CN107034882A - A kind of anchoring system and its application process based on tensioning umbrella anchored end - Google Patents

A kind of anchoring system and its application process based on tensioning umbrella anchored end Download PDF

Info

Publication number
CN107034882A
CN107034882A CN201710440438.5A CN201710440438A CN107034882A CN 107034882 A CN107034882 A CN 107034882A CN 201710440438 A CN201710440438 A CN 201710440438A CN 107034882 A CN107034882 A CN 107034882A
Authority
CN
China
Prior art keywords
anchor
anchored end
tensioning
anchor cable
guide plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710440438.5A
Other languages
Chinese (zh)
Other versions
CN107034882B (en
Inventor
周子琳
卞跃威
郭劲松
杨志豪
曾毅
倪艇
丁鹏飞
邢敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority to CN201710440438.5A priority Critical patent/CN107034882B/en
Publication of CN107034882A publication Critical patent/CN107034882A/en
Application granted granted Critical
Publication of CN107034882B publication Critical patent/CN107034882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means

Abstract

The present invention relates to building foundation pit and slope retaining technical field, especially a kind of tensioning umbrella anchored end, it is characterised in that:The anchoring system at least includes tensioning umbrella anchored end and anchor cable, the tensioning umbrella anchored end at least includes steel pipe, guide plate, removable ring flange, anchor plate and two pieces of limiting plates, wherein described guide plate and the removable ring flange are sleeved on the periphery of the steel pipe and can slided on the steel pipe, the anchor cable is connected to a fixed by the anchor cable hole with the guide plate and the removable ring flange, the tensioning of the anchor cable can be such that the removable ring flange is slided along the steel pipe and drive the anchor plate to be expanded to the periphery in umbrella along the guide plate outer rim.It is an advantage of the invention that:Entirety can be formed with the stable soil body in deep, provide larger withdrawal resistance by the effect between anchor plate and steady soil, be remarkably improved the stability of foundation ditch and side slope.

Description

A kind of anchoring system and its application process based on tensioning umbrella anchored end
Technical field
The present invention relates to building foundation pit and slope retaining technical field, especially a kind of tensioning umbrella anchored end.
Background technology
In subway open-cut foundation ditch, highway and Along Railway slope protection works and China Democratic National Construction Association's foundation ditch, it is often necessary to which free face is carried on the back The unstable soil body carries out supporting afterwards, to prevent foundation ditch and slope deforming, unstability, landslide.Anchoring support system is foundation ditch and side One of new technique not only economic but also practical, is made up of Retaining Structures and anchor cable system two parts in the engineering of slope.Anchoring support System utilizes anchor cable(Bar)The soil pressure that soil-baffling structure at free face is born in the form of pulling force to be delivered in the stable soil body in deep Anchoring section, then the pulling force is delivered to by the stable soil body in anchor hole periphery by the interaction between anchoring section and the stable soil body.
Anchor cable(Bar)Pattern is various, divides main according to the mode of action between anchoring section pattern and anchoring section and the stable soil body Including three kinds of cylindrical type, continuous ball-shape and anchored end expansion type.Wherein anchored end expansion type anchor cable(Bar)Anchoring section with it is steady Determine adhesion strength of the effect between soil layer between anchoring body and the soil body and expand the end of soil layer at body to hold intensity two parts and constitute, because The anchor cable of this type(Bar)Higher withdrawal resistance can be provided, the quality of anchoring support system is significantly improved, with preferable Economic benefit.
The research to anchored end expansion type anchor pole is goed deep into constantly both at home and abroad, and blasting procedure and water jet method are occurred in that in succession For the non-mechanical reaming method that represents and pressure formula mechanical hole reaming method and mechanical reaming method that PCBA reamings earth anchor is representative. Above reaming engineering method is noteworthy characterized by:Reaming forms later anchoring section slurries and bonds the anchored end to form expansion with dowel, carries For anchor force.But these methods need to apply special broaching equipment or material, equipment price and operating expenses are expensive, construction technology Complexity, large volume reaming is very difficult, and the raising of anchor force is limited.Therefore need badly and study new anchored end expansion type anchor pole, Ensure that anchoring support system can provide larger withdrawal resistance, while should also take into account the convenience and operability of construction.
The content of the invention
The purpose of the present invention is there is provided a kind of tensioning umbrella anchored end, in drilling according to above-mentioned the deficiencies in the prior art When can with drilling rod to soil layer deep move, in place after can be by pulling anchor cable the anchor plate in anchored end is expanded to periphery The stable soil body in inlay bur hole depth portion is opened, so as to improve the withdrawal resistance and stability of support system.
The object of the invention is realized and completed by following technical scheme:
A kind of anchoring system based on tensioning umbrella anchored end, for carrying out supporting to soil-slope, it is characterised in that:The anchor Solid system at least includes tensioning umbrella anchored end and anchor cable, and the tensioning umbrella anchored end at least includes steel pipe, guide plate, removable Dynamic ring flange, anchor plate and two pieces of limiting plates, wherein the guide plate and the removable ring flange are sleeved on the steel pipe Periphery can simultaneously be slided on the steel pipe, the inclined outside shape arrangement of anchor plate, its one end and the removable ring flange Be hinged, its plate body is welded and fixed with the guide plate, two pieces of limiting plates be respectively fixedly disposed at the steel pipe periphery and Be respectively used to carry out the guide plate and the removable ring flange it is spacing, in the guide plate and the removable ring flange Upper to offer anchor cable hole respectively, the anchor cable is connected by the anchor cable hole with the guide plate and the removable ring flange Fixed, the tensioning of the anchor cable can be such that the removable ring flange is slided along the steel pipe and drive the anchor plate to be led described in Expanded to the periphery in umbrella to plate outer rim.
Soil-baffling structure is provided with the outside of the soil-slope, the anchor cable is locked by anchor head, and the anchor head passes through Waist rail is connected to a fixed with the soil-baffling structure.
Aerofoil profile drilling piece is fixedly installed in the bottom periphery of the steel pipe, the aerofoil profile creeps into piece with the uniform cloth of symmetry shape Put the bottom periphery in the steel pipe.
A kind of application process for being related to the above-mentioned anchoring system based on tensioning umbrella anchored end, it is characterised in that:For Supporting is carried out to soil-slope, methods described at least comprises the following steps:
By the way that tensioning umbrella anchored end is fixedly connected with anchor cable in tensioning umbrella anchored end;
Rig is in place, while the tensioning umbrella anchored end is connected with drilling rod, regard the tensioning umbrella anchored end as brill Inlet side pierces the soil body until projected depth;
Before the drilling rod is extracted, the anchor cable is tensed, is made between the guide plate and anchor plate of the tensioning umbrella anchored end Pad stress destruction, makes removable ring flange be slided along steel pipe and drive outer rim of the anchor plate along the guide plate to week The stable soil body of the expansion of side periphery and inlay bur hole depth portion;
The drilling rod and the tensioning umbrella anchored end are disengaged by back-drilling, and extract the drilling rod;
To bore inner slip casting, middle grout cures hole to be drilled are reached after design strength, and tensioning is carried out to the anchor cable and applies pre- Clamp force, after pretightning force reaches design load, the anchor cable and anchor head is connected firmly to form anchoring system.
In the drilling process of the tensioning umbrella anchored end and the drilling rod, to the inner pressure inside pipe slip casting, pressure In lower end injection hole of the slurries by the thin-wall steel tube of the tensioning umbrella anchored end, wash away and replace formation in drilling process Soil body residue, and drilling around formation protective layer.
After drilling terminates, the pulling force for tensing the anchor cable is more than the limit of the pad between the guide plate and anchor plate Bearing capacity, records pulling force and displacement in the cinching process of the anchor cable, when its displacement close to the removable ring flange and Stop during length between its corresponding limiting plate.
It is an advantage of the invention that:The anchoring system constituted using described anchored end and by it(Main member has:New Draw umbrella anchored end, anchor cable, soil-baffling structure, waist rail, backing plate and anchor head)Carry out foundation ditch and slope retaining, the anchor plate of anchored end Tension is opened and is embedded in steady soil, forms entirety with the stable soil body in deep, anchoring section is except that can utilize anchoring section and body layer Between interfacial treatment provide outside withdrawal resistance, the effect also passed through between anchor plate and steady soil provides larger resistance to plucking Power, is remarkably improved the stability of foundation ditch and side slope;Present invention drilling, slip casting and once completed into anchor, technique is simple, low cost Honest and clean, construct convenient, the risk and expense of reduction foundation ditch and slope project.
Brief description of the drawings
Fig. 1 is the structural representation of original state of the present invention;
Fig. 2 be in Fig. 1 A-A to sectional view;
Fig. 3 is B-B direction sectional view in Fig. 1;
Fig. 4 is the structural representation of expansion state of the present invention;
Fig. 5 creeps into the structural representation of piece for aerofoil profile in the present invention;
Fig. 6 connects the structural representation of anchor cable system for the present invention;
Fig. 7 is use state schematic diagram of the present invention.
Embodiment
Feature of present invention and other correlated characteristics are described in further detail by embodiment below in conjunction with accompanying drawing, so as to In the understanding of technical staff of the same trade:
As shown in figs. 1-7, label 1-22 is expressed as in figure:Drilling rod connection buckle 1, limiting plate 2, pad 3, guide plate 4, Anchor cable hole 5, anchor plate 6, limiting plate 7, thin-wall steel tube 8, fixing pin 9, removable ring flange 10, anchor cable hole 11, aerofoil profile drilling Piece 12, anchor head 13, backing plate 14, anchor cable 15, tensioning umbrella anchored end 16, steady soil 17, unstable soil layer 18, soil-baffling structure 19th, free section of anchor cable 20, anchorage cable anchoring section 21, waist rail 22.
Embodiment:As shown in figure 1, the tensioning umbrella anchored end thin-wall steel tube 8 in the present embodiment, on the top of thin-wall steel tube 8 Portion is provided with the drilling rod connection buckle 1 for being connected to a fixed with drilling rod so that tensioning umbrella anchored end can be with drilling rod together Creep into and moved to soil body deep layer.With reference to shown in Fig. 1 and Fig. 3, the bottom periphery of thin-wall steel tube 8 is provided with three pieces of aerofoil profile drillings Piece 12, three pieces of aerofoil profiles drilling pieces 12 are centrosymmetric arrangement centered on the center of circle of thin-wall steel tube 8, to ensure during drilling soil layer Uniform force.As shown in figure 5, aerofoil profile drilling piece 12 is swallow-tail form deformed steel flats, one side surface is inclined-plane, and the inclined-plane causes three Block aerofoil profile drilling piece 12 may make up cone tip shape, consequently facilitating thin-wall steel tube 8 creeps into underground layer.
As shown in figure 1, being provided with removable ring flange in its body periphery to direction is pushed up the bottom of by along the body of thin-wall steel tube 8 10 and guide plate 4, guide plate 4 and removable ring flange 10 can be slided up and down on the body of thin-wall steel tube 8 respectively.Leading The periphery of plate 4 is provided with four pieces of anchor plates 6, as shown in Fig. 2 during four pieces of anchor plates 6 are in centered on the center of circle of thin-wall steel tube 8 The heart is arranged symmetrically.One end of four pieces of anchor plates 6 is hinged on removable ring flange 10 by fixing pin 9 respectively, four pieces of grapplings Position temporary weld of the plate body of plate 6 respectively with guide plate 4 in pad 3 is fixed.Anchor cable hole 5 is offered on guide plate 4, Anchor cable hole 11 is offered on removable ring flange 10, anchor cable hole 5 and anchor cable hole 11 are used to be connected with anchor cable.
As shown in figure 1, being provided with limiting plate 7 in the top of removable ring flange 10, set limited in the top of guide plate 4 The upward sliding progress that position plate 2, wherein limiting plate 7 are used for removable ring flange 10 on thin-wall steel tube 8 is spacing, and limiting plate On the one hand the upward sliding progress being used for guide plate 4 on thin-wall steel tube 8 is spacing, on the other hand for being pushed up in drilling process Pushing away guide plate 4 makes anchored end to be rotationally advancing in the soil body.
With reference to shown in Fig. 4, Fig. 5 and Fig. 6, anchor cable by anchor cable hole 5 and anchor cable hole 11 respectively with guide plate 4 and removable method Blue disk 10 is connected.Thin-wall steel tube 8 is connected by drilling rod connection buckle 1 with drilling rod.In drilling process, due to limiting plate 2 Effect, drilling rod drives tensioning umbrella anchored end 16 and anchor cable 15 to be rotationally advancing together in the soil body, and the pressure slurries in drilling rod lead to In the lower end injection hole for crossing thin-wall steel tube 8, the soil body residue formed in drilling process, and the shape around drilling are washed away and replaced Collapse hole is prevented into protective layer.When tensioning umbrella anchored end 16 is crept into projected depth, extract before drilling rod, tense anchor cable 15 and drive Removable ring flange 10 is moved to hole month(Tensioning), anchor plate 6 can be along the outer rim of guide plate 4 to peripheral expansion(Umbrella)It is embedding Enter to drill the stable soil body in deep, i.e., original state as shown in Figure 1 is transformed to expansion state as shown in Figure 4;When removable method Blue disk 10 stops stretch-draw anchor 15 when being moved to limiting plate 7, extracts drilling rod.
Guide plate 4 forms individual components by pad 3, removable ring flange 10 by fixing pin 9 and anchor plate 6, In drilling rod connection buckle 1, limiting plate 2, limiting plate 7, thin-wall steel tube 8 and aerofoil profile drilling piece 12 with revolution drilling rod rotary drilling soil layer During, the part will not produce rotation, only can under the thrusting action of limiting plate 2 and drilling rod together to soil layer deep move It is dynamic, and drive anchor cable 15 to extend together.To ensure guide plate 4, removable ring flange 10, anchor plate 6 and anchor cable 15 not with thin Wall steel pipe and aerofoil profile drilling piece 12 rotate, and the middle part opening diameter of guide plate 4 and removable ring flange 10 should be slightly bigger than Steel Thin-Wall The external diameter of pipe 8, it is generally preferable to be 1-2cm.
With reference to shown in Fig. 6 and Fig. 7, the tensioning umbrella anchored end 16 in the present embodiment when in use, with reference to anchor cable 15, earth-retaining The components such as structure 19, waist rail 22, backing plate 14 and anchor head 13 constitute anchoring system.As shown in fig. 7, tensioning umbrella anchored end 16 is passed through Unstable soil layer 18 with holding force in steady soil 17, to ensure the stabilization of anchor force.Soil-baffling structure 19 is arranged on detrimental soil The periphery of layer 18 to it to carry out supporting.It is connected to a fixed between anchor cable 15 and soil-baffling structure 19 by waist rail 22.Anchor cable 15 exists It is divided into free section of anchor cable 20, anchorage cable anchoring section 21 in soil layer, wherein free section of anchor cable 20 refers to non-slip casting section, anchorage cable anchoring section 21 refer to slip casting section.
The present embodiment has following construction procedure:
1)According to slope height, formation physical parameters and code requirement, supporting scheme is calculated, single anchor cable system resistance to plucking is determined Power, the length of anchoring section 21, the spacing of anchor cable 15 etc..
2)According to design parameter, tensioning umbrella anchored end 16 is made, and be connected with anchor cable 15;
3)Rig is in place, creeps into tensioning umbrella anchored end 16 to projected depth according to the spacing and direction of design, extracts drilling rod Before, anchor cable 15 is tensed, the stress destruction of pad 3 between guide plate 4 and anchor plate 6, the removable upward sliding of ring flange 10 draws Pin joint of the anchor plate 6 at fixing pin 9 is played progressively to rotate and along the outer rim of guide plate 4 to peripheral expansion inlay bur hole depth The stable soil body in portion, so as to improve the withdrawal resistance and stability of support system.The expansion action of anchor plate 6 is until removable ring flange 10 stop when being moved to limiting plate 7.
4)Drilling rod is disengaged with tensioning umbrella anchored end 16 by back-drilling, and extracts drilling rod.
5)To the slip casting of anchoring section 21, middle grout cures hole to be drilled are reached after design strength, at anchor cable 15 and anchor head 13 Tensioning equipment is connected, and applies pretightning force, after pretightning force reaches design load, and the He of waist rail 22 is installed in the outside of soil-baffling structure 19 Cushion block 14, then anchor head 13 is locked into anchor cable 15 form reliable and stable anchoring system.
6)1 is repeated to each anchor cable system in anchoring system)-5)The step of complete the construction of whole anchoring system.
The present embodiment is in the specific implementation:Anchor cable 15 can be steel wire, the steel for connecting anchor head 13 and removable ring flange 10 Twisted wire or glass fiber-reinforced polymer.
In order to ensure being smoothed out for drilling, it is to avoid anchor plate 6 has been inserted into the periphery soil body, anchor plate 6 in drilling process Initial expanded diameter should be less than aerofoil profile creep into piece 12 expanded diameter.
The quantity of anchor plate 6 is chosen as 4-8 pieces, but its distribution should be in equally center centered on the center of circle of thin-wall circular tube 8 It is arranged symmetrically;Similarly, the quantity of anchor cable 15 is 2-4 beams, and anchor cable hole 5 and anchor cable hole 11 for connecting anchor cable 15 also should be with thin-walleds It is centrosymmetric and is opened on guide plate 4 and removable ring flange 10 centered on the center of circle of pipe 8.
Although above example is elaborated referring to the drawings the design to the object of the invention and embodiment, this Field those of ordinary skill will recognize, limited without departing from claim under the precondition of scope, still can be right The present invention makes various modifications and variations, therefore does not repeat one by one herein.

Claims (6)

1. a kind of anchoring system based on tensioning umbrella anchored end, for carrying out supporting to soil-slope, it is characterised in that:It is described Anchoring system at least include tensioning umbrella anchored end and anchor cable, the tensioning umbrella anchored end at least include steel pipe, guide plate, can Rotary flange disk, anchor plate and two pieces of limiting plates, wherein the guide plate and the removable ring flange are sleeved on the steel pipe Periphery and can be slided on the steel pipe, the inclined outside shape of the anchor plate is arranged, its one end and the removable flange Disk is hinged, and its plate body is welded and fixed with the guide plate, and two pieces of limiting plates are respectively fixedly disposed at the periphery of the steel pipe And be respectively used to carry out the guide plate and the removable ring flange it is spacing, in the guide plate and the removable flange Anchor cable hole is offered on disk respectively, the anchor cable is connected by the anchor cable hole with the guide plate and the removable ring flange Fixation is connect, the tensioning of the anchor cable can be such that the removable ring flange is slided along the steel pipe and drive the anchor plate described in Guide plate outer rim is expanded to the periphery in umbrella.
2. a kind of anchoring system based on tensioning umbrella anchored end according to claim 1, it is characterised in that:In the soil Soil-baffling structure is provided with the outside of matter side slope, the anchor cable is locked by anchor head, the anchor head passes through waist rail and the earth-retaining knot Structure is connected to a fixed.
3. a kind of anchoring system based on tensioning umbrella anchored end according to claim 1, it is characterised in that:In the steel The bottom periphery of pipe is fixedly installed aerofoil profile drilling piece, and the aerofoil profile drilling piece is evenly arranged in the bottom of the steel pipe with symmetry shape Portion periphery.
4. a kind of application process for the anchoring system based on tensioning umbrella anchored end being related to described in claim 1-3, its feature It is:For carrying out supporting to soil-slope, methods described at least comprises the following steps:
By the way that tensioning umbrella anchored end is fixedly connected with anchor cable in tensioning umbrella anchored end;
Rig is in place, while the tensioning umbrella anchored end is connected with drilling rod, regard the tensioning umbrella anchored end as brill Inlet side pierces the soil body until projected depth;
Before the drilling rod is extracted, the anchor cable is tensed, is made between the guide plate and anchor plate of the tensioning umbrella anchored end Pad stress destruction, makes removable ring flange be slided along steel pipe and drive outer rim of the anchor plate along the guide plate to week The stable soil body of the expansion of side periphery and inlay bur hole depth portion;
The drilling rod and the tensioning umbrella anchored end are disengaged by back-drilling, and extract the drilling rod;
To bore inner slip casting, middle grout cures hole to be drilled are reached after design strength, and tensioning is carried out to the anchor cable and applies pre- Clamp force, after pretightning force reaches design load, the anchor cable and anchor head is connected firmly to form anchoring system.
5. a kind of application process of anchoring system based on tensioning umbrella anchored end according to claim 4, its feature exists In:In the drilling process of the tensioning umbrella anchored end and the drilling rod, to the inner pressure inside pipe slip casting, pressure slurries lead to In the lower end injection hole for the thin-wall steel tube for crossing the tensioning umbrella anchored end, the soil body formed in drilling process is washed away and replaced Residue, and the formation protective layer around drilling.
6. a kind of application process of anchoring system based on tensioning umbrella anchored end according to claim 4, its feature exists In:After drilling terminates, the pulling force for tensing the anchor cable is more than the ultimate bearing of the pad between the guide plate and anchor plate Power, records pulling force and displacement in the cinching process of the anchor cable, when its displacement is close to the removable ring flange and its right Stop during length between the limiting plate answered.
CN201710440438.5A 2017-06-13 2017-06-13 A kind of anchoring system and its application method based on tensioning umbrella anchored end Active CN107034882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710440438.5A CN107034882B (en) 2017-06-13 2017-06-13 A kind of anchoring system and its application method based on tensioning umbrella anchored end

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710440438.5A CN107034882B (en) 2017-06-13 2017-06-13 A kind of anchoring system and its application method based on tensioning umbrella anchored end

Publications (2)

Publication Number Publication Date
CN107034882A true CN107034882A (en) 2017-08-11
CN107034882B CN107034882B (en) 2019-04-26

Family

ID=59541106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710440438.5A Active CN107034882B (en) 2017-06-13 2017-06-13 A kind of anchoring system and its application method based on tensioning umbrella anchored end

Country Status (1)

Country Link
CN (1) CN107034882B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267571A (en) * 2018-11-08 2019-01-25 兰州理工大学 There are the anchors and its construction method under cavity condition in a kind of slopes
CN109494576A (en) * 2018-12-10 2019-03-19 李秋香 A kind of tower electric power cabinet of field quick-assembling
CN109898527A (en) * 2019-02-28 2019-06-18 广西交通设计集团有限公司 The construction method that a kind of bamboo root shape interlocking anchor pile and unstable rock slope reinforce
CN110410124A (en) * 2019-08-21 2019-11-05 周艳君 Anchoring process and anchorage element device can be recycled in one kind falling leaf formula
CN113047881A (en) * 2021-05-07 2021-06-29 南京博联特光电科技有限公司 GFRP intelligent combined anchor rod suitable for subway tunnel support and construction method
CN113125194A (en) * 2021-03-02 2021-07-16 绍兴文理学院 Rock mechanics testing machine capable of effectively preventing soil drilling collapse accident
CN113136875A (en) * 2021-04-29 2021-07-20 江苏科技大学 Foundation pit supporting structure and construction method thereof
CN113174975A (en) * 2021-05-08 2021-07-27 青海大学 Ecological protection slope for recovering vegetation on deteriorated grassland
CN114737565A (en) * 2022-04-29 2022-07-12 中国矿业大学 Fully-recyclable distributed end support anchor rod and construction method thereof
CN114790735A (en) * 2022-05-10 2022-07-26 长江水利委员会长江科学院 Method for realizing cooperative uplift resistance of umbrella-shaped anchor and grouting body
CN115030158A (en) * 2022-05-27 2022-09-09 中铁第六勘察设计院集团有限公司 Assembly type device for lifting large-diameter cast-in-place pile and green construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05239830A (en) * 1992-02-27 1993-09-17 East Japan Railway Co Method of mechanical type earth anchor construction and anchor body
CN2451634Y (en) * 2000-08-09 2001-10-03 合肥工业大学 Expansion anchor
CN2542724Y (en) * 2002-05-23 2003-04-02 谭跃虎 Composite earth anchor for supporting construction
CN102518132A (en) * 2012-01-09 2012-06-27 长江水利委员会长江科学院 Tensioned self-locking umbrella type anchor and soil slope reinforcement method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05239830A (en) * 1992-02-27 1993-09-17 East Japan Railway Co Method of mechanical type earth anchor construction and anchor body
CN2451634Y (en) * 2000-08-09 2001-10-03 合肥工业大学 Expansion anchor
CN2542724Y (en) * 2002-05-23 2003-04-02 谭跃虎 Composite earth anchor for supporting construction
CN102518132A (en) * 2012-01-09 2012-06-27 长江水利委员会长江科学院 Tensioned self-locking umbrella type anchor and soil slope reinforcement method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267571A (en) * 2018-11-08 2019-01-25 兰州理工大学 There are the anchors and its construction method under cavity condition in a kind of slopes
CN109494576A (en) * 2018-12-10 2019-03-19 李秋香 A kind of tower electric power cabinet of field quick-assembling
CN109494576B (en) * 2018-12-10 2021-02-05 大庆宏富来电气设备制造有限公司 Open-air tower electric power cabinet of assembling fast
CN109898527A (en) * 2019-02-28 2019-06-18 广西交通设计集团有限公司 The construction method that a kind of bamboo root shape interlocking anchor pile and unstable rock slope reinforce
CN110410124A (en) * 2019-08-21 2019-11-05 周艳君 Anchoring process and anchorage element device can be recycled in one kind falling leaf formula
CN113125194A (en) * 2021-03-02 2021-07-16 绍兴文理学院 Rock mechanics testing machine capable of effectively preventing soil drilling collapse accident
CN113136875A (en) * 2021-04-29 2021-07-20 江苏科技大学 Foundation pit supporting structure and construction method thereof
CN113136875B (en) * 2021-04-29 2022-03-08 江苏科技大学 Foundation pit supporting structure and construction method thereof
CN113047881A (en) * 2021-05-07 2021-06-29 南京博联特光电科技有限公司 GFRP intelligent combined anchor rod suitable for subway tunnel support and construction method
CN113047881B (en) * 2021-05-07 2023-09-26 南京博联特光电科技有限公司 GFRP intelligent combined anchor rod suitable for subway roadway support and construction method
CN113174975A (en) * 2021-05-08 2021-07-27 青海大学 Ecological protection slope for recovering vegetation on deteriorated grassland
CN114737565A (en) * 2022-04-29 2022-07-12 中国矿业大学 Fully-recyclable distributed end support anchor rod and construction method thereof
CN114737565B (en) * 2022-04-29 2023-03-03 中国矿业大学 Fully-recyclable distributed end-bearing anchor rod and construction method thereof
CN114790735A (en) * 2022-05-10 2022-07-26 长江水利委员会长江科学院 Method for realizing cooperative uplift resistance of umbrella-shaped anchor and grouting body
CN115030158A (en) * 2022-05-27 2022-09-09 中铁第六勘察设计院集团有限公司 Assembly type device for lifting large-diameter cast-in-place pile and green construction method

Also Published As

Publication number Publication date
CN107034882B (en) 2019-04-26

Similar Documents

Publication Publication Date Title
CN107034882A (en) A kind of anchoring system and its application process based on tensioning umbrella anchored end
CN106193030B (en) A kind of prestressing force grouted anchor bar and construction method with hangnail head
CN100513745C (en) Construction method for mechanical hole reaming of anchor rod
US8997889B2 (en) Underwater drilling arrangement and method for introducing a foundation element into a bed of a body of water
CN207828965U (en) A kind of pouch expansion variable diameters steel reinforcement cage and anchor pole or pile foundation
CN206396816U (en) A kind of blower foundation various dimensions ruggedized construction
CN104179177B (en) A kind of nail anchor device for foundation pit supporting construction and construction method thereof
CN106836179B (en) The construction method of vertical strengthening ribs enhanced bellows grouting pile
CN109113081A (en) Fabricated drainage prestress anti-slide pile structure and construction process thereof
CN206521873U (en) A kind of reducing steel reinforcement cage and its enlarging anchor rod or pile foundation
CN208996032U (en) A kind of dowel recoverable umbrella-type anchoring piece
CN206829130U (en) A kind of tensioning umbrella anchored end
CN104947663B (en) Special drive type umbrella-shaped anchor for rushing to deal with emergency as well as application method of anchor
CN109898527B (en) Bamboo-root-shaped interlocking anchor bar pile and construction method for reinforcing unstable rock slope
WO2013089466A1 (en) Method and apparatus for pouring bonding filler in a perforation expansion portion for enhancing the support force of a pile or tensile member
CN104457655B (en) A kind of folding blade blade multipoint displacement meter anchor head for soft soil layer
CN208668408U (en) The passive type of follow-up synchronous with whirl spraying anchor cable is without structure type umbrella enlarged footing
CN208586608U (en) The active umbrella enlarged footing of follow-up synchronous with whirl spraying anchor cable
CN109469055A (en) A kind of part pipe seam formula end expansion type energy-absorption anchor rod and its construction method
CN105626109B (en) It is a kind of that there is the method for repeating to apply prestressed cable bolting
CN106223334B (en) A kind of restorative procedure and its ruggedized construction of broken pile
CN105239575B (en) One kind drilling base expanding and base expanding grouting Static Pipe Pile Construction device and construction method
CN204059353U (en) The nail anchor device of pattern foundation pit supporting structure
CN205116168U (en) End grout static pressure tubular pile construction equipment is expanded in drilling
KR20130095107A (en) Apparatus for maintaining expanded underground drill hole and metohd therefor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhou Zilin

Inventor after: Bian Yuewei

Inventor after: Sheng Yingping

Inventor after: Guo Jinsong

Inventor after: Yang Zhihao

Inventor after: Zeng Yi

Inventor after: Ni Ting

Inventor after: Ding Pengfei

Inventor after: Xing Min

Inventor before: Zhou Zilin

Inventor before: Bian Yuewei

Inventor before: Guo Jinsong

Inventor before: Yang Zhihao

Inventor before: Zeng Yi

Inventor before: Ni Ting

Inventor before: Ding Pengfei

Inventor before: Xing Min