
Effect solves the problem of inefficiency and person works' amount are big, labor intensity is big.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment.
In figure, the part of 1. material box, 2. rotating bar, 3. back-moving spring, 4. rotating shaft, 5. pedal 6..
Embodiment
The invention will be further elaborated with reference to the accompanying drawings and examples, but is not limitation of the invention.
Embodiment:
Reference picture 1, a kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy, including
Material box 1;
Rotating bar 2, the rotating bar 2 is longitudinally disposed, and the material box 1 is arranged on the upper end of the rotating bar 2;
Back-moving spring 3, the back-moving spring 3 is arranged on rear side of the lower end of rotating bar 2;
Rotating shaft 4, the rotating bar 2 is arranged in rotating shaft 4 with rotating shaft 4 to be turnably connected, and the rotating shaft 4 is located at material box 1
Between back-moving spring 3, the length of the rotating shaft 4 to the lower end of rotating bar 2 is less than the length that the upper end of rotating bar 2 is arrived in rotating shaft 4, to protect
Card rotating bar 2 lower end, which rotates shorter distance, can cause upper end to rotate longer distance.
On front side of the lower end of rotating bar 2 during stress, 4 rotation around the shaft of rotating bar 2, during the non-stress in the lower end of rotating bar 2 front side,
The position that rotating bar 2 is returned in the presence of back-moving spring 3 before rotating.
Described rotating bar 2 is set for fore-and-aft tilt, and the material box 1 is arranged on the front side of the rotating bar 2, makes material
Box 1 takes part in box closer to operator to facilitate.
Including pedal 5, the pedal 5 is arranged on the front side of the bottom of rotating bar 2.Set pedal 5 foot-operated to facilitate.
The height of the front side of the material box 1 is more than the height of rear side, to prevent from acting too fast part from the front side of material box 1
Drop.
The described foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy is 2-4, operator's
Left foot, right crus of diaphragm respectively operate 1-2.
In use, when operator rides stress on front side of the lower end of rotating bar 2, the lower end of rotating bar 2,4 rotation around the shaft of rotating bar 2
Turn so that material box 1 from the distal end apart from operator is moved to near-end with the rotation of the upper end of rotating bar 2, takes operator
Part 6 in material box 1, then operator pin is removed from the lower end of rotating bar 2, on front side of the lower end of rotating bar 2 during non-stress, rotate
The position that bar 2 is returned in the presence of back-moving spring 3 before rotating, material box 1 is grasped with the rotation of the upper end of rotating bar 2 from distance
The near-end of author is moved to distal end, material box 1 is not stopped the sight of operator, and operator can carry out installation behaviour with a hand
While work, another hand captures part under the assistance that homonymy is ridden, and carries out operation element without sight is removed
Hand, it is achieved thereby that both hands operation.
Claims (4)
1. a kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy, it is characterised in that including
Material box;
Rotating bar, the rotating bar is longitudinally disposed, and the material box is arranged on the upper end of the rotating bar;
Back-moving spring, the back-moving spring is arranged on rear side of the lower end of rotating bar;
Rotating shaft, the rotating bar is arranged in rotating shaft with rotating shaft to be turnably connected, and the rotating shaft is located at material box with resetting
Between spring, the length of the rotating shaft to rotating bar lower end is less than rotating shaft to the length of rotating bar upper end.
2. the large-scale workpiece foot-operated material delivery system according to claim 1 for meeting action Principles of Economy, it is special
Levy and be, described rotating bar is set for fore-and-aft tilt, and the material box is arranged on the front side of the rotating bar.
3. the large-scale workpiece foot-operated material delivery system according to claim 1 for meeting action Principles of Economy, it is special
Levy and be, including pedal, the pedal is arranged on the front side of the rotating bar bottom.
4. the large-scale workpiece foot-operated material delivery system according to claim 1 for meeting action Principles of Economy, it is special
Levy and be, the height of the front side of the material box is more than the height of rear side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710109436.8A CN107052742A (en) | 2017-02-27 | 2017-02-27 | A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710109436.8A CN107052742A (en) | 2017-02-27 | 2017-02-27 | A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107052742A true CN107052742A (en) | 2017-08-18 |
Family
ID=59621745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710109436.8A Pending CN107052742A (en) | 2017-02-27 | 2017-02-27 | A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107052742A (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4361223A (en) * | 1980-12-01 | 1982-11-30 | American Can Company | Material handling apparatus |
TW200828486A (en) * | 2006-09-22 | 2008-07-01 | Mirae Corp | Pushing block and a handler with the pushing block |
TW201029900A (en) * | 2009-02-14 | 2010-08-16 | Siemag Gmbh | Lifting bar conveyor |
CN103318615A (en) * | 2013-05-22 | 2013-09-25 | 苏州市职业大学 | Output device capable of performing scaling by utilizing motion proportion |
CN203558450U (en) * | 2013-09-25 | 2014-04-23 | 桐乡市河山工艺玻璃器皿厂 | Bottle body transmission mechanism |
CN203714802U (en) * | 2014-01-28 | 2014-07-16 | 重庆市双恩农机制造有限公司 | Single conveying device for snow blower assembling |
CN103979213A (en) * | 2014-05-24 | 2014-08-13 | 国家电网公司 | Nylon cable tie automatic storing and taking device |
CN203935810U (en) * | 2014-04-30 | 2014-11-12 | 江苏爱多光伏科技有限公司 | Slurry puddle support |
CN105966943A (en) * | 2016-06-26 | 2016-09-28 | 应金宝 | Piston type conveying mechanism and conveying method thereof |
CN205675798U (en) * | 2016-06-16 | 2016-11-09 | 太仓北新建材有限公司 | Plasterboard collects bunching device |
CN206500849U (en) * | 2017-02-27 | 2017-09-19 | 桂林电子科技大学 | A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy |
-
2017
- 2017-02-27 CN CN201710109436.8A patent/CN107052742A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4361223A (en) * | 1980-12-01 | 1982-11-30 | American Can Company | Material handling apparatus |
TW200828486A (en) * | 2006-09-22 | 2008-07-01 | Mirae Corp | Pushing block and a handler with the pushing block |
TW201029900A (en) * | 2009-02-14 | 2010-08-16 | Siemag Gmbh | Lifting bar conveyor |
CN103318615A (en) * | 2013-05-22 | 2013-09-25 | 苏州市职业大学 | Output device capable of performing scaling by utilizing motion proportion |
CN203558450U (en) * | 2013-09-25 | 2014-04-23 | 桐乡市河山工艺玻璃器皿厂 | Bottle body transmission mechanism |
CN203714802U (en) * | 2014-01-28 | 2014-07-16 | 重庆市双恩农机制造有限公司 | Single conveying device for snow blower assembling |
CN203935810U (en) * | 2014-04-30 | 2014-11-12 | 江苏爱多光伏科技有限公司 | Slurry puddle support |
CN103979213A (en) * | 2014-05-24 | 2014-08-13 | 国家电网公司 | Nylon cable tie automatic storing and taking device |
CN205675798U (en) * | 2016-06-16 | 2016-11-09 | 太仓北新建材有限公司 | Plasterboard collects bunching device |
CN105966943A (en) * | 2016-06-26 | 2016-09-28 | 应金宝 | Piston type conveying mechanism and conveying method thereof |
CN206500849U (en) * | 2017-02-27 | 2017-09-19 | 桂林电子科技大学 | A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE202014000309U1 (en) | Systems for moving a lift truck and lifting a load | |
CN106865128A (en) | A kind of cosmetics box body automatic lifting charging conveying rotating mechanism | |
CN107815951B (en) | A kind of road and bridge construction joint-cutting device | |
CN109998927A (en) | A kind of vomitus collecting device of automatic open-close | |
CN206500849U (en) | A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy | |
CN205510916U (en) | All -in -one of peeling off is picked to coconut | |
CN107052742A (en) | A kind of foot-operated material delivery system of large-scale workpiece for meeting action Principles of Economy | |
CN106418556A (en) | Longan peeling and kernel taking device | |
CN206620430U (en) | A kind of municipal works digging apparatus | |
CN206187153U (en) | Device is scrambleed in supplementary automation | |
CN206294848U (en) | A kind of longan peeling takes nuclear device | |
CN206716105U (en) | A kind of adjustable medical Chinese herbal medicine shredding facilities | |
CN203483177U (en) | Suspension type display structure | |
CN205622151U (en) | Electromechanical pipeline threading frame | |
CN108433502A (en) | Rotary feeding wearable device | |
CN110404203A (en) | A kind of deep well rescue machine people | |
CN106307561A (en) | Using method of intelligent claw for mandarin orange peeling robot | |
CN106307565A (en) | Intelligent claw for mandarin orange peeling robot | |
CN207060555U (en) | One kind braiding bag sealer automatic charging device | |
CN206623084U (en) | Hand depressurizes the four of mechanical exoskeleton device and refers to bending drawing guiding drive system | |
CN108571176A (en) | A kind of high stable high building construction protective device | |
CN104565142B (en) | A kind of brake self-locking device | |
CN215074999U (en) | Environment-friendly mouse killer | |
CN209497917U (en) | A kind of novel herbicidal equipment | |
CN205799542U (en) | Apery based on image recognition is competed for speed robot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |