One kind plus drag-line tower crane climbing frame apparatus and its application method
Technical field
The present invention relates to construction tower crane technique for fixing field, and in particular to one kind plus drag-line tower crane climbing frame apparatus and
Its application method.
Background technology
At present, with the invention of economic construction, construction of super highrise building project is more and more, and adhesion tower-crane is as up to
The main vertical transportation machinery of architecture construction, serves great function in construction operation.Tower crane climbing frame is connection tower crane
With a kind of mechanical device of agent structure, its main function is to provide the tower crane climbing strong point, and transmits tower crane load to support
Beam.Traditional tower crane climbing frame is made up of stress C-type beam and contact bar, when from middle-size and small-size tower crane, and contact bar is to whole device
Supporting role it is very small, the climb peace of frame of increase is torn open, has bad luck workload, and construction takes time and effort, and construction is complicated, inconvenient for use.
The content of the invention
It is an object of the invention to provide one kind plus drag-line tower crane climbing frame apparatus and its application method, change tradition and climb frame
Complicated, peace tears the problem of having bad luck inconvenient, less economical open.
To achieve the above object, the present invention is adopted the following technical scheme that:
One kind plus drag-line tower crane climbing frame apparatus, it is characterised in that:The C-type beam being be arranged in parallel including twice, the C of twice C-type beam
Shape opening is oppositely arranged and independent mutually;Every C-type beam is made up of two secondary beams of middle girder and end, and the secondary beam hangs down
The straight end being arranged on the inside of girder;Tension member is connected between twice secondary beam in same C-type beam;At the end of girder phase dorsal part
Portion, provided with the parallel or coaxial line with secondary beam, the connecting seat for being fixed with supporting construction;Use is equipped with the girder and secondary beam
In the holding device fastened with the main limb of tower crane tower body.
The tension member is 1 road, 2 roads, the connecting rod of 3 roads flexibility or rigidity, and the connecting rod is drag-line, bar steel plate, channel-section steel
Or reinforcing bar.
The section form of the girder is box, H types, groove profile, compound section or lattice.
The section form of the secondary beam is box, H types, groove profile, compound section or lattice.
Be provided with the bottom plate of the connecting seat one group be used for be fixedly mounted preformed hole, for being connected with supporting construction.
The secondary beam is located at the outer end of the holding device on girder, is connected with girder inner vertical.
The present invention also protects a kind of application method of above-mentioned plus drag-line tower crane climbing frame apparatus, it is characterised in that including
Following steps:
Step 1: determining C-type beam size:According to tower crane size, the size of C-type beam is determined, and then determine the size of each part;
Step 2: material prepares:Size according to determination carries out the preparation of each part, each part connection be fabricated to girder, secondary beam,
Connecting seat;
Step 3: the preparation of C-type beam:Installation site including holding device is default, the fixation of primary-secondary beam, the fixation of connecting seat and
Hole to be provided is offered in the main limb position of tower crane tower body on the web of the setting of tension member between secondary beam, girder and secondary beam, top is inside set
Tight device;
Step 4: bottom adds the arrangement of drag-line tower crane climbing frame apparatus:The twice C-type beam of preparation is arranged symmetrically in supporting construction
On, form non-closed tower crane climbing frame apparatus;
Step 5: bottom adds the fixation of drag-line tower crane climbing frame apparatus:The girder of C-type beam and the supporting construction bolt of bottom are connected
Connect, realize the fixation for adding drag-line tower crane climbing frame apparatus;
Step 6: upper strata adds the lifting of drag-line tower crane climbing frame apparatus:The C-type beam for adding drag-line tower crane climbing frame is lifted to pre-
If height;
Step 7: upper strata adds arrangement and the fixation of drag-line tower crane climbing frame apparatus:Upper strata is carried out with reference to step 4 and step 5 to add
The arrangement of drag-line tower crane climbing frame apparatus and fixation, and adjust the main limb of reinforcement section that holding device holds out against tower crane tower body;
Step 8: quality quality inspection:Plus drag-line tower crane climbing frame installs in place, carries out construction quality quality inspection.
Compared with prior art, the technical advantages of the present invention are that:
Of the present invention plus drag-line tower crane climbing frame apparatus simple structure, novel in design, twice C-type beam is independently arranged, same
Without contact bar between secondary beam on axis, superfluous constraint contact bar is saved, material is saved, while reducing cost, reduces and climb
The peace of liter frame, which is torn open, has bad luck workload, and it is more convenient to construct, and low to workmen's technical requirements, be particularly suitable for use in high-building construction
The middle-size and small-size tower crane climbing frame that climbs.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, above-mentioned and/or other aspects of the invention and advantage will become
Become apparent from and be easier to understand, these accompanying drawings are schematical, are not intended to limit the present invention, wherein:
Fig. 1 is of the present invention plus the dimensional structure diagram of the embodiment of drag-line tower crane climbing frame apparatus;
Fig. 2 is Fig. 1 top view;
The use state schematic diagram that Fig. 3 is of the present invention plus drag-line tower crane climbing frame apparatus coordinates with tower crane.
Reference:1-C types beam, 2- girders, 3- secondary beams, 4- tension members, 5- connecting seats, 51- bottom plates, 52- top plates, 53-
Ribbed stiffener, 54- preformed holes, 6- holding devices, 7- hole to be provideds, 8- tower cranes tower body, 9- supporting constructions, 10- climb palmula block.
Embodiment
Hereinafter, the implementation for adding drag-line tower crane climbing frame apparatus and its application method of the present invention is described with reference to the accompanying drawings
Example.
The embodiment recorded herein is the specific embodiment of the present invention, the design for illustrating the present invention,
It is explanatory and exemplary, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein
Implement exception, those skilled in the art can also be based on the application claims and specification disclosure of that using aobvious
The other technical schemes being clear to, these technical schemes include any obvious using making for the embodiment to recording herein
The technical scheme of substitutions and modifications.
The accompanying drawing of this specification is schematic diagram, aids in illustrating the design of the present invention, it is schematically indicated the shape of each several part
And its correlation.It note that between the structure of each part for the ease of clearly showing the embodiment of the present invention, each accompanying drawing
Do not drawn according to identical ratio.Identical reference marker is used to represent identical part.
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and
It is non-to be used to limit the scope of the present invention.The embodiment of the present invention is described in further detail below in conjunction with accompanying drawing.
Referring to Fig. 1 and Fig. 2, one kind plus drag-line tower crane climbing frame apparatus, it is characterised in that:The C being be arranged in parallel including twice
Type beam 1, the c-shaped opening of twice C-type beam 1 is oppositely arranged and independent mutually;Every C-type beam 1 is by the two of middle girder 2 and end
Root secondary beam 3 is constituted, and secondary beam 3 is vertically set on the end of the inner side of girder 2;Drawknot is connected between twice secondary beam in same C-type beam 1
Part 4;Tension member 4 is 1 road, 2 roads, the connecting rod of 3 roads flexibility or rigidity, and connecting rod is drag-line, bar steel plate, channel-section steel or reinforcing bar.In master
The end of the phase dorsal part of beam 2, the position of correspondence secondary beam 3 is provided with the connecting seat 5 for being used for being connected with supporting construction 9;Such as Fig. 3, this
Connecting seat 5 includes the bottom plate 51 and top plate 52 that horizontal parallel is set in embodiment, and is vertical at ribbed stiffener between the two
53, be provided with bottom plate 51 one group be used for be fixedly mounted preformed hole 54, overlapped during the setting of connecting seat 5 with the axis of secondary beam 3.
Girder 2 can using section form as box, H types, groove profile, compound section or lattice.Secondary beam 3 can with section shape
Formula is box, H types, groove profile, compound section or lattice.It is equipped with girder 2 and secondary beam 3 for being fastened with the main limb of tower crane tower body
Holding device 6;Hole to be provided 7 is offered in the main limb position of tower crane tower body on the web of girder 2 and secondary beam 3, holding device is inside set
6.Secondary beam 3 is located at the outer end of the holding device on girder 2, is connected with the inner vertical of girder 2.
The invention further relates to the application method of above-mentioned plus drag-line tower crane climbing frame apparatus, such as Fig. 3 is of the present invention adds
The use state schematic diagram that drag-line tower crane climbing frame apparatus coordinates with tower crane, it is characterised in that comprise the following steps:
Step 1: determining C-type beam size:According to tower crane size, the size of C-type beam is determined, and then determine the size of each part;
Step 2: material prepares:Size according to determination carries out the preparation of each part, each part connection be fabricated to girder, secondary beam,
Connecting seat;
Step 3: the preparation of C-type beam 1:Installation site including holding device is default, the fixation of primary-secondary beam, the fixation of connecting seat
Hole to be provided is offered in the main limb position of tower crane tower body on the web of the setting of tension member between secondary beam, girder and secondary beam, is inside set
Holding device;
Step 4: bottom adds the arrangement of drag-line tower crane climbing frame apparatus:The twice C-type beam of preparation is arranged symmetrically in supporting construction
On, form non-closed tower crane climbing frame apparatus;
Step 5: bottom adds the fixation of drag-line tower crane climbing frame apparatus:The girder of C-type beam and the supporting construction bolt of bottom are connected
Connect, realize the fixation for adding drag-line tower crane climbing frame apparatus;
Step 6: upper strata adds the lifting of drag-line tower crane climbing frame apparatus:The C-type beam for adding drag-line tower crane climbing frame is lifted to pre-
If height;
Step 7: upper strata adds arrangement and the fixation of drag-line tower crane climbing frame apparatus:Upper strata is carried out with reference to step 4 and step 5 to add
The arrangement of drag-line tower crane climbing frame apparatus and fixation, and adjust the main limb of reinforcement section that holding device 6 holds out against tower crane tower body 8;
Step 8: quality quality inspection:Plus drag-line tower crane climbing frame installs in place, carries out construction quality quality inspection.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.