CN107051085A - One kind spraying waste gas pretreatment system and preprocess method - Google Patents
One kind spraying waste gas pretreatment system and preprocess method Download PDFInfo
- Publication number
- CN107051085A CN107051085A CN201710296113.4A CN201710296113A CN107051085A CN 107051085 A CN107051085 A CN 107051085A CN 201710296113 A CN201710296113 A CN 201710296113A CN 107051085 A CN107051085 A CN 107051085A
- Authority
- CN
- China
- Prior art keywords
- waste gas
- tower body
- demisting layer
- treatment apparatus
- pretreatment system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D50/00—Combinations of methods or devices for separating particles from gases or vapours
- B01D50/60—Combinations of devices covered by groups B01D46/00 and B01D47/00
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Treating Waste Gases (AREA)
- Separation Of Particles Using Liquids (AREA)
Abstract
Disclosed herein one kind spraying waste gas pretreatment system and preprocess method, the spraying waste gas pretreatment system includes the Wet vertical waste gas pre-treating device and dry method horizontal waste gas advanced treatment apparatus of series connection, the Wet vertical waste gas pre-treating device includes tower body, the demisting layer filler limiter in tower body is set in turn in from top to bottom, demisting layer random packing, demisting layer packing support device, the Multi-layer sprinkling device being staggered and eddy flow tower tray, material-storing box, the part that the tower body is located above demisting layer filler limiter is set to reducing tower body end socket, the demisting layer packing support device is set to hump shape, and uniform intervals are provided with perforation on hump shape demisting layer packing support device;The dry method horizontal waste gas advanced treatment apparatus includes main body, in 90 degree of air inlets being staggered, air outlet, the one-level set gradually in main body, two grades, tertiary filter, and total system floor space of the present invention is small, consumptive material service life length, coating cloud, water smoke clearance high.
Description
Technical field
The present invention relates to waste gas preprocessing technical field, more particularly to a kind of spraying waste gas pretreatment system and preprocess method.
Background technology
In the spraying production process of the paint industries such as furniture, automobile, bicycle, motorcycle, metallic article and Large-Scale Equipment manufacture
In, the waste gas containing VOC such as triphen, ethyl acetate, ketones can be produced, these waste gas are main to be existed in forms such as coating cloud, paint slags.Mesh
Before, the preprocess method of such spraying waste gas is usually to use single wet method or single dry method, by wet method or dry method
After waste gas after pretreatment is handled through other subsequent purification equipment again, discharged through air-introduced machine.Wherein wet method is using more
Wet type packed tower, dry use it is more be multistage filter.In actual applications, traditional wet method packed tower gas-liquid distribution
Uneven, absorption efficiency is low, and filler service life is short and cause usage amount big, so as to cause air outlet gas concentration and viscosity
Greatly, and easily block;Individually using dry method pretreatment, defect is just so that filter pressure is big, thus cause filter resistance it is big,
The problems such as easily blocking, so filter service life is short, replacement frequency is big;Along with the air intake of traditional dry method multistage filter
With air outlet point-blank, the pressure of filter is bigger, loses faster, i.e., service life is shorter for mouth;And it is either independent
Wet method or dry method pretreatment, its coating cloud, water smoke clearance be high, so that totally unfavorable to follow-up waste gas purification.
The content of the invention
It is an object of the invention to overcome disadvantages mentioned above, there is provided one kind spraying waste gas pretreatment system.
To achieve the above object, the technical solution adopted in the present invention is:
One kind spraying waste gas pretreatment system, including a Wet vertical waste gas pre-treating device and a dry method horizontal waste gas depth
Processing unit, the Wet vertical waste gas pre-treating device include a tower body, be arranged at the side-lower of tower body one air inlet,
Demisting layer filler limiter, the random packing of demisting layer, demisting layer packing support in the tower body are set in turn in from top to bottom
Device, the Multi-layer sprinkling device being staggered and eddy flow tower tray, material-storing box, the tower body are located at the portion above demisting layer filler limiter
Set up separately to be set in the middle of the diameter reducing tower body end socket of reduction successively from bottom to top, the upper end of the reducing tower body end socket and be provided with out
Air port, the demisting layer packing support device is set to uniform intervals on hump shape, and hump shape demisting layer packing support device
It is provided with perforation;The dry method horizontal waste gas advanced treatment apparatus includes main body, is arranged at the air intake of main body upper end side
Mouthful, be arranged at the air outlet of main body lower end side, be set in turn in from top to bottom in the main body be used for catch granule
The grade one filter of footpath granule foreign, the secondary filter for removing water smoke, the tertiary filter for catching fine particle,
The air inlet of the dry method horizontal waste gas advanced treatment apparatus is staggered with air outlet in 90 degree;The Wet vertical waste gas is pre-
The air outlet of processing unit is connected with the air inlet of dry method horizontal waste gas advanced treatment apparatus by pipeline.
Each perforation is formed as a space, voidage >=90% of the whole demisting layer packing support device.
The air inlet of the Wet vertical waste gas pre-treating device is set to 45 ° of angle shapes.
The quantity of the eddy flow tower tray and the quantity of spray thrower are both provided with being set to above each eddy flow tower tray
One spray thrower, the spray thrower includes spray main pipe and is arranged at the shower nozzle of described spray main pipe one end, and the shower nozzle is set
Midline position inside the tower body.
Each layer eddy flow tower tray is provided with one group or inside and outside two groups of blades, and the elevation angle of the blade is set to 25 °,
Liquid-gas ratio 1.5-2 L/ m3。
Each layer eddy flow tower tray is provided with the overflow pipe group equal with blade group number quantity, and each overflow pipe group
It is provided with three overflow pipes, the curved weir a width of 50-70mm, a diameter of 90-150mm of each overflow pipe.
The tower body bottom side of the wall is extended outward a hollowed extension point, the hollowed extension point and the storage
Hopper is communicated.
The grade one filter is designed using layer structure, and the secondary filter is designed using pouched case, and described three
Level filter uses folding box type structure design.
One kind spraying waste gas preprocess method, comprises the following steps:
The air inlet of the first step, waste gas through Wet vertical waste gas pre-treating device enters in tower body;
Second step, waste gas are contacted with the Sprayer Circulation liquid that spray thrower shower nozzle sprays, and realize that gas-liquid is fully contacted,
Eddy flow tower tray gets rid of the bulky grain coating cloud cyclonic separation in waste gas to material-storing box;
3rd step, waste gas complete coating cloud, the separation of water smoke by demisting layer random packing;
4th step, air outlet of the waste gas through reducing tower body end socket from Wet vertical waste gas pre-treating device discharge it
Enter dry method horizontal waste gas advanced treatment apparatus afterwards;
The small particle that 5th step, the grade one filter of dry method horizontal waste gas advanced treatment apparatus are gone in removing exhaust gas
Grain coating cloud impurity;
6th step, the secondary filter of dry method horizontal waste gas advanced treatment apparatus get rid of the water smoke in waste gas;
7th step, the secondary filter of dry method horizontal waste gas advanced treatment apparatus get rid of trickle in waste gas
Grain impurity.
The waste gas after waste gas preprocess method is handled is sprayed into photocatalysis below, plasma, activity by described
The subsequent purification processing units such as charcoal/zeolite/molecular sieve adsorption, burning, carry out the purified treatment of waste gas, after purified treatment
Gas is discharged in air through air-introduced machine.
The present invention compared with prior art, has the advantages that:
A, connected with dry method horizontal waste gas advanced treatment apparatus using Wet vertical waste gas pre-treating device, so that
Both share different parts in processing waste gas, in this way, both pressure for bearing are all than relatively low, so that damage rate is low,
Service life is relatively long;
Multi-layer rotational flow tower tray is set in b, tower body so that void tower wind speed is big, in this way, can not only cause gas-liquid
It is evenly distributed, is the work reduction difficulty of follow-up demisting layer random packing, and occupation area of equipment is small, can save throwing
Money;
C, multi-layer rotational flow tower tray and spray thrower are staggered so that bulky grain coating cloud can be useless in Wet vertical
Gas pretreatment unit is divided;Reducing tower body end socket, hump shape demisting layer packing support device and hump shape demisting layer are filled out
The uniform perforation set on material eyelid retractor, can effectively improve the removal efficiency of water smoke in waste gas, be stood in this way, greatly reducing wet method
Coating cloud concentration, the viscosity of the waste gas of formula waste gas pre-treating device air outlet, so as to effectively reduce dry method horizontal waste gas depth below
The resistance of processing unit, extends the service life of each filter of dry method horizontal waste gas advanced treatment apparatus;And hump shape demisting layer
The service life of filler can also effectively be extended by dissipating the perforation being uniformly arranged on heap demisting layer packing support device;
D, dry method horizontal waste gas advanced treatment apparatus are had using one-level, two grades, tertiary filter combination
It is synchronous to remove small particle coating cloud particle, water smoke, the effect of fine particle, so that by Wet vertical waste gas pre-treating device
With the effect of dry method horizontal waste gas advanced treatment apparatus, coating cloud, water smoke clearance height, i.e. waste gas pretreatment can be follow-up effectively
Waste gas purification creates basic condition;
E, dry method horizontal waste gas advanced treatment apparatus are designed using upper air inlet, lower air outlet structure, i.e., air inlet is arranged on
Side, air outlet is arranged below, and both staggeredly 90 degree of settings, so that the pressure of filters at different levels not only can be effectively reduced, and
And it is easy to the equipment of front end and rear end to connect, so as to effectively save floor space, simultaneously, it is ensured that system arrangement is smooth, drop
Lower resistance;
So as to which the present invention is especially suitable for the applications such as furniture, automobile, bicycle, motorcycle, metallic article and Large-Scale Equipment manufacture
The spraying waste gas pretreatment of industry, what the high solid that is particularly suitable for use in, powder, multicomponent mixture coating, colouring agent and adhesive were produced
Coating cloud, the pretreatment for painting slag.
Brief description of the drawings
Fig. 1 sprays the schematic diagram of the Wet vertical waste gas pre-treating device of waste gas pretreatment system for the present invention;
Fig. 2 sprays the front view of the dry method horizontal waste gas advanced treatment apparatus of waste gas pretreatment system for the present invention;
Fig. 3 is the top view of demisting of the present invention layer packing support device;
Fig. 4 is the front view of demisting of the present invention layer packing support device;
Fig. 5 is the enlarged diagram according to part A in Fig. 4;
Fig. 6 is the top view of demisting of the present invention layer filler limiter;
Fig. 7 is the main view enlarged diagram of eddy flow tower tray of the present invention;
Fig. 8 is the vertical view enlarged diagram of eddy flow tower tray of the present invention;
Fig. 9 is the right view of dry method horizontal waste gas advanced treatment apparatus of the present invention;
Figure 10 is the process flow diagram of exhaust-gas treatment.
Embodiment
As shown in Fig. 1,2,3,4,5, present invention spraying waste gas pretreatment system includes a Wet vertical waste gas and pre-processes dress
1 and a dry method horizontal waste gas advanced treatment apparatus 2 are put, the Wet vertical waste gas pre-treating device 1 includes a tower body 10, set
The air inlet 11 for being placed in the side-lower of tower body 10 1, the demisting layer filler limit being set in turn in from top to bottom in the tower body 10
Position device 12, the random packing 13 of demisting layer, demisting layer packing support device 14, the Multi-layer sprinkling device 15 and the eddy flow tower tray that are staggered
16th, material-storing box 17, the part that the tower body 10 is located at the top of demisting layer filler limiter 12 is set to diameter from bottom to top successively
Air outlet 18, the demisting layer are provided with the middle of the reducing tower body end socket 101 of reduction, the upper end of the reducing tower body end socket 101
Packing support device 14 is set to uniform intervals on hump shape, and hump shape demisting layer packing support device 14 and is provided with perforation
141;The dry method horizontal waste gas advanced treatment apparatus 2 includes main body 21, is arranged at the air inlet of the upper end side of main body 21
22nd, be arranged at the air outlet 23 of the lower end side of main body 21, be set in turn in from top to bottom in the main body 21 be used for catch
Catch the grade one filter 23 of small size particle impurity, the secondary filter 25 for removing water smoke, for catching fine particle
Tertiary filter 26, air inlet 22 and the air outlet 23 of the dry method horizontal waste gas advanced treatment apparatus 2 are staggered in 90 degree;
The air outlet 18 of the Wet vertical waste gas pre-treating device 1 leads to the air inlet 22 of dry method horizontal waste gas advanced treatment apparatus 2
Piping(It is not shown)Connection.
The demisting layer packing support device 14 is made using FRP materials, and because demisting layer packing support device
Uniform intervals are provided with perforation 141 on 14, and each perforation 141 is formed as a space, preferably, whole demisting layer filler
Voidage >=90% of eyelid retractor 14.
In the present embodiment, preferably, the tower body 10 is made using using PP materials, diameter range is 1000-
4000mm.When the diameter range of tower body 10 is 1000-2000mm, made using the PP plates of 8-12mm thickness;When tower body 10
When diameter range is 2000-4000mm, made using the PP plates of 12-14mm thickness.
The air inlet 11 of the Wet vertical waste gas pre-treating device 1 is set to 45 ° of angle shapes, so that air-flow
Uniform Flow from the bottom up.
As shown in fig. 6, the demisting layer filler limiter 12 is in grid-like, and grid spacing≤60mm, grille strip thickness
For 3mm.Preferably, the demisting layer filler limiter 12 is made using PP materials.
Demisting layer random packing 13 uses special random packing, its voidage >=90%, the m of specific surface area >=1802/
m3, density about 82kg/ m3, about 4400/m of bulk density3, piling height 0.46-0.61m, more than 10um water smoke clearance can
Up to 99%.
As shown in Fig. 1,7,8, the quantity of the eddy flow tower tray 16 and the quantity of spray thrower 15 are set to, each eddy flow
The top of tower tray 16 is both provided with a spray thrower 15.The spray thrower 15 includes spray main pipe 151 and is arranged at the spray
The shower nozzle 152 of the one end of main pipe 151, the shower nozzle 152 is arranged at the midline position inside the tower body 10.
In the present embodiment, each layer eddy flow tower tray 16 is provided with one group or inside and outside two groups of blades 161, the leaf
The elevation angle of piece 161 is set to 25 °, and liquid-gas ratio is 1.5-2 L/ m3.Such parameter designing so that blade 161 can be fast and effeciently
Bulky grain coating cloud cyclonic separation in waste gas is got rid of to material-storing box 17.Each layer eddy flow tower tray 16 is provided with and blade
The equal overflow pipe group of 161 groups of number quantity, and each overflow pipe group is provided with three overflow pipes 162, each overflow pipe 162
Curved weir a width of 50-70mm, a diameter of 90-150mm.As 10 diameters of tower body≤2000mm, using single group blade 161;When
10 diameters of 2000m < tower bodies≤4000mm, using double groups of blades 161., can be using two layers of eddy flow tower tray when coating cloud concentration is relatively low
The structure design of mono- layer of demisting layer random packing 13 of 16+, if coating cloud concentration is higher, can be selected using three layers of eddy flow tower tray
The structure design of mono- layer of demisting layer random packing 13 of 16+.
The material-storing box 17 of the Wet vertical waste gas pre-treating device 1 is arranged in the lower end of tower body 10, and the material-storing box
Anti-corrosion screen pack 19 is set in 17, so as to prevent water carries impurity secretly from entering circulating pump.Preferably, the anti-corrosion screen pack
19 are made of PP materials.In the present embodiment, one hollow prolongs preferably, the bottom side of the wall of the tower body 10 is extended outward
Extending portion point 102, the hollowed extension point 102 is communicated with the material-storing box 17, so as to be formed as a Large Copacity material-storing box.
The Wet vertical waste gas pre-treating device 1 is additionally provided with a mechanical float ball liquid-level switch 103, for past storage
It is automatically replenished in hopper 17.
The Wet vertical waste gas pre-treating device 1 is additionally provided with a differential manometer 104, the positive crimping of the differential manometer 104
Mouth is connected to the air inlet 11 of tower body 10, and negative port is connected to the air outlet 18 of tower body 10, the differential manometer 104 and air inlet
11 and air outlet 18 be attached by PTFE flexible pipes 105.
The outside of tower body 10 of the Wet vertical waste gas pre-treating device 1 is additionally provided with multiple maintenance entrances 106 and added
Gu rib 107.
As shown in Fig. 2,9, the grade one filter 23 of the dry method horizontal waste gas advanced treatment apparatus 2 is set using layer structure
Meter, initial drop≤100Pa, coating cloud seizure amount >=28kg/ m2, it is mainly used in catching a diameter of 2.5-10um small particle paint
Mist impurity, its removal efficiency >=99%, filtering accuracy is up to G3, G4.In the present embodiment, the size of the grade one filter 23
For 592*592*46mm.In other embodiments, its size can also specifically be set according to exhaust air rate.
The secondary filter 25 is made of hard synthesis water delivery materials, is designed using pouched case, is effectively gone water removal
Mist, its filtering accuracy is up to M5, M6.In the present embodiment, the secondary filter 25 is sized to 592*592*
600mm.In other embodiments, its size can also specifically be set according to exhaust air rate.
The tertiary filter 26 is made of high-efficiency glass fiber material, using folding box type structure design, and initial drop≤
250Pa, the fine particle for catching a diameter of 1-2.5um, filtering accuracy is up to F7, F8.Preferably, the tertiary filter
Catch net is provided with 26(It is not shown), the catch net can effectively prevent air turbulence.In the present embodiment, the three-level mistake
The size 592*592*292mm of filter 26.In other embodiments, its size can also specifically be set according to exhaust air rate.
The folding of the layer structure of the grade one filter 23, the pouched case of secondary filter 25 and tertiary filter 26
Folded case structure can use known technology, from without repeating herein.
Hinge type maintenance door is provided with the main body 21 of the dry method horizontal waste gas advanced treatment apparatus 2(It is not shown), beat
Open the maintenance door, you can overhaul, change the one-level, two grades, tertiary filter 24,25,26.
Present invention spraying waste gas preprocess method, comprises the following steps:
The air inlet 11 of the first step, waste gas through Wet vertical waste gas pre-treating device 1 enters in tower body 10;
The Sprayer Circulation liquid that second step, waste gas spray with the shower nozzle 152 of spray thrower 15 is contacted, and realizes that gas-liquid is fully contacted, eddy flow tower
Disk 16 gets rid of the bulky grain coating cloud cyclonic separation in waste gas to material-storing box 17;
Specifically, waste gas up flows after entering in tower body 10, sequentially passes through multi-layer rotational flow tower tray 16 and the dust in waste gas
It is stained with weight after Sprayer Circulation liquid and becomes weight, so the coating cloud of bulky grain is by the centrifugal drying of blade 161 of eddy flow tower tray 16 to lower section
In material-storing box 17;I other words, Multi-layer sprinkling device 15 is staggered with eddy flow tower tray 16, can enable bulky grain coating cloud at this
Stage is divided;And the motion of eddy flow tower tray 16 can also cause void tower wind speed big, so that uniform gas-liquid distribution, is follow-up
Demisting layer random packing 13 work reduction difficulty;Sprayer Circulation liquid can also reduce the temperature of waste gas.
3rd step, waste gas complete coating cloud, the separation of water smoke by demisting layer random packing 13;
Specifically, up flowed with the waste gas after the processing of spray thrower 15 by eddy flow tower tray 16, by demisting layer filler
Enter demisting layer random packing 13 after eyelid retractor 14, the waste gas of demisting layer 13 pairs of entrance of random packing carries out coating cloud, water smoke
Separation, i.e. demisting layer random packing 13 absorb most of water smoke in waste gas.Because the top of demisting layer filler limiter 12
As reducing tower body end socket 101, so that the wind speed in demisting layer random packing 13 is small, in this way, effectively increasing demisting layer
The water smoke removal efficiency of random packing 13;Along with employing hump shape demisting layer packing support device 14, and hump shape demisting layer
Perforation 141 is also evenly arranged with packing support device 14 so that the air quantity of the wind by demisting layer random packing 13 it is uniform,
Wind speed is stable, so that when carrying out coating cloud, the separation of water smoke, all fillers all work, all water smoke is being absorbed, in this way, water smoke
Separating effect more preferably, and can delay the service life of filler, so as to reduce the usage amount of filler.And traditional demisting layer filler
Eyelid retractor is then slab lattice shape, so that when separating every time, the always lower sections of filler worked, the filler of upper part
Effect is not worked even less, so as to cause the filler life-span especially short, every being accomplished by changing filler soon so that filler is used
Amount is very big.
4th step, waste gas are through reducing tower body end socket 101 from the discharge of air outlet 18 of Wet vertical waste gas pre-treating device 1
Enter dry method horizontal waste gas advanced treatment apparatus 2 afterwards;
The small size particle coating cloud that 5th step, the grade one filter 23 of dry method horizontal waste gas advanced treatment apparatus 2 are gone in removing exhaust gas
Impurity;
6th step, the secondary filter 25 of dry method horizontal waste gas advanced treatment apparatus 2 get rid of the water smoke in waste gas;
7th step, the secondary filter 25 of dry method horizontal waste gas advanced treatment apparatus 2 get rid of the fine particle impurity in waste gas.
As shown in Figure 10, the waste gas after the spraying waste gas preprocess method processing enter photocatalysis below, etc.
The subsequent purification processing units 3 such as gas ions, activated carbon/zeolite/molecular sieve adsorption, burning, carry out the purified treatment of waste gas, pass through
Gas after purified treatment is discharged in air through air-introduced machine 4.
Claims (10)
1. one kind spraying waste gas pretreatment system, it is characterised in that:It is dry including a Wet vertical waste gas pre-treating device and one
The horizontal waste gas advanced treatment apparatus of method, the Wet vertical waste gas pre-treating device includes a tower body, is arranged at the tower body one
The air inlet of side-lower, the demisting being set in turn in from top to bottom in tower body layer filler limiter, the random packing of demisting layer,
Demisting layer packing support device, the Multi-layer sprinkling device and eddy flow tower tray, material-storing box that are staggered, the tower body are located at demisting layer filler
Part above limiter is set to the diameter reducing tower body end socket of reduction successively from bottom to top, the reducing tower body end socket it is upper
Air outlet is provided with the middle of end, the demisting layer packing support device is set to hump shape, and hump shape demisting layer filler branch
Uniform intervals are provided with perforation on support device;The dry method horizontal waste gas advanced treatment apparatus includes main body, is arranged at the main body
The air inlet of upper end side, it is arranged at the air outlet of main body lower end side, is set in turn in from top to bottom in the main body
Be used for catch the grade one filter of small size particle impurity, the secondary filter for removing water smoke, for catching trickle
The tertiary filter of grain, air inlet and the air outlet of the dry method horizontal waste gas advanced treatment apparatus are staggered in 90 degree;Institute
The air inlet for stating the air outlet and dry method horizontal waste gas advanced treatment apparatus of Wet vertical waste gas pre-treating device is connected by pipeline
Connect.
2. spraying waste gas pretreatment system according to claim 1, it is characterised in that:Each perforation is formed as
Gap, voidage >=90% of the whole demisting layer packing support device.
3. spraying waste gas pretreatment system according to claim 2, it is characterised in that:The Wet vertical waste gas pretreatment
The air inlet of device is set to 45 ° of angle shapes.
4. the spraying waste gas pretreatment system according to claim 1 or 2 or 3, it is characterised in that:The number of the eddy flow tower tray
Amount and the quantity of spray thrower are both provided with a spray thrower, the spray thrower includes being set to above each eddy flow tower tray
Spray main pipe and the shower nozzle for being arranged at described spray main pipe one end, the shower nozzle are arranged at the center line position inside the tower body
Put.
5. spraying waste gas pretreatment system according to claim 4, it is characterised in that:Each layer eddy flow tower tray is all provided with
One group or inside and outside two groups of blades are equipped with, the elevation angle of the blade is set to 25 °, liquid-gas ratio 1.5-2 L/ m3。
6. spraying waste gas pretreatment system according to claim 5, it is characterised in that:Each layer eddy flow tower tray is all provided with
The overflow pipe group equal with blade group number quantity is equipped with, and each overflow pipe group is provided with three overflow pipes, each overflow
The curved weir a width of 50-70mm, a diameter of 90-150mm of pipe.
7. the spraying waste gas pretreatment system according to claim 1 or 2 or 3 or 5 or 6, it is characterised in that:Under the tower body
Side wall is extended outward a hollowed extension point, and the hollowed extension point is communicated with the material-storing box.
8. spraying waste gas pretreatment system according to claim 7, it is characterised in that:The grade one filter uses stratiform
Structure design, the secondary filter is designed using pouched case, and the tertiary filter uses folding box type structure design.
9. one kind spraying waste gas preprocess method, it is characterised in that:Comprise the following steps:
The air inlet of the first step, waste gas through Wet vertical waste gas pre-treating device enters in tower body;
Second step, waste gas are contacted with the Sprayer Circulation liquid that spray thrower shower nozzle sprays, and realize that gas-liquid is fully contacted,
Eddy flow tower tray gets rid of the bulky grain coating cloud cyclonic separation in waste gas to material-storing box;
3rd step, waste gas complete coating cloud, the separation of water smoke by demisting layer random packing;
4th step, air outlet of the waste gas through reducing tower body end socket from Wet vertical waste gas pre-treating device discharge it
Enter dry method horizontal waste gas advanced treatment apparatus afterwards;
The small particle that 5th step, the grade one filter of dry method horizontal waste gas advanced treatment apparatus are gone in removing exhaust gas
Grain coating cloud impurity;
6th step, the secondary filter of dry method horizontal waste gas advanced treatment apparatus get rid of the water smoke in waste gas;
7th step, the secondary filter of dry method horizontal waste gas advanced treatment apparatus get rid of trickle in waste gas
Grain impurity.
10. spraying waste gas pretreatment system according to claim 9, it is characterised in that:Locate in advance by the spraying waste gas
It is follow-up that waste gas after the processing of reason method enters photocatalysis, plasma, activated carbon/zeolite/molecular sieve adsorption, burning below etc.
Purifying processing device, carries out the purified treatment of waste gas, and the gas after purified treatment is discharged in air through air-introduced machine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710296113.4A CN107051085A (en) | 2017-04-28 | 2017-04-28 | One kind spraying waste gas pretreatment system and preprocess method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710296113.4A CN107051085A (en) | 2017-04-28 | 2017-04-28 | One kind spraying waste gas pretreatment system and preprocess method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107051085A true CN107051085A (en) | 2017-08-18 |
Family
ID=59604142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710296113.4A Pending CN107051085A (en) | 2017-04-28 | 2017-04-28 | One kind spraying waste gas pretreatment system and preprocess method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107051085A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108057308A (en) * | 2018-02-26 | 2018-05-22 | 郑州启风环保科技有限公司 | Water rotation type high-efficiency dust remover |
CN108686449A (en) * | 2018-08-01 | 2018-10-23 | 昆山钛锟环保节能科技有限公司 | Mist of oil separating and treating apparatus in a kind of exhaust gas |
CN108686450A (en) * | 2018-08-07 | 2018-10-23 | 昆山钛锟环保节能科技有限公司 | A kind of wet type non-filling dust treatment device |
CN113198301A (en) * | 2021-06-01 | 2021-08-03 | 江苏省环境工程技术有限公司 | Deep purification method for VOCs and particulate matters in dry tail gas of artificial board industry |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120103195A1 (en) * | 2010-10-28 | 2012-05-03 | Industrial Tool & Die Co., Inc. | Machine tool mounted mist collector |
CN203437257U (en) * | 2013-08-30 | 2014-02-19 | 大连绿亿环保科技有限公司 | Spray organic waste gas purifying processing system |
CN205815408U (en) * | 2016-07-21 | 2016-12-21 | 杭州益蓝环境科技有限公司 | A kind of purifying column for exhaust-gas treatment |
CN206103638U (en) * | 2016-10-19 | 2017-04-19 | 成都双流三兴家俱实业有限公司 | Organic waste gas purifying equipment |
CN206660864U (en) * | 2017-04-28 | 2017-11-24 | 深圳瑞科曼环保科技有限公司 | One kind spraying waste gas pretreatment system |
-
2017
- 2017-04-28 CN CN201710296113.4A patent/CN107051085A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120103195A1 (en) * | 2010-10-28 | 2012-05-03 | Industrial Tool & Die Co., Inc. | Machine tool mounted mist collector |
CN203437257U (en) * | 2013-08-30 | 2014-02-19 | 大连绿亿环保科技有限公司 | Spray organic waste gas purifying processing system |
CN205815408U (en) * | 2016-07-21 | 2016-12-21 | 杭州益蓝环境科技有限公司 | A kind of purifying column for exhaust-gas treatment |
CN206103638U (en) * | 2016-10-19 | 2017-04-19 | 成都双流三兴家俱实业有限公司 | Organic waste gas purifying equipment |
CN206660864U (en) * | 2017-04-28 | 2017-11-24 | 深圳瑞科曼环保科技有限公司 | One kind spraying waste gas pretreatment system |
Non-Patent Citations (2)
Title |
---|
大连理工大学: "《化工原理 下》", 31 December 2002, pages: 201 - 202 * |
张洪等: "《环境工程设备》", pages: 241 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108057308A (en) * | 2018-02-26 | 2018-05-22 | 郑州启风环保科技有限公司 | Water rotation type high-efficiency dust remover |
CN108686449A (en) * | 2018-08-01 | 2018-10-23 | 昆山钛锟环保节能科技有限公司 | Mist of oil separating and treating apparatus in a kind of exhaust gas |
CN108686450A (en) * | 2018-08-07 | 2018-10-23 | 昆山钛锟环保节能科技有限公司 | A kind of wet type non-filling dust treatment device |
CN113198301A (en) * | 2021-06-01 | 2021-08-03 | 江苏省环境工程技术有限公司 | Deep purification method for VOCs and particulate matters in dry tail gas of artificial board industry |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107051085A (en) | One kind spraying waste gas pretreatment system and preprocess method | |
CN106390652B (en) | A kind of Wet-type high-efficient eddy flow removing fine particle device | |
CN204134434U (en) | A kind of large ash quantity lacquer spraying waste gas treating apparatus | |
CN208943751U (en) | A kind of spray column for exhaust-gas treatment | |
CN206660864U (en) | One kind spraying waste gas pretreatment system | |
CN207546211U (en) | A kind of VOCs exhaust treatment systems | |
CN206688445U (en) | A kind of Tower for purifying waste gas | |
CN206168143U (en) | Wet classification dust collector | |
CN202645945U (en) | Cyclone agglutination combined separator used before natural gas compressor | |
CN209865628U (en) | Spray tower with high-efficient washing purifies and high-efficient dehydration defogging simultaneously | |
CN206996183U (en) | High efficiency low pressure drop spraying and dust-removing system | |
CN208526172U (en) | A kind of horizontal multi-stage filtering wet type resonance string grid dust-extraction unit | |
CN207445851U (en) | A kind of New Coal Mine efficient composite wet scrubber | |
CN115212668B (en) | Coalescing filter element and coalescing filter | |
CN205517072U (en) | Multistage tube bundle dust removal defogging device | |
CN107715688A (en) | A kind of VOCs exhaust treatment systems | |
CN111632439B (en) | Enhanced separation type raw gas coalescence separator | |
CN208177103U (en) | A kind of effective fluidized demister arrangements | |
CN208771100U (en) | A kind of effective fluidized demister | |
CN207287018U (en) | A kind of spray powder treating column | |
CN209752502U (en) | Novel efficient paint mist treatment device for cyclone tower | |
CN203591672U (en) | Whirlwind type natural gas washing pot | |
CN206424768U (en) | Smoke-eliminating dust-controlling desulfurizing apparatus | |
CN207412981U (en) | Pneumatic emulsifying processing unit | |
CN104587769A (en) | Micro-foam water spray activated carbon adsorption environmental protecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 518000 e, block a, 6 / F, building 9, Baoneng Science Park, Qinghu community, Longhua street, Longhua District, Shenzhen City, Guangdong Province Applicant after: SHENZHEN RECOMMEN ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd. Address before: 518000 Shenzhen street, Bantian District, Longgang District, Guangdong City, province, South Ring Road, Bantian International Center Applicant before: SHENZHEN RECOMMEN ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd. |
|
CB02 | Change of applicant information |