CN107035068A - 一种部分组合预制柱的拼接方法 - Google Patents

一种部分组合预制柱的拼接方法 Download PDF

Info

Publication number
CN107035068A
CN107035068A CN201710309433.9A CN201710309433A CN107035068A CN 107035068 A CN107035068 A CN 107035068A CN 201710309433 A CN201710309433 A CN 201710309433A CN 107035068 A CN107035068 A CN 107035068A
Authority
CN
China
Prior art keywords
overlap
post
splicing
profile steel
vertical muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710309433.9A
Other languages
English (en)
Inventor
徐国军
蒋路
张洋
常康辉
颜於滕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201710309433.9A priority Critical patent/CN107035068A/zh
Publication of CN107035068A publication Critical patent/CN107035068A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明涉及一种部分组合预制柱的拼接方法,其包括如下工艺步骤:1),预制H型钢‑混凝土部分组合柱;2),部分组合预制柱在搭接区预先不灌混凝土,在搭接区的腹板上开螺栓孔;3),拼接的预制柱中的纵筋伸出各自的中间区至搭接区,但拼接柱伸出的纵筋留有一段距离d;4),拼接的两根柱在搭接区进行栓焊连接;5),在搭接区,采用搭接钢筋与拼接柱中的纵筋焊接连接;6),在完成上述2~5后,在搭接区灌注混凝土。本发明的部分组合预制柱的拼接方法具有施工方便,拼接牢固等诸多有点,填补了国内在部分组合柱柱柱拼接方面的空白。

Description

一种部分组合预制柱的拼接方法
【技术领域】
本发明涉及一种建筑构件的施工方法,具体涉及一种部分组合预制柱的拼接方法,属于建筑施工方法技术领域。
【背景技术】
钢-混凝土部分组合构件是二十世纪八十年代欧洲提出的一种新型组合构件,其截面的基本型式是在H型钢构件的翼缘间填充混凝土。这种组合构件具有承载力大、刚度大、抗火性能好等优点,目前在国内还没有实际应用。
然而,在H型钢构件的翼缘间填充混凝土会造成部分组合柱在柱柱拼接时较为困难。
因此,为解决上述技术问题,确有必要提供一种创新的部分组合预制柱的拼接方法,以克服现有技术中的所述缺陷。
【发明内容】
为解决上述问题,本发明的目的在于提供一种施工方便,拼接牢固的部分组合预制柱的拼接方法。
为实现上述目的,本发明采取的技术方案为:一种部分组合预制柱的拼接方法,其包括如下工艺步骤:
1),预制H型钢-混凝土部分组合柱;
2),部分组合预制柱在搭接区预先不灌混凝土,在搭接区的腹板上开螺栓孔;
3),拼接的预制柱中的纵筋伸出各自的中间区至搭接区,但拼接柱伸出的纵筋留有一段距离d;
4),拼接的两根柱在搭接区进行栓焊连接;
5),在搭接区,采用搭接钢筋与拼接柱中的纵筋焊接连接;
6),在完成上述2~5后,在搭接区灌注混凝土。
本发明的部分组合预制柱的拼接方法进一步为:所述H型钢-混凝土部分组合柱由H型钢柱和填充在H型钢柱内的混凝土组成;其中,所述H型钢柱包括腹板以及设置在腹板两端的翼缘;所述H型钢柱的上下翼缘上焊接有系杆;所述混凝土内预埋有纵筋;所述纵筋沿H型钢柱的长度方向延伸。
本发明的部分组合预制柱的拼接方法还为:所述步骤4)具体为:预制柱的搭接处腹板通过连接板进行螺栓连接,螺栓连接完成后,对搭接处的翼缘及腹板进行焊接连接。
与现有技术相比,本发明具有如下有益效果:本发明的部分组合预制柱的拼接方法具有施工方便,拼接牢固等诸多有点,填补了国内在部分组合柱柱柱拼接方面的空白。
【附图说明】
图1是本发明的部分组合预制柱的结构示意图。
图2是本发明的步骤5)完成后的结构示意图。
【具体实施方式】
请参阅说明书附图1和附图2所示,本发明为一种部分组合预制柱的拼接方法,其包括如下工艺步骤:
1),预制H型钢-混凝土部分组合柱1。其中,所述H型钢-混凝土部分组合柱1由H型钢柱2和填充在H型钢柱2内的混凝土3组成。其中,所述H型钢柱2包括腹板21以及设置在腹板21两端的翼缘22。所述H型钢柱2的上下翼缘22上焊接有系杆23,系杆23用于拉结H型钢上下翼缘22以及约束内灌的混凝土3。
所述混凝土3填充在翼缘22之间,其内预埋有纵筋24。所述纵筋24沿H型钢柱2的长度方向延伸。
2),部分组合预制柱在搭接区预先不灌混凝土,在搭接区的腹板21上开螺栓孔25。
3),拼接的预制柱中的纵筋24伸出各自的中间区至搭接区,但拼接柱伸出的纵筋24留有一段距离d。
4),拼接的两根柱在搭接区进行栓焊连接;即预制柱1的搭接处腹板21通过连接板4进行螺栓连接,螺栓连接完成后,对搭接处的翼缘22及腹板21进行焊接连接。
5),在搭接区,采用搭接钢筋5与拼接柱中的纵筋24焊接连接。
6),在完成上述2~5后,在搭接区灌注混凝土。
以上的具体实施方式仅为本创作的较佳实施例,并不用以限制本创作,凡在本创作的精神及原则之内所做的任何修改、等同替换、改进等,均应包含在本创作的保护范围之内。

Claims (3)

1.一种部分组合预制柱的拼接方法,其特征在于:包括如下工艺步骤:
1),预制H型钢-混凝土部分组合柱;
2),部分组合预制柱在搭接区预先不灌混凝土,在搭接区的腹板上开螺栓孔;
3),拼接的预制柱中的纵筋伸出各自的中间区至搭接区,但拼接柱伸出的纵筋留有一段距离d;
4),拼接的两根柱在搭接区进行栓焊连接;
5),在搭接区,采用搭接钢筋与拼接柱中的纵筋焊接连接;
6),在完成上述2~5后,在搭接区灌注混凝土。
2.如权利要求1所述的部分组合预制柱的拼接方法,其特征在于:所述H型钢-混凝土部分组合柱由H型钢柱和填充在H型钢柱内的混凝土组成;其中,所述H型钢柱包括腹板以及设置在腹板两端的翼缘;所述H型钢柱的上下翼缘上焊接有系杆;所述混凝土内预埋有纵筋;所述纵筋沿H型钢柱的长度方向延伸。
3.如权利要求1所述的部分组合预制柱的拼接方法,其特征在于:所述步骤4)具体为:预制柱的搭接处腹板通过连接板进行螺栓连接,螺栓连接完成后,对搭接处的翼缘及腹板进行焊接连接。
CN201710309433.9A 2017-05-04 2017-05-04 一种部分组合预制柱的拼接方法 Pending CN107035068A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710309433.9A CN107035068A (zh) 2017-05-04 2017-05-04 一种部分组合预制柱的拼接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710309433.9A CN107035068A (zh) 2017-05-04 2017-05-04 一种部分组合预制柱的拼接方法

Publications (1)

Publication Number Publication Date
CN107035068A true CN107035068A (zh) 2017-08-11

Family

ID=59537331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710309433.9A Pending CN107035068A (zh) 2017-05-04 2017-05-04 一种部分组合预制柱的拼接方法

Country Status (1)

Country Link
CN (1) CN107035068A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035605A (zh) * 2017-12-12 2018-05-15 河海大学 一种装配式输电塔塔身连接节点及其制作方法
CN108571095A (zh) * 2018-06-15 2018-09-25 浙江绿筑集成科技有限公司 一种组合剪力墙及其拼接方法
CN109736511A (zh) * 2019-01-10 2019-05-10 上海电气电站环保工程有限公司 基于波纹腹板h型钢的预制组合结构柱及其制作方法
CN109914611A (zh) * 2019-04-12 2019-06-21 西安建筑科技大学 一种保证弱轴连接带穿洞钢筋t形件
CN109914612A (zh) * 2019-04-12 2019-06-21 西安建筑科技大学 一种pec柱弱轴方向的分段连接节点及其施工方法
CN110344541A (zh) * 2019-06-20 2019-10-18 浙江大东吴建筑科技有限公司 一种部分填充组合柱装配式安装工装
CN111042438A (zh) * 2019-12-31 2020-04-21 山东大学 部分填充混凝土组合蜂窝钢梁、柱及其制作方法
CN111979900A (zh) * 2020-08-04 2020-11-24 南华大学 一种预制桥墩与承台的连接及施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1256735A (zh) * 1997-05-15 2000-06-14 卡纳姆曼纳克集团公司 组合钢/混凝土柱
CN201738458U (zh) * 2010-08-31 2011-02-09 武汉长丰赛博思钢结构工程有限公司 新型冷弯矩形钢管柱和h型钢梁装配式端板连接节点
CN202248353U (zh) * 2011-09-21 2012-05-30 广东新元素板业有限公司 一种具有防火保护设施的钢柱结构
CN102995758A (zh) * 2012-12-14 2013-03-27 金天德 组合型钢管混凝土柱与钢梁的刚接节点
CN103510627A (zh) * 2013-09-25 2014-01-15 沈阳工业大学 方钢管混凝土柱与工字钢梁的套管式节点及其加工方法
WO2016019438A1 (en) * 2014-08-05 2016-02-11 Illinois Tool Works Inc. Coupling an upper end of a hollow section column to a building unit support
US9376798B1 (en) * 2014-12-17 2016-06-28 William L. Bong W-column for on-site erection of steel framed high rise buildings, and methods of use
CN105839846A (zh) * 2016-03-22 2016-08-10 哈尔滨工业大学 预制装配式钢筋混凝土叠合梁

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1256735A (zh) * 1997-05-15 2000-06-14 卡纳姆曼纳克集团公司 组合钢/混凝土柱
CN201738458U (zh) * 2010-08-31 2011-02-09 武汉长丰赛博思钢结构工程有限公司 新型冷弯矩形钢管柱和h型钢梁装配式端板连接节点
CN202248353U (zh) * 2011-09-21 2012-05-30 广东新元素板业有限公司 一种具有防火保护设施的钢柱结构
CN102995758A (zh) * 2012-12-14 2013-03-27 金天德 组合型钢管混凝土柱与钢梁的刚接节点
CN103510627A (zh) * 2013-09-25 2014-01-15 沈阳工业大学 方钢管混凝土柱与工字钢梁的套管式节点及其加工方法
WO2016019438A1 (en) * 2014-08-05 2016-02-11 Illinois Tool Works Inc. Coupling an upper end of a hollow section column to a building unit support
US9376798B1 (en) * 2014-12-17 2016-06-28 William L. Bong W-column for on-site erection of steel framed high rise buildings, and methods of use
CN105839846A (zh) * 2016-03-22 2016-08-10 哈尔滨工业大学 预制装配式钢筋混凝土叠合梁

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035605A (zh) * 2017-12-12 2018-05-15 河海大学 一种装配式输电塔塔身连接节点及其制作方法
CN108035605B (zh) * 2017-12-12 2020-07-31 河海大学 一种装配式输电塔塔身连接节点及其制作方法
CN108571095A (zh) * 2018-06-15 2018-09-25 浙江绿筑集成科技有限公司 一种组合剪力墙及其拼接方法
CN108571095B (zh) * 2018-06-15 2023-09-01 浙江绿筑集成科技有限公司 一种组合剪力墙及其拼接方法
CN109736511A (zh) * 2019-01-10 2019-05-10 上海电气电站环保工程有限公司 基于波纹腹板h型钢的预制组合结构柱及其制作方法
CN109914611A (zh) * 2019-04-12 2019-06-21 西安建筑科技大学 一种保证弱轴连接带穿洞钢筋t形件
CN109914612A (zh) * 2019-04-12 2019-06-21 西安建筑科技大学 一种pec柱弱轴方向的分段连接节点及其施工方法
CN110344541A (zh) * 2019-06-20 2019-10-18 浙江大东吴建筑科技有限公司 一种部分填充组合柱装配式安装工装
CN111042438A (zh) * 2019-12-31 2020-04-21 山东大学 部分填充混凝土组合蜂窝钢梁、柱及其制作方法
CN111979900A (zh) * 2020-08-04 2020-11-24 南华大学 一种预制桥墩与承台的连接及施工方法

Similar Documents

Publication Publication Date Title
CN107035068A (zh) 一种部分组合预制柱的拼接方法
CN106381925A (zh) 一种带套管的装配式钢筋混凝土柱与柱拼接节点
CN204781368U (zh) 新型钢梁-混凝土柱钢节点及预制件
CN101914952A (zh) 中空钢管混凝土柱与钢梁的连接节点及其施工方法
CN108487453B (zh) 一种钢管混凝土柱与钢筋混凝土梁连接结构及其连接方法
CN107044177A (zh) 一种装配式混凝土剪力墙拆分、拼装连接结构及连接方法
CN205954921U (zh) 一种新型螺栓连接的预制装配式带暗支撑大板剪力墙结构
CN105714933B (zh) 一种框架结构中的梁柱连接节点
CN107338866A (zh) 一种钢结构柱梁刚性节点的连接方法及连接结构
CN104563305A (zh) 一种混凝土叠合梁与钢管混凝土柱连接节点及施工方法
CN105275087B (zh) 预制装配式混凝土梁柱的连接结构
CN108149825A (zh) 一种用于装配式建筑的预制板、预制板与梁的连接方式及施工方法
CN107190850B (zh) 一种部分组合柱弱轴向梁柱节点的制作方法
CN207048072U (zh) 一种部分组合柱弱轴向梁柱节点
CN106948476B (zh) 体内预应力组合梁构成的框架及其施工方法
CN206308797U (zh) 一种涂胶与单向螺栓相结合的矩形钢管柱加强节点
CN206752848U (zh) 一种l型组合柱
CN206844316U (zh) 一种带套管的装配式钢筋混凝土柱与柱拼接节点
CN205444571U (zh) 一种墙板连接节点
CN107268783A (zh) 一种既有钢筋混凝土柱与新增钢筋混凝土梁节点连接结构
CN106836485A (zh) 一种钢结构梁钢柱的加强连接节点及其施工方法
CN207672766U (zh) 新增楼板与原有梁连接结构
CN207314380U (zh) 一种管廊的叠合梁与叠合板连接节点
CN206752850U (zh) 一种部分组合预制柱的拼接结构
CN106869320B (zh) 组合柱组合梁构成的框架及其施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170811

RJ01 Rejection of invention patent application after publication