The content of the invention
It is an object of the invention to overcome the defect of prior art there is provided a kind of frame in the combined hanging support of wall and its
Construction method, solves to cause tower crane and truck crane not to use to cause lifting construction because construction site is limited in the prior art
Difficult the problem of.
Realizing the technical scheme of above-mentioned purpose is:
Frame of the present invention in the combined hanging support of wall, including:
It is set up in the first support body on the inside of wall;And
It is set up in the second support body of wall outer side, second support body is sheathed on first support body and with described
One support body is adjustably connected, and adjusts the spacing of first support body and second support body to adapt to the wall so as to realize
Body, second support body is in the end away from the wall provided with lifting pole.
Frame of the present invention is set up in wall in the combined hanging support of wall and constructed, and makes it in the construction of compact building
With the advantage for not accounting for place;By the second support body level being sheathed on into first support body and can with first support body
Adjustably connect, make the support that there is width can be adjusted with wall size, be easy to dismounting, it is reusable the characteristics of, make branch
The use of frame is more flexible, with good adaptability;The supporting structure is simple, can without setting built-in fitting in structure
Make by oneself at the scene, reach the purpose for saving construction cost.
Frame of the present invention in the combined hanging support of wall further improvement is that, first support body include be oppositely arranged
A pair of first T-shaped components, the first T-shaped component includes being set up in the first cross bar on the wall and with described first
Multiple connecting holes are offered on cross bar the first montant connected vertically, first cross bar;
Second support body includes a pair of second T-shaped components being oppositely arranged, and the second T-shaped component includes being set up in institute
State the second cross bar on wall and with second cross bar the second montant connected vertically, offer on second cross bar many
Individual connecting hole, second cross bar is sheathed on first cross bar, by through right on second cross bar and the first cross bar
The connector for the connecting hole answered is fastenedly connected second cross bar and first cross bar, so as to realize second support body and institute
The first support body is stated adjustably to connect.
Frame of the present invention in the combined hanging support of wall further improvement is that, in addition to be installed in first support body
On locating part, the locating part is adjustably coupled to first support body, by adjust the locating part be connected to it is described
The position of first support body causes the end of the locating part to be resisted against the wall, and then it is described to pull second support body to cause
Second support body is close to the outside of the wall.
Frame of the present invention in the combined hanging support of wall further improvement is that, the locating part be fastening screw, institute
State and through hole is offered on the first montant, and the through hole is correspondingly provided with fixing nut, the fastening screw is screwed together described
Fixing nut simultaneously passes through the through hole, by rotating the fastening screw so that the end of the fastening screw is resisted against the wall
Body, it is achieved thereby that adjusting the link position of the fastening screw.
Frame of the present invention in the combined hanging support of wall further improvement is that, first cross bar and it is described first erect
The junction that bar is relatively distant from the wall is provided with the first floor, and second cross bar and second montant are relatively distant from described
The junction of wall is provided with the second floor.
Present invention also offers a kind of frame in the construction method of the combined hanging support of wall, comprise the following steps:
One first support body is provided, first support body is set up in the inner side of wall;
One second support body is provided, second support body is set up in the outside of wall, and second support body is placed on institute
State on the first support body, second support body is adjustably connected with first support body, adjust first support body and described
The spacing of second support body is to adapt to the wall, in the fixed lifting branch in end of second support body away from the wall
Bar.
Frame of the present invention in wall combined hanging support construction method further improvement is that,
First support body includes a pair of first T-shaped components being oppositely arranged, and first montant is fixed on into described the
The lower surface of one cross bar, makes first cross bar is vertical with the first montant to be connected to form the first T-shaped component, in first cross bar
On open up multiple connecting holes;
Second support body includes a pair of second T-shaped components being oppositely arranged, and second montant is fixed on into described the
The lower surface of two cross bars, makes second cross bar is vertical with the second montant to be connected to form the second T-shaped component, in second cross bar
On open up multiple connecting holes, second cross bar is sheathed on first cross bar, by connector pass through second cross bar
Corresponding connecting hole is fastenedly connected second cross bar and first cross bar with the first cross bar, so as to realize second frame
Body is adjustably connected with first support body;
Frame of the present invention in wall combined hanging support construction method further improvement is that,
Also include the locating part being installed on first support body, the locating part is adjustably coupled to the first
Body, the position of first support body is connected to so that the end of the locating part is resisted against the wall by adjusting the locating part
Body, and then pull second support body to cause second support body to be close to the outside of the wall.
Frame of the present invention in wall combined hanging support construction method further improvement is that,
The locating part is fastening screw, and through hole is opened up in the first montant bottom, and in the through hole, correspondence is fixed
Fixing nut, the fastening screw is screwed together the fixing nut and through the through hole, rotating the fastening screw makes
The end for obtaining the fastening screw relies on wall, it is achieved thereby that adjusting the link position of the fastening screw.
Frame of the present invention in wall combined hanging support construction method further improvement is that,
Fixed first floor in junction for being relatively distant from wall in first cross bar and first montant, in described
Fixed second floor in junction that two cross bars and second montant are relatively distant from wall.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Reference picture 1 and Fig. 8, the invention provides a kind of frame in the combined hanging support and its construction method of wall, are used for
Solve to cause tower crane and truck crane not to use to cause that lifting construction is difficult to ask because construction site is limited in the prior art
Topic.Frame of the present invention is set up in wall in the combined hanging support of wall and constructed, and it is had in the construction of compact building
The advantage in place is not accounted for;By the way that the second support body level is sheathed on into first support body and be can adjust with first support body
Ground connect, make the support that there is width can be adjusted with wall size, be easy to dismounting, it is reusable the characteristics of, make support
Using more flexible, with good adaptability;The supporting structure is simple, without setting built-in fitting in structure, can be existing
Field self-control, reaches the purpose for saving construction cost.
The combined hanging support to frame in wall is illustrated below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, the He of first support 11 that frame of the present invention includes being arranged mutually in the combined hanging support of wall
Second support 12, the connector 13 for being fixedly connected with two supports, and for the support to be fixed on to the locating part of wall
14。
As shown in Figure 1, Figure 4 and Figure 5, the first support body 11 includes a pair of first T-shaped components being oppositely arranged, head rod
115, floor 113.Wherein, the first T-shaped component includes the first cross bar 111 and the first montant 112, and the first montant 112 is fixedly arranged on the
The lower surface of one cross bar 111, it is vertical with the first cross bar 111 to be connected, multiple connecting holes are offered on the first cross bar 111, for even
Connect the first support body 11 and the second support body 12.First cross bar 111 is preferably 70mm*70mm*4mm square steel, and the first montant 112 is preferred
For 80mm*70mm*4mm square steel.The two ends of head rod 115 are fixedly arranged on a pair of first T-shaped components that this is oppositely arranged respectively
Medial surface so that this is fixedly connected to the first T-shaped component.Head rod 115 is preferably 30mm*30mm*4mm side
Steel, and preferably two, is fixedly arranged on the junction and the bottom of the first montant 112 of the first cross bar 111 and the first montant 112 respectively
Through hole, to strengthen the stability of the first support body 11.Floor 113 is fixedly arranged on the first cross bar 111 and the first montant 112 away from wall
The junction of side, the stability for strengthening the first support body 11.Floor 113 is preferably the thick isosceles right-angled triangle plates of 4mm.
As shown in Fig. 1, Fig. 6 and Fig. 7, the second support body 12 includes a pair of second T-shaped components being oppositely arranged, the second connecting rod
125, lift pole 124, and floor 123.Wherein, the second T-shaped component includes the second cross bar 121 and the second montant 122, second
Montant 122 is fixedly arranged on the lower surface of the second cross bar 121, vertical with the second cross bar 121 to be connected, and is offered on the second cross bar 121 many
Individual connecting hole, for connecting the first support body 11 and the second support body 12, the level of the second cross bar 121 is sheathed on corresponding first cross bar
111, to realize that the first support body 11 and the mutual of the second support body 12 are arranged, the second cross bar 122 is installed with one end away from wall
Pole 124 is lifted, for setting the devices such as electric block, assembly pulley with Building woods such as lifting curtain wall column, plate, steel constructions
Material.Second cross bar 121, the second montant 122, lifting pole 124 are preferably all 80mm*80mm*4mm square steel.Second connecting rod
125 two ends are fixedly arranged on a pair of second T-shaped components that this is oppositely arranged respectively, so that this is fixedly connected to the second T-shaped component.The
One connecting rod 115 is preferably 30mm*30mm*4mm square steel.Floor 123 is fixedly arranged on the second cross bar 121 and the second montant 122 is remote
From the junction of wall side, the stability for strengthening the second support body 12.Floor 123 is preferably the thick isosceles right angles three of 4mm
Angular plate.
As shown in Fig. 1 to Fig. 3 and Fig. 8, connector 13 is arranged in connecting hole, and connector 13 includes connecting screw rod 131 and spiral shell
Together in the attaching nut 130 of connecting screw rod 131, connecting screw rod 131 passes through connecting hole and the second horizontal stroke on the first cross bar 111
Corresponding connecting hole on bar 121, and be threaded onto against the second cross bar 121 to realize the first support body 11 by attaching nut 130
With being fixedly connected for the second support body 12.
Locating part 14 is adjustably coupled to the first support body 11, and the position of the first support body 11 is connected to by adjusting locating part 14
Put so that the end of locating part 14 is resisted against wall 15, and then pulls the second support body 12 to cause the second support body 12 to be close to wall 15
Outside.
Locating part 14 is to offer through hole on fastening screw 142, the first montant 112, and through hole is correspondingly provided with fixed spiral shell
Mother 141, fastening screw 142 is screwed together fixing nut 141 and through the through hole, causes top by rotating fastening screw 142
The end of tight screw rod 142 is resisted against wall 15, it is achieved thereby that the link position of regulation fastening screw 14.
As one preferred embodiment, as shown in figure 8, in one end fixed one away from wall 15 on fastening screw 142
Spanner 143, is screwed together in fastening screw 142 more laborsaving during fixing nut 141, fastening screw 142 is preferably relied on
Metope 15.
As it is another preferred embodiment, as shown in figure 8, the steel plate of sandwiched one between fastening screw 142 and wall 15
144, because steel plate is difficult deformation, wall 15 can be preferably protected when fastening screw 142 leans metope 15, in order to avoid wall 15
Caused damage by the pressure of fastening screw 142.
The construction method to frame in the combined hanging support of wall is illustrated below.
Frame of the present invention comprises the following steps in the construction method of the combined hanging support of wall:
One first support body 11 is provided, the first support body 11 is set up in the inner side of wall 15;
One second support body 12 is provided, the second support body 12 is set up in the outside of wall 15, and the second support body 12 is placed on
On one support body 11, the second support body 12 is set adjustably to be connected with the first support body 11, the first support body 11 of regulation and the second support body 12
Spacing is to adapt to wall 15, in the fixed lifting pole 124 in end of second support body 12 away from wall 15.
First support body 11 includes a pair of first T-shaped components being oppositely arranged, and the first T-shaped component includes the He of the first cross bar 111
First montant 112, the first cross bar 111 is set up on wall 15, and the first montant 112 is perpendicularly fixed at into the first cross bar 111
Lower surface, in opening up multiple connecting holes on the first cross bar 111;
Second support body 12 includes a pair of second T-shaped components being oppositely arranged, and the second T-shaped component includes the He of the second cross bar 121
Second montant 122, the second cross bar 121 is set up on wall 15, and the second montant 122 is perpendicularly fixed at into the second cross bar 121
Lower surface, in opening up multiple connecting holes on the second cross bar 121, the second cross bar 121 is sheathed on the first cross bar 111;
A connection piece 13 is provided, connector 13 is tight through corresponding connecting hole on the second cross bar 121 and the first cross bar 111
The second cross bar 121 and the first cross bar 111 are solidly connected, so as to realize that the second support body 12 is adjustably connected with the first support body 11.
One locating part 14 is provided, locating part 14 is adjustably coupled to the first support body 11, regulation locating part 14 is connected to
The position of first support body 11 causes the end of locating part 14 to be resisted against wall 15, and then pulls the second support body 12 to cause the second support body
12 are close to the outside of wall 15.
Locating part 14 is fastening screw 142, and through hole is opened up in the bottom of the first montant 112, in the fixed fixation of through hole correspondence
Nut 141, fastening screw 142 is screwed together fixing nut 141 and through through hole, rotation fastening screw 142 to hold out against spiral shell
The end of bar 142 relies on wall 15, it is achieved thereby that the link position of regulation fastening screw 142.
Fixed first floor 113 in junction of wall 15 is relatively distant from the first cross bar 111 and the first montant 112, in
Two cross bars 121 and the second montant 122 are relatively distant from fixed second floor 123 in junction of wall 15.
It is made as after Fig. 4, Fig. 5 and Fig. 6, Fig. 7 the first support body 11 and the second support body 12, using this in the combination of wall
During hoisting bracket, the thickness of wall 15 is first measured, the second support body 12 is sheathed with to the suitable position of the first support body 11 according to wall size
Put, be fixedly connected with connector 15 after the first support body 11 and the second support body 12, electric block, cunning are set at lifting pole 124
The devices such as wheel group and sagging hanging belt 16.Then the support is set up in wall 15, the first support body 11 is placed on the inside of wall, second
Support body 12 is placed in wall outer side.Now, if the distance of the first montant 112 and the inner surface of the second montant 122 is slightly larger than in the support
The width of wall 15, then be close to wall 15, and be threaded onto fixing nut with fastening screw 142 by the inner surface of the second montant 112
141, and leaned through through hole to wall 15, then the support stabilizing bracket is located at wall 15, you can start lifting construction.During construction,
Material requested is bundled to hanging belt 16, will be required by lifting the devices such as the electric block, the assembly pulley that are set at pole 124
Material is pulled up to required height.
By taking lifting curtain wall steel column as an example.Before lifting, the support is adjusted into size according to width of wall body, then pacified support
It is put on structure wall, and holds out against fastening screw.By required lifting material transport to lifting by crane in the floor of position, bandage is tied, will
Column tiltedly drops out outdoor, reaches plumbness, static a moment, then is pulled up to installed height mark by armstrong's patent cucurbit, positions
Fine setting, it is ensured that by adaptor and built-in fitting firm welding after zero deflection, welds the detachable hook in errorless rear on inspection.Through practice card
Bright, when lift heavy control is below constant weight, the invention can be used as a kind of hoisting bracket of safe and convenient.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper
State it is bright the present invention is made many variations example.Thus, some of embodiment details should not constitute limitation of the invention, this
Invention regard the scope defined using appended claims as protection scope of the present invention.