CN107043067B - A kind of S-shaped tube panel boom hoisting - Google Patents

A kind of S-shaped tube panel boom hoisting Download PDF

Info

Publication number
CN107043067B
CN107043067B CN201611223429.2A CN201611223429A CN107043067B CN 107043067 B CN107043067 B CN 107043067B CN 201611223429 A CN201611223429 A CN 201611223429A CN 107043067 B CN107043067 B CN 107043067B
Authority
CN
China
Prior art keywords
round
tube panel
shaped tube
load bearing
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611223429.2A
Other languages
Chinese (zh)
Other versions
CN107043067A (en
Inventor
范福吉
李立平
彭杰
严双伍
陈巍
张炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Chuanguo Boiler Co Ltd
Original Assignee
Sichuan Chuanguo Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Chuanguo Boiler Co Ltd filed Critical Sichuan Chuanguo Boiler Co Ltd
Priority to CN201611223429.2A priority Critical patent/CN107043067B/en
Publication of CN107043067A publication Critical patent/CN107043067A/en
Application granted granted Critical
Publication of CN107043067B publication Critical patent/CN107043067B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention relates to rubbish waste heat boiler air preheater manufacturing technology fields, disclose a kind of S-shaped tube panel boom hoisting, including two round load bearing beams, it is socketed with multiple suspension hooks on the round load bearing beam, at least two lifting lugs are welded on the circle load bearing beam, the suspension hook can hook the elbow at S-shaped tube panel both ends.The configuration of the present invention is simple, it is easy to operate, it can ensure that S-shaped tube panel lifts stability, prevent tube panel in hoisting process from deforming, ensure that the quality of tube panel.

Description

A kind of S-shaped tube panel boom hoisting
Technical field
The present invention relates to rubbish waste heat boiler air preheater manufacturing technology field, more particularly to a kind of S-shaped tube panel lifting Device.
Background technology
The Enlargement Tendency of the rubbish waste heat boiler type of furnace at present, until making rubbish waste heat boiler air preheater device increasingly Huge, internal structure is complicated, and difficulty is brought to product manufacturing.Set of heat exchange tubes as important component inside preheater, manufacture and Assembly is the key factor of preheater product quality.S-shaped tube panel has the spies such as big planar dimension, itself poor rigidity, yielding Sign, when carrying out set of heat exchange tubes assembly, because in general hoisting process can caused by coiled pipe deform, coiled pipe quality is caused Serious damage so that installation process can not be successfully progress.Therefore, it is necessary to a kind of devices can be suitable by large-sized S-shaped tube panel Profit smoothly lifts to designated position, and can ensure that the quality of S-shaped tube panel is intact in hoisting process.
Invention content
The technical problem to be solved by the present invention is to:In view of the above problems, a kind of simple in structure, operation is provided It is convenient, it can ensure the boom hoisting that S-shaped tube panel lifts stability, prevents tube panel from deforming.
The technical solution adopted by the present invention is as follows:A kind of S-shaped tube panel boom hoisting, including two round load bearing beams, in institute It states and is socketed with multiple suspension hooks on round load bearing beam, be welded at least two lifting lugs on the circle load bearing beam, the suspension hook can Hook the elbow at S-shaped tube panel both ends.
Two lifting lugs are all arranged on the every round load bearing beam in a kind of S-shaped tube panel boom hoisting of the present invention, Round crossbeam is provided between corresponding lifting lug on two round load bearing beams, the circle crossbeam and two round load bearing beams hang down Directly, the round crossbeam passes through the lifting lug and is removably joined together.
A kind of S-shaped tube panel boom hoisting of the present invention, the lifting lug end horizontal is provided with positioning screw, described Positioning screw holds out against the round crossbeam across the lifting lug, and vertical with the round crossbeam axis, realize round crossbeam with The locking of lifting lug.
A kind of S-shaped tube panel boom hoisting of the present invention, the circle load bearing beam upper weld have multiple positioning pins, And a positioning pin is set between the two neighboring suspension hook.
A kind of S-shaped tube panel boom hoisting of the present invention, the circle crossbeam bottom end are provided with two gag lever posts, institute State that gag lever post is parallel with round load bearing beam and equal length, the gag lever post can be moved axially along the round crossbeam.
A kind of S-shaped tube panel boom hoisting of the present invention, the gag lever post pass through the set that is sleeved on the round crossbeam Cylinder realizes that axial movement, the gag lever post are welded in the sleeve bottom end.
Two sleeves are arranged on the every round crossbeam in a kind of S-shaped tube panel boom hoisting of the present invention.
Compared with prior art, having the beneficial effect that using above-mentioned technical proposal:The configuration of the present invention is simple, easy to operate spirit Living, width is adjustable, increases its use scope, can ensure the stability of hoisting process, is effectively prevented tube panel deformation, is subtracting Lifting quality is also assured while few operating personnel, shortens the assembly duration.
Description of the drawings
Fig. 1 is front view of the present invention.
Fig. 2 is vertical view of the present invention.
Fig. 3 is the sectional view along A-A in Fig. 2.
Fig. 4 is the structural schematic diagram that suspension hook rides on gag lever post in the present invention.
Fig. 5 is S-shaped tube panel structural schematic diagram.
Reference numeral:1 is round load bearing beam, and 2 be suspension hook, and 3 be lifting lug, and 4 be round crossbeam, and 5 be positioning screw, and 6 be fixed Position pin, 7 be gag lever post, and 8 be sleeve, and 9 be elbow.
Specific implementation mode
The present invention is described further below in conjunction with the accompanying drawings.
Embodiment 1
As shown in Fig. 1 to 5, a kind of S-shaped tube panel boom hoisting, including two parallel and identical round load bearing beams of length 1, multiple suspension hooks 2 are socketed on round load bearing beam 1, this, which is on every round load bearing beam 1, is arranged 13 suspension hooks 2, in circle It is welded at least two lifting lugs 3 on load bearing beam 1, is respectively provided with two lifting lugs 3,2 lower end of suspension hook on every round load bearing beam 1 herein Elbow 9 for catching on S-shaped tube panel both ends;On two round load bearing beams 1 round crossbeam is provided between corresponding lifting lug 3 4, round crossbeam 4 passes through lifting lug 3 and is removably joined together, here by the positioning screw 5 being horizontally placed on lifting lug 3 Realize being detachably connected between them, positioning screw 5 holds out against round crossbeam 4 across lifting lug 3, and with 4 axis of round crossbeam Vertically, lifting lug 3 and round crossbeam 4 are locked together;There are multiple positioning pins 6 in 1 upper weld of round load bearing beam, this is in often 14 positioning pins 6 are welded on root circle load bearing beam 1, and are provided with above-mentioned positioning pin 6 between two adjacent suspension hooks 2, are prevented Suspension hook 2 is to slide together being not used, and needs to obtain when using and separates one by one so that suspension hook 2 can be hooked more quickly pair The elbow answered.
In lifting, the distance between two round load bearing beams 1 are adjusted, and round crossbeam 4 is locked by positioning screw 5 With lifting lug 3, the present apparatus is passed through into lifting lug 3 and derricking gear(It is not shown in figure)It is fixedly connected, is hung to right over S-shaped tube panel, makes The elbow 9 of S-shaped tube panel both sides can just be contacted by obtaining suspension hook 2, all suspension hooks 2 be hooked elbow 9, then by entire S-shaped tube panel It slings, transport to installation region is laid flat after adjustment position is accurate, all suspension hooks 2 is detached from elbow 9, the present apparatus hangs installing zone Lifting is completed in domain.Using the present apparatus in hoisting process, entire S-shaped tube panel is highly stable, and there is no because of its own poor rigidity Mutability and cause tube panel to be bent, ensure that the quality of S-shaped tube panel, while decreasing the number of operative employee, reduce labour Intensity, the distance between two round load bearing beams 1 can be adjusted by round crossbeam 4 and positioning screw 5, increase the present apparatus Use scope.
Embodiment 2
As shown in Fig. 1 to 5, on the basis of embodiment 1, for convenience when unloading S-shaped tube panel, ensure to have been detached from The suspension hook 2 of elbow 9 is no longer unexpected to be repeated to hook elbow 9, devises two gag lever posts 7, gag lever post 7 is welded on 8 bottom end of sleeve, set Cylinder 8 is socketed on round crossbeam 4 so that gag lever post 7 can be moved axially along round crossbeam 4, be arranged two on every round crossbeam 4 Sleeve 8, same root gag lever post 7 are welded in 8 bottom end of corresponding sleeve on two round crossbeams 4.
When unloading S-shaped tube panel, each suspension hook 2 is detached from elbow 9, and shackle hook 2, it is made to ride over gag lever post 7 On, the present apparatus is then hung into S-shaped tube panel region, such setting ensure that is not at shaking shape after suspension hook 2 is detached from elbow 9 State is efficiently avoided when hanging the present apparatus, and individual suspension hooks 2 ensure that lifting because shaking the case where hooking elbow 9 again It is smoothed out.
In addition, the present apparatus can also realize the turn operation of S-shaped tube panel, when needing to turn over S-shaped tube panel, first will Round crossbeam 4 is removed so that two round load bearing beams 1 detach, and unilateral round load bearing beam 1 is passed through lifting lug 3 and derricking gear It is fixedly connected, slings to 9 top of elbow of S-shaped tube panel one end, all suspension hooks 2 hook elbow 9, slowly lift by crane, and lift coiled pipe Shield one end, the other end is fulcrum, slowly then S-shaped tube panel is slowly laid flat S-shaped tube panel to another side to overturn, and suspension hook 2 is taken off From elbow 9, tube panel region is hung, completes the turn operation of S-shaped tube panel.
The invention is not limited in specific implementation modes above-mentioned.The present invention, which expands to, any in the present specification to be disclosed New feature or any new combination, and disclose any new method or process the step of or any new combination.If this Field technology personnel are altered or modified in the unsubstantiality that the spirit for not departing from the present invention is done, should belong to power of the present invention The claimed range of profit.

Claims (5)

1. a kind of S-shaped tube panel boom hoisting, it is characterised in that:Including two round load bearing beams(1), in the round load bearing beam (1)On be socketed with multiple suspension hooks(2), the circle load bearing beam(1)On be welded at least two lifting lugs(3), the suspension hook(2) The elbow at S-shaped tube panel both ends can be hooked(9);
The every round load bearing beam(1)On two lifting lugs are all set(3), in two round load bearing beams(1)Upper corresponding lifting lug (3)Between be provided with round crossbeam(4), the circle crossbeam(4)With two round load bearing beams(1)Vertically, the round crossbeam (4)Across the lifting lug(3)And it is removably joined together;
The lifting lug(3)End horizontal is provided with positioning screw(5), the positioning screw(5)Across the lifting lug(3)Hold out against institute State round crossbeam(4), and with the round crossbeam(4)Axis is vertical, realizes round crossbeam(4)With lifting lug(3)Locking.
2. a kind of S-shaped tube panel boom hoisting according to claim 1, it is characterised in that:The circle load bearing beam(1)On Portion is welded with multiple positioning pins(6), and the two neighboring suspension hook(2)Between be arranged a positioning pin(6).
3. a kind of S-shaped tube panel boom hoisting according to claim 2, it is characterised in that:The circle crossbeam(4)Bottom end It is provided with two gag lever posts(7), the gag lever post(7)With round load bearing beam(1)Parallel and equal length, the gag lever post(7) It can be along the round crossbeam(4)Axial movement.
4. a kind of S-shaped tube panel boom hoisting according to claim 3, it is characterised in that:The gag lever post(7)Pass through set In the round crossbeam(4)On sleeve(8)Realize axial movement, the gag lever post(7)It is welded in the sleeve(8)Bottom end.
5. a kind of S-shaped tube panel boom hoisting according to claim 4, it is characterised in that:The every round crossbeam(4) Two sleeves of upper setting(8).
CN201611223429.2A 2016-12-27 2016-12-27 A kind of S-shaped tube panel boom hoisting Expired - Fee Related CN107043067B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611223429.2A CN107043067B (en) 2016-12-27 2016-12-27 A kind of S-shaped tube panel boom hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611223429.2A CN107043067B (en) 2016-12-27 2016-12-27 A kind of S-shaped tube panel boom hoisting

Publications (2)

Publication Number Publication Date
CN107043067A CN107043067A (en) 2017-08-15
CN107043067B true CN107043067B (en) 2018-09-18

Family

ID=59543854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611223429.2A Expired - Fee Related CN107043067B (en) 2016-12-27 2016-12-27 A kind of S-shaped tube panel boom hoisting

Country Status (1)

Country Link
CN (1) CN107043067B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108750920A (en) * 2018-09-10 2018-11-06 扬州中远海运重工有限公司 A kind of traveling cradle peculiar to vessel
CN114988266B (en) * 2022-08-02 2022-09-30 中国能源建设集团山西电力建设有限公司 Method for connecting hoisting tool of boiler flexible tube panel with good bearing performance and high stability

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2277818A1 (en) * 2009-07-24 2011-01-26 Massimo Fabbri Device for handling bundles of profiles such as beams, I-beams, pipes and the like
CN201737594U (en) * 2010-04-22 2011-02-09 东方日立锅炉有限公司 Lifting rack for serpentine tube panels
CN201842567U (en) * 2010-04-22 2011-05-25 东方日立锅炉有限公司 Lifting frame for modular tube panel of waste heat boiler
CN103350947A (en) * 2013-07-18 2013-10-16 中国五冶集团有限公司 Suspension system and suspension method both special for boiler heating surface pipe rack
CN103539002A (en) * 2013-10-17 2014-01-29 江西稀有稀土金属钨业集团有限公司 Lifting device for electrolytic copper plates
CN203439898U (en) * 2013-07-16 2014-02-19 江联重工股份有限公司 Tube bundle lifting device of large heat exchanger
CN203474230U (en) * 2013-10-08 2014-03-12 铜陵有色金属集团股份有限公司金昌冶炼厂 Lifting appliance for lifting cathode plate and anode plate of electrodeposition technology
CN205772932U (en) * 2016-05-23 2016-12-07 五冶集团上海有限公司 A kind of dry quenched coke boiler economizer coil installs suspender in place

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2277818A1 (en) * 2009-07-24 2011-01-26 Massimo Fabbri Device for handling bundles of profiles such as beams, I-beams, pipes and the like
CN201737594U (en) * 2010-04-22 2011-02-09 东方日立锅炉有限公司 Lifting rack for serpentine tube panels
CN201842567U (en) * 2010-04-22 2011-05-25 东方日立锅炉有限公司 Lifting frame for modular tube panel of waste heat boiler
CN203439898U (en) * 2013-07-16 2014-02-19 江联重工股份有限公司 Tube bundle lifting device of large heat exchanger
CN103350947A (en) * 2013-07-18 2013-10-16 中国五冶集团有限公司 Suspension system and suspension method both special for boiler heating surface pipe rack
CN203474230U (en) * 2013-10-08 2014-03-12 铜陵有色金属集团股份有限公司金昌冶炼厂 Lifting appliance for lifting cathode plate and anode plate of electrodeposition technology
CN103539002A (en) * 2013-10-17 2014-01-29 江西稀有稀土金属钨业集团有限公司 Lifting device for electrolytic copper plates
CN205772932U (en) * 2016-05-23 2016-12-07 五冶集团上海有限公司 A kind of dry quenched coke boiler economizer coil installs suspender in place

Also Published As

Publication number Publication date
CN107043067A (en) 2017-08-15

Similar Documents

Publication Publication Date Title
CN107043067B (en) A kind of S-shaped tube panel boom hoisting
CN106244956B (en) Super large-scale aluminium alloy slab keeps flat the method that vertical quenching is realized in shove charge
CN109095343A (en) Assembled hanger
CN107916316A (en) A kind of converter lining brick masonry apparatus and method that can be integrally built by laying bricks or stones
JP5213381B2 (en) Demolition and construction method of blast furnace hot stove
CN207479496U (en) A kind of high-temperature ring forge piece hoisting mechanism
CN215160253U (en) Hoisting device for multi-workpiece heat treatment
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN205132906U (en) TD coating is handled and is used hoist
CN212505151U (en) Hoisting clamp of single crystal furnace guide cylinder
CN202265309U (en) Semi-automatic hanger for large-sized ring forgings
CN202912565U (en) Special hanger for large-scale disk-shaped members
CN103508319B (en) The bracing or strutting arrangement that uses and lift the method for one end of large-scale workpiece during upset large-scale workpiece
CN105465764A (en) Overheater coiled pipe series hanger rod device
CN211769996U (en) Movable gantry hanging bracket
JP6514677B2 (en) In-furnace scaffolding system for boiler maintenance and its installation method
CN215249025U (en) High performance flange heat treatment hoisting structure
CN206047025U (en) A kind of mud core drying device
CN214879549U (en) Crane lifting gripper
CN211619748U (en) Solid solution heat treatment lifting appliance
CN210916166U (en) Large-scale long pull rod guenching unit
CN206854383U (en) A kind of die sleeve
CN213572929U (en) Annular hanger
CN217081830U (en) Dismounting device of removable pipeline of L type
CN213536981U (en) Steel plate lifting appliance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180918

Termination date: 20201227