CN107026747A - The statistical summaries method and device of network management performance data - Google Patents
The statistical summaries method and device of network management performance data Download PDFInfo
- Publication number
- CN107026747A CN107026747A CN201610070695.XA CN201610070695A CN107026747A CN 107026747 A CN107026747 A CN 107026747A CN 201610070695 A CN201610070695 A CN 201610070695A CN 107026747 A CN107026747 A CN 107026747A
- Authority
- CN
- China
- Prior art keywords
- performance parameter
- counter
- value
- parameter value
- performance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/24—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks using dedicated network management hardware
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/56—Provisioning of proxy services
- H04L67/565—Conversion or adaptation of application format or content
Abstract
The invention provides a kind of statistical summaries method and device of network management performance data, wherein, this method includes:Obtain the performance parameter value for each network element that webmaster is managed, obtain performance parameter transformation rule corresponding with the performance parameter value, the performance parameter value is changed according to the performance parameter transformation rule, obtain the original value of the performance parameter value, and collect the original value of each network element, obtain the performance parameter statistics for each network element.Using above-mentioned technical proposal, solve the problem of webmaster statistic property parameter value is inaccurate, the webmaster accurate and effective geo-statistic performance parameter value of each network element being capable of timely and accurately awareness network O&M state.
Description
Technical field
The present invention relates to the communications field, in particular to a kind of statistical summaries method and device of network management performance data.
Background technology
In the communication equipment network management system of correlation technique, according to third generation mobile Partnership Program (3rd Generation
Partnership Project, referred to as 3GPP) consensus standard exactly define evaluation, the various important operations of mark system
State is normal, whether good and bad parameter, i.e. counter.Network management system is pressed by taken at regular intervals, statistical counter data
The result of overall merit device systems operation conditions is obtained after being calculated according to certain algorithm.
In counters count described above, in the communications field, it usually needs statistics and the performance parameter calculated have:Equipment
Transmitting/receiving power, network object noise jamming, the signal intensity received indicate (Received Signal Strength
Indication, referred to as RSSI), Reference Signal Received Power (Reference Signal Receiving Power, referred to as
RSRP)。
For above-mentioned counter, 3GPP agreements and communications field common rule are made with dBm (dBm)
For the calculation of these power statistic values, i.e.,:
Power statistic value=10lg (power calculation original value)
The reason for carrying out power statistic calculating using dBm is as follows:
1st, it is not linear for the decay of wireless signal, but decay into logarithmic relationship.More can with decibel
Embody this relation.
2nd, unit ratio is made of decibel and is easier description with unit watt is done, often the hectowatt on the power tens that emitter comes out,
Having arrived receiving terminal is calculated with picowatt.
3rd, convenience of calculation, the calculation formula of decay calculated with decibel be only used as addition and subtraction just can be with.
But, above-mentioned counters count value is reported to behind webmaster side, and webmaster side needs to be converged according to time of counter, space
Total mode carries out collecting calculating to these counter datas, is used so as to export combined data for consolidated statement.However, base
Side of standing to original power value take the logarithm after operation, and webmaster side is collected clearly according still further to taking the data of logarithm
It is inaccurate, took taken the logarithm again after being collected acquisition its decibel value of the summarized results and original value of logarithm obviously unequal.
In addition to the above-mentioned this power statistic listed in detail, during radio network performance data is reported, other parts are also related to
Counter Value is the scene for being reported to webmaster side after network element side network element is converted again.
As can be seen here, it is inevitable when carrying out collecting calculating to above-mentioned network management performance data statistical items by the way of correlation technique
There is webmaster side summarized results and the summarized results that actually wants to reach have deviation, some scenes or under the conditions of, it is this
Deviation can double amplification.Therefore, webmaster side is necessary to be related to the converted counters count of network element specially treated to this
Summarized manner accurately calculate and handle, and eliminates the statistical value introduced because collecting inaccurate, it is to avoid network key is joined
Number and O&M statistic etc. produce the influence of deviation.
For in correlation technique, the problem of webmaster statistic property parameter value is inaccurate, there is presently no efficiently solve scheme.
The content of the invention
The invention provides a kind of statistical summaries method and device of network management performance data, at least to solve net in correlation technique
The problem of pipe statistic property parameter value is inaccurate.
According to an aspect of the invention, there is provided a kind of statistical summaries method of network management performance data, including:
Obtain the performance parameter value for each network element that webmaster is managed;
Obtain performance parameter transformation rule corresponding with the performance parameter value;
The performance parameter value is changed according to the performance parameter transformation rule, the original value of performance parameter value is obtained, and converge
The original value of the performance parameter value of total each network element, obtains the performance parameter statistics for each network element.
Further, the webmaster obtains performance parameter transformation rule corresponding with the performance parameter value, according to the property
The energy Parameter Switch rule conversion performance parameter value, obtaining the original value of performance parameter value includes:
Obtain counter list corresponding with the performance parameter value;
According to prset counter model information, the counting of performance Parameter Switch is carried out the need for determining in the counter list
Device;
Performance parameter conversion according to the counter for needing to carry out performance Parameter Switch described in the counter model information
Rule, conversion and the corresponding performance parameter value of counter for needing to carry out performance Parameter Switch, obtain performance and join
The original value of numerical value.
Further, collect the original value of the performance parameter value of each network element, obtain for each described network element
Performance parameter statistics include:According to the summary information of the counter model information, collect each counter
The original value of performance parameter value, obtains collecting performance parameter value, regard the performance parameter aggregate value as the performance parameter
Statistical value.
Further, the summary information of the counter model information includes:The time of the counter and/or space are converged
Overall algorithm.
Further, after the performance parameter value for obtaining each network element that webmaster is managed, including:By the performance
Parameter value is packaged into big data memory object, wherein, the big data memory object is used to obtain counter list.
Further, the performance parameter value includes:The performance number of each network element.
According to another aspect of the present invention there is provided a kind of statistical summaries device of network management performance data, applied to webmaster,
Including:
First acquisition module, the performance parameter value for obtaining each network element that webmaster is managed;
Second acquisition module, for obtaining performance parameter transformation rule corresponding with the performance parameter value;
First modular converter, for changing the performance parameter value according to the performance parameter transformation rule, obtains performance ginseng
The original value of numerical value, and collect the original value of the performance parameter value of each network element, obtain for each described net
The performance parameter statistics of member.
Further, described device also includes:
3rd acquisition module, for obtaining counter list corresponding with the performance parameter value;
Determining module, for according to prset counter model information, determining to carry out performance the need in the counter list
The counter of Parameter Switch;
Second modular converter, for according to needed described in the counter model information carry out performance Parameter Switch counting
The performance parameter transformation rule of device, conversion needs the corresponding performance ginseng of the counter for carrying out performance Parameter Switch with described
Numerical value, obtains the original value of performance parameter value.
Further, first modular converter also includes:
Collection unit, for the summary information according to the counter model information, collects the performance of each counter
The original value of parameter value, is obtained collecting performance parameter value, and the performance parameter aggregate value is counted as the performance parameter
Value.
Further, the summary information of the counter model information includes:The time of the counter and/or space are converged
Overall algorithm.
Further, described device also includes:Package module, the performance for obtaining each network element that webmaster is managed is joined
After numerical value, the performance parameter value is packaged into big data memory object, wherein, the big data memory object is used for
Obtain counter list.
By the present invention, the performance parameter value for each network element that webmaster is managed is obtained, is obtained corresponding with the performance parameter value
Performance parameter transformation rule, change the performance parameter value according to the performance parameter transformation rule, obtain performance parameter value
Original value, and collect the original value of the performance parameter value of each network element, obtain the performance parameter for each network element
Statistical value, solve the problem of webmaster statistic property parameter value is inaccurate, each network element of webmaster accurate and effective geo-statistic
Performance parameter, being capable of timely and accurately awareness network O&M state.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, the present invention
Schematic description and description be used for explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of the statistical summaries method of network management performance data according to embodiments of the present invention;
Fig. 2 is a kind of structured flowchart one of the statistical summaries device of network management performance data according to embodiments of the present invention;
Fig. 3 is a kind of structured flowchart two of the statistical summaries device of network management performance data according to embodiments of the present invention;
Fig. 4 is a kind of structured flowchart three of the statistical summaries device of network management performance data according to embodiments of the present invention;
Fig. 5 is a kind of structured flowchart four of the statistical summaries device of network management performance data according to embodiments of the present invention;
Fig. 6 is counters count method of summary flow chart according to embodiments of the present invention;
Fig. 7 is that network object performance data according to embodiments of the present invention obtains flow chart;
Fig. 8 is that counters count transformation model according to embodiments of the present invention obtains flow chart;
Fig. 9 is counter power Transformation Service flow chart according to embodiments of the present invention;
Figure 10 is that counter according to embodiments of the present invention collects calculation flow chart;
Figure 11 is the statistical summaries installation drawing of network management performance data according to embodiments of the present invention.
Embodiment
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that in the feelings not conflicted
Under condition, the feature in embodiment and embodiment in the application can be mutually combined.
It should be noted that term " first ", " second " in description and claims of this specification and above-mentioned accompanying drawing
Etc. being for distinguishing similar object, without for describing specific order or precedence.
A kind of statistical summaries method of network management performance data is provided in the present embodiment, and Fig. 1 is according to embodiments of the present invention
A kind of network management performance data statistical summaries method flow chart, as shown in figure 1, the flow comprises the following steps:
Step S102, obtains the performance parameter value for each network element that webmaster is managed;
Step S104, obtains performance parameter transformation rule corresponding with the performance parameter value;
Step S106, changes the performance parameter value according to the performance parameter transformation rule, obtains the original of performance parameter value
Value, and collect the original value of the performance parameter value of each network element, obtain counting for the performance parameter of each network element
Value.
By above-mentioned steps, the performance parameter value for each network element that webmaster is managed is obtained, is obtained and the performance parameter value pair
The performance parameter transformation rule answered, changes the performance parameter value according to the performance parameter transformation rule, obtains performance parameter value
Original value, and collect the original value of the performance parameter value of each network element, obtain joining for the performance of each network element
Number statistical values, solve the problem of webmaster statistic property parameter value is inaccurate, each network element of webmaster accurate and effective geo-statistic
Performance parameter, being capable of timely and accurately awareness network O&M state.
In the present embodiment, the webmaster obtains performance parameter transformation rule corresponding with the performance parameter value, according to the performance
Parameter Switch rule changes the performance parameter value, and obtaining the original value of performance parameter value includes:Obtain and the performance parameter value
Corresponding counter list;According to prset counter model information, performance ginseng is carried out the need for determining in the counter list
The counter of number conversion;The performance ginseng of the counter of performance Parameter Switch is carried out according to the needs in the counter model information
Number transformation rule, changes the performance parameter value corresponding with the counter that the needs carry out performance Parameter Switch, obtains performance
The original value of parameter value, counter model information is advance self-defined setting, defines the counter in counter list
Whether need to carry out performance Parameter Switch, counter model information also stored for the performance parameter transformation rule of counter.
In the present embodiment, collect the original value of the performance parameter value of each network element, obtain for each network element
Performance parameter statistics include:According to the summary information of the counter model information, collect the performance ginseng of each counter
The original value of numerical value, obtains collecting performance parameter value, using the performance parameter aggregate value as the performance parameter statistics, should
The summary information of counter model information includes:Algorithm is collected in the time of the counter and/or space.
In the present embodiment, after the performance parameter value for each network element that the acquisition webmaster is managed, by the performance parameter value
Big data memory object is packaged into, wherein, the big data memory object is except for obtaining counter list, also for follow-up
Processing module and process are used.
In the present embodiment, the performance parameter value includes:The performance number of each network element.
A kind of statistical summaries device of network management performance data is additionally provided in the present embodiment, and applied to webmaster, the device is used
In realizing above-described embodiment and preferred embodiment, repeating no more for explanation had been carried out.As used below, art
Language " module " can realize the combination of the software and/or hardware of predetermined function.Although the device described by following examples
Preferably realized with software, but hardware, or the realization of the combination of software and hardware is also that may and be contemplated.
Fig. 2 is a kind of structured flowchart one of the statistical summaries device of network management performance data according to embodiments of the present invention, is such as schemed
Shown in 2, the device includes:
First acquisition module 22, the performance parameter value for obtaining each network element that webmaster is managed;
Second acquisition module 24, is connected with the first acquisition module 22, for obtaining performance corresponding with the performance parameter value
Parameter Switch rule;
First modular converter 26, is connected with the second acquisition module 24, for being somebody's turn to do according to performance parameter transformation rule conversion
Performance parameter value, obtains the original value of performance parameter value, and collects the original value of the performance parameter value of each network element,
Obtain the performance parameter statistics for each network element.
By above-mentioned steps, the first acquisition module 22 obtains the performance parameter value for each network element that webmaster is managed, second
Acquisition module 24 obtains performance parameter transformation rule corresponding with the performance parameter value, and the first modular converter 26 is according to the property
Energy Parameter Switch rule changes the performance parameter value, obtains the original value of performance parameter value, and collects being somebody's turn to do for each network element
The original value of performance parameter value, obtains the performance parameter statistics for each network element, solves webmaster statistic property ginseng
The problem of numerical value is inaccurate, the webmaster accurate and effective geo-statistic performance parameter of each network element, can timely and accurately understand
Network O&M state.
Fig. 3 is a kind of structured flowchart two of the statistical summaries device of network management performance data according to embodiments of the present invention, is such as schemed
Shown in 3, the device also includes:
3rd acquisition module 32, is connected with the first acquisition module 22, for obtaining count corresponding with the performance parameter value
Device list;
Determining module 34, is connected with the 3rd acquisition module 32, for according to prset counter model information, determining the meter
The counter of performance Parameter Switch is carried out the need in number device list;
Second modular converter 36, is connected with determining module 34, for being carried out according to the needs in the counter model information
The performance parameter transformation rule of the counter of performance parameter conversion, conversion carries out the counter of performance Parameter Switch with the needs
The corresponding performance parameter value, obtains performance parameter original value.
Fig. 4 is a kind of structured flowchart three of the statistical summaries device of network management performance data according to embodiments of the present invention, is such as schemed
Shown in 4, first modular converter 26 also includes:
Collection unit 42, for the summary information according to the counter model information, collects the performance ginseng of each counter
Number original value, obtains collecting performance parameter value, regard the performance parameter aggregate value as the performance parameter statistics.
Fig. 5 is a kind of structured flowchart four of the statistical summaries device of network management performance data according to embodiments of the present invention, is such as schemed
Shown in 5, the device also includes:
Package module 52, is connected with the first acquisition module 22, for obtaining the performance for each network element that webmaster is managed
After parameter value, the performance parameter value is packaged into big data memory object, wherein, the big data memory object is used to obtain
Take counter list.
It should be noted that above-mentioned modules can be by software or hardware to realize, for the latter, Ke Yitong
Cross in the following manner realization, but not limited to this:Above-mentioned modules are respectively positioned in same processor;Or, each above-mentioned mould
Block is located in different processors respectively.
It is described in detail with reference to the preferred embodiment of the present invention.
The preferred embodiment of the present invention provides a kind of statistical summaries method of network management performance data, it is intended to solve above-mentioned be related to
Counters count the problem of collect inaccurate.
A kind of statistical summaries method for network management performance data that the preferred embodiment of the present invention is somebody's turn to do, comprises the following steps:
Obtain reported by network elements network object performance number;Obtain network object and be related to counters count transformation model;Pass through statistics
Transformation Service will need the counter data for counting conversion to carry out recalculating statistics;Summary counts device data;Reverse collects
The statistics conversion value of value.
Preferably, reported by network elements network object performance data value is obtained, including:
After webmaster starts, according to the performance data collection cycle set in advance, at the end of the collection period, performance is triggered
Data acquisition flow.
Preferably, performance data collection flow includes:
Monitoring network element report network object performance data directory, by the performance data files scanned under the catalogue according to performance
Object type reads server memory post package into big data memory object respectively, passes to post-processing module and carries out data
Processing.
Preferably, obtain network object and be related to counters count transformation model, including:
The above-mentioned network object performance data value got of parsing, gets the counter list that data are related to, and then will
The list passes to counters count transformation model and obtains service, and the counter and right for needing to change is obtained by the service
The transformation rule answered.
Preferably, by counting Transformation Service the counter data for counting conversion will be needed to carry out recalculating statistics, including:
According to statistics transformation rule, the big data memory object counter data is obtained, it would be desirable to the counter data of conversion
Statistics is recalculated, counters count original value is obtained.
Preferably, by the counter original value being converted to, collect algorithm according to its time, space and carry out collecting calculating.
Preferably, obtained counter data will be calculated by collecting, according to counters count transformation rule, calculating is obtained
Counter summarizing and reporting value, i.e., the Statistical Principles in being defined according to counter carry out calculating and reported.
A kind of statistical summaries device of network management performance data of the present invention, including:
Reported by network elements performance data acquisition module;Counters count transformation model acquisition module;Counters count Transformation Service
Module;Performance data statistical summaries module;Counters count value reverse module.
Preferably, reported by network elements performance data acquisition module includes:
Task of measuring performance monitors module, for obtaining the task of measuring performance list that webmaster is issued to network element side network element in real time;
Reporting performance data catalogue monitors module, for monitoring reporting performance data data directory in real time, according to the survey issued
Measure task list, dynamic access correspondence performance object type reported data;
Performance data collection parsing module, for obtaining performance data in reporting catalogue from the data, and data file is read
Get after internal memory, defined according to each performance object Type model, data are packaged into big data memory object by object type,
Used for post-processing module and the transmission that circulated between each process.
Preferably, counters count transformation model acquisition module, including:
Counters count changes enabled state and counter list acquisition module, for obtaining net from network management system model library
The counter list of statistics conversion is supported in the counter being related in first reporting performance data;
Statistics event counter transformation rule acquisition module is supported, based on being obtained from network management system model library and supporting conversion
The transformation rule of number device.
Preferably, Transformation Service module is counted, for by reported by network elements performance data, according to counters count transformation rule,
Its counter raw absolute values statistics is converted.
Preferably, counter collects computing module, for the time by reported by network elements counter data according to counter, sky
Between collect algorithm, progress collects calculating, obtains counter combined data.
Preferably, counters count value reverse module, for this to be collected to the counter aggregate value after calculating, according to counting
Device counts transformation model, calculates it and counts conversion value.
By the preferred embodiment of the present invention, using accurate computing counter original value, carry out after collect statistics, then reverse its
Count the mode of conversion value.Solve in current implementation because reported by network elements counter data Counter statistical value converges
Not the problem of total does not calculate accurately true, so as to reach accurate statistics, computing counter statistical summaries value so that user uses
When this network management system carries out network monitoring and O&M, it can accurately obtain network object and report value, can in time, accurately
Awareness network O&M state and carry out network operation.
The actual beneficial effect that the preferred embodiment of the present invention is brought, can be simply bright by data and Shi Jishiyong scene
Find out.Exemplified by being related to the counter that power statistic collects:The Counter Value that two neighboring granularity network element side network element is reported
Respectively:30dbm and 10dbm;If the time summarized manner of counter is summation, then according to prior art, pass through
Counter Value after collecting is 40dbm, and corresponding counter power raw value is:10000mw.But actually report
It is worth and is:Two neighboring granularity counter power raw value is respectively:1000mw and 10mw, then counter power is original
It should be 1010mw to be worth summarized results, and corresponding statistical value should be:30.04dbm.Can be with by this simple examples
Find out, before reported by network elements Counter Value after conversion is calculated, in webmaster side using prior art to the inclined of its aggregate value
Difference is amplified at double, causes the result of calculations such as collect statistics inaccurate, and influence systematic parameter is assessed etc..Such as according to the present invention
Preferred embodiment methods described, then will eliminate the influence that this deviation is brought, it is ensured that final statistical summaries result is defined
Really it is worth.
Below with reference to accompanying drawing and combine the preferred embodiment of the present invention and describe in detail, it is necessary to illustrate, do not conflicting
In the case of, the feature in embodiment and embodiment in the application can be mutually combined.
Fig. 6 is counters count method of summary flow chart according to embodiments of the present invention, as shown in fig. 6, this method is main
Comprise the following steps:
S601, obtains network object reporting performance data;
S602, obtains counter power statistic transformation model;
S603, counters count conversion is calculated;
S604, data summarization is calculated;
S605, counters count anti-calculate.
Below in conjunction with Fig. 7 to Figure 10, above-mentioned counters count is described in detail and collects each process step workflow and details.
Fig. 7 is that network object performance data according to embodiments of the present invention obtains flow chart, that is, corresponds to step S601, should
Method is mainly included the following steps that:
S701, obtains performance list object.This method is realized by the monitoring task started with NM server.The monitoring
After task start, real-time, interactive network management performance task management module.If webmaster side performance tasks change, the monitoring
Method obtains change details and real-time update performance object list;
S702, judges whether object needs reported data in the performance object list obtained in S701 steps.If be not required to
Reported data is wanted, then the object flow terminates, the next object of circular treatment;If it is required, then jumping to step S703;
S703, scan performance data report catalogue.The step method by monitoring scan performance data reporting file catalogue,
Reporting performance data is monitored whether in real time.
S704, according to S703, judges whether have new file to report in reporting performance data catalogue, if so, then jumping to
S705 steps, are otherwise reported with regard to circular wait data;
S705, by performance object encapsulation of data into big data memory object.The step presses the above-mentioned performance data reported
Made a distinction according to performance object, big data memory object is packaged into respectively, obtained and call for post processing flow and module.
Fig. 8 is that counters count transformation model according to embodiments of the present invention obtains flow chart, that is, corresponds to step S602,
This method is mainly included the following steps that:
S801, obtains counter list.After Fig. 7 each process step, network object performance data can be got
Big data memory object.The step obtains its corresponding counter i.e. by loading the performance data big data memory object
List information;
S802, counter model information is obtained from database.The performance data got with reference to S801 is related to counter row
Table, by database interactive service, reads network management performance data storehouse model information, gets the model letter for being related to counter
Breath;
S803, judges whether the counter got needs to carry out statistics conversion.The meter that searching loop reported data is related to
Number device, obtains whether counter needs statistics transition flag position, if mark mark needs conversion, jumps to step S804;
Otherwise the next counter model information of circular treatment;
S804, obtains counters count transformation rule.As above, if counter needs to count conversion, counter mould is read
The statistics transformation rule of the timer in type information, i.e. conversion formula, and being cached is handled for post-processing step acquisition.
Fig. 9 is counter power Transformation Service flow chart according to embodiments of the present invention, that is, corresponds to step S603, the party
Method is mainly included the following steps that:
S901, acquisition needs to count event counter list.Being got from the result of figure 8 above step needs to carry out work(
The counter list of rate conversion, including each counter the positional information in big data memory object;
S902, obtains counters count transformation rule.The power that correspondence counter is directly got from S804 results turns
Change the calculation formula of rule, i.e. power statistic;
S903, computing counter statistics original value.The counter power statistic rule got by above-mentioned S902, instead
Release counter original value.For example it is related to the foregoing counter power statistic referred to, nonce counter power statistic turns
Changing rule is:
Power statistic value=10lg (power raw value)
Then by above-mentioned power transformation rule formula, power raw value formula counter can be released, i.e.,:
Power raw value=10(0.1* power statistics value)
Figure 10 is that counter according to embodiments of the present invention collects calculation flow chart, that is, corresponds to step S604, this method master
Comprise the following steps:
Step S1001, obtains counter list.Reported by network elements network object performance data is got from S601 steps
Big data memory object, gets the counter list reported from the data;
Step S1002, counter model is obtained from database.By data, services, interactive webmaster performance database model,
So as to get the corresponding model information of the S1001 counters;
Step S1003, getting the time of counter, space from the counter model in S1002 steps collects algorithm.
Step S1004, collects calculating.Collect algorithm according to S1003 counters, calculate each counter aggregate value.
By the above-mentioned counters count aggregate value for collecting and calculating and obtaining, according to the statistics transformation model of counter, counted
Device collects performance number.
Figure 11 is the statistical summaries installation drawing of network management performance data according to embodiments of the present invention, including:
Performance data acquisition module 112 (equivalent to first acquisition module 22 of above-described embodiment), for performing above-mentioned S601
Step and corresponding with Fig. 7;
Counter power statistic transformation model acquisition module 114 (equivalent to second acquisition module 24 of above-described embodiment),
For performing above-mentioned S602 steps and corresponding with Fig. 8;
Modular converter 116 (equivalent to the partial function of first modular converter 26 of above-described embodiment) is counted, for performing
Above-mentioned S603 steps and corresponding with Fig. 9;
Data summarization module 118 (equivalent to the partial function of first modular converter 26 of above-described embodiment), for performing
Above-mentioned S604 steps and corresponding with Figure 10.
The statistical summaries method and apparatus of the network management performance data provided using above-described embodiment, by obtaining report network pair
As performance data is related to the model information of counter, so as to obtain whether it needs statistics to change and transformation model, from
And calculating can be collected by first to the progress of counter original value, then the mode of power statistic is carried out, so as to accurate
Calculate the power aggregate value for obtaining counter so that operator can accurately be referred to when carrying out network monitor, O&M
Statistical value is marked, being capable of awareness network service state accurately and in time.
The preferred embodiment of the present invention realizes following technique effect:Compared with prior art, counter data statistics is achieved
Collect the progress of accuracy so that the awareness network service state that operator can be promptly and accurately, especially in following side
Face effect is notable:(1) preferred embodiment of the present invention is by obtaining counters count transformation model come accurate computing counter work(
Rate aggregate value;(2) the accurate calculating that the preferred embodiment of the present invention is collected by webmaster side to counter power statistic is handled,
Directly reported better than base station in correlation technique and some collect the problem of having inaccurate after network element power conversion value.
Through the above description of the embodiments, those skilled in the art can be understood that according to above-described embodiment
Method the mode of required general hardware platform can be added to realize by software, naturally it is also possible to by hardware, but a lot
In the case of the former be more preferably embodiment.Understood based on such, technical scheme is substantially in other words to existing
The part for having technology to contribute can be embodied in the form of software product, and the computer software product is stored in one
In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions are make it that a station terminal equipment (can
To be mobile phone, computer, server, or network equipment etc.) perform method described in each embodiment of the invention.
Embodiments of the invention additionally provide a kind of storage medium.Alternatively, in the present embodiment, above-mentioned storage medium can
The program code for performing following steps to be arranged to storage to be used for:
S1, obtains the performance parameter value for each network element that webmaster is managed;
S2, obtains performance parameter transformation rule corresponding with the performance parameter value;
S3, changes the performance parameter value according to the performance parameter transformation rule, obtains the original value of performance parameter value, and converge
The original value of total each network element, obtains the statistical value of the performance parameter value for each network element.
Alternatively, storage medium is also configured to the program code that storage is used to perform the method and step of above-described embodiment:
Alternatively, in the present embodiment, above-mentioned storage medium can include but is not limited to:USB flash disk, read-only storage (ROM,
Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk,
Magnetic disc or CD etc. are various can be with the medium of store program codes.
Alternatively, in the present embodiment, processor performs above-described embodiment according to the program code stored in storage medium
Method and step.
Alternatively, the specific example in the present embodiment may be referred to showing described in above-described embodiment and optional embodiment
Example, the present embodiment will not be repeated here.
Obviously, those skilled in the art should be understood that above-mentioned each module of the invention or each step can be with general
Computing device realizes that they can be concentrated on single computing device, or is distributed in multiple computing devices and is constituted
Network on, alternatively, the program code that they can be can perform with computing device be realized, it is thus possible to by they
Storage is performed by computing device in the storage device, and in some cases, can be to be held different from order herein
They, are either fabricated to each integrated circuit modules or will be many in them by the shown or described step of row respectively
Individual module or step are fabricated to single integrated circuit module to realize.So, the present invention is not restricted to any specific hardware
Combined with software.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the technology of this area
For personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made is any
Modification, equivalent substitution, improvement etc., should be included in the scope of the protection.
Claims (11)
1. a kind of statistical summaries method of network management performance data, it is characterised in that including:
Obtain the performance parameter value for each network element that webmaster is managed;
Obtain performance parameter transformation rule corresponding with the performance parameter value;
The performance parameter value is changed according to the performance parameter transformation rule, the original of the performance parameter value is obtained
Value, and collect the original value of each network element, obtain the performance parameter statistics for each network element.
2. according to the method described in claim 1, it is characterised in that the webmaster obtains corresponding with the performance parameter value
Performance parameter transformation rule, changes the performance parameter value according to the performance parameter transformation rule, obtains the property
The original value of energy parameter value includes:
Obtain counter list corresponding with the performance parameter value;
According to prset counter model information, performance Parameter Switch is carried out the need for determining in the counter list
Counter;
Performance parameter according to the counter for needing to carry out performance Parameter Switch described in the counter model information
Transformation rule, conversion needs the corresponding performance parameter value of counter of progress performance Parameter Switch with described, obtains
To the original value of performance parameter value.
3. method according to claim 2, it is characterised in that collect the performance parameter value of each network element
Original value, obtains including for the performance parameter statistics of each network element:
According to the summary information of the counter model information, collect the original of the performance parameter value of each counter
Initial value, obtains collecting performance parameter value, regard the performance parameter aggregate value as the performance parameter statistics.
4. method according to claim 3, it is characterised in that the summary information of the counter model information includes:
Algorithm is collected in the time of the counter and/or space.
5. according to the method described in claim 1, it is characterised in that the performance for obtaining each network element that webmaster is managed
After parameter value, including:
The performance parameter value is packaged into big data memory object, wherein, the big data memory object is used to obtain
Take counter list.
6. method according to any one of claim 1 to 5, it is characterised in that the performance parameter value includes:Institute
State the performance number of each network element.
7. the statistical summaries device of a kind of network management performance data, applied to webmaster, it is characterised in that including:
First acquisition module, the performance parameter value for obtaining each network element that webmaster is managed;
Second acquisition module, for obtaining performance parameter transformation rule corresponding with the performance parameter value;
First modular converter, for changing the performance parameter value, obtaining property according to the performance parameter transformation rule
The original value of energy parameter value, and collect the original value of the performance parameter value of each network element, obtain being directed to institute
State the performance parameter statistics of each network element.
8. device according to claim 7, it is characterised in that described device also includes:
3rd acquisition module, for obtaining counter list corresponding with the performance parameter value;
Determining module, for according to prset counter model information, determining to carry out the need in the counter list
The counter of performance parameter conversion;
Second modular converter, for according to needing described in the counter model information to carry out performance Parameter Switch
The performance parameter transformation rule of counter, conversion needs the corresponding institute of counter of progress performance Parameter Switch with described
Performance parameter value is stated, the original value of performance parameter value is obtained.
9. device according to claim 8, it is characterised in that first modular converter also includes:
Collection unit, for the summary information according to the counter model information, collects each counter
The original value of performance parameter value, obtains collecting performance parameter value, regard the performance parameter aggregate value as the performance
Parameter statistics.
10. device according to claim 9, it is characterised in that the summary information of the counter model information includes:
Algorithm is collected in the time of the counter and/or space.
11. device according to claim 7, it is characterised in that described device also includes:
After package module, the performance parameter value for obtaining each network element that webmaster is managed, the performance is joined
Numerical value is packaged into big data memory object, wherein, the big data memory object is used to obtain counter list.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610070695.XA CN107026747A (en) | 2016-02-01 | 2016-02-01 | The statistical summaries method and device of network management performance data |
PCT/CN2016/110108 WO2017133333A1 (en) | 2016-02-01 | 2016-12-15 | Method and device for counting and collecting network-manager performance data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610070695.XA CN107026747A (en) | 2016-02-01 | 2016-02-01 | The statistical summaries method and device of network management performance data |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107026747A true CN107026747A (en) | 2017-08-08 |
Family
ID=59499393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610070695.XA Pending CN107026747A (en) | 2016-02-01 | 2016-02-01 | The statistical summaries method and device of network management performance data |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN107026747A (en) |
WO (1) | WO2017133333A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109062797A (en) * | 2018-07-26 | 2018-12-21 | 百度在线网络技术(北京)有限公司 | The method and apparatus for generating information |
WO2019223443A1 (en) * | 2018-05-22 | 2019-11-28 | 腾讯科技(深圳)有限公司 | Method and apparatus for processing database configuration parameter, and computer device and storage medium |
CN112564957A (en) * | 2020-12-01 | 2021-03-26 | 武汉绿色网络信息服务有限责任公司 | Method and device for acquiring running data of virtual network element |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101242617A (en) * | 2008-03-04 | 2008-08-13 | 中兴通讯股份有限公司 | A testing system and method for original performance statistical data |
CN102075964A (en) * | 2009-11-24 | 2011-05-25 | 大唐移动通信设备有限公司 | Method and equipment for acquiring performance data by using network management system |
CN102104885A (en) * | 2009-12-18 | 2011-06-22 | 中兴通讯股份有限公司 | Network element performance counting method and system |
US20130058464A1 (en) * | 2008-05-09 | 2013-03-07 | Agere Systems Llc | Detection of double talk in telecommunications networks |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100373871C (en) * | 2003-11-25 | 2008-03-05 | 中兴通讯股份有限公司 | A method of data observation applied to network management system |
CN102905278B (en) * | 2011-07-28 | 2016-06-01 | 华为技术有限公司 | The management method of coverage optimization, device and system |
CN104079436B (en) * | 2014-07-14 | 2017-03-29 | 武汉大学 | A kind of Element management system of striding equipment in the EPON networks of agreement |
-
2016
- 2016-02-01 CN CN201610070695.XA patent/CN107026747A/en active Pending
- 2016-12-15 WO PCT/CN2016/110108 patent/WO2017133333A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101242617A (en) * | 2008-03-04 | 2008-08-13 | 中兴通讯股份有限公司 | A testing system and method for original performance statistical data |
US20130058464A1 (en) * | 2008-05-09 | 2013-03-07 | Agere Systems Llc | Detection of double talk in telecommunications networks |
CN102075964A (en) * | 2009-11-24 | 2011-05-25 | 大唐移动通信设备有限公司 | Method and equipment for acquiring performance data by using network management system |
CN102104885A (en) * | 2009-12-18 | 2011-06-22 | 中兴通讯股份有限公司 | Network element performance counting method and system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019223443A1 (en) * | 2018-05-22 | 2019-11-28 | 腾讯科技(深圳)有限公司 | Method and apparatus for processing database configuration parameter, and computer device and storage medium |
US11507626B2 (en) | 2018-05-22 | 2022-11-22 | Tencent Technology (Shenzhen) Company Ltd | Method and apparatus for processing database configuration parameter, computer device, and storage medium |
CN109062797A (en) * | 2018-07-26 | 2018-12-21 | 百度在线网络技术(北京)有限公司 | The method and apparatus for generating information |
CN109062797B (en) * | 2018-07-26 | 2019-12-27 | 百度在线网络技术(北京)有限公司 | Method and device for generating information |
CN112564957A (en) * | 2020-12-01 | 2021-03-26 | 武汉绿色网络信息服务有限责任公司 | Method and device for acquiring running data of virtual network element |
CN112564957B (en) * | 2020-12-01 | 2022-05-17 | 武汉绿色网络信息服务有限责任公司 | Method and device for acquiring running data of virtual network element |
Also Published As
Publication number | Publication date |
---|---|
WO2017133333A1 (en) | 2017-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8364429B2 (en) | Systems and methods for metering and analyzing energy consumption of events within a portable device | |
CN107026747A (en) | The statistical summaries method and device of network management performance data | |
EP1982543B1 (en) | Performance monitoring of location-based service in a mobile telecommunications network | |
US11635985B2 (en) | Using degree of completeness of real-time data to maximize product revenue | |
CN112688309B (en) | Branch topology construction method and device applied to power distribution network | |
CN102104885A (en) | Network element performance counting method and system | |
CN112948224A (en) | Data processing method, device, terminal and storage medium | |
CN112073904B (en) | Event monitoring method, system, device, electronic equipment and storage medium | |
CN111475846A (en) | System for asset management by using specific data analysis method | |
CN110198551B (en) | Network quality obtaining method and device | |
KR20110129456A (en) | Communication system, information analysis device, and information analysis method | |
CN103200585B (en) | Signaling traffic subsystem, extension counter treatment system and method | |
CN108632054A (en) | The prediction technique and device of information propagation amount | |
CN102572753A (en) | Method and system for analyzing signaling of mobile application part | |
US8892730B2 (en) | Performance management implementation method and network management system | |
US9065737B1 (en) | Measuring traffic utilization | |
CN112597532A (en) | Monitoring method and device for sensitive data access | |
CN111597198A (en) | Internet of things data query method for heterogeneous resource access and related equipment | |
JP5614666B2 (en) | Method and apparatus for measuring base station performance | |
CN107895029A (en) | Information statistical method and information statistical device | |
CN112801837A (en) | Device clustering method and device, storage medium and electronic device | |
CN108802589A (en) | Active device offset parameter determines method, apparatus, storage medium and electronic equipment | |
CN103475500B (en) | A kind of network performance index acquisition, device and system | |
WO2024018506A1 (en) | Data time interval unification device, data time interval unification method, and data time interval unification program | |
CN114417025A (en) | Method and device for determining data publishing parameters, storage medium and electronic device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171020 Address after: 201203, Shanghai, China (Shanghai) free trade experimentation area, Blue Road No. 889, block B, 205 Applicant after: Shanghai Zhongxing Software Co., Ltd. Address before: 518057 Nanshan District science and technology, Guangdong Province, South Road, No. 55, No. Applicant before: ZTE Corporation |
|
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170808 |