CN107030877A - It is a kind of for steel performance steel loose tool of prefabricated component and preparation method thereof - Google Patents

It is a kind of for steel performance steel loose tool of prefabricated component and preparation method thereof Download PDF

Info

Publication number
CN107030877A
CN107030877A CN201710360006.3A CN201710360006A CN107030877A CN 107030877 A CN107030877 A CN 107030877A CN 201710360006 A CN201710360006 A CN 201710360006A CN 107030877 A CN107030877 A CN 107030877A
Authority
CN
China
Prior art keywords
steel
channel
concrete
section steel
surface layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710360006.3A
Other languages
Chinese (zh)
Other versions
CN107030877B (en
Inventor
黄炜
石安仁
苟文源
吴鹏
陈建仓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xixian New Area Juzhen Housing Industrial Co ltd
Original Assignee
Xi ` An Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi ` An Industrial Co Ltd filed Critical Xi ` An Industrial Co Ltd
Priority to CN201710360006.3A priority Critical patent/CN107030877B/en
Publication of CN107030877A publication Critical patent/CN107030877A/en
Application granted granted Critical
Publication of CN107030877B publication Critical patent/CN107030877B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/22Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members assembled from preformed parts
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The present invention relates to a kind of for steel performance steel loose tool of prefabricated component and preparation method thereof, surface layer steel plate including concrete slab and above concrete slab, concrete slab includes being internally provided with channel-section steel, distribution bar mesh sheet, anchoring piece and the concrete layer for lifting by crane crab-bolt;Channel-section steel includes many longitudinal channel-section steels and two transverse channel steels, its upper surface is connected with the lower surface of surface layer steel plate successively, distribution bar mesh sheet includes many longitudinal reinforcements and transverse steel, transverse steel passes through longitudinal channel-section steel to tighten the through hole that patch lower flange is opened up, and is fastenedly connected respectively with many longitudinal reinforcements by fastener;Anchoring piece is uniformly distributed in concrete layer, and upper surface is connected with the lower surface of surface layer steel plate successively;Lifting crab-bolt has multiple, and is evenly distributed on the rectangle frame inside configuration of channel-section steel along longitudinal direction.The present invention has that peace mould is convenient, dismounting easily, fast, cheap speed of application, rigidity and intensity is good, convenient transport the features such as, it is practical.

Description

A kind of steel performance steel loose tool for prefabricated component and its Preparation method
Technical field
The invention belongs to construction engineering technical field, and in particular to a kind of steel and concrete for prefabricated component Combining structure steel loose tool and preparation method thereof.
Background technology
At present, the building industry of China still uses traditional handicraft in large quantities, and the common drawback that traditional handicraft is present is:Apply In work link, live waste of raw materials is big, building waste pollution environment, builds dust pollution air, builds influence of noise resident Life, the construction period is long, and architectural energy consumption is big.In addition, along with expanding economy, the rise of labour cost, building cost is increasingly It is high.
For the shortcoming of above existing building structure, country puts into effect a series of policy of encouragement housing industrializations, house production Industry is using the production of element precast metaplasia, fabricated construction as the mode of production, with design standard, component component, mechanization of building operation It is characterized, is the great change in traditional architecture industry development model and path, its essence is being undergone technological transformation to traditional architecture industry, Promote the process of construction industry scientific and technological progress.Assembled architecture is to realize one of effective way of housing industrialization, meets China and carries The resources conservation that goes out, environment-friendly social desirability.For distant and have apart from industrialization base or built component factory For the assembled project of urgent duration demand, prefabricated components have that big, integrated cost is lost in transport.And nomadic Component factory is compared for Large Precast Members factory, has very big advantage in terms of haul distance, price, therefore build nomadic structure Part factory is particularly important.Wherein prefabricated components die station is to integrate template assemblies, molding component and component conservation, and whole There is the component system of particularly significant effect, only steel loose tool could meet nomadic component factory in individual element precast working procedure Construction demand.
Current existing steel loose tool faces problems, and on the one hand existing steel loose tool has overall cost height, fetal membrane and poured The problems such as leakiness, smaller integral rigidity;On the other hand, existing steel loose tool thickness direction sectional dimension is big, be unfavorable for overall fortune It is defeated, be not suitable for arrangement and the development of nomadic component factory, therefore a kind of Novel steel loose tool of searching turns into present urgent need to resolve Problem.
The content of the invention
In view of this, the invention provides a kind of steel performance steel loose tool for prefabricated component And preparation method thereof, to solve technical problem set forth above.
The technical scheme is that:A kind of steel performance steel loose tool for prefabricated component, Including concrete slab and the surface layer steel plate being arranged above concrete slab, the concrete slab includes concrete layer, concrete layer It is internally provided with channel-section steel, distribution bar mesh sheet, anchoring piece and lifting crab-bolt;The channel-section steel includes many longitudinal channel-section steels and two horizontal strokes To channel-section steel, wherein two transverse channel steels and two cannelure steel toe tails are sequentially connected composition rectangle frame border structure, remaining longitudinal direction Channel-section steel is evenly distributed in rectangle frame border structure, and the upper surface of channel-section steel is connected with the lower surface of surface layer steel plate;The distribution Reinforced mesh includes many longitudinal reinforcements and transverse steel, and the transverse steel passes through longitudinal channel-section steel to tighten what patch lower flange was opened up Through hole, is fastenedly connected with many longitudinal reinforcements respectively by fastener;The anchoring piece has multiple, and is uniformly distributed in concrete In layer, the upper surface of anchoring piece is connected with the lower surface of surface layer steel plate successively;The lifting crab-bolt has multiple, divides along longitudinal direction is uniform Rectangle frame inside configuration of the cloth in channel-section steel.
It is preferred that steel plate is unilateral checkered steel plate, the side for having decorative pattern is connected with concrete slab.
It is preferred that anchoring piece is the cutting back channel-section steel for the regular length for being cut into channel-section steel by length direction.
The preparation method of the steel performance steel loose tool of prefabricated component is:
S1. channel-section steel is processed:Channel-section steel uses 500 × 370 × 45 types, is used as the main body framework of concrete slab;Under channel-section steel is close to 12mm apertures are opened on the edge of a wing, are easy to the transverse steel in concrete slab to pass through;
S2. anchoring piece is processed:On the basis of 500 × 370 × 45 type groove steel, by length direction be cut into length for 20mm~ 40mm cutting back channel-section steel, is used as coagulation plate and the pre-buried weldment of surface layer steel plate;
S3. surface layer steel plate is transported to construction site, axis is errorless with confirming surface layer steel plate and Combined concrete loose tool;First Concrete board constructions template is carried out around surface layer steel plate to set up, and it is fixed using magnetic holder supporting;Then by channel-section steel and anchor Firmware is sequentially placed into the template for having set up completion, is carried out channel-section steel and anchoring piece successively with surface layer steel plate using manual gas shield welding Full weld is welded, the position of arrangement lifting crab-bolt after welding is finished, and the position for lifting by crane crab-bolt is fixed using fastener;Will Transverse steel passes through longitudinal channel-section steel to tighten the through hole that patch lower flange is opened up, and is connected respectively with many longitudinal reinforcement fastenings by fastener Connect, formed after distribution bar mesh sheet and carry out concrete and pour, before casting concrete, template should water profit mould, clean out, pour Build in Concrete, note not touching reinforcing bar during vibrated concrete, strength grade of concrete is performed by standard, standard curing 1 ~2 weeks, remove magnetic holder and template, you can form the concrete board constructions of steel and Combined concrete loose tool.
It is preferred that the length of cutting back channel-section steel is 30mm in step S2.
A kind of steel performance steel loose tool and its making for prefabricated component that the present invention is provided Method, prefabricated components formwork just can be completed by being fixed on the outside of steel loose tool and plastic formwork assembly, magnetic holder, with peace mould side Just the characteristics of easy, speed of application is fast, is dismantled;Concrete slab is welded by channel-section steel anchoring piece and surface layer steel plate, is greatly enhanced The rigidity and support performance of steel loose tool, prefabricated components molding effect are good, and quality is readily obtained guarantee, with traditional steel loose tool phase Than the steel performance steel placenta has the features such as cheap, rigidity and intensity are good, convenience is transported, practicality By force, it is adapted to the construction demand of nomadic component factory.
Brief description of the drawings
Fig. 1 is overall structure diagram of the invention.
Fig. 2 is the arrangement schematic diagram of channel-section steel, longitudinal reinforcement and transverse steel in the concrete slab of the present invention.
Fig. 3 is the arrangement schematic diagram of anchoring piece in the concrete slab of the present invention.
Fig. 4 is the structural representation of the transverse steel wears groove steel of the present invention.
Fig. 5 is the anchoring piece of the present invention and the connection diagram of surface layer steel plate.
Description of reference numerals:
1st, surface layer steel plate;2nd, concrete slab;3rd, channel-section steel;4th, crab-bolt is lifted by crane;5th, longitudinal reinforcement;6th, transverse steel;7th, anchor Part.
Embodiment
The invention provides a kind of steel performance steel loose tool for prefabricated component and its making Method, with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5 structural representation, is carried out to the specific embodiment of the present invention It is described in detail, it is to be understood that protection scope of the present invention is not limited by embodiment.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 5, a kind of steel for prefabricated component that the present invention is provided is with mixing Structural steel loose tool, including concrete slab 2 and the surface layer steel plate 1 for being arranged at the top of concrete slab 2, the concrete slab close in solidifying local soil type 2 include concrete layer, and concrete layer is internally provided with channel-section steel 3, distribution bar mesh sheet, anchoring piece 7 and lifting crab-bolt 4;The groove Steel 3 includes many longitudinal channel-section steels and two transverse channel steels, wherein two transverse channel steels and two cannelure steel toe tails are sequentially connected Rectangle frame border structure is constituted, remaining longitudinal channel-section steel is evenly distributed in rectangle frame border structure, and the upper surface and face of channel-section steel 3 The lower surface of layer steel plate 1 is connected;The distribution bar mesh sheet includes many longitudinal reinforcements 5 and transverse steel 6, the transverse steel 6 tighten the through hole that patch lower flange is opened up through longitudinal channel-section steel, are fastenedly connected respectively with many longitudinal reinforcements 5 by fastener;Institute Stating anchoring piece 7 has multiple, and is uniformly distributed in concrete layer, the lower surface of the upper surface of anchoring piece 7 successively with surface layer steel plate 1 It is connected;The lifting crab-bolt 4 has multiple, and the rectangle frame inside configuration of channel-section steel 3 is evenly distributed on along longitudinal direction.
Further, steel plate 1 is unilateral checkered steel plate, and the side for having decorative pattern is connected with concrete slab 2.
Further, anchoring piece 7 is the cutting back channel-section steel for the regular length for being cut into channel-section steel 3 by length direction.
The preparation method of the steel performance steel loose tool of prefabricated component is:
S1. channel-section steel 3 is processed:Channel-section steel 3 uses 500 × 370 × 45 types, is used as the main body framework of concrete slab 2;Channel-section steel 3 is tight 12mm apertures are opened in patch lower flange, and the transverse steel 6 being easy in concrete slab 2 is passed through;
S2. anchoring piece 7 is processed:On the basis of 500 × 370 × 45 type groove steel, by length direction be cut into length for 20mm~ 40mm cutting back channel-section steel, is used as coagulation plate and the pre-buried weldment of surface layer steel plate;
Surface layer steel plate 1 is transported to construction site, axis is errorless with confirming surface layer steel plate 1 and Combined concrete loose tool;First Concrete board constructions template is carried out around surface layer steel plate 1 to set up, and it is fixed using magnetic holder supporting;Then by the He of channel-section steel 3 Anchoring piece 7 is sequentially placed into the template for having set up completion, using manual gas shield welding by channel-section steel 3 and anchoring piece 7 and surface layer steel plate 1 according to Secondary progress full weld welding, the position of arrangement lifting crab-bolt 4 after welding is finished, and entered the position for lifting by crane crab-bolt 4 using fastener Row is fixed;Pass through longitudinal channel-section steel to tighten the through hole that patch lower flange is opened up transverse steel 6, by fastener respectively with many longitudinal directions Reinforcing bar 5 is fastenedly connected, and is formed after distribution bar mesh sheet and is carried out concrete and pour, before casting concrete, and template should water profit mould, Clean out, note not touching reinforcing bar during casting concrete, during vibrated concrete, strength grade of concrete is held by standard OK, standard curing 1~2 week, removes magnetic holder and template, you can form the concrete board constructions of steel and Combined concrete loose tool.
Further, the length of cutting back channel-section steel is 30mm in step S2.
A kind of steel performance steel loose tool and its making for prefabricated component that the present invention is provided Method, prefabricated components formwork just can be completed by being fixed on the outside of steel loose tool and plastic formwork assembly, magnetic holder, with peace mould side Just the characteristics of easy, speed of application is fast, is dismantled;Concrete slab is welded by channel-section steel, anchoring piece and surface layer steel plate, is greatly enhanced The rigidity and support performance of steel loose tool, prefabricated components molding effect are good, and quality is readily obtained guarantee, with traditional steel loose tool phase Than the steel performance steel placenta has the features such as cheap, rigidity and intensity are good, convenience is transported, practicality By force, it is adapted to the construction demand of nomadic component factory.
Disclosed above is only the preferably specific embodiment of the present invention, and still, the embodiment of the present invention is not limited to this, What any those skilled in the art can think change should all fall into protection scope of the present invention.

Claims (5)

1. a kind of steel performance steel loose tool for prefabricated component, it is characterised in that including concrete Plate (2) and the surface layer steel plate (1) being arranged above concrete slab (2), the concrete slab (2) include concrete layer, concrete Layer is internally provided with channel-section steel (3), distribution bar mesh sheet, anchoring piece (7) and lifting crab-bolt (4);The channel-section steel (3) includes many and indulged To channel-section steel and two transverse channel steels, wherein two transverse channel steels and two cannelure steel toe tails are sequentially connected composition rectangle frame frame Structure, remaining longitudinal channel-section steel is evenly distributed in rectangle frame border structure, and upper surface and the surface layer steel plate (1) of channel-section steel (3) Lower surface is connected;The distribution bar mesh sheet includes many longitudinal reinforcements (5) and transverse steel (6), and the transverse steel (6) is worn Cross longitudinal channel-section steel and tighten the through hole that patch lower flange is opened up, be fastenedly connected respectively with many longitudinal reinforcements (5) by fastener;It is described Anchoring piece (7) has multiple, and is uniformly distributed in concrete layer, the upper surface of anchoring piece (7) successively with surface layer steel plate (1) Surface is connected;The lifting crab-bolt (4) has multiple, and the rectangle frame inside configuration of channel-section steel (3) is evenly distributed on along longitudinal direction.
2. a kind of steel performance steel loose tool for prefabricated component according to claim 1, its It is characterised by, the steel plate (1) is unilateral checkered steel plate, the side for having decorative pattern is connected with concrete slab (2).
3. a kind of steel performance steel loose tool for prefabricated component according to claim 1, its It is characterised by, the anchoring piece (7) is the cutting back channel-section steel for the regular length for being cut into channel-section steel (3) by length direction.
4. a kind of preparation method of steel performance steel loose tool for prefabricated component, it is characterised in that Including following construction procedure:
S1. channel-section steel (3) is processed:Channel-section steel (3) uses 500 × 370 × 45 types, is used as the main body framework of concrete slab (2);Channel-section steel (3) it is close to lower flange and opens 12mm apertures, the transverse steel (6) being easy in concrete slab (2) is passed through;
S2. anchoring piece (7) is processed:On the basis of 500 × 370 × 45 type groove steel, by length direction be cut into length for 20mm~ 40mm cutting back channel-section steel, is used as coagulation plate and the pre-buried weldment of surface layer steel plate;
S3. surface layer steel plate (1) is transported to construction site, axis is errorless with confirming surface layer steel plate (1) and Combined concrete loose tool;It is first Concrete board constructions template is first carried out around surface layer steel plate (1) to set up, and it is fixed using magnetic holder supporting;Then by channel-section steel (3) be sequentially placed into anchoring piece (7) in the template for having set up completion, using manual gas shield welding by channel-section steel (3) and anchoring piece (7) with Surface layer steel plate (1) carries out full weld welding successively, the position of arrangement lifting crab-bolt (4) after welding is finished, and will be risen using fastener The position of cat bolt (4) is fixed;Pass through longitudinal channel-section steel to tighten the through hole that patch lower flange is opened up transverse steel (6), pass through Fastener is fastenedly connected with many longitudinal reinforcements (5) respectively, is formed and pouring for concrete is carried out after distribution bar mesh sheet, poured mixed Before solidifying soil, template should water profit mould, clean out, note not touching reinforcing bar during casting concrete, during vibrated concrete, mix Solidifying soil strength grade is performed by standard, and magnetic holder and template are removed in standard curing 1~2 week, you can form steel and Combined concrete tire The concrete board constructions of mould.
5. a kind of system of steel performance steel loose tool for prefabricated component according to claim 4 Make method, it is characterised in that the length of cutting back channel-section steel is 30mm in the step S2.
CN201710360006.3A 2017-05-20 2017-05-20 Steel and concrete combined structure steel moulding bed for prefabricated components and manufacturing method thereof Active CN107030877B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710360006.3A CN107030877B (en) 2017-05-20 2017-05-20 Steel and concrete combined structure steel moulding bed for prefabricated components and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710360006.3A CN107030877B (en) 2017-05-20 2017-05-20 Steel and concrete combined structure steel moulding bed for prefabricated components and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN107030877A true CN107030877A (en) 2017-08-11
CN107030877B CN107030877B (en) 2024-04-02

Family

ID=59539713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710360006.3A Active CN107030877B (en) 2017-05-20 2017-05-20 Steel and concrete combined structure steel moulding bed for prefabricated components and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN107030877B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107599150A (en) * 2017-09-13 2018-01-19 长沙远大住宅工业集团股份有限公司 It is a kind of go out muscle prefabricated components forming method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2619988Y (en) * 2003-05-29 2004-06-09 吴方伯 Reinforced concrete assembled floor
WO2012096639A1 (en) * 2011-01-10 2012-07-19 Johnson Frank K Modular construction mold apparatus and method for constructing concrete buildings and structures
CN102767284A (en) * 2012-08-08 2012-11-07 张家口市第一建筑工程有限公司 Semi-prefabricating construction process for concrete thin-wall lower return eave
CN202559570U (en) * 2012-05-09 2012-11-28 宝钢建筑系统集成有限公司 Thin-wall light steel composite floor slab without dismantling bottom cast
WO2013185277A1 (en) * 2012-06-11 2013-12-19 浙江省建工集团有限责任公司 Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN103758319A (en) * 2014-01-26 2014-04-30 湖北弘毅钢结构工程有限公司 Prefabricated facing lightweight concrete external wallboard
CN203792477U (en) * 2014-04-09 2014-08-27 石广林 Reinforced concretesoffit formwork adopting segmentedprefabrication
WO2015135442A1 (en) * 2014-03-10 2015-09-17 初明进 Prefabricated reinforced concrete member
CN204691029U (en) * 2015-01-29 2015-10-07 仙泊绿建筑有限公司 A kind of monolithic floor manufactured in advance
CN105064398A (en) * 2015-08-19 2015-11-18 中国能源建设集团天津电力建设有限公司 One-time overall pouring construction method for nuclear powder single-hole GD gallery
CN205617631U (en) * 2015-12-24 2016-10-05 河南远大可持续建筑科技有限公司 High strength modularization floor
CN206913415U (en) * 2017-05-20 2018-01-23 西咸新区矩阵住宅工业有限公司 A kind of steel performance steel loose tool for prefabricated component

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2619988Y (en) * 2003-05-29 2004-06-09 吴方伯 Reinforced concrete assembled floor
WO2012096639A1 (en) * 2011-01-10 2012-07-19 Johnson Frank K Modular construction mold apparatus and method for constructing concrete buildings and structures
CN202559570U (en) * 2012-05-09 2012-11-28 宝钢建筑系统集成有限公司 Thin-wall light steel composite floor slab without dismantling bottom cast
WO2013185277A1 (en) * 2012-06-11 2013-12-19 浙江省建工集团有限责任公司 Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN102767284A (en) * 2012-08-08 2012-11-07 张家口市第一建筑工程有限公司 Semi-prefabricating construction process for concrete thin-wall lower return eave
CN103758319A (en) * 2014-01-26 2014-04-30 湖北弘毅钢结构工程有限公司 Prefabricated facing lightweight concrete external wallboard
WO2015135442A1 (en) * 2014-03-10 2015-09-17 初明进 Prefabricated reinforced concrete member
CN203792477U (en) * 2014-04-09 2014-08-27 石广林 Reinforced concretesoffit formwork adopting segmentedprefabrication
CN204691029U (en) * 2015-01-29 2015-10-07 仙泊绿建筑有限公司 A kind of monolithic floor manufactured in advance
CN105064398A (en) * 2015-08-19 2015-11-18 中国能源建设集团天津电力建设有限公司 One-time overall pouring construction method for nuclear powder single-hole GD gallery
CN205617631U (en) * 2015-12-24 2016-10-05 河南远大可持续建筑科技有限公司 High strength modularization floor
CN206913415U (en) * 2017-05-20 2018-01-23 西咸新区矩阵住宅工业有限公司 A kind of steel performance steel loose tool for prefabricated component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107599150A (en) * 2017-09-13 2018-01-19 长沙远大住宅工业集团股份有限公司 It is a kind of go out muscle prefabricated components forming method

Also Published As

Publication number Publication date
CN107030877B (en) 2024-04-02

Similar Documents

Publication Publication Date Title
CN105256947B (en) Method for constructing recycled mixed concrete beams and slabs
CN101985856B (en) Removal-free prefabricated reinforced concrete template with cross holes inside and manufacturing method thereof
CN109267584A (en) Assembly concrete prismoid shaped basis and column steel connection structure and assembly method
CN107584650A (en) Using the bridge prefabrication devices and methods therefor of self-propelled continuous productive process
CN201972393U (en) Dismantling-free precast reinforced concrete template with crossed holes inside
CN104712086B (en) Assembled type concrete hollow composite floor slab and manufacturing method thereof
CN104831932A (en) Construction technology for high-grade concrete column base
CN108708551A (en) A kind of preparation method of TRC permanent formworks beam or column
CN206913415U (en) A kind of steel performance steel loose tool for prefabricated component
CN110344844A (en) A kind of track engineering section of track well construction method
CN107030877A (en) It is a kind of for steel performance steel loose tool of prefabricated component and preparation method thereof
CN109267585A (en) Assembled prismoid shaped basis and rod structure and assembly method
CN108149845A (en) The extrusion forming of concrete column and beam exempts from form removal shell and its preparation method and application
CN108442234A (en) Edge of a wing isolating pad and its construction method for prefabricated case beam
CN206521768U (en) A kind of shear connector in the double-deck box hat concrete combined structure of immersed tube tunnel
CN205712565U (en) A kind of prefabricated two-sided wall
CN209227581U (en) Assembly concrete prismoid shaped basis and column steel connection structure
CN107476477A (en) A kind of assembled hollow floor and its construction method
CN106759933A (en) Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures
CN107882243B (en) A kind of cassette ceiling and construction method of concrete-filled rectangular steel tube waffle beam structure
CN207244961U (en) A kind of Prefabricated stacking floor with side flanging for being used to drop plate region
CN209227579U (en) Assembled prismoid shaped basis and rod structure
CN204001713U (en) V-type cylinder oblique line section concrete is built mould
CN207905242U (en) The extrusion forming of concrete column and beam exempts from form removal shell and its production equipment
CN202689278U (en) Superimposed hollow slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20171107

Address after: 710000 No. 3, No. 10302, E District, BDEF international business center, airport new town, Xi Xian new district, Xi'an, Shaanxi

Applicant after: XIXIAN NEW AREA JUZHEN HOUSING INDUSTRIAL CO.,LTD.

Address before: 710000 E District 10302, BDEF, international business center, airport new town, Xi Xian new district, Xi'an, Shaanxi

Applicant before: XIXIAN NEW AREA MATRIX INDUSTRIAL CO.,LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant